reverse pigging of natural gas pipeline
DESCRIPTION
The methodology of cleaning the natural gas pipelines by reversing the flow of gas .TRANSCRIPT
Reverse Cleaning Reverse Cleaning PiggingPigging
By: By: GAS O&M, NCRGAS O&M, NCRRandeep NainRandeep NainAbhinav GoelAbhinav Goel
Flow of PresentationFlow of Presentation
• A brief Introduction to pipeline piggingA brief Introduction to pipeline pigging
• Why reverse pigging of Jatauli – Dadri sectionWhy reverse pigging of Jatauli – Dadri section
• Planning for reverse piggingPlanning for reverse pigging
• Pre pigging preparationsPre pigging preparations
• Actual execution of the exercise Actual execution of the exercise
• Key TakeawaysKey Takeaways
Pipeline PiggingPipeline Pigging
• Removal of accumulated dust Removal of accumulated dust from the pipeline by using from the pipeline by using cylindrical shaped pigs.cylindrical shaped pigs.
• No interruption of flow in the No interruption of flow in the pipeline.pipeline.
• The pig is launched upstream The pig is launched upstream from the pig launcherfrom the pig launcher
• Pressure driven flow of gas Pressure driven flow of gas pushes the pig along down pushes the pig along down the pipeline.the pipeline.
• Pig is received downstream at Pig is received downstream at the pig receiver along with the pig receiver along with the collected dustthe collected dust
NCR PIPELINES DETAILSNCR PIPELINES DETAILS
G’BAD11 CUSTOMERS
SECUANDARABAD4 CUSTOMERS
SHIWALI RR STN
SONEPAT 11 CUSTOMERS
NTPC FARIDABAD
HBJ 24”
MARUTI
B’ GARH11 CUSTOMERS
S’BAD10 CUSTOMERS
GREP36”, 76 Km
18”, 47 Km. 24”, 45 Km.
14”, 14 KM
16”, 64 KM
CHAINSA
12”, 34 KM.
8”, 59KM.
4”, 18.2 KM.
8”/4”, 19 Km
6” / 4”, 19.8 KM
6” / 4”19.2 KM
DESUNTPCDADRI
JATOULI
4”, 21 KM
HNG/HSI
DHAULA KUAN
NOIDATAP OFF
KURI KHERA
PR SEC’BAD
Sv-3
8”
IGL N/GN
G0UNA36”
38.27KM
BAWANA
NANGAL
20”56KM
NDPL
8”13KM
20 NEW CUSTOMERS
JHAJHAR
36”, 71.6 KMVDPL48”, 76 Km
SULTANPUR
18” SNPL MANESAR
5 CUSTOMERS
10”, 5.4 KM
Hayatpur Tap OffOMAX
Auto
KAJARIA
Rathi Steel
Lafarge Baral
Maruti Suzuki
OMAX Auto
Suzukii Power Train
GGL-CGD
GGL-TOYO
Croslay PushpanjaliBhushan 2
Tirupati
Diamond Potteries
IOCL DADRI
PARLE
HNG
Ghazipur
Bamheta
Sv-4
Dasna
CGS MEERUT
Apprehension and area of concern for Pigging Apprehension and area of concern for Pigging of NCR Pipelinesof NCR Pipelines
• 20 MMSCMD of NCR gas supply can't be interrupted20 MMSCMD of NCR gas supply can't be interrupted
• previous pigging experiences were not very encouraging previous pigging experiences were not very encouraging
• An un quantified huge quantity of dust anticipated An un quantified huge quantity of dust anticipated
• It may effect the gas supply to power plants and other It may effect the gas supply to power plants and other customerscustomers
Why Reverse PiggingWhy Reverse Pigging
• NTPC Dadri is located at the fag end of GREP .NTPC Dadri is located at the fag end of GREP .
• All the dust collected during pigging gets accumulated at NTPC All the dust collected during pigging gets accumulated at NTPC Dadri .Dadri .
• The accumulated dust can lead to interruption of gas supply to The accumulated dust can lead to interruption of gas supply to NTPC .NTPC .
• The dust also gets transferred to pipeline section connected to The dust also gets transferred to pipeline section connected to Dadri such Dadri o Desu p/l .Dadri such Dadri o Desu p/l .
