RESOURCE DEVELOPMENT AND NEAR TERM PRODUCTION POTENTIAL IN FINLAND December 2017 TSXV : RUP

Upload: ngohanh

Post on 15-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

RESOURCEDEVELOPMENTANDNEARTERMPRODUCTIONPOTENTIALINFINLAND

December2017TSXV:RUP

Page 2: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

CAUTIONARYSTATEMENT

CautionaryNoteRegardingForward-LookingInformationThisdocumentcontainscertainforward-lookingstatementsor“forwardlookinginformation”withinthemeaningofapplicablesecuritieslaws,relatingbutnotlimitedtoRupertResourceLtd.(“TheCompany”)’sexpectations,intentions,plansandbeliefs.Forward-lookinginformationcanoftenbeidentifiedbyforward-lookingwordssuchas“anticipate”,“believe”,“expect”,“goal”,“plan”,“intent”,“estimate”,“may”and“will”orsimilarwordssuggestingfutureoutcomesorotherexpectations,beliefs,plans,objectives,assumptions,intentionsorstatementsaboutfutureeventsorperformance.Forward-lookinginformationmayincludereserveandresourceestimates,estimatesoffutureproduction,unitcosts,costsofcapitalprojectsandtimingofcommencementofoperations,andisbasedoncurrentexpectationsthatinvolveanumberofbusinessrisksanduncertainties.Factorsthatcouldcauseactualresultstodiffermateriallyfromanyforward-lookingstatementinclude,butarenotlimitedto,failuretoestablishestimatedresourcesandreserves,thegradeandrecoveryofminedorevaryingfromestimates,capitalandoperatingcostsvaryingsignificantlyfromestimates,delaysinobtainingorfailurestoobtainrequiredgovernmental,environmentalorotherprojectapprovals,inflation,changesinexchangerates,fluctuationsincommodityprices,delaysinthedevelopmentofprojectsandotherfactors.Forward-lookingstatementsaresubjecttorisks,uncertaintiesandotherfactorsthatcouldcauseactualresultstodiffermateriallyfromexpectedresults.

Potentialshareholdersandprospectiveinvestorsshouldbeawarethatthesestatementsaresubjecttoknownandunknownrisks,uncertaintiesandotherfactorsthatcouldcauseactualresultstodiffermateriallyfromthosesuggestedbytheforward-lookingstatements.Investorsarecautionednottoplaceunduerelianceonforward-lookinginformation.Byitsnature,forward-lookinginformationinvolvesnumerousassumptions,inherentrisksanduncertainties,bothgeneralandspecific,thatcontributetothepossibilitythatthepredictions,forecasts,projectionsandvariousfutureeventswillnotoccur.TheCompanyundertakesnoobligationtoupdatepubliclyorotherwisereviseanyforward-lookinginformationwhetherasaresultofnewinformation,futureeventsorothersuchfactorswhichaffectthisinformation,exceptasrequiredbylaw.

ThisinformationisqualifiedinitsentiretybycautionarystatementsandriskfactordisclosurecontainedinfilingsmadebytheCompany,includingtheCompany’sfinancialstatementsandrelatedMD&AfortheyearendedFebruary28,2017filedwiththesecuritiesregulatoryauthoritiesincertainprovincesofCanadaandavailableatwww.sedar.com.

CautionaryNotetoU.S.InvestorsConcerningResourceEstimateTheresourceestimatesinthisdocumentwerepreparedinaccordancewithNationalInstrument43-101,adoptedbytheCanadianSecuritiesAdministrators.TherequirementsofNationalInstrument43-101differsignificantlyfromtherequirementsoftheUnitedStatesSecuritiesandExchangeCommission(the“SEC”).Weusetheterms“measured”,“indicated”and“inferred”resources.AlthoughthesetermsarerecognizedandrequiredinCanada,theSECdoesnotrecognizethem.TheSECpermitsU.S.miningcompanies,intheirfilingswiththeSEC,todiscloseonlythosemineraldepositsthatconstitute“reserves”.UnderUnitedStatesstandards,mineralizationmaynotbeclassifiedasareserveunlessthedeterminationhasbeenmadethatthemineralizationcouldbeeconomicallyandlegallyextractedatthetimethedeterminationismade.UnitedStatesinvestorsshouldnotassumethatalloranyportionofameasuredorindicatedresourcewilleverbeconvertedinto“reserves”.Further,“inferredresources”haveagreatamountofuncertaintyastotheirexistenceandwhethertheycanbeminedeconomicallyorlegally,andUnitedStatesinvestorsshouldnotassumethat“inferredresources”existorcanbelegallyoreconomicallymined,orthattheywilleverbeupgradedtoahighercategory.

