Request for Proposals Geotechnical Services Project: Southern Oregon University Science Building Renovation Description of Project: Southern Oregon University (SOU) is designing a complete renovation of the Science Building which is located on the SOU campus in Ashland. A major part of this renovation is a complete seismic upgrade of the existing structure. SOU requests proposals from qualified Geotechnical Engineers to conduct an investigation of the site and prepare a site specific geotechnical report to aid in design of the seismic upgrade. The Structural Engineer for the renovation project is kpff Consulting Engineers, Portland, OR. The Science Building was constructed in two phases. The original (Science I) building was built in 1957- 58 and includes two stories plus a partial basement. Science I is constructed with cast-in-place concrete walls, floors and roof. The Science II addition was built in 1968-69 and includes four stories plus a mechanical penthouse on the roof. Science II is a cast-in-place concrete frame building with pre-cast exterior wall panels. The gross area of the entire Science I/II facility is approximately 103,000 square feet. The structures have not been altered since their original construction and no additions to the building will be part of this project. The renovation scope is limited to a remodel of the existing building. A map of the project location is attached to this RFP. Oregon University System (OUS) Retainer Consultants Eligible: Proposers must be currently enrolled in the OUS professional Consultant retainer program to be eligible for this project. The form of agreement between SOU and the Engineer will be a supplement to the consultant's OUS retainer contract. Contact Person: Jim McNamara Project Manager Facilities Management and Planning 351 Walker Avenue Ashland, Oregon 97520 Voice: 541-552-6888 Email: mailto:[email protected] Timeline: Request for Proposals issued: February 19, 2013 Written Questions Due from Proposers: February 22, 2013 @ 1:00 PM Addendum Issued (if required): February 22, 2013 @ 4:00 PM Proposals Due: February 27, 2013 @ 4:00 PM Retainer Supplement Issued: February 28, 2013 Complete Work and Issue Final Report: March 22, 2013 Page 1 of 3

Upload: others

Post on 14-Jan-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Request for Proposals Geotechnical Services

Request for Proposals Geotechnical Services

Project: Southern Oregon University Science Building Renovation

Description of Project: Southern Oregon University (SOU) is designing a complete renovation of the Science Building which is located on the SOU campus in Ashland. A major part of this renovation is a complete seismic upgrade of the existing structure. SOU requests proposals from qualified Geotechnical Engineers to conduct an investigation of the site and prepare a site specific geotechnical report to aid in design of the seismic upgrade. The Structural Engineer for the renovation project is kpff Consulting Engineers, Portland, OR.

The Science Building was constructed in two phases. The original (Science I) building was built in 1957-58 and includes two stories plus a partial basement. Science I is constructed with cast-in-place concrete walls, floors and roof. The Science II addition was built in 1968-69 and includes four stories plus a mechanical penthouse on the roof. Science II is a cast-in-place concrete frame building with pre-cast exterior wall panels. The gross area of the entire Science I/II facility is approximately 103,000 square feet. The structures have not been altered since their original construction and no additions to the building will be part of this project. The renovation scope is limited to a remodel of the existing building. A map of the project location is attached to this RFP.

Oregon University System (OUS) Retainer Consultants Eligible: Proposers must be currently enrolled in the OUS professional Consultant retainer program to be eligible for this project. The form of agreement between SOU and the Engineer will be a supplement to the consultant's OUS retainer contract.

Contact Person: Jim McNamara Project Manager Facilities Management and Planning 351 Walker Avenue Ashland, Oregon 97520 Voice: 541-552-6888 Email: mailto:[email protected]

Timeline: Request for Proposals issued: February 19, 2013 Written Questions Due from Proposers: February 22, 2013 @ 1:00 PM Addendum Issued (if required): February 22, 2013 @ 4:00 PM Proposals Due: February 27, 2013 @ 4:00 PM Retainer Supplement Issued: February 28, 2013 Complete Work and Issue Final Report: March 22, 2013

Page 1 of 3

Page 2: Request for Proposals Geotechnical Services

Minimum Qualifications: All services shall be performed under the direct supervision of a licensed Oregon Geotechnical Engineer. The final report shall bear the Engineer's seal. The Engineer must have completed a minimum of five (5) comparable geotechnical investigations within the last eight (8) years. Geotechnical Investigation - Minimum Requirements: General

