responses to i nformation request 12 - · pdf filefrom hard rock copper-gold mines ... adams,...

21
Informati Respons Respons Respons on Request se to Informa se to Informa se to Informa 12 Resp ation Reques ation Reques ation Reques Informat ponses to I st 12a st 12b st 12c tion Reques nformation st 12 Request 12 2 12 12 12 12 2-1 2-3 2-7 2-13

Upload: vanhuong

Post on 19-Mar-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Informati

ResponsResponsRespons

on Request

se to Informase to Informase to Informa

12

Resp

ation Requesation Requesation Reques

Informat

ponses to I

st 12ast 12bst 12c

tion Reques

nformation

st 12

Request 12

2

12

12 12 12

2-1

2-3 2-7 2-13

Page 2: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Federal Review Panel Information Request 12

12-1

IR 12 – Tailings Hydraulic Conductivity

References: EIS Guidelines, Section 2.7.2.4.2 EIS, Section 2.7.2.4 EIS Appendix B of 2.2.4-D (Report on the Preliminary Design of the Tailings Storage Facility) EIS Appendix 2.6.1.4 D-A (Baseline Groundwater Hydrology Assessment) EIS Appendix 2.7.2.4 A-B (Water Management Report) EIS Appendix 2.7.2.4 A-C (Numerical Hydrogeologic Analysis) Related Comments: CEAR # 276 (BC Ministry of Mines, Energy and Natural Gas) CEAR # 272 (Natural Resources Canada) CEAR # 290 (Tsilhqot’in National Government) CEAR # 292 (Environment Canada) Rationale: For the post-closure period, the Proponent estimates seepage through the base of the Tailings Storage Facility (TSF) to be approximately 9 L/s (Section 2.7.2.4, p.663; Appendix 2.7.2.4A-C, p.17). This estimate was obtained by assuming that the hydraulic conductivity of tailings was 1E-08 m/s (Appendix 2.7.2.4A-C, p.10). Natural Resources Canada (NRCan) noted that Knight-Piésold Ltd. (KPL 2007) reports a hydraulic conductivity value of 5E-07 m/s measured on a sample by a falling head test after a drained settling test. The KPL (2010) reports an average value of 4.5E-08 m/s measured on a sample using the same procedure. Knight-Piésold Ltd (2010) also reports hydraulic conductivity values for the same material based on a consolidation test. Measured values for this test range between 1.3E-07 m/s and 6.1E-06 m/s whereas back calculated values range between 1.8 E-08 m/s and 4.4E- 09 m/s. The authors of the report considered that measured values were too high and likely erroneous. NRCan expressed concern that the Proponent has characterized the tailings seepage rate by using only two samples with measurements of hydraulic conductivity on these samples ranging over three orders of magnitude depending on the test methodology used. The value used by the Proponent for numerical groundwater flow modeling and estimates of TSF seepage (1E-08 m/s) is at the low end of this range and cannot, according to NRCan, be considered conservative. The seepage rate estimate was derived using a 3D MODFLOW numerical groundwater flow model in which the TSF was represented using the “River Package” (Appendix 2.7.2.4A-C, p.10, p. 15, p. 23). This approach represents the TSF as a Cauchytype boundary condition rather than as an explicit part of the model flow domain. The boundary condition is determined through a specified head value that accounts for the water level in the impoundment and a conductance value that accounts for the hydraulic conductivity of the tailings.

Page 3: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Federal Review Panel Information Request 12

12-2

The 3D MODFLOW model contrasts with the 2D SEEP/W modeling presented in Appendix B of Appendix 2.2.4-D in which the TSF is an explicit part of flow model domain. In NRCan’s view, this approach does not account for flow patterns within the TSF impoundment and does not yield estimates of seepage from the TSF that can be accepted as reliable. The Panel would like to better understand these matters. Information Requested: The Panel requests that Taseko:

a. Provide the rationale used to select the tailings conductivity value of 1E-08 m/s for numerical groundwater flow modeling and to estimate TSF seepage rather than 5 x 10-8 m/s (the mean hydraulic conductivity of all glacial tills in the project area) in the model for predicting seepage rates from the TSF.

b. Develop, and report on, a 3D numerical groundwater flow model for the purpose of estimating seepage through the embankments and base of the TSF. The model should feature the TSF as an explicit part of the model domain rather than as a boundary condition. Materials within the TSF include PAG waste rock and tailings of varying degrees of compaction and textural coarseness should be used and be assigned realistic values for their hydraulic properties.

c. Conduct a sensitivity analysis of the seepage model using a higher hydraulic conductivity for glacial till should be undertaken with a “worst case” scenario using the highest hydraulic conductivities for all geologic materials included in the model.

