KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction Technology Korea Institute of Construction Technology

Upload: others

Post on 30-Aug-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Research Infrastructure of Full Scale Experimental Substantiation

River Experiment Center

Korea Institute of Construction TechnologyKorea Institute of Construction Technology

Page 2: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS CONTENTS

Outline Outline Outline Outline Outline Outline Outline Outline Outline Outline Outline Outline

ⅡⅡⅡⅡⅡⅡⅡⅡ Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities Supporting Facilities

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

ⅠⅠⅠⅠⅠⅠⅠⅠ

ⅣⅣⅣⅣⅣⅣⅣⅣ Closing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing Remarks

Page 3: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

ⅠⅠⅠⅠⅠⅠⅠⅠ

Back-

ground

� Lack of experiment facilities capable of conducting full scale tests of river hydraulics and ecology

• Researchers and technicians• Facilities• Climate change• River restoration

Goals

� Full scale experimentation• Hydraulic and ecological experiments in full scale• Simulation of prototype river conditions

- Physical factors: flow rate, geomorphology, sediments, geometry, …- Ecological species: vegetation, fishes, invertebrate, ...- River environments: floods, water quality, …

� Quantitative investigation of natural prototype river conditions

OutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutline

1. Background & Goals

Page 4: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

ⅠⅠⅠⅠⅠⅠⅠⅠ

2005.12Approval of establishment of Korean type multipurpose river experiment center (National Assembly Consideration, $ 12M)

2006.11Agreement of Korean type multipurpose river experiment center (Kyeongsangbuk-Do, Andong-Si, KICT)

2006.12 Working design for the center (Dongbu Eng.)

2007.12 Construction and supervision order of the center (Cheonggu Const., Dongbu Eng.)

2008.04 Groundbreaking ceremony of the center

2009.12 Construction completion & renamed as the River General Experiment Center

2011.09 Opening of Pungnam Bridge over the Nadong River

2011.09 Renamed as the River Experiment Center of the River & Coastal Research Division

2012.12 Official opening of the River Experiment Center

2013.01 Opening of the guest house( 館館館館) for business and academic cooperation

OutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutline

2. History of the River Experiment Center

2009200920092009

2011201120112011

2012201220122012

Page 5: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

ⅠⅠⅠⅠⅠⅠⅠⅠ OutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutline

3. Views (2009.10 ~ 2013.05)

Oct. 2009 Jun. 2012

Dec. 2012 May. 2013

Page 6: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

2012. 6

Total area : 193,051 m2

Supporting Facilities: Research building, Guest house, Electronic room & Pump station

- large capacity pumps (max. flow rate of 10 m3/s),Experiment Facilities: three proto-type channels (560~680 m long, 11 m wide),

a concrete flume (50 m long, 2 m wide, 1.4 m Height), two artificial pond

4. Facilities of KICT-REC

OutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineOutlineⅠⅠⅠⅠⅠⅠⅠⅠ

Page 7: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

ⅡⅡⅡⅡⅡⅡⅡⅡ취수탑

Supply flow from the intake to the inflow tank and the head tank with large capacity pumps

Electronic Room & Pump Station Inflow Tank

Research BuildingGuest House

Store flow discharged to the channels, temporarily

Consist of analysis & control labs, meeting room, seminar room, and conference hall

Dormitory facilities for cooperating researchers’ convenience

Supporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting Facilities

1. Main Facilities

175kW 2ea, 490kW 1ea,

310kW 1ea (Total 10.0 m3/s)

Gates

Water level control of each channel

Page 8: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

2. Research Building

현위치

현위치

현위치

현위치

MeetingMeetingMeetingMeetingRoomRoomRoomRoom

DirectorDirectorDirectorDirectorTechnicalTechnicalTechnicalTechnicalAssistanceAssistanceAssistanceAssistance

Laboratory Laboratory Laboratory Laboratory ⅡⅡⅡⅡ Laboratory Laboratory Laboratory Laboratory ⅠⅠⅠⅠ

Visiting Lab.Visiting Lab.Visiting Lab.Visiting Lab.