1. Provide a site specific seismic site hazard investigation as defined by OSSC Section 1802.4 Field Exploration

1. Obtain utility locates and procure any required permits from authorities having jurisdiction. 2. Provide borings or test pits as required for a complete site evaluation. Indicate the number of

proposed borings/test pits in your Proposal (Item #3 of the Proposal Requirements) 3. Classify and log subsurface soil conditions in the test holes and obtain bulk samples for

laboratory testing. 4. Perform laboratory testing as required to determine soil classifications, allowable bearing

pressures for short and long term loadings, active and passive soil pressures, friction coefficient, and related information for use by the structural engineer.

5. Evaluate site seismic hazards including, but not limited to, site geology, subsurface conditions, faults, ground movement, liquefaction potential and related information as necessary for the structural engineer to design a seismic retrofit for the existing building.

Geotechnical Report

1. Provide design recommendations including, but not limited to, bearing capacities (short and long term), active and passive lateral pressures, friction coefficient, seismic recommendations, boring logs, laboratory test results, maps and supporting documentation.

Required Deliverables:

1. Provide two originals of the final geotechnical report, wet-stamped and signed by the Geotechnical Engineer of Record. Provide an electronic pdf of the complete report.

2. Allow for a minimum one hour of consultation with the Structural Engineer of Record after the Structural Engineer has reviewed the final geotechnical report and recommendations.

Insurance Requirements: The Engineer shall provide and maintain insurance coverages as mandated by the Oregon University System in their standard professional consultant agreement. Certificates of Insurance evidencing the required coverage shall be provided prior to the start of on-site work. Use of Geotechnical Engineer's Report: It is understood that the Owner and the Owner's agents will reproduce and distribute the geotechnical report without modification. The documents delivered under this agreement shall be the exclusive property of SOU. Proposal Requirements:

1. Provide a cover letter stating the firm’s legal name, address and phone number. 2. Provide the resume' for the geotechnical engineer proposed for this project. Include the

Engineer's Oregon registration number.

Page 2 of 3

Page 3: Request for Proposals Geotechnical Services

3. Provide a list of recent, comparable geotechnical investigations the proposed Engineer has completed (limit response on this item to one page maximum).

4. Briefly describe the approach proposed for this project. Include the quantity and type of borings or test pits that will be used.

5. Provide a not-to-exceed fee proposal for this project. Include all costs in the fee proposal, both direct and indirect, as well as all reimbursable expenses.

Proposal Submittal: Proposals must be delivered by 4:00 PM on February 27, 2013 to:

Drew Gilliland Southern Oregon University Director, Facilities Management and Planning 351 Walker Avenue, Ashland, OR 97520 Phone: (541) 552-6233 FAX: (541) 552-6235 Email: [email protected]

Emailed or faxed proposals are acceptable for this project. Contract Award SOU will award this project to the Geotechnical Engineer offering the best combination of qualifications, experience and proposed fee. SOU may reject any submittal not in compliance with all prescribed procedures and requirements, and may cancel this solicitation or reject, for good cause, all responses upon a finding by SOU that it is in the public interest to do so. Please note that throughout this procurement, SOU will not accept responses or queries that require SOU to pay the cost of production or delivery. SOU is an AA/EEO employer. Questions or Additional Information: For questions about this RFP, contact Jim McNamara (541-552-6888 or mailto:[email protected]). Questions or requests for clarification must be submitted not later than 1:00 PM on February 22, 2013. An addendum (if required) will be posted on the OUS procurement website on February 22, 2013.