Page 4: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12a

12-3  

Information Request #12a

Provide the rationale used to select the tailings conductivity value of 1 x 10-8 m/s for numerical groundwater flow modeling and to estimate TSF seepage rather than 5 x 10-8 m/s (the mean hydraulic conductivity of all glacial tills in the project area) in the model for predicting seepage rates from the TSF.

Response Summary

The value of 1 x 10-8 m/s used for tailings hydraulic conductivity is considered appropriate for estimating flux through the tailings mass, as described below. Furthermore, the value of 5 x 10-8 m/s for the till unit is appropriate for estimating seepage from the TSF basin, based on samples collected at site over various site investigation programs. Both glacial till and tailings materials are represented in both the 2D seepage model and the 3D numerical groundwater flow modeling using values appropriate to their respective characteristics.

The response to IR12c presents a sensitivity analysis of the seepage modelling, where the hydraulic conductivities of each unit were varied. These results show that seepage from the TSF into the underlying groundwater system is driven primarily by the hydraulic conductivity of the underlying geologic units, and less so by the conductance of the deposited tails and PAG. This is consistent with the response to IR12b, which explains the representation of the TSF as a flux boundary on the natural geologic materials.

Discussion

The glacial till and tailings mass were represented in both the 2D seepage model and the 3D groundwater flow model. The following sections provide additional information on both the glacial till and the tailings mass. Glacial Till An appropriate value for the hydraulic conductivity of the glacial till was selected based on a review of the site specific data and published data. This review included results from the following sources:

In situ testing undertaken in the Glacial Till unit at 14 test locations across the project site.

Laboratory hydraulic conductivity of 18 Glacial Till samples from locations across the project site.

Typical published values of hydraulic conductivity for Glacial Till. Based on this review, in the 2D model an average hydraulic conductivity value of 1 x 10-8 m/s is a reasonable estimate of the average in situ hydraulic conductivity of the Glacial Till for

Page 5: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12a

12-4  

preliminary design. At the request of the Panel, the seepage sensitivity analysis has been expanded to assess the effect of the variability of the hydraulic conductivity of embankment foundation materials. This analysis is presented in the response to IR12c. In the 3D model, the hydraulic conductivity assigned to the glacial till underlying the TSF was assigned a value of 5 x 10-8 m/s. This hydraulic conductivity is slightly higher than the value used in the 2D seepage analysis, but is considered to be more conservative since the intent of the 3D model is to predict seepage migration on a project scale. Sensitivity scenarios conducted with the 3D model considered the glacial till hydraulic conductivity ranging from 2.5 x 10-7 to 1.0 x 10-8 m/s, capturing the value used in the 2D seepage analysis. Tailings Appropriate hydraulic conductivity values for the tailings mass were chosen based on review of the available hydraulic conductivity data and tailings consolidation modelling. This review included results from the following sources:

Laboratory hydraulic conductivity test results from tailings materials generated from metallurgical test work undertaken on samples recovered from the project site.

Laboratory permeability test results from similar tailings materials recovered from other mine sites for which Knight Piésold has provided technical advice.

Large strain tailings consolidation modelling. Typical published values of hydraulic conductivity for similar tailings materials.

The combined vertical hydraulic conductivity tailings data from this review is shown on Figure 12A-1. Tailings hydraulic conductivity measurements provided as part of tailings consolidation testing were identified as erroneous in the Knight Piésold report (EIS Appendix B of 2.2.4-D Report on the Preliminary Design of the Tailings Storage Facility). The measured values suggested that the hydraulic conductivity at high stresses (lower void ratio) are higher than hydraulic conductivity values provided by settling tests (very low stress and high void ratio). The test data was corrected as shown on the attached Figure 12A-1 by calculating the vertical hydraulic conductivity based on the coefficient of consolidation (cv) and the coefficient of volume change (mv).