2

Page 3: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

ABOUTRUPERT

CORNERSTONEASSETINTHECENTRALLAPLANDGREENSTONEBELT

3(1) Refer to page 1, forward looking “Cautionary Statement”.

Neartermproductionpotential• Mine,1500tpdmillandtailingsdam(1)

• Trackrecordoflowoperatingcosts(EUR30/tmilled)• Initialproductiontargetof35,000oz/a• Improvedgradepotentialtodrivehigheroz/annum(1)

Resourcedevelopment• Historicalaverageof1000oz/verticalmeterdespitepoor

understandingofgeologicalcontrols• Newgeologicalmodelandapproachtoresource

definition

Regionalexplorationupside

• 225km2 landpositioninhighprofilenewjurisdiction• Nearmineandregionalopportunities• ExtensivedatapackagefromGTKandpreviousowners• 2017fieldworkhasgeneratedseveraldrilltargets

CapitalStructure(asat31August2017)

SharesonIssue 101,114,992

Options&Warrants 6,542,777

FullyDilutedShares* 117,843,149

MarketCapitalisation(atCAD1.00/shr)

CAD101mln

Cash CAD7mln

Convertible(5%CouponExC$0.95)

CAD8mln

Ticker TSXV:RUP

ISIN CA78165J1057

Page 4: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

LEADERSHIP

4

BrianHinchcliffe - Executive ChairmanBrianwasco-founderofKirklandLakeGoldandRamblerMetalsandMining,producingminesinOntarioandNewfoundlandrespectively.PriortothisBrianco-foundedbasemetalproducerAmericanPacificMiningandjointventuredtheconstructionoftheLomadeHierro nickelmineinVenezuela.

Jukka Nieminen – MDRupertFinlandOyJukkawasinstrumentalintheacquisitionofthePahtavaaraProjectfortheCompanyandis ageologistwithover20yearsofexperienceintheminingindustry.HestartedhiscareerwithOutokumpu attheForrestania NickelminesinWesternAustraliabeforereturningtoFinlandtoworkasaminegeologistatthePahtavaara andtheOrivesi Goldmines.LatterlyhewasGeneralManagerofBelvedereMining’sHituranickelmineandCEOoftheBelvedere’sFinnishoperatingsubsidiary.

JariYlinen- SeniorGeologistJarijoinedRupertResourcesinJune2016andhasover10yearsexperienceinexplorationandmining.HeworkedpreviouslyasSeniorGeologistatFirstQuantumMineralsLtd.HehasalsoworkedwithseveralgreenfieldsexplorationprojectsandmineswithOutokumpu MiningOy.

EXPERIENCEDMANAGEMENTTEAMLEADINGTHECOMPANYJamesWithall- ChiefExecutiveOfficerJameshasover20years’experienceinmining.HewaspreviouslyaManagingPartnerandFund ManageratBakerSteelCapitalManagersresponsiblefortheirgoldequitiesfund. Jamesworkedformorethansevenyearsasageologist,workinginWesternAustraliafornumberofminingcompaniesinexploration,projectandminegeologistroles.

MichaelSutton- P.Geo.,Non-ExecutiveDirectorMikeisageologistwhohasworkedinsomeofthemostprolificproducingCanadiangoldcamps,includingTimminsandKirklandLake.MikehasbeenawardedProspectoroftheYearbytheOntarioProspectorsAssociationandcreditedwiththediscoveryoftheSouthMineComplexatKirklandLakeGold

ThomasCredland – HeadofCorporateDevelopmentAgeologistwithover15yearsexperienceinmining,ThomasbeganhiscareerasageologistinWesternAustraliabeforereturningtotheUnitedKingdomtoworkasamininganalyst.HethenmovedintoaninstitutionalsalesroleatCanaccordbeforespendingfiveyearsinaseniorcorporaterole.ThomascontributedtotheidentificationandacquisitionofthePahtavaara minebyRupert.

Page 5: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

MININGINFINLAND

NEWGENERATIONOFLARGERPROJECTSBEINGDEVELOPEDINLAPLAND

5

GoldminingisnewinFinland• StateownedminingcompanyOutokumpu focussedon

basemetals• Noforeigninvestmentpriortomid-1990s• LimitedfundingfromNordicfinancialmarkets• Only30yearsgoldexplorationonCentralLapland

(>100inAbitibi,NorsemanWiluna)• 8MozKittila mineonlycommencedproductionin2009

Finnishminesoftenoperatewithlowgradeores• Lowpowercosts(US$0.075/kwh)• Technologicallyadvanced• Highproductivitiesandwelleducatedworkforce• Largevolumebutoftennofocusongrade

1

2

3

4

56

7

8

10

9

11

12

MinesofFinland

Gold1.Kittila (Agnico Eagle)2.Pahtavaara (RupertResources)3.Laiva (NordicMines)4.Pampalo (Endomines)5.Orivesi (DragonMining)6.Jokisivu (DragonMining)

