resetting the force… since 2003 - ndiastorage.blob.core ... · bde/div (fy09) div hq hood to...
TRANSCRIPT
533.7K
547.4K
358.2K
350.5K
201.5K
206.0K
16.8 Months Dwell 12 Months BOG48 Months Dwell12 Months MOB
Joint Basing
Centers of Excellence
Exportable Training Capability
TT Training
Other HQs Relocation
BRAC: Budget $4.5B / Projects 83
FY 08 09 10 11 12 13
SUST
XX
X
XMEB
XMEB
XFIRES
BfSBX
BfSB
X
XMEB
X
USAR115 of 131 105 of 112 48 of 60
268/303
FY 09 Operational Graphics
AC
B M-F F48 39 44
42 34 39
+7ARNG
B M-F F28 46 38
2841 36
+4
B M-F F0 12 48
3810
+1
AC
AC
NG
NG ARNG
AC
AR
Rebalance:14.1K 2.6K 4.0K
ACOM Relocation
X
• CMETL doctrine, organization, & training development• AETF continues to build capability: IBCT, Fires, & SUS• Test: Spin Out, Rifleman’s Radio, & NLOS-LS
FCS:
XSUST
AC
XXXXXX
+1 +2 (3)+4 (7)
X(-)
5 1X
TBD
Modular Conversion - EDATESB-BCT M-F Multi-Functional F-Functional
Generating Force
Growth: 21 BrigadesX
XADA
XSIG
XENG
X
- All AC -
AC
AC
AC
Spin Out Test/Eval Spin Out Fielding
APS
ASCC
Fires – Ft SillSustainment – Ft Lee
Maneuver – Ft BenningHRC – Ft KnoxFCS – Ft Bliss
Evolution: AETF to FBCT
Unit reset
12
BDE/DIV (FY09)
DIV HQ Hood to Carson
TT Remission/ Reconstitute
1
DIV HQ Reconstitute
Hood to Carson
1
Facilities: MILCON Budget $6.1B / Projects 166
NG
NG
XXXX XXXX
X5=
X2=
X5=
8=
XM-F / F
13=
X
88.6K / 142.3K
20 13BCT
M-F / F Brigades
=+
Total
33XXXXXXXX
APS
FCS CORE Delivery/FieldingFCS CORE Delivery/FieldingFCS CORE Delivery/Fielding2 4 7 14+
FCS CORE Development TNGFCS CORE Development TNGFCS CORE Development TNG
APS 2 APS 4APS 3 PTDOAPS 5APS 1
Title X
IIII
SUS
CCMRF
AC RCRCRC
09-110-211-312-2
1 2
Story Myer Dix Rich.LewisEustis Sam
Personnel
BfSB
FY 08 09 10 11 12 13
1:41:1.4X
8
XXXX XXSETAF
XXXXAFRICOMEUCOM
GOAL
46X
7
X
3
X
6MF / F
X
14SECFOR
X
6TF PHX
X
2
162XX
AC NG USAR
AS OF: 2/10/2009
4:03 PM
UNCLASSIFIED
Setting the ForceSetting the Force Thru FY08 WorkloadAs of 12/10/08
** - As of 1/08 Includes Depot On-Site Teams
12,879 Missile Systems15,032 Missile Rounds Reset
13.3K Short Tons Ammunition Processed for Reissue in SWA
4,027 Tracks39,658 Wheels*
(* Includes Reset & Recap)
ARMY PLANThe Army will undertake a disciplined, orderly reconstitution to restore combat power.
2,905* Aircraft Scheduled2,473* Completed
CEERTNVDs 44,201;
SINCGARS 34,079Overhaul Totals
19,256 Generators24,372 Commo/Electric
105,414 COMSEC
2,000+ Tracked* 2,000+ Tracked* FY08FY08
3,200+ 3,200+ Generators Generators
FY08FY08 11,000+ Missiles11,000+ MissilesFY08FY08
FY08 ProjectionsFY08 Projections(2/15/08)
410+ 410+ Aircraft Aircraft FY08FY08
Small Arms(201,570 Overhauled /421,564
SARET)
96,000+ Small 96,000+ Small Arms FY08 Arms FY08 ****
12,000+ 12,000+ Wheeled Wheeled
FY08FY08
What We’ve Done . . . What We’re Doing
4
UNCLASSIFIED
Corporate America Seeking Best Business
Practices
$33K
$19K
$0$5,000
$10,000$15,000$20,000$25,000$30,000$35,000
FY06 FY08
HMMWV Recap Unit Cost
$31M $29M
$21M
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
FY06 FY07 FY08 YTD
M1 Reset, Recap and Overhaul Labor Savings
$709K
$420K
$0
$200,000
$400,000
$600,000
$800,000
FY06 FY08
CH‐47 T‐55 Engine Overhaul Unit Cost
$1.18M
$1.07M
$1,000,000
$1,050,000
$1,100,000
$1,150,000
$1,200,000
FY03 FY08
AN/TPS‐75 Air Defense Radar Overhaul Unit Cost
Our Performance Now is Equal or Better than Industry PartnersOur Performance Now is Equal or Better than Industry Partners
Malcolm Baldrige Quality Award23 Shingo Awards
Master Black Belt
Black Belt
Green Belt
36
656
3,497
LSS Benefits FY08 $310M FY07 $305M FY06 $247M FY05 $110M
5
UNCLASSIFIED
UNCLASSIFIED
Improvement Based on Industry Standards
ISO Certifications
ISO 9001:2000 Quality Management
System (23 sites)
ISO 14001:2000 Environmental
Management System (9 sites)
ISO 9001:2000 + AS9100BAviation
Maintenance System (1 site)
AS 9110 2003-01 International Aerospace Quality Systems Standards (1 site)
OHSAS 18001 Occupational
Health and Safety
Administration System (1 site)
Safety Voluntary Protection Program (VPP) (2 sites)
2007 Baldrige Quality AwardUS Army Armament Research, Development & Engineering Center
6
Lower Cost …Higher Quality…Faster Delivery!Lower Cost …Higher Quality…Faster Delivery!
Master Black Belts 36Black Belts 656Green Belts 3497
Master Black Belts 36Black Belts 656Green Belts 3497
Shingo Prize Recipients - Public Sector :
2005 –AMC 1 Total 5
2006 –AMC 4 Total 9
2007 –AMC 12 Total 17
2008 – AMC 6 Total 11
2008 SHINGO PRIZE RECIPIENTSSilver• Red River Army Depot Heavy Expanded Mobility Tactical Truck (HEMTT)
Bronze• Tobyhanna Army Depot AN/TYQ-23 Tactical Air Operations Module• Red River Army Depot Trailers • Letterkenny Army Depot Biological Integrated Detection System (BIDS)• Red River Army Depot Patriot Missile• Tobyhanna Army Depot AN/ASM-189 Electronic Maintenance Shop Van
LSS Financial BenefitsFY08 $310MFY07 $305MFY06 $247MFY05 $110M
LSS Financial BenefitsFY08 $310MFY07 $305MFY06 $247MFY05 $110M
UNCLASSIFIED
• Prognostic, not diagnostic
- Fix only what needs to be fixed before it fails- Continuously refine from what we learn to be more predictive, more accurate
• Successes in aviation and missile fleets
- Increased aircraft availability, flight hours- Reduced sustainment costs (60% for Hellfire)
• Way ahead
- Ground combat systems- Wheeled vehicle fleets- C4ISR systems
7
UNCLASSIFIED
AMSAA- Warfighter- PMs- TARDEC- ARL- ATEC- CASCOM- Academia- etc.
Records Conditions essential Records Conditions essential to prognostic developmentto prognostic development
Capable of Identifying Capable of Identifying Health/Impending FailuresHealth/Impending Failures Data collected from Data collected from
instrumentation package & instrumentation package & sent to AMSAA for analysis sent to AMSAA for analysis & feedback& feedback
Unit receives monthly feedbackUnit receives monthly feedbackreports compiled from recordedreports compiled from recordedconditions and maintenance conditions and maintenance
Records Fuel Records Fuel Consumption, speed Consumption, speed profiles, vibrations, profiles, vibrations, & other parameters & other parameters by bumper numberby bumper number
As of Dec 08, AMSAA CBM Instrumentation Packages in
OIF/OEF, CONUS, Alaska, & KoreaVehicle Type Quantity
M1151 HMMWV 3IMG MRAP 3
CAIMAN MRAP 10Buffalo MRAP 2RG-33 MRAP 3RG-31 MRAP 4
M916A3 6M915 3
M1070A1 HETs 3M984A2 HEMTTs 4
M1075 HEMTT PLS 3LMTV/MTV 9
Strykers 9
Algorithm Development
Conditions
Maintenance
Usage
Asset Monitoring Tool
Vehicle Speed
0
5
10
15
20
25
30
35
40
45
50
0 to 1
0
10 to
20
20 to
25
25 to
30
30 to
35
35 to
40
40 to
50
MPH
Tim
e (%
)
SN03
SN18
SN26
SN14
Speed Profiles
Fuel Economy
0
10
20
30
40
50
60
70
80
90
100
0 to 1
1 to 2
2 to 3
3 to 4
4 to 6
6 to 9
9 to 1
212
to 15
15 to
2020
to 30
MPG
Tim
e (%
)
SN03
SN18
SN26
SN14
Fuel Economy
Engine Load
0
10
20
30
40
50
60
70
80
90
100
0 to 1
1 to 1
010
to 20
20 to
3030
to 40
40 to
5555
to 70
70 to
8080
to 95
95 to
105
Percent Load (%)
Tim
e(%
)SN3
SN18
SN26
SN14
Engine Load
8
UNCLASSIFIED
PREVENTIVEPREVENTIVE INDICATORSINDICATORS DIAGNOSTICSDIAGNOSTICS PROGNOSTICSPROGNOSTICS ONON--CONDITIONCONDITION
• Sensor Installation• Knowledge Development• Fault Diagnosis• Remaining Component Useful Life• Inspection Targeting
• Sensor Installation• Knowledge Development• Fault Diagnosis• Remaining Component Useful Life• Inspection Targeting
• Reactive Maintenance• Time Based
Inspection/Overhaul
• Proactive Maintenance• Proactive Supply
transactions
BradleyBradley AbramsAbrams
Tactical Wheeled VehiclesTactical Wheeled VehiclesChassis
Powertrain
Maintenance capabilities derived from near real-time assessment and analysis of data from embedded sensors and platform’s history
StrykerStryker
Chassis ElectronicsSuite
Remote Weapon Station
Up-fittedEquipment
CBM+ Goals:• Increase Platform
Availability and Readiness
• Reduce Operations & Support (O&S) Costs
Key CBM+ Enablers• Health Management
Embedded Sensors
Diagnostics
Prognostics• Maintenance Aids (MSD, PMA)• IETMs• Digital Logbooks• Data Storage• Data Networks
9
UNCLASSIFIED
• What We Are:
Increasing collaboration at all levels of AMC and ASA(ALT) incorporating lessons learned from four years of operating as LCMCs
Exploring all ways to improve effectiveness and efficiency to:
Reduce costs wherever possible
Improve support to the Warfighter
Grow the Army during continuous Reset
Improve reliability of systems to reduce life cycle costs
Improve transparency
Provide the Army’s Senior Leadership with the right information in a timely manner to make the best decisions at the appropriate level
• We Are Not:
Changing the command structure
Modifying duties and responsibilities assigned by law or regulation
10
12
UNCLASSIFIED
Align functions and
fiscal authorities
Improve ARFORGEN
Incentivize good
stewardship
Responsive and realistic
requirements process
• Era of persistent conflict is a fact of life
• Materiel Enterprise approach gaining momentum
AMC taking the lead on CSA’s imperatives – RESET Robust collaboration with our partners
• New administration: uncertainty of defense budget levels going forward
Support the Warfighter through good stewardship of every dollar
• Sustain our Industrial Base Key role in revitalizing aging infrastructure
Retain and advance workforce skill sets and productivity
13
UNCLASSIFIED