Past Pigging experiencePast Pigging experience
• Intelligent Pigging of 36” Jatauli- Intelligent Pigging of 36” Jatauli- Dadri section was executed in Dadri section was executed in 20062006
• First Foam PIG received with 15 Kg. First Foam PIG received with 15 Kg. dust on 30th March’06.dust on 30th March’06.
• Gauge PIG received with 1900 Kg. Gauge PIG received with 1900 Kg. dust on 30th March’06. dust on 30th March’06.
• Magnetic PIG received with huge 40-Magnetic PIG received with huge 40-50 tons of dust on 31st March’0650 tons of dust on 31st March’06
• Scrubber , filter vessels , PCV and Scrubber , filter vessels , PCV and station piping got damaged.station piping got damaged.
• Gas supply to NTPC Dadri was Gas supply to NTPC Dadri was interruptedinterrupted
Damaged Scrubber Drain Elbow Replacement Of Elbow
EFFECT OF PIGGING
Cleaning pigging of Dadri-Desu line in 2007Cleaning pigging of Dadri-Desu line in 2007
• Cleaning pigging of Dadri-Cleaning pigging of Dadri-Desu line was done on Desu line was done on December’07December’07
• Gas flow was hampered Gas flow was hampered during pigging during pigging
• Foam pig retrieve in piecesFoam pig retrieve in pieces
• Customers had refused to Customers had refused to give their consent for pigging.give their consent for pigging.
• There after pigging operations There after pigging operations were come to halt.were come to halt.
Planning for Reverse Pigging operationPlanning for Reverse Pigging operation
Connectivity of Bawana – SV-4 Desu-Bahadurgarh pipeline
Interconnection of GREP and VDPL at DadriInterconnection of GREP and VDPL at Dadri
-Enabled flow of gas from VDPL to GREPEnabled flow of gas from VDPL to GREP
-Both VDPL and GREP could be operated at different pressureBoth VDPL and GREP could be operated at different pressure
--10 MMSCMD uncompressed HP gas in GREP
Pre Pigging activitiesPre Pigging activities• Modification of receiver at Dadri Modification of receiver at Dadri
• Checking of Sv’s valve performance, receiver launcher Checking of Sv’s valve performance, receiver launcher barrels barrels
• Arranging Logistics during pigging at JatoliArranging Logistics during pigging at Jatoli
• Team deployed at Chhainsa, Faridabad and Gurgaon Team deployed at Chhainsa, Faridabad and Gurgaon
• Arranging the fire tender at Jatoli and other dust and Arranging the fire tender at Jatoli and other dust and liquid hydrocarbon handling and disposal liquid hydrocarbon handling and disposal arrangementsarrangements
Reverse Cleaning Pigging of 36" Dia GREP Reverse Cleaning Pigging of 36" Dia GREP PipelinePipeline
Section:- Dadri - Jatauli (73.850 KM) :Section:- Dadri - Jatauli (73.850 KM) :
- Pigs were launched from Dadri for reverse Pigs were launched from Dadri for reverse
- Received at IP Station Jatauli Received at IP Station Jatauli
- Four runs of pigs i.e. Foam Pig , Gauge Pig , Brush Pig and - Four runs of pigs i.e. Foam Pig , Gauge Pig , Brush Pig and magnetic pig magnetic pig
SV StationSV Station
Station Station Interval Interval Distance Distance
(KM)(KM)
Distance Distance BetweeBetwee
n SV n SV (KM)(KM)
Gas flow In Gas flow In MMSMMMSM
DD
Gas/Pig Gas/Pig VelocitVelocit
y y (KM/Hr)(KM/Hr)
Time Time DuraDurationtion
Expected Expected PIG PIG
Arrival Arrival Time Time HrsHrs
DADRIDADRI 499499 00 9.339.33 8.838.83 0.000.00 0.290.29
LADPURA LADPURA (SV-12)(SV-12) 479.66479.66 19.3419.34 9.339.33 8.838.83 2.192.19 0.450.45
CHAINSA(SV-CHAINSA(SV-11+CP+11+CP+RR)RR) 456.75456.75 22.9122.91 9.089.08 8.608.60 2.662.66 0.590.59
JATAULI JATAULI (IP5+CP(IP5+CP+RR)+RR) 423.35423.35 33.433.4 4.524.52 4.284.28 7.807.80 0.670.67
