Review of Offtake Arrangements DocumentSection I - NTS Operational Flows9th July 2010 – Offtake Arrangements Workstream
Review --- how to approach?
• Re-test some basic assumptions on why information is needed and WHAT it is used for (by NTS and DNs).
• Wouldn’t necessarily start with existing Section I rules
• No hidden agendas..we all have businesses to run, safe and efficient so lets be efficient in this regard.
• No tail wagging the dog! Let’s create a set of business requirements that work, NOT shoe horn procedures around pre existing rules that do NOT!
Why now?
• Inappropriate to knowingly continue in a potential non compliant position
• Never a good time...momentum gained..keep it moving
• Earliest possible signals for any I.S alterations to develop in existing systems (link to SOMSA timeframes or DNCS?)
• Any issues lurking in Exit Reform from October 2012 flushed out in sufficient time to manage.
Review Proposal – suggested T.O.R• General review of the current NTS Operational flow requirement arrangements and processes
within UNC OAD Section I to determine if they are still appropriate, coherent and relevant.
• Implications of any changes to OPNs
• Implications of any revisions to pressure commitments between National Grid NTS and GDNs
• Review of application of Low Demand Days
• Suitability of percentage measures as Offtake tolerances
• Aggregation of requests by LDZ vs Exit zone
• Impact of the implementation of Modification Proposal 0195AV (‘Introduction of Enduