resume-update-12-02-2016 -01 - pdf

29
1 RESUME Name Mr. Ekasit Thaopha Address 13 / 165 Hongsaranthanee Village Lane 14 Maptapud Buddhis maptapud Raod District Maptapud Muang Rayong Province 21150 Telephone No. mobile no. 087-3675046,062-7953345 E -mail ethaopha @gmail.com, [email protected] Nationality Thai Race Thai Health Excellent Religion Buddhism Marital Status Married Identity card no. 3 5304 00075 075 Tax ID 1- 53843507 4 Date of birth June 271972 Age 43 Years Qualification Conferred : Diploma Of Vocational Certification Education In Trade & Industry (Production Technoloye Program) Cumulative GPA : 3.09 Maptapud Technical Callege Rayong Code & Standard : ASME B31.1, B31.3, B31.4, B31.8, Section V & VIII & IX API 570, 571, 574, 577, 578, 1104. AWS D1.1 Special Welfare Training Inspection Mr. Ekasit Thaopha

Upload: -

Post on 19-Jan-2017

138 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: RESUME-UPDATE-12-02-2016 -01 - PDF

1

RESUME

Name Mr. Ekasit Thaopha

Address 13 / 165 Hongsaranthanee Village Lane 14 Maptapud

Buddhis maptapud Raod District Maptapud

Muang Rayong Province 21150

Telephone No. mobile no. 087-3675046,062-7953345

E -mail ethaopha @gmail.com, [email protected]

Nationality Thai

Race Thai

Health Excellent

Religion Buddhism

Marital Status Married

Identity card no. 3 5304 00075 075

Tax ID 1- 53843507 – 4

Date of birth June 27’ 1972

Age 43 Years

Qualification Conferred : Diploma Of Vocational Certification Education In Trade &

Industry (Production Technoloye Program)

Cumulative GPA : 3.09

Maptapud Technical Callege Rayong

Code & Standard : ASME B31.1, B31.3, B31.4, B31.8, Section V & VIII & IX

API 570, 571, 574, 577, 578, 1104.

AWS D1.1

Special Welfare Training Inspection

Mr. Ekasit Thaopha

Page 2: RESUME-UPDATE-12-02-2016 -01 - PDF

2

Welding Inspector CSWIP 3.1

Ultrasonic Testing ASNT UT Level II

Cert No. CNI No.813-10-373

Radiographic Testing ASNT RT Level II

Cert No. CNI No. 813-10-373

Basic fire fighting

Confind space

Painting Level I

PT Level I

SUMMARY OF WORK EXPERIENCES

Over 24 years of work experiences in the Welding ,fabrication and erection of

Piping Mechanical Equipment both in process and power piping for oil and gas

refineries,

Petrochemicals and power plants respectively. Recent years account generally

on supervision work and handling daily multiple tasks in the execution of work

load to meet delivery schedule. Such duties and responsibilities include but not

limited to the following.

1. Coordination with the project management on daily work progress reportproblems

encountered at shop and / or site.

2. Liaison with the customer and / or customer authorized representative.

3. Responsible in the daily safety, quality and productivity of the job.

4. Provision of immediate solution for any usual problems that occur so at not to

hamper shop or site work delivery schedule.

5. Act as a team leader in the execution of the job by providing detailed

technical knowledge to every subordinates.

Page 3: RESUME-UPDATE-12-02-2016 -01 - PDF

3

The Expansion of LPG Facilities at Khao Bo Ya LPG Terminal Project )

Laemchabang Chonburi ( Thailand )

Samsung C&T – ITD J/V

TOCGC Expansion II Project

( Maptaphut-Rayong In Thailand )

Samsung Engineering (Thailand) Company Limited.

Page 4: RESUME-UPDATE-12-02-2016 -01 - PDF

4

IRPC UHV Project ( IRPC )

(Rayong In Thailand)

SK Engineering & Construction

HMC-3 New On-Line Mixer Project ( HMC )

( Maptaphut-Rayong In Thailand )

SCT ENC Thai Co.,Ltd.