The corrected tailings vertical hydraulic conductivity correlates well with the two hydraulic conductivity values (5 x 10-7 m/s and 4.5 x 10-8 m/s) from falling head values recorded during tailings settling tests. The settling tests represent tailings after sedimentation but before any significant consolidation (i.e. fresh tailings near the surface of the deposit). As can be seen from Figure 12A-1, the corrected data correlates well with hydraulic conductivity testing undertaken on tailings from other mine sites, and with published data. A vertical hydraulic conductivity of 1

Page 6: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12a

12-5  

x 10-8 m/s is therefore shown to be a reasonable estimate of the consolidated tailings materials, whilst a vertical hydraulic conductivity of 1 x 10-7 m/s is shown to be appropriate for the unconsolidated tailings materials.

In the 3D model, the vertical tailings conductivity value of 1 x 10-8 m/s along with the thickness of tailings in the TSF was used to calculate a representative conductance value for the cells representing tailings within the TSF. This approach is described in detail as part of the response to IR12b.

Page 7: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12a

12-6  

References Taseko Mines Limited (2012). New Prosperity Gold-Copper Mine Project Environmental

Impact Statement.

Page 8: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

M:\1\01\00266\30\A\Correspondence\Letters\VA13-00369 - TSF and FCD IR Responses\Figures\[IR12, 13 - Figures.xls]Fig IR12-1 Print 27/02/2013 4:24 PM

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

0 10 20 30 40 50 60 70 80 90

Ver

tica

l Hyd

rau

lic C

on

du

ctiv

ity

(m/s

)

Depth (m)

Hydraulic Conductivity Data on Tailings Samplesfrom Hard Rock Copper-Gold Mines

New Prosperity - Hydraulic Conductivity calculated ateach stress range using cv and mv values

New Prosperity - Raw hydraulic conductivity fromLaboratory Data

1.E‐10

1.E‐09

1.E‐08

1.E‐07

1.E‐06

Adams, 2005 R. Sarsbyquoting Blight (1994)

S.G.Vick (1990)

Ver

tica

l Hyd

rau

lic C

on

du

ctiv

ity

(m/s

)

Source of Data

0 31JAN'13 ISSUED WITH LETTER LM/ACR GIJ

DATE DESCRIPTION PREP'D CHK'D APP'DREV

RELATIONSHIP BETWEEN TAILINGS VERTICAL HYDRAULIC CONDUCTIVITY AND DEPTH

FIGURE 12A-1

TASEKO MINES LIMITED

NEW PROSPERITY GOLD-COPPER PROJECT

REV0

P/A NO. VA101-266/30

REF. NO.VA13-00360

NOTES:1. DEPTH HAS BEEN APPROXIMATED BY ASSUMING HYDROSTATIC CONDITIONS AND AN AVERAGE DENSITY OF

1.4t/m³. 2. ADAMS, M.D., ADVANCES IN GOLD ORE PROCESSING, ELSEVIER (2005)3. SARSBY, R., ENVIRONMENTAL GEOTECHNICS, THOMAS TELFORD (2000)4. VICK, S.G., PLANNING, DESIGN, AND ANALYSIS OF TAILINGS DAMS (1990) REPORTS TYPICAL PERMEABILITY

RANGES.

SELECTED HYDRAULIC CONDUCTIVITY VALUE FOR UNCONSOLIDATED TAILINGS

SELECTED HYDRAULIC CONDUCTIVITY VALUE FOR CONSOLIDATED TAILINGS

CORRECTED NEW PROSPERITY LABORATORY DATA (GREY CROSS to PINK SQUARES)

Page 9: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12b

12-7  

Information Request #12b

Develop, and report on, a 3D numerical groundwater flow model for the purpose of estimating seepage through the embankments and base of the TSF. The model should feature the TSF as an explicit part of the model domain rather than as a boundary condition. Materials within the TSF include PAG waste rock and tailings of varying degrees of compaction and textural coarseness should be used and be assigned realistic values for their hydraulic properties.

Response Summary

Taseko believes the 2D seepage model and 3D numerical groundwater flow model that have been used to estimate seepage for the New Prosperity TSF achieve the same result as a 3D model that includes the TSF as an explicit part of the model domain, and that a reasonable estimate of seepage from the TSF has been calculated already to assess potential impacts to the receiving environment. The development of a 3D numerical model with the attributes requested will not provide any improved refinement in the estimates of seepage to those already completed.

The 2D seepage model and the 3D numerical groundwater model both incorporate tailings and PAG waste rock units with different realistic hydraulic conductivities.

