Anette Boklund 1 Sten Mortensen 2 Maren Holm Johansen 3 Tariq Halasa 1 1 Technical University of Denmark, National Veterinary Institute, Denmark 2 The Danish Veterinary and Food Administration, Head Office, Denmark 3 Veterinary Control Office North, Denmark RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR FOOT-AND- MOUTH DISEASE (FMD)

Upload: others

Post on 21-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

Anette Boklund1

Sten Mortensen2

Maren Holm Johansen3

Tariq Halasa1

1 Technical University of Denmark, National Veterinary Institute, Denmark 2 The Danish Veterinary and Food Administration, Head Office, Denmark 3 Veterinary Control Office North, Denmark

RESOURCE ESTIMATIONS IN

CONTINGENCY PLANNING FOR FOOT-AND-

MOUTH DISEASE (FMD)

Page 2: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

2 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

• Foot and mouth disease (FMD)

– highly contagious disease

– ruminants and pigs (and other cloven-hoofed)

– can lead to a large economic damage.

• EU legislation

– must provide contingency plans

– be prepared for an outbreak

Background

Page 3: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

3 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Background

• Contingency plans should include

– Provision for adequate resources

• Personnel

• Equipment

• Laboratory capacity

– Take into account resources needed to control a large number of outbreaks occurring within a short time

– Ensure methods for mass disposal of animal carcasses and animal waste without endangering human health or environment

Page 4: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

4 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Questions

• What are the needs in an outbreak of FMD?

Page 5: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

5 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods – simulation model

Transport vehicle

Infected herd

Movements of pigs

Person contacts

Neighbouring herd

Semen

Semen

Abattoir

Transport vehicle

Infected herd

Movements of pigs

Person contacts

Neighbouring herd

Semen

Semen

Abattoir

Herd data ID-numbers Numbers of animals Coordinates Herd types

Movement data - movements of animals - movements to abattoir - milk tanker routes - distances

Data related to FMD - time to symptoms - within-herd spread

Danish contingency - are symptoms recognised - are rules followed - are things reported (symptoms, contacts mv.)

Page 6: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

6 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods – simulation model

Transport vehicle

Infected herd

Movements of pigs

Person contacts

Neighbouring herd

Semen

Semen

Abattoir

Transport vehicle

Infected herd

Movements of pigs

Person contacts

Neighbouring herd

Semen

Semen

Abattoir

All epidemics started in a cattle herd in a cattle dense area

1000 epidemics simulated

1000 randomly chosen herds

Page 7: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

7 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods - Sampling 100/1000 epidemics

Page 8: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

8 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods - Sampling 100/1000 epidemics

100 epidemics around the median are extracted

Page 9: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

9 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods - Sampling 100/1000 epidemics

100 epidemics around the median are extracted

Zone

culling/vaccination

Page 10: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

10 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods - Data from simulation model

Average of herds in 100 epidemics

• Detected (118)

• Depopulated (143)

• Suspicions (5*detected)

• In zones

– Protection zones (1768)

– Surveillance zones (8080)

• Duration (87 days)

Daily averages used

Page 11: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

11 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods – Data from simulation model

Page 12: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

12 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods – Data from experts

Which type of

people should

each team

consist of?

How much

time will they

spend in one

herd?

What

equipment do

they need?

Page 13: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

13 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Methods – Ressource estimations

• Examples:

Task VET-days

Assistant-days

1 suspicion with symptoms 1 1

1 traced contacts ½ ½

1 zone visit ¼

Page 14: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

14 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Page 15: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

15 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Results –staff needed (Local crisis center)

Page 16: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

16 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Danish Emergency Managentment Agency is responsible

for the hygiene barrier, i.e. getting people, equiment and trrucks

in and out of outbreak farms

Page 17: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

17 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Results –staff needed (VETs - local)

Page 18: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

18 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Results – rendering

Page 19: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

19 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Results (worst case) – lab capacity

• Virus isolation in cell culture: 40 samples per week

• Antigen ELISA (virus detection): 200 samples per week

• RT-PCR analysis: 2000 samples per week

• Serological analyses: 25000 samples per week

Page 20: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

20 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Perspective

• Are we prepared?

Page 21: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

21 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Perspective

• Compare with the current staff

– Identify staff for different functions

– Identify training need by function

– Develop training programme by function

Page 22: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

22 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Perspective

• Compare with the current staff numbers

– Identify staff for different functions

– Identify training needs by function

– Develop training programme by function

• Changing herd structure?

Page 23: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

23 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Perspective

• Compare with the current staff numbers

– Identify staff for different functions

– Identify training needs by function

– Develop training programme by function

• Changing herd structure?

• Other control measures

– Depopulation

– Emergency vaccination

• Identify other ressource needs and secure by contracts

– Killing equipment

– Wellies, protective chlothing

– Cars, hotels

– Cleaning and disinfection

Page 24: RESOURCE ESTIMATIONS IN CONTINGENCY PLANNING FOR …16 Resource estimations in contingency planning for foot-and-mouth disease (FMD) Danish Emergency Managentment Agency is responsible

24 Resource estimations in contingency planning for foot-and-mouth disease (FMD)

Acknowledgements

• Thanks to our co-authors: Tariq Halasa and Maren Holm Johansen

• Thanks to the expert group for their great effort in this work:

– The Danish Veterinary and Food Administration:

• Majbritt Birkmose, Deputy head of Veterinary Control Office, North

• Jesper Valbak, Official Veterinarian

• Annelise Pallesen, Official Veterinarian

• Peter Lybecker Larsen, Official Veterinarian

• Tina Mørk, Veterinary Officer (Head Office)

• Stig Mellergaard, Deputy Head of Division for Animal Health

• Kim Vandrup Sigsgaard, Head of Danish Alert Unit for Food

• Erik Jepsen, Head of information

– The Danish Emergency Management Agency:

• Hans Kaj Henrik Bruhn, Major (CP)