Polymetallic(Ni,Cu,PGM)7.Kevitsa (Boliden)8.Sakatti Project(AngloAmerican)

Chrome9.Kemi(Outokumpu)

Copper10.Pyhasalmi (FirstQuantum)11.Kylylahti (Boliden)

Nickel12.Talvivaara (FinnishState)

Page 6: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

Pahtavaara (RupertResources)• AcquiredbyRUPinSept2016• 45,000mdrilled,25kmofIP

Kevitsa Mine(Boliden)• BoughtfromFQMforUSD712mln

Kittila Mine(Agnico Eagle)• Productionexpandedto200koz/a• Europe’slargestgoldmine(8Moz)

Sakatti Project(AngloAmerican)• Resourceof44Mt@4%Cueq.

Kutuvuoma (Aurion Resources/B2)• USD15millionJVsignedwithB2• FormerPahtavaara satellitepit

Risti (Aurion Resources)• Potentialbonanzadiscovery• CAD15mlninvestmentbyKinross

ACTIVITYINCENTRALLAPLAND,FINLAND

SIXSIGNIFICANTRECENTDEVELOPMENTSWITHIN50KMRADIUSOFPAHTAVAARA

Activityhighlightssourcedfromcompanyinformation

6

12

3

45

6

1

2

3

4

5

6

Page 7: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

THEPAHTAVAARA PROJECT

ACQUISITIONCOSTUSD2.5MLN/REPLACEMENTVALUEUSD120MLN(1)

7

30,000mofUGdevelopmentTailingspond1500tpd mill Openpit1 2 3 4

1

2

3 4

(1) Refer to page 1, forward looking “Cautionary Statement”.

FIRSTWORLDINFRASTRUCTURE,LOWHISTORICOPERATINGCOSTS

Page 8: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

AFULLYESTABLISHEDMININGPROJECT

500ktpaProcessingPlantandTailingsFacility• Planthashistoricallyproducedover350koz• Freemillingorewith80to90%recoveries(1)

• Reagentcostsminimal,givenuseofphysicalprocessing(spirals,shakingtables,flashflotation)

• Lowcostgridhydropower• Environmentallyuncomplicatedtailings(nocyanide)

FullyEstablishedUndergroundMine• 30kmof5mx5mdevelopment

• Mechanisedlongholeminingmethodused

• Goodgroundconditions

• Miningcontractorhaspreparedforfutureoperation

• Dewateringupgradeunderway

(1) Refer to page 1, forward looking “Cautionary Statement”.

8

Page 9: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

RESOURCEDEVELOPMENT

9

Past20yearsofownership• 300,000mofpreviousdrilling

• Fragmenteddatabase

• Nogeologicalmodel&Minimalgradecontrol

• Butstillmanagedtoproduce350koz

Rupertinitiatives• Databaseupgradeandvalidation

• Industryexpertscomplimentingin-housework

• Developinglithologicalandstructuralmodels

• Basemetalsulphidemineralisationidentified

Systemappearstohavescale• 1400mstrikex400mwidthx450mdepth

• Remainsunconstrained.

Nextsteps• NewmodeltobedrilltestedinQ42017

PREVIOUSWORKCOULDHAVEUNDERESTIMATEDSCALEOFPAHTAVAARA

Page 10: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

RESOURCESCLOSETOEXISTINGINFRASTRUCTURE

10

350KOZHISTORICALPRODUCTIONFROMSURFACEANDUNDERGROUND(1000OZ/VM)

KAROLIINA LANSI HARPOON NFE

30KMOF5MX5MUNDERGROUNDINFRASTRUCTURE

PREVIOUSLYDEFINEDMINERALISATION

PREVIOUSLYMINEDSTOPES

OPENPITS

MINERALISATIONPOTENTIALATDEPTH,INWORKINGSANDALONGSTRIKE

Page 11: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

SIGNIFICANTRESULTSFROMDRILLING

11

Karoliina• Westernextensionofdeposit,mineralisationclose

toexistinginfrastructure• Intersectionsinclude:116005- 32g/tover5m,

117315- 23g/tover9m,11733110.3g/tover3m&19.9g/tover3m

NFE• Newhighgradezone<200mfromexisting

undergroundinfrastructure.