The 3D numerical model was specifically developed at a regional scale, and this representation is deemed appropriate. Reducing the model scale to that of the project (i.e. inclusion of specific layers within the TSF) is not expected to produce substantially different results than existing simulation predictions.

Furthermore, the current model provides a single base case for the pre-development groundwater conditions allowing for direct comparison between the pre-development and post-development scenarios. Modeling of the TSF at the embankment scale would require artificial boundary conditions that would allow water to enter and leave the model domain introducing error into the results.

Discussion

The following approaches were taken to estimate seepage rates from the TSF:

2D Embankment Scale Seepage Modelling

KP conducted two-dimensional (2D) groundwater flow simulations using SEEP/W (the “2D model”) to provide preliminary estimates of seepage rates through the embankment and shallow foundation materials for the Main, South and West embankments (i.e. sectional embankment scale). The specific objectives of this work were to estimate pore pressure conditions in the embankments to support slope stability assessments and design of filter zones and embankment scale seepage interception collection facilities. These analyses used four cross sections for the Main embankment, two for the South embankment and one for the West embankment. This

Page 10: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12b

12-8  

work is documented in Appendix 2-2-4-D (KP 2012a) of the EIS which describes the link between the 2D model and the water balance.

The TSF design allows for seepage collection and recycle ponds downstream of the Main, West and South Embankments. The Main embankment design also includes depressurization wells installed at the downstream toe. The purpose of these wells is primarily to reduce potential hydraulic uplift pressures/exit gradients in the downstream shell zone of the embankment (i.e. to enhance embankment stability). As a secondary effect, these wells will also serve to intercept potential shallow seepage under the embankments.

The selection of hydrogeologic parameters, and the scale of hydrostratigraphic layering included in the 2D model were driven by the need to investigate potential hydraulic conditions that may affect embankment stability, and by the need to provide robust design for seepage interception and collection facilities (i.e. design pumping rates and pond capacities). As such, different ranges of parameters than for the median range parameters generally applied in the calibrated 3D model (see below) were used to investigate the effects of e.g. lower hydraulic conductivity till overlying a higher hydraulic conductivity basalt at the embankment scale. This is a conservative design case used to examine potential vertical hydraulic gradients at the core zone and in the downstream embankment shell zone and led to the design of vertical depressurization wells to mitigate high pressures where these conditions may be identified during embankment construction.

Based on the results of the 2D seepage modelling and on significant design and operations experience with tailings storage facilities, KP estimated a final seepage rate of 46 – 60 L/s from the TSF, divided as follows:

25 – 30 L/s for the Main Embankment

20 – 25 L/s for the South Embankment

1 – 5 L/s for the West Embankment

KP (2012a) also estimates that 65% will be lost through the embankments and immediately recaptured by the embankment seepage collection systems, and that 35% of the seepage will be lost through the shallow foundations. Specific portions of the shallow seepage foundation are recaptured further downstream by seepage collection ponds and groundwater interception wells (if ongoing water quality monitoring indicates this is required). The seepage estimates along with climate and surface hydrology runoff estimates are used to design and size the infrastructure that will handle embankment scale seepage interception/depressurization well flows and storm water runoff from the dam slope.

Page 11: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko M

 

3D Basin

The 3D mvalley shydrogeogroundwto predicHydrogeparametevalues anmodifiedgeometriunits (i.e

Table 12Results

As summestimates

As the dsmall in Downstreinterceptseepage aponds in

Results o150 m dpotentialLake, 2)