75.6575.65 12.6512.65
PIGPIG TRACKING CHARTTRACKING CHART
In-house Cleaning Pigging of 36" In-house Cleaning Pigging of 36" Dia GREP Pipeline Dia GREP Pipeline Section:- Dadri - Section:- Dadri - Jatauli 73.850 KMJatauli 73.850 KM
Pig runPig run 11 22 33 44
DateDate 17-Oct-1117-Oct-11 18-Oct-1118-Oct-11 19-Oct-1119-Oct-11 20-Oct-1120-Oct-11
Type of PIGType of PIG FOAMFOAM GAUGEGAUGE
Cleaning Cleaning (Brush + (Brush + Magnet) Magnet)
PigPig
Cleaning Cleaning (Brush + (Brush + Magnet) Magnet)
PigPig
Launching stnLaunching stn DADRIDADRI DADRIDADRI DADRIDADRI DADRIDADRI
Launch timeLaunch time 8:30 AM8:30 AM 4:10 PM4:10 PM 6:25 AM6:25 AM 5:13 AM5:13 AM
Receiving stnReceiving stn JATAULIJATAULI JATAULIJATAULI JATAULIJATAULI JATAULIJATAULI
Received timeReceived time 01:30 AM on 01:30 AM on 18.10.201118.10.2011
02:00 AM on 02:00 AM on 19.10.201119.10.2011 5:30 PM5:30 PM 9:20 PM9:20 PM
PIG travelling time in hrsPIG travelling time in hrs 17 hrs17 hrs 09 hrs 50 min09 hrs 50 min 11 hrs 05 min11 hrs 05 min 16 hrs 07 min16 hrs 07 min
Condition of pigCondition of pig Partially damagePartially damage GoodGood GoodGood GoodGood
Debris in kgDebris in kg 20.020.0 50.050.0 5.05.0 10.010.0
Liquid in lit.Liquid in lit. 2020 00 00 00
CUMMULATIVE DEBRIS IN CUMMULATIVE DEBRIS IN LtrLtr 20.020.0 20.020.0 20.020.0 20.020.0
CUMMULATIVE DEBRIS IN CUMMULATIVE DEBRIS IN kgkg 20.020.0 70.070.0 75.075.0 85.085.0
RemarksRemarks Partially foam Partially foam damagedamage
Gauge plate Gauge plate found OKfound OK
Pig launched at Dadri Pig received at Jatoli
Challenges faced during pigging:-Challenges faced during pigging:-GREP line pig barrel door got stick at Dadri and Jatoli because of GREP line pig barrel door got stick at Dadri and Jatoli because of
misalignment between barrel door and barrelmisalignment between barrel door and barrel
DO’sDO’s• Always check all the valvesAlways check all the valves• Always close the barrel door in align condition only by simple pushAlways close the barrel door in align condition only by simple push• Regularly open and close barrel doorsRegularly open and close barrel doors• Always make the pig receiving trolley and pig handling arrangements Always make the pig receiving trolley and pig handling arrangements
(chain pulley blocks, trolley etc)(chain pulley blocks, trolley etc)• Arrangements for hydrocarbon mug and liquid handling and disposalArrangements for hydrocarbon mug and liquid handling and disposal• Always launch the pig with pig tracking system with adequate battery Always launch the pig with pig tracking system with adequate battery
lifelife
Main Challenges
AchievementsAchievements
• Successful completion of GREP cleaning pigging Successful completion of GREP cleaning pigging
• Confidence build up to do future pigging of various other NCR Confidence build up to do future pigging of various other NCR pipelines with effecting the gas supplypipelines with effecting the gas supply
Future Course of actionFuture Course of action• Scrubber shall be installed at Jatoli for future cleaning piggingScrubber shall be installed at Jatoli for future cleaning pigging
• Foam pigs OF DADRI-DESU Pipeline is planed.Foam pigs OF DADRI-DESU Pipeline is planed.
• Job awarded for the Intelligent Pigging of 16” CFPL & 14” CGPLJob awarded for the Intelligent Pigging of 16” CFPL & 14” CGPL
Benefits of the exerciseBenefits of the exercise
TangibleTangible• Prevention of revenue lossPrevention of revenue loss • Pipeline EfficiencyPipeline Efficiency
• confidence for future pigging operationsconfidence for future pigging operations
• Goodwill among customersGoodwill among customers
Intangible