results from the 2011-12 tripod survey pilot, project update

24
Results from the 2011- 12 Tripod Survey Pilot, Project Update WSFCS Board of Education February 12, 2013 Slides courtesy of Cambridge Education and NCDPI Compiled by Marty Ward, WSFCS Research and Evaluation

Upload: tyme

Post on 22-Feb-2016

35 views

Category:

Documents


0 download

DESCRIPTION

Results from the 2011-12 Tripod Survey Pilot, Project Update. WSFCS Board of Education February 12, 2013 Slides courtesy of Cambridge Education and NCDPI Compiled by Marty Ward, WSFCS Research and Evaluation. 2011-12 Tripod Survey Pilot . - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Results from the 2011-12 Tripod Survey Pilot, Project Update

Results from the 2011-12 Tripod Survey Pilot, Project Update

WSFCS Board of EducationFebruary 12, 2013

Slides courtesy of Cambridge Education and NCDPI

Compiled by Marty Ward, WSFCS Research and Evaluation

Page 2: Results from the 2011-12 Tripod Survey Pilot, Project Update

2011-12 Tripod Survey Pilot • Purpose was to test interest in and feasibility of using a

Student Classroom Survey as part of our balanced system to measure Teacher Effectiveness

• One year state mandate• The survey selected for pilot was the Tripod, which is part of

the Gates-funded MET Project

Page 3: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 4: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 5: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 6: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 7: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 8: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 9: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 10: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 11: Results from the 2011-12 Tripod Survey Pilot, Project Update

Regional Tripod Survey Training January 2013

WSFCS represented by– Steve Oates– Rusty Hall (Old Town)– Old Town teacher– Sara Cook (Speas/Middle Fork)– Speas teacher– Marty Ward

Page 12: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 13: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 14: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 15: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 16: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 17: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 18: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 19: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 20: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 21: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 22: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 23: Results from the 2011-12 Tripod Survey Pilot, Project Update
Page 24: Results from the 2011-12 Tripod Survey Pilot, Project Update

Tripod Survey

Questions?