Mines Limited

n Scale Seep

model was cale. The

ologic condwater flow dir

ct changes ologic param

er values (wnd experiencd during moc mean valu. excludes hy

2B-1. Summ

marized in Ts of the geom

epressurizatrelation to team of the ion wells araffected grothe event th

of the 3D modown gradiely three grouWest toward

Respo

page Modelli

also used toe specific oitions at thrections andto this sys

meters inpuwhere data pece at similar odel calibratues for hydydraulic con

mary of Geo

Table 12B-1metric mean,

ion wells anthe 3D mod

Main embre proposed undwater th

his seepage m

odelling indient from thundwater flods Big Onion

onse to Inform

ing

o predict seeobjectives o

he site includ discharge rstem duringut to the 3Dermitted, i.eprojects (w

tion. Table draulic condnductivity re

ometric Mea

1 above, ca, and capture

nd seepage cdel extents), ankment anas seepage m

hat may bypamay have a n

icated that whe TSF seeow paths fron Lake, and

mation Reque

epage from tof this woruding the dates to river

g mine opeD model we. glacial tillhere data we12B-1 belo

ductivity testsults from te

an and Mod

librated moed within sen

collection pothey were n

nd seepage mitigation toass the deprenegative effe

without grounpage collec

om the TSF 3), South to

est 12b

the TSF, burk were to

distribution rs, creeks anderations andere initiallyl, basalt, bedere unavaila

ow comparests completedests complet

del Calibrat

del parametnsitivity sim

onds are embnot explicitlycollection po be installeessurization ect on down-

undwater pumction/depress

basin as folowards Wasp

ut on a projeo evaluate of hydraulicd lakes in th

d mine closy based on drock) or baable, i.e. fluvs the modeld within indted across mu

ted Hydrau

ters were gemulation resu

mbankment scy included iponds, groued, if neededwells and se

-gradient rec

mp back welsurization syllows: 1) Nop Lake.

ect or Fish Cpre-developc head, reg

he study areasure/post-clogeometric m

ased on litervial materiall calibrated dividual maultiple units)

ulic Conduct

enerally cloults.

cale featuresin the 3D m

undwater seed, to recovereepage colle

ceptors.

lls installed ystem, thereorth towards

12-9

Creek pment gional a, and osure. mean rature l) and

with aterial ).

tivity

ose to

s (i.e. model. epage r TSF ection

100 - e are s Fish

Page 12: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12b

12-10  

Incorporating these groundwater seepage pump back wells into the 3D model shows that groundwater seepage recovery wells downstream of the main embankment will effectively capture the majority of seepage migrating north from the TSF towards Fish Lake. For water balance and water quality modelling, it was conservatively assumed that these downstream recovery wells will capture 60% of seepage which bypasses the seepage collection ponds (shallow and deep foundation seepage).

Given the relatively small volumes of seepage water estimated to flow in the direction of the south and west embankments that may bypass the seepage collection systems, it was unnecessary to incorporate groundwater seepage pump back wells into the 3D groundwater flow model.

3D Model Boundary Conditions and Scale Effects

The River Package (Harbaugh and McDonald 1996) was used to simulate material properties and hydraulic heads within the TSF footprint. This represents the TSF as a “Cauchy Type” or “Type 2” boundary condition where the flux of water into/ out of the model is dependent on the head value and the assigned conductance value. The TSF head value was assigned based on the predicted TSF filling schedule and the corresponding TSF pond elevation predicted by the water balance modelling (KP 2012b). The conductance of the cells was assigned based on the distribution and thickness of materials in the TSF (either PAG or tails or no conductance where the pond overlies basin materials), with the hydraulic conductivity values of Tails K = 1.0 x 10-8 m/s and PAG K = 1.0 x 10-4 m/s.

At the regional scale, this representation is deemed appropriate for several reasons:

In order to represent the suggested level of detail with respect to the TSF embankments and material distribution within the 3D model would require a level of model refinement and subsequent computational time disproportionate to the level of perceived certainty/accuracy in the output. In other words the “refinement” would be the addition of model complexity, which while appearing to provide greater precision, would be inconsistent with the accuracy of inputs and results. A refined representation at the project scale is not expected to produce significantly different results than existing simulation predictions, and certainly nothing that isn’t already captured within the sensitivity analysis.

Using a Cauchy type boundary condition allows for direct comparison between the pre-development and post-development conditions. This allows for numerical modelling of pre and post-development conditions using the same groundwater modelling domain and code and provides a single base case for the pre-development groundwater conditions.

Page 13: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12b

12-11  

The grid size and computational time required to model the TSF at the embankment scale would require reducing the model area to smaller than the watershed-scale. This would require assigning constant or general head boundaries along model domain edges. These artificial boundary conditions allow water to enter and leave the model and cause “boundary effects” which introduce sources of error

As the TSF fills, groundwater flow within the tailings will be driven by consolidation towards the drainage boundaries in the TSF. Fundamentally, these drainage boundaries will include: 1) lateral groundwater flow towards the edges of the TSF, 2) lateral groundwater flow towards the coarser PAG material, 3) vertical flow upwards to the TSF pond, 4) vertical flow downwards into the underlying groundwater system.

Lateral flows from the TSF towards the valley sidewalls will be curtailed by high head inflows from the basin sidewalls, or will exit to the supernatant pond where water will either evaporate, be pumped back to process as reclaim, or infiltrate vertically to the groundwater system.

Flow into the groundwater system will be mediated by the hydraulic conductivity of the underlying materials (PAG, tailings, glacial till, or rock). This is essentially the same condition simulated by the Cauchy type boundary condition in the groundwater flow model.

As discussed above, at the embankments, geotechnical design practice is to prevent the development of pore pressures within the dam shells using drains and filters. Accepted industry practice is to simulate these conditions using 2D seepage analyses. Different hydraulic parameters are used in the basin scale and embankment scale models specifically to account for the difference in model scale (i.e. hydraulic conductivity is a scale dependent property). As the intent of the 2D seepage analysis is to support the embankments drains, seepage collection pond and pump design and sizing, a more conservative range of parameters is used.

Locally the main differences between the 2D and 3D representations of the TSF assessments are some small differences in flux magnitudes and directions around the dam abutments and foundations. However, these differences are within the purview of the geotechnical engineers and are mitigated in drain and foundation design, and captured within the sensitivity simulation results.

Page 14: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12b

12-12  

References

Taseko Mines Limited (2012). New Prosperity Gold-Copper Mine Project Environmental Impact Statement.

Page 15: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12c

12-13  

Information Request #12c

Conduct a sensitivity analysis of the seepage model using a higher hydraulic conductivity for glacial till should be undertaken with a “worst case” scenario using the highest hydraulic conductivities for all geologic materials included in the model.

Response Summary

A sensitivity analysis of the TSF seepage estimates through the embankments was conducted for the 2D seepage model, as requested by the Panel. The hydraulic conductivities of the Glacial Till, Fractured/Weathered Basalt and the Competent Basalt were varied, as shown in Table 12C-1 below. The results of the sensitivity analysis indicated that total seepage through the embankment walls could range from 30 l/sec up to 160 l/s, depending upon the combination of hydraulic conductivities selected. The conservative estimate values used in the design of the TSF, as well as in the EIS were 50 to 60 l/sec. These values are considered conservative from the perspective of investigating potential hydraulic conditions that may affect embankment stability, as outlined in the response to IR12b. The proposed mitigation of depressurization wells, seepage collection ponds and groundwater pump back wells can be optimized and expanded to increase seepage capture, should the seepage rates be greater.

An additional sensitivity analysis was conducted for the TSF basin seepage in the 3D numerical model. It showed that the basin seepage could range from 2 l/sec to 42 l/sec, depending upon the variation in hydraulic conductivities. The value selected for the EIS was 9 l/sec based on the selected hydraulic conductivities for the glacial till and shallow bedrock for the New Prosperity project site. These results show that seepage from the TSF into the underlying groundwater system is driven primarily by the hydraulic conductivity of the underlying geologic units, and less so by the conductance of the deposited tails and PAG. Although higher values are not expected, these can be accommodated through optimization and expansion of the groundwater pump back wells.

Discussion

2D Model Sensitivity Analysis and Results

In response to the Panels request, additional seepage analyses have been undertaken to characterize the variation in seepage rates through the TSF. This has been achieved by varying the hydraulic conductivity parameters of the foundation materials. Variations in the hydraulic conductivities of three foundation materials were considered in the sensitivity analyses. This included the Glacial Till, Fractured/Weathered Basalt and Competent Basalt materials. A figure illustrating the typical geometry of these units is provided in Figure 12C-1 (reproduced from EIS Appendix B of 2.2.4-D Report on the Preliminary Design of the Tailings Storage Facility). The results of these analyses are presented in Table 12C-1.

Page 16: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12c

12-14  

Table 12C-1. Seepage Sensitivity Analysis Results: Variation in Hydraulic Conductivity of Foundation Materials

Case

Saturated Permeability, KH (m/s) Total Seepage Through

Embankment Walls (l/sec)

Glacial Till Fractured/ Weathered

Basalt

Competent Basalt

Conservative estimate as used in KP design report

(ref: VA101-266/27-3 Appendix B)

1 x 10-8 3 x 10-6 3x10-7 50 to 60

Intermediate Case 5 x 10-8 3 x 10-6 3 x 10-7 140 to 150

Worst Case

(requested by the Panel) 1 x 10-7 5 x 10-6 5 x 10-7 150 to 160

Reasonable Estimate Case1 1 x 10-8 1 x 10-6 1 x 10-7 30 to 40

1 Typically the level of accuracy of hydraulic conductivity is an order of magnitude. The values used in the conservative estimate in the design report use mean field data values.