AdministrationAdministrationAdministrationAdministrationOfficeOfficeOfficeOffice

ToiletToiletToiletToilet

Conference HallConference HallConference HallConference Hall

SeminarSeminarSeminarSeminarRoomRoomRoomRoom

ControlControlControlControlRoomRoomRoomRoom

MachineryMachineryMachineryMachineryRoomRoomRoomRoom

EntranceEntranceEntranceEntrance

GeneratorGeneratorGeneratorGeneratorRoomRoomRoomRoom

ReceptionReceptionReceptionReceptionRoomRoomRoomRoom

LaboratoryLaboratoryLaboratoryLaboratoryⅢⅢⅢⅢ

KRRNKRRNKRRNKRRNSecretariatSecretariatSecretariatSecretariat

LoungeLoungeLoungeLounge

RobbyRobbyRobbyRobby

Meeting Room (20~25)Meeting Room (20~25)Meeting Room (20~25)Meeting Room (20~25) Conference Hall (120)Conference Hall (120)Conference Hall (120)Conference Hall (120) Seminar Room (60~70)Seminar Room (60~70)Seminar Room (60~70)Seminar Room (60~70) Visiting Lab. (12~15)Visiting Lab. (12~15)Visiting Lab. (12~15)Visiting Lab. (12~15)

ⅡⅡⅡⅡⅡⅡⅡⅡ Supporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting FacilitiesSupporting Facilities

Page 9: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Nakdong River

Research Building

Guest House

RetentionPond

Concrete Flume& Water Tank

Large Weir Model

Steep-slope Channel (A1)Steep-slope Channel (A1)

Straight Channel (A2)Straight Channel (A2)

Meandering Channel (A3)Meandering Channel (A3)

1. Layout Sketch of Experiment Facilities

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 10: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

• Channel type: Steep sloped

• Total length: 590 m• Test section: 520 m

• Main experiments- Revetment test - Roughness test

(vegetation, bed)- Structure stability

• Cross section

Inflow Outflow

Flow

stabilization

Revetment stability

test region

Flow resistance

test region

Structure stability

test region

ⅠⅠⅠⅠ ⅡⅡⅡⅡ ⅢⅢⅢⅢ ⅣⅣⅣⅣ

� revetment stability and flow resistance

Slope : 1/70 Slope : 1/1000

3 m

1: 2 slope1: 2

slope

11 m

2. Steep slope channel (A1)

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 11: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Revetment stability test

Flow resistance test (pussy willow)

Inflow Outflow

Flow

stabilization

Revetment stability

test region

Flow resistance

test regionStructure stability

test region

ⅠⅠⅠⅠ ⅡⅡⅡⅡ ⅢⅢⅢⅢ ⅣⅣⅣⅣ1 2

3 4

32 41

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Bridge pier failure test

Page 12: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

취수탑

InflowOutflow

Hydraulic structures

test region (1)

ⅠⅠⅠⅠ ⅡⅡⅡⅡ ⅢⅢⅢⅢ

� hydraulic structures and river restoration

Hydraulic structures

test region (2)

Wetlands and flood plain

test region (2)

• Channel type: Straight channel

• Total length: 560 m

• Test section: 470 m

• Main experiments- River crossing structures

and ecological effects - Wetlands and flood plain

• Test region

3. Straight channel (A2)

Slope : 1/800

• Cross section

A

A’

C

C’

3 m

1: 21: 2

11 m

A-A’ section C-C’ section

1 m

1: 2

16 m

1: 2 1: 2

6.5 m

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 13: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

InflowOutflow

Hydraulic structures

test region (1)

ⅠⅠⅠⅠ ⅡⅡⅡⅡ ⅢⅢⅢⅢ

Hydraulic structures

test region (2)

Wetlands and flood plain

test region (2)