End of RFP

Attachment: SOU Campus Map

Page 3 of 3

Page 4: Request for Proposals Geotechnical Services

BRID

GE S

T

AVER

Y ST

GARF

IELD

ST

WIG

HTMA

N ST

LEE ST

IOWA ST

CALIF

ORNI

A ST

PALM

AV

S MO

UNTA

IN A

VS

MOUN

TAIN

AV

UNIV

ERSI

TY W

AY

WEBSTER ST

N COLLEGE WAY

McNEAL PAVILION

MEYERFITNESSCENTER

RACQUETBALL COURTS& CLIMBING GYM

CAMPUS PUBLIC SAFETY& PARKING ENFORCEMENT

B

C

D

STAD

IUM

ST

STAD

IUM

ST

MILITARY SCIENCEGOLD PROGRAM

FMPRESIDENCE HALL

STORAGE &MAINTENANCE

MARK O. HATFIELDENVIRONMENTAL SCIENCES COMPLEX

E MAIN ST

QUINCY ST

OLD MILL VILLAGE(STUDENT FAMILY HOUSING)

OLD MILL VILLAGE(STUDENT FAMILY HOUSING)

SCIENCEWORKSMUSEUM

US FISH & WILDLIFEFORENSIC LAB OREGON ARMY

NATIONAL GUARDARMORY

41

1

39

2

4

37

6

38

COXHALL

12

ASHLAND ST / HWY 66

INDI

ANA

ST

SISKIYOU BLVD

FRAN

CES

LANE

MONR

OE S

T

OREGON ST

13

A B

C

D

E

FGH

I

MADRONE ST

16

40

14

10

20

LEON

ARD

ST

18

19

MARION ADY

SCHNEIDERMUSEUM

ARTHANNONLIBRARY

SUSANNEHOMES

CHURCHILL

CENTRALUTILITIES

PLANT

2123

22

2425

ROCA

ST FERN ST

SCIENCE

3027

ASHLAND ST

J.K.SOURSLIFE SCIENCES

LAB

31

36

32

37

29

CENTRAL

COMPUTING SERVICES

TAYLOR

BOOKSTORE STEVENSON

UNION

BRITT

THEATREARTS

MUSIC

521S MTN

VISITINGFACULTYHOUSING

PLUNKETT CENTER(SWEDENBURG)

34

ELKA

DER

ST

WAL

KER

AV

RVTV

1400 Siskiyou Bl

1465 Webster St

351 Walker St

364 Stadium St

1475

382

380

378 Wightman St

144

1485

IOWA ST

1500 E Main St

1490 E Main St1420 E Main St

132108

9684 72 120

60

40

9

6

10

8

7

5

43

21

Maint.11

13

14

16

17

12

15

18

21

20

221361 Quincy St

19

Family &Apartment

Housing Office

Schneider Child Care

Center

595 Indiana St

545 Indiana St

555 Indiana St

1280 Siskiyou Bl

580 Roca St

1290 Ashland St

1250 Siskiyou Bl1275 Siskiyou Bl

578 Roca St

1250 Ashland St

1170 Siskiyou Bl

1122

11201118 Siskiyou Bl

460 University Wy

480 University Wy

475 University Wy

1077 / 1079Ashland St

450S Mountain Av

990 Siskiyou Bl

20AMADRONEAPARTMENT

COMPLEX

1380 Madrone St

HENRY ST

1525 Webster St

CAMPBELLCENTER

Osher LifelongLearning Institute

(OLLI)655

CASCADE HALLResidence Complex

& Dining Center1401 Oregon St

STUDENT HEALTH &WELLNESS CENTER

560 Indiana StEXTENDEDCAMPUS

PROGRAMS1388

DEBOERSCULPTURE

1350

RESIDENTIAL EDUCATION& SERVICES OFFICE (RES)

LIBRARYCOFFEE

SHOP

ADMISSIONS

JAVA UNIONCOFFEE SHOP

ELMO'SFOOD COURT

ACCESSIBLETRANSITSTOP

EDUCATION / PSYCHOLOGY370 S Mountain Av

A

GREENSPRINGSRESIDENCE COMPLEX

450 Wightman St

RAIDERSTADIUM

FOOTBALLPRACTICE

FIELDS

UNIVERSITYSOCCER FIELD

RECREATION FIELDS

UNIVERSITYSOFTBALL

FIELD

S COLLEGE WAY9

8

ACCESSCENTER

TENNISCOURTS

350

TENNISCOURTS

1508 Webster St

mcnamaraj
Polygon
mcnamaraj
Callout
SOU SCIENCE BUILDING RENOVATION PROJECT