3D Model Sensitivity Analysis and Results

3D model sensitivity analysis have been conducted and reported on in Appendix 2.7.2.4 A-C of the 2012 EIS. The corresponding glacial till hydraulic conductivity values and seepage estimate results are summarized in Table 12C-2.

Page 17: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12c

12-15  

Table 12C-2. 3D Model TSF Seepage Sensitivity Results

Hydraulic Conductivity K (m/s) Seepage through TSF Foundation Materials (L/s) Glacial Till Shallow Bedrock (Basalt)

Base Case 5.0 x 10-8 2.0 x 10-7 9

Low Conductivity Case

1.0 x 10-8 4.0 x 10-8 2

High Conductivity or “Worst Case”

2.5 x 10-7 1.0 x 10-6 42

The results show that seepage from the TSF into the underlying groundwater system is driven primarily by the hydraulic conductivity of the underlying geologic units, and less so by the conductance of the deposited tails and PAG.

In the 3D model, materials under the TSF basin consist of glacial till varying from 5 to 15 m thick underlain by bedrock. These glacial till materials have been extensively investigated (KP 2012a) with drilling and test pitting investigations and have been confirmed to form a natural low permeability liner throughout the TSF footprint. The till thickness used in the 3D model was based on the glacial till isopach map produced by KP (2012a). These figures are both included as Figures 12C-2 and Figure 12C-3. Accounting for the sensitivity scenarios described above, the hydraulic conductivity of the glacial till in the 3D model ranges from 1.0x10-8 to 2.5x10-7m/s.

Additional site investigations during detailed design will include test pit investigations to verify the presence of at least a 2 m thickness of competent low permeability glacial till prior to inundation by the tailings pond and before completion of the embankment raises. Based on field and laboratory testing, and experience from other projects in the general area (Mt. Polley, Gibraltar), the expected hydraulic conductivity of compacted glacial till is approximately 1.0 x 10-9 m/s, an order of magnitude lower than the values used in both the 2D and 3D analysis.

The “worst case” sensitivity scenario occurs where the till conductivity is the highest. In the 3D model, this is the high conductivity sensitivity case where the till conductivity is assumed to be 2.5 x 10-7 m/s. Any higher hydraulic conductivity till encountered will be limited in extent and in isolated areas within the extent of the TSF and easily remedied with the application of additional till or compaction

Page 18: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

Taseko Mines Limited Response to Information Request 12c

12-16  

References

Taseko Mines Limited (2012). New Prosperity Gold-Copper Mine Project Environmental Impact Statement.

Page 19: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

M:\1\01\00266\27\A\Report\3 - Tailings Storage Facility\Appendices\Appendix B - Tailings Storage Facility Seepage Analyses\[Seepage Analysis.xls]Fig_B.2Print 26/02/2013 1:43 PM

0 29JUN'12 ISSUED WITH REPORT DR GIJ KJB

DATE DESCRIPTION PREP'D CHK'D APP'DREV

TSF EMBANKMENT SEEPAGE ANALYSISMAIN EMBANKMENT FINAL (El. 1595 m)

FIGURE 12C-1

TASEKO MINES LIMITED

NEW PROSPERITY GOLD-COPPER PROJECT

REV0

P/A NO. VA101-266/27

REF. NO.3

NOTES:1. 15 M OF GLACIAL TILL LAYER UNDERLAYING THE EMBANKMENT AT THE MAXIMUM EMBANKMENT ELEVATION.

PAG

Glacial Till

Weathered Basalt

High Flow Rate Through Weathered Basalt

Basalt

Zone C

Zone CTailings Consolidated

Tailings Unconsolidated

Zone S

Page 20: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,
Page 21: Responses to I nformation Request 12 - · PDF filefrom hard rock copper-gold mines ... adams, m.d., advances in gold ore processing, elsevier (2005) 3. sarsby, r., environmental geotechnics,

BGC ENGINEERING INC.B AN APPLIED EARTH SCIENCES COMPANYGC

N:\B

GC

\Pro

ject

s\04

99 K

nigh

t Pie

sold

\022

- N

ew P

rosp

erity

\60

CE

AA

Res

pons

e E

ffort

\02

Tec

h M

emo

Res

pons

es\F

igur

e_S

ourc

e_F

iles