Retrofitting for Resiliency. Deep Energy Retrofits provide resiliency to existing buildings. Building and Energy Consultants Lloyd Hamilton, owner IGSHPA Certified Geothermal Designer/Installer Deep Energy Retrofits Net-Zero Energy Building. Deep Energy Retrofit. Purpose of Grant - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/1.jpg)
Retrofitting for Resiliency
Deep Energy Retrofits provide resiliency to existing buildings
![Page 2: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/2.jpg)
Building and Energy ConsultantsLloyd Hamilton, owner
IGSHPA Certified Geothermal Designer/InstallerDeep Energy Retrofits
Net-Zero Energy Building
![Page 3: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/3.jpg)
Deep Energy RetrofitPurpose of Grant
• Develop a process for cost effective DEREnergy savings should make it cost neutral
• Make it durableAssembly should be expected to last 100
years• Make it duplicable
Process should be easy to learn
![Page 4: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/4.jpg)
Deep Energy RetrofitThe team
Lloyd Hamilton, Verdae, LLCBrian Mulder, Mulder Construction
Todd Pascarella, Energy Experts Michael Drechsler, Dow Chemical
Joe Lstiburek, Building Science CorpGreg Pedrick, project manager NYSERDA
![Page 5: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/5.jpg)
Deep Energy Retrofit
Cottekill House Circa 1945Attic poorly insulated
Rhinebeck House Circa 1790 to 1990Attic Insulated and air sealed 1990
Roxbury HouseCirca 1850
![Page 6: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/6.jpg)
Deep Energy RetrofitRhinebeck House
Before DER work
![Page 7: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/7.jpg)
Deep Energy RetrofitRhinebeck House
After DER work
![Page 8: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/8.jpg)
Deep Energy RetrofitRhinebeck House
![Page 9: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/9.jpg)
Deep Energy RetrofitRhinebeck House
* = DER WORK
Total Project Cost $109,463.45DER Portion, with Windows and Doors $61,958Extra to add DER to a Siding and Window Job $32,831.28
Task Labor Cost
Travel $4,785.00Site Prep $2,821.50Wrap Sill with EDPM $412.50DER work on walls $11,533.50*Reframe window RO $1,848.00Window and Door Bucks $3,077.25*Install windows $3,679.50*Interior trim $2697.25*Non DER work $3861.00Spray foam basement $1,315.50*Siding $7,275Masonry labor and material $7,000Total $50,306.00
Task Material CostDER work on walls $5,807.72*Window RO flashing tape $4967.54*Window Bucks $789.56*Windows $18,895.75*Window Trim $1,142.96*Doors $5,551.63*Siding $8,867.35Non DER work $10,634.94Closed Cell Spray Foam $2,500*Total $59,157.45
![Page 10: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/10.jpg)
Deep Energy RetrofitCottekill House
Before DER work After DER work
![Page 11: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/11.jpg)
Deep Energy RetrofitCottekill House
![Page 12: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/12.jpg)
Deep Energy RetrofitPlan the work
• Focus on the whole building from the basement slab to the roof peak.
• Integrate the air, water, vapor and thermal control layers so they are continuous and aligned with each other.
• Pay close attention to transitions.
![Page 13: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/13.jpg)
Deep Energy RetrofitBenefits
• Occupants can stay in home during work• Improved Comfort• Improved indoor air quality• Increased building durability• Reduced energy consumption• Increased value of home• First step to net zero energy home
![Page 14: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/14.jpg)
![Page 15: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/15.jpg)
Deep Energy RetrofitHow to begin?
• Go to www.deepenergyretrofit.com• Go to www.buildingscience.com• Buy “Builders Guide to Cold Climates” from
www.eeba.org Become an expertor
Hire an expert in DER to lead the team.
![Page 16: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/16.jpg)
Deep Energy RetrofitWhen to begin?
NOW! Interest rates are lowContractors need workMaterials are going up in price
![Page 17: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/17.jpg)
Deep Energy Retrofit• Inexpensive when done in conjunction with a
planned window and siding replacement• Can be done in stages• Do the basement and attic now using on-bill
financing and wait on the walls until you are ready to replace the windows and siding
![Page 18: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/18.jpg)
DERFrom This
![Page 19: Retrofitting for Resiliency](https://reader035.vdocuments.net/reader035/viewer/2022062305/56815b1f550346895dc8d4b3/html5/thumbnails/19.jpg)
DERTo This