Page 5: RESUME-UPDATE-12-02-2016 -01 - PDF

5

Propylene Plant Project ( IRPC )

(Rayong In Thailand) SC Plus Development Co.,Ltd

Jetty Development And LNG Receiving Terminal Project (PTT LNG)

( Maptaphut-Rayong In Thailand )

GS Neotek ( Thailand ) Co.,Ltd

Page 6: RESUME-UPDATE-12-02-2016 -01 - PDF

6

Ethane Separation Project (PTT ESP)

( Maptaphut-Rayong In Thailand )

Samsung Engineering Co.,Ltd

BPEX Project / 250000 MTA HDPE

( Maptaphut-Rayong In Thailand )

Daewoo Tech (Thailand) Co.,Ltd

Page 7: RESUME-UPDATE-12-02-2016 -01 - PDF

7

Alcan Gove Third Stage Expansion Project

( Sattaheeb Port Chonburi In Thailand )

Vatana Phaisal Engineering Co.,Ltd

Present Position : QA/QC Inspector

Experience Record Period : Samsung C/T-ITD J/V

Owner PTT

2015-2015 (The Expansion of LPG Facilities at Khao Bo Ya LPG Terminal Project)

● Inspection co-ordinator to PMC

● NDT Control / RT,PT,MT,PMI,Ferrite

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Reviewed Film

Page 8: RESUME-UPDATE-12-02-2016 -01 - PDF

8

● Visual inspection Check Fit-up

And Joint weld

● Marerial Reiving Inspection

● Reviewed document for structure

And Piping

● Tei-in Work ( Existing line )

● Visual inspection Check ( Holiday Test )

● Visual inspection Check Hydro Static Test

● Visual inspection Check Line check

( punch - A And punch –B )

● Visual inspection Check Reinstatement

Present Position : QA/QC Superintendent

Experience Record Period : Samsung Engineering

Owner TOCGC

2014-2015 ( TOCGC Expansion II Project )

● Inspection co-ordinator to TOCGC

● NDT Control / RT,PT,MT,PMI,Ferrite

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Reviewed Film

● Visual inspection Check Fit-up

And Joint weld

● Marerial Reiving Inspection

● Reviewed document for structure

And Piping

● Visual inspection Check painting For

Piping and Structure

● Tei-in Work ( Existing line )

● Visual inspection Check ( HOT-TAP )

Before welding, During welding, and after welding

● Visual inspection Check Hydro Static Test

● Visual inspection Check Line check

( punch - A And punch –B )

● Visual inspection Check Reinstatement

Page 9: RESUME-UPDATE-12-02-2016 -01 - PDF

9

Present Position : QA/QC Welding Inspector

Experience Record Period SK Engineering & Construction

Owner FOSTER WHEELER

Client ( IRPC UHV PROJECT )

2013-2014 ( IRPC UHV Project )

● Inspection co-ordinator to FOSTER WHEELER

● NDT Control / RT,PT,MT,PMI

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Reviewed Film

● Visual inspection Check Fit-up

And Joint weld

● Marerial Reiving Inspection

● Reviewed document for structure

And Piping

● Visual inspection Check painting For

Piping and Structure

● Tei-in Work ( Revamp )

Position : QA/QC Manager Experience Record Period SCT ENC Thai Co.,Ltd

Client ( UAC Universal Adsorbent & Co., Ltd. )

2012-2013 ( Petroleum Production Project )

● Inspection co-ordinator to UAC

● NDT Control / RT,PT

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Reviewed Film

● Marerial Reiving Inspection ● Reviewed document for structure

And Piping

● Visual inspection Check painting For

Piping and Structure

● Any Quality Checking CCS Shop ( Bang Pra-Chonburi)

For Piping ● Any Quality Checking Tiesco Shop ( Phanthong-Chonburi)

For Structure

Page 10: RESUME-UPDATE-12-02-2016 -01 - PDF

10

Position : QA/QC Manager Experience Record Period SCT ENC Thai Co.,Ltd 2012-2012 ( HMC-3 On-Line Mixer Project )

( HMC )

● Inspection co-ordinator to HMC

● NDT Control / RT,MT,PT,PMI,FERRITE

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

● Visual inspection Check Flushing And Cleaning ● Marerial Reiving Inspection

● Reviewed document for mechanical, structure

● Visual inspection Check Leveling and center line

For Mixer,Bag empty device and screw feeder

● Visual inspection Check Cleaning inside And

outside For Mixer,Bag empty device and screw feeder ● Visual inspection Check plumbness and elevation

Dimension and bolt torque for structure

● Visual inspection Check painting and insulation

● Final package and review (All document )

Position : QA/QC Manager 2011-2012 SC Plus Development Co.,Ltd

( Propylene Plant Project )

( IRPC )