River crossing structures: ecofriendly low head structures

1 2 3 4

4321

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 14: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Flow

stabilization

Inflow Outflow

Sinuosity

(1.2)

ⅠⅠⅠⅠ

ⅡⅡⅡⅡ

ⅢⅢⅢⅢ

Meandering test region

ⅣⅣⅣⅣ

� meandering process and flooding

Flow

stabilization

Flooding

test region

• Channel type: Meandering

• Total length: 680 m

• Test section: 620 m

• Main experiments- Meandering process - Flood frequency- Ecological monitoring

Sinuosity

(1.0)

Sinuosity

(1.5)

Sinuosity

(1.7)

Sinuosity

(1.0)

4. Meandering channel (A3)

Slope : 1/800

• Cross section

3 m

1: 2 slope1: 2

slope

11 m

1 m

1: 2

11 m

1: 2

1: 2

1: 2 1 m

B

B’

A

A’

A-A’ section B-B’ section

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 15: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Fish Screen MonitoringGPS Floater test

Flow

stabilization

Inflow Outflow

Sinuosity

(1.2)

ⅠⅠⅠⅠ

ⅡⅡⅡⅡ

ⅢⅢⅢⅢ

Meandering test region

ⅣⅣⅣⅣ

Flow

stabilization

Flooding

test regionSinuosity

(1.5)

Sinuosity

(1.7)

32

4

1 4

321

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Test of the Debris Effecton the Bridge Pier

Page 16: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

5. Concrete Flume

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Fish Screen Set (bubble, light, sound)

Test of Reaction to soundTest of Reaction to lightTest of Reaction to bubble

Page 17: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

� Area: 17,523 m2

� Retention storage: 14,862 m3

� Main experiments:

- Ecological environment test in the retention pond

- Lake retention test

취수탑

� Area: 1,203 m2

� Flow rate: Max. of 0.15 m3/s

� Main experiments:

- Aquatic plant purification

- Organism habitat tests

� Retention Pond � Multi-purpose Pond

6. Artificial Pond

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 18: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Ultrasonic wave meter, Pressure type sensor, …

Water level measurements

Flow velocitymeasurements

1D velocity meter (propeller type, price-cup type),

3D Micro-ADV, …

River bed measurements

3D scanner (range: max. of 400 m; accuracy of ±3 mm),

RTK GPS, Total Station, Laser Level, …

Weather Station, Drag force

meter, …

Others

7. Measurement Equipment

ⅢⅢⅢⅢⅢⅢⅢⅢ Experiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment FacilitiesExperiment Facilities

Page 19: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

The Future of the KICT-REC

ⅣⅣⅣⅣⅣⅣⅣⅣ Closing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing RemarksClosing Remarks

� Making a role in the world as a global experiment center

� Making the KICT-REC be a place where any researchers focused river experiments in the world can voluntarily come, conduct research and discuss in there

For the CHy Project on the Assessment of the Performance of Flow Measurements and Techniques

� Providing a variety of test site and condition for this project

� Carrying out some parts of tests in this project.

� Making a role to establish and spread of international Standard

Page 20: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

Thank youThank youThank youThank youThank youThank youThank youThank youThank youThank youThank youThank you

Page 21: Research Infrastructure of Full Scale Experimental ... · KICT Research Infrastructure of Full Scale Experimental Substantiation River Experiment Center Korea Institute of Construction

KICT

ⅡⅡⅡⅡⅡⅡⅡⅡ취수탑

Steep-slope Channel (A1)Steep-slope Channel (A1)

Straight Channel (A2)Straight Channel (A2)

Meandering Channel (A3)Meandering Channel (A3)

Retention PondRetention Pond

Research BuildingResearch Building

Outflow PondOutflow Pond

Security CheckpointSecurity Checkpoint

Pumping StationPumping Station

Inflow TankInflow Tank

Multi-purpose Lake Research StationMulti-purpose Lake Research Station