• Intersectionsinclude:116011- 432g/tover1mand245g/tover1m

Harpoon• 20mfromexistinginfrastructurewithpossible

openpitpushbackonnearsurfaceprojection• Intersectionsinclude:116231- 6.9g/tover12m,

116232- 34.3g/tover2.75m,116234- 4.8g/tover11.6m

Lansi• Unminedsulphide zonewithopenpitpotential

andextensiontodepth

• Intersectionsinclude:112806- 14.5g/tAuequivalentover6m

Notedrillintersectionsareuncutandareg/tAuovercorelength(nottruewidth)unlessstatedotherwise

1m @ 9.41g/t Au

1m @ 2.63g/t Au

1m @ 18.95g/t Au

KaroliinaZone– DDH117331

Page 12: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

FOURNEARMINEEXPLORATIONTARGETS

12

PROGRAMTOIDENTIFYPOTENTIALSATELLITEDEPOSITS

Page 13: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

NEARMINETARGETS

Westernextension• LocatedinamagneticlowandcoincidentwithGTKbaseoftillcopperandgoldanomalies• AlongtrendfromaseriesofresistiveIPanomaliesfromthe2016survey.• Promisingresultsforionicleachandheavymineralsampling(goldgraincounts)

IPSouth• LargeIPresistivityanomalycoincidentwithbothcopperandgoldbaseoftillanomalies.• Elevatedionicleachrelativeresponseratioforgold• HeavymediagoldgraincountssimilartosamplingovertheknownKaroliina zone

Arthur• Targeteddueastrongrelativeresponseratioforgoldinthe2017ILprogram• Baseoftillgoldanomalyandhistoricaltrenchingactivities

IPNorth• LargeIPresistivityanomaly• GoodIonicleachresponseratioforgoldandcopper

TARGETSWITHIN5KMOFMILLGENERATEDBYGEOPHYSICSANDSOILGEOCHEMISTRY

13

Page 14: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

REGIONALEXPLORATIONTARGETS

Historicdatapackage• GTKbaseoftillsampling• 300kmin-minedrilling• Airbornemagnetics• 27kmofIPgeophysics• Nearminegroundmag• 300kmofdiamonddrilling

RUPexploration2017• 1012ionicleachsamples• 172geochem.samples• 200+rocksamples(results

pending)

UTILISINGEXTENSIVEHISTORICALDATAPACKAGE

14

Page 15: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

EXPLORATION- REGIONAL

15

STRUCTURALLYCOMPLEXANDHIGHLYPROSPECTIVE

Page 16: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

GOLDCENTRE- REDLAKE,ONTARIO

16

STRATEGIC256HECTARELANDPOSITIONINTHE23MOZREDLAKEGOLDCAMP

RupertResourceshasaportfolioofstrategiclicenses.TheGoldCentre,RedLakepropertyis100%owned,priorexplorationhasdemonstratedthecontinuationoftheBalmerformation.

MapsourcedfromGoldcorp

Page 17: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

GOLDCENTRESTATUSANDSTRATEGY

• Balmer maficmetavolcanics identifiedindrillcoreandonsurface

• DiscoveryoftheFarEastZonebyGoldcorphasprovidedfurthersupportthatthesouthwestdippingRedLakeMinetrendpotentiallyextendsthroughtheGoldCentrepropertyatdepth.

• 9anomaloustrendsinterpretedfrom2013IPsurvey

• Followupworkcouldinclude:drillingandfurtherIPsurveys

17

POTENTIALTOJOINTVENTURETOACCELERATEDEVELOPMENT

Page 18: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

COMMITTEDTODELIVERINGEXCEPTIONALSHAREHOLDERRETURNS

18

Timing&AssetSelection• Bottomofcycleacquisitionofastrategicasset• Finland- lowpoliticalrisk,securetenure,skilledworkforce• Neartermproductionpotentialfromestablishedmine

ProjectDevelopmentStrategy• Buildingthein-mineresourcesbase(1)

• Identifyingnearminesatelliteprojects• ExploringthepotentialoftheregionFocusonGrowth&Returns• Demonstratehiddenvalueofpoorlyunderstoodassets• Ensureinvestmentisaccretivetovaluation• Maximise returnspershareoverallothermetrics

(1) See Company’s press release dated September 8, 2016 for historical resources and reserves details disclosed in a NI 43-101 report prepared for the previous propertyowners and effective January 1, 2013. A qualified person has not done sufficient work to classify these historical estimates as current mineral resources or mineralreserves and the Company is not treating the historical estimate as current mineral resources or mineral reserves.

SYSTEMATICPROJECTDEVELOPMENT

Page 19: RESOURCE DEVELOPMENT AND NEAR TERM ...rupertresources.com/wp-content/uploads/2017/12/1711109...classified as a reserve unless the determination has been made that the mineralization

19

CONTACTDETAILS

JamesWithall– ChiefExecutiveOfficerEmail- [email protected]

ThomasCredland– HeadofCorporateDevelopmentEmail- [email protected]

Address82RichmondStreetEastSuite203, Toronto,OntarioM5C1P1

Websitewww.rupertresources.com