● Inspection co-ordinator to GSC

● NDT Control / RT,MT,PT,PMI,FERRITE

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Visual inspection Check Fit-up

And Joint weld

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

● Visual inspection Check Wrapping And

Holiday Test

Page 11: RESUME-UPDATE-12-02-2016 -01 - PDF

11

● Marerial Reiving Inspection

Position : QC Supervisor

2011-2011 Vatana Phaisal Engineering Co.,Ltd HP-SMR Project ( SCG DOW )

● Inspection co-ordinator to Technip

● NDT Control / RT,MT,PT,PMI,PWHT

● Line Check Punch… A…Cleared

● Line Check Punch… B…Cleared

● Reviewed Package

● Reviewed Film

Position : QC Supervisor

GS Neotek ( Thailand ) Co.,Ltd 2010-2011 ( Jetty Development And LNG Receiving Terminal Project )

( PTT LNG )

● Inspection co-ordinator to GSC

● NDT Control / RT,MT,PT,PMI,FERRITE,PWHT

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● Visual inspection Check Fit-up

And Joint weld

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

● Visual inspection Check Wrapping And

Holiday Test

Position : QC Supervisor

2010-2010 Renew Coils Engineering & Supply Co.,LTD ( PTTAR # 2 Tei-In & Minormech Project )

● Inspection co-ordinator to PTTAR

● NDT Control / RT,MT,PT,PMI

● Electrodes control

● Visual inspection Check Fit-up

And Joint weld

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

Position : QC Supervisor

Page 12: RESUME-UPDATE-12-02-2016 -01 - PDF

12

2010-2010 Renew Coils Engineering & Supply Co.,LTD

( TPE NOVO Project )

● Inspection co-ordinator to TPE & SCG

● NDT Control / RT,MT,PT,PMI

● Electrodes control

● Visual inspection Check Fit-up

And Joint weld

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

Position : QC Supervisor

2009-2010 Samsung Engineering Co.,Ltd

( Ethane Separation Project PTT )

● Inspection co-ordinator to PTT

● NDT Control / RT,MT,PT,PMI

● Visual inspection Check Fit-up

And Joint weld

● Reviewed Package

● Reviewed Film

● Visual inspection Check

Hydrostatic & Pneumatic Test

Position : QA/QC Inspector

2008-2009 : Daewoo Tech( Thailand ) Co.,Ltd

(BPEX Project/250000 MTA HDPE)

● Inspection co-ordinator to BPE

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● NDT Control / RT,MT,PT

● Prepare welder list, card & certification

● Visual inspection Check Fit-up And Joint weld

● Visual inspection Check Wrapping And

Holiday Test

● Reviewed Film

● Visual inspection Check Hydrostatic &

Pneumatic Test And Flushing

● Visual inspection Check Tank & Hopper

Equipment & Structure & Silo

● Visual inspection Check Painting

● Marerial Reiving Inspection

● Roundness Checked

Page 13: RESUME-UPDATE-12-02-2016 -01 - PDF

13

Position : QC Supervisor 2007-2008 : Thai woo ree Engineering Co.,Ltd.

(Condensate Tank Phase III Project PTTAR)

● Inspection co-ordinator to RRC

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● NDT Request / RT,MT,PT

● Prepare welder list, card & certification

● Inspection report, documentation preparation

● Final Release inspection

● Hydrostatic & Pneumatic Test

● Visual inspection Check Painting

Position : QC Supervisor

2006-2007 : Thai woo ree Engineering Co.,Ltd.

(ATC Reformer and Aromatics Complex II Project)

● Inspection co-ordinator to skec.

● Monitor welder qualification

● Electrodes control

● WQT/Welder certification

● NDT Request / RT,MT,PT,PWHT,PMI

● Prepare welder list, card & certification

● Inspection report, documentation preparation

● Final Release inspection

● Visual inspection Check Painting

Position : QC Supervisor

2006-2006 : Thai woo ree Engineering Co.,Ltd

(ROC FURNACE Q Project)

● Inspection co-ordinator to REPCO

● NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

● Electrodes control

● WQT/Welder certification

● NDT Request / RT,MT,PT,PWHT,PMI

● Prepare welder list, card & certification

● Inspection report, documentation preparation

● Final Release inspection

● Visual inspection Check Painting

Position : QC Supervisor

2005-2006 : Vatana Phaisal Engineering Co.,Ltd.

Page 14: RESUME-UPDATE-12-02-2016 -01 - PDF

14

: (Alcan Gove Third Stage Expansion Project)

● Inspection co-ordinator to Alcan

● ISO.DWG. Revision Checked, ISO.DWG.

AsbuiltChecked

● Material Checked, Fabrication Checked, Welded

Inspection

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

: Document Controller

● Welding Control Sheet, Daily Report, NDT Report

: General

● Welder Test Inspection, Fabrication & Dimension

Checked

● Plumness Check And Elevation Check And

Dimension Check For Steel Structure boiler

● Plumness Check And Elevation Check And

Dimension Check For Flare Stack

● Visual inspection Check Painting

Position : QC Supervisor

2004-2005 : Vatana Phaisal Engineering Co.,Ltd.

: (SMPC3 Project)

● WPS & PQR

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Pressure Gauge Calibration And Certificate

● Hydrostatic & Pneumatic Test

● Visual inspection Check Painting

Position : QC Supervisor

2004-2004 : Vatana Phaisal Engineering Co.,Ltd.

: Eastern Fluid Transport Co.,Ltd. (40 Bar steam supply

to BPE)

● WPS & PQR

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Hydrostatic & Pneumatic Test

● Visual inspection Check Painting

Position : QC Supervisor

2004-2004 : Vatana Phaisal Engineering Co.,Ltd.

: NPC (National Petrochemical Public Co.,Ltd.

Page 15: RESUME-UPDATE-12-02-2016 -01 - PDF

15

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Pressure Gauge Calibration And Certificate

● Hydrostatic & Pneumatic Test

● Visual inspection Check Painting

Position : QC Supervisor

2002-2004 : Vatana Phaisal Engineering Co.,Ltd.

: Shin-Etsu Silicons (Thailand) Limited Asia and

Industrial Enterprise (S-1 Project)

● WPS & PQR

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Hydrostatic & Pneumatic Test

Position : QC Supervisor

2000-2002 : Vatana Phaisal Engineering Co.,Ltd

: Alstom Power Co.,Ltd. Bang*Bo Samutprakarn

Bang-Bo HRSG power project

● WPS & PQR

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Hydrostatic & Pneumatic Test

Position : QC Supervisor

1999-2000 : Vatana Phaisal Engineering Co.,Ltd

: Alstom Power Co.,Ltd. Sriracha Chonbury

Bowin HRSG power project HRSG # 11, HRSG # 21 2

unit

● WPS & PQR

● Welder Qualify & Welder Record

● Visual Inspection

● NDT Controll

● Hydrostatic & Pneumatic Test

Position : QC Supervisor

1999-1999 : Vatana Phaisal Engineering Co.,Ltd

: Tractebel Engineering International for PTT

: New DPCU. And Piping Modification Project

: Map Ta Phud, Rayong Province

Page 16: RESUME-UPDATE-12-02-2016 -01 - PDF

16

● Hot Tap Check Before Welding

● Welder Qualify & Welder Record

● Visual Inspection Check And Control Temperatur

● NDT Controll

● Hydrostatic & Pneumatic Test

Position : QC Supervisor

1999-1999 : Vatana Phaisal Engineering Co.,Ltd

: L’AIR LIQUIDE (THAILAND) Co.,Ltd.

L’Air Liquide Hydrogen Pipeline Network

Map Ta Phud, Rayong Province

● Document Control Isometric Drawing

● NDT Control (PT, X-Ray)

● Final Document Control

● Quality Welder & Welder Record

● Inspection and testing

Position : QC Supervisor

1999-1999 : Vatana Phaisal Engineering Co.,Ltd

: Rayong Olefins Co.,Ltd. Cracking Heater Repair

Work, H-100 A, D and F Project.

● Document Control Isometric Drawing

● NDT Control (PT, X-Ray)

● Final Document Control

● Quality Welder & Welder Record

● Inspection and testing

Position : QA/QC Foreman

1998-1999 : Vatana Phaisal Engineering Co.,Ltd

: PPG Siam Silica Co.,Ltd. Granulation and Agitator

Project

● Document Control Isometric Drawing

● NDT Control (PT, X-Ray)

● Final Document Control

● Quality Welder & Welder Record

● Inspection and testing

Position : QC Foreman

1998-1998 : Vatana Phaisal Engineering Co.,Ltd

: Samsung Engineering (T) Co.,Ltd. For BSTE Project

● Document Control Isometric Drawing

● NDT Control

● Record Quality Control/Summarize

Page 17: RESUME-UPDATE-12-02-2016 -01 - PDF

17

● Test Package Total 1,400 Packages

● Inspection and testing

Position : QC Foreman

1997-1998 : Vatana Phaisal Engineering Co.,Ltd

: Thai Plastic and Chemical Co.,Ltd.

Rayong province. (300,000 MTPY TPC/VCM

Expansion Project

● Document Control Isometric Drawing

● NDT Control (PT, X-Ray)

● Final Document Control

● Quality Welder & Welder Record

● Inspection and testing

Position : QC Foreman

1996-1997 : Vatana Phaisal Engineering Co.,Ltd

: Samsung Engineering Co.,Ltd. (TPI plant Project)

● Document Control Isometric Drawing

● NDT Control (PT, X-Ray)

● Final Document Control

● Quality Welder & Welder Record

● Inspection and testing

Position : QC Inspector

1995-1996 : SHINO Thai Engineering Co.,Ltd. (Thai Refinery

Co.,Ltd.)

: ISO.DWG.

● Joint Marking Checked, Dia-Inch Summary Checked

● ISO.DWG. Revision Checked, ISO.DWG.

AsbuiltChecked

: Field Inspection

● Material Checked, Fabrication Checked, Welded

Inspection● Air Leakage Test Inspection,

Equipment Erection Inspector

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

: Document Controller

● Welding Control Sheet, Daily Report, NDT Report

● Package Test Report, Equipment Erection Report

: General

● Welder Test Inspection, Fabrication &

Dimension Checked

● Inspection and testing

Page 18: RESUME-UPDATE-12-02-2016 -01 - PDF

18

Position : QC Inspector

1994-1995 : Vatana Phaisal Engineering Co.,Ltd

(Star Petroleum Refining Project)

: ISO.DWG.

● Joint Marking Checked, Dia-Inch Summary Checked

● ISO.DWG. Revision Checked, ISO.DWG.

AsbuiltChecked

: Field Inspection

● Material Checked, Fabrication Checked, Welded

Inspection

● Air Leakage Test Inspection, Equipment Erection

Inspector

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

: Document Controller

● Welding Control Sheet, Daily Report, NDT Report

● Package Test Report, Equipment Erection Report

: General

● Welder Test Inspection, Fabrication &

Dimension Checked

● Tank Fabrication Inspection, Sandblast &

Primer Coat Inspection

● Inspection and testing

Position : QC Inspector

1993-1994 : Vatana Phaisal Engineering Co.,Ltd

: Ljucky Engineering Co.,Ltd.

(TPI Plant Project)

● Material Checked, Fabrication Checked, Welded

Inspection

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

: Document Controller

● Welding Control Sheet, Daily Report, NDT Report

Position : QC Inspector

1992-1993 : Vatana Phaisal Engineering Co.,Ltd

: (Siam Yamoto Steel Co.,Ltd.)

● Material Checked, Fabrication Checked, Welded

Inspection

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● RT. Checked (X & Gamma Radiography Test)

Page 19: RESUME-UPDATE-12-02-2016 -01 - PDF

19

● VT. Checked Equipment And Pump

Position : Assist Foreman ( QC)

1991-1992 : Vatana Phaisal Engineering Co.,Ltd

: (PTT Plant Project Sreracha Chonbury)

●Tank and Piping Fabrication and Installation

● Material Checked, Fabrication Checked, Welded

Inspection

: NDE. Inspection

● PT. Checked (Dye Penetration Test)

● Dimension. Checked

● Plumness Checked (Thank)

● Roundness Checked

● VT. Checked Joint Welding

Page 20: RESUME-UPDATE-12-02-2016 -01 - PDF

20

Page 21: RESUME-UPDATE-12-02-2016 -01 - PDF

21

Page 22: RESUME-UPDATE-12-02-2016 -01 - PDF

22

Page 23: RESUME-UPDATE-12-02-2016 -01 - PDF

23

Page 24: RESUME-UPDATE-12-02-2016 -01 - PDF

24

Page 25: RESUME-UPDATE-12-02-2016 -01 - PDF

25

Page 26: RESUME-UPDATE-12-02-2016 -01 - PDF

26

Page 27: RESUME-UPDATE-12-02-2016 -01 - PDF

27

Page 28: RESUME-UPDATE-12-02-2016 -01 - PDF

28

Page 29: RESUME-UPDATE-12-02-2016 -01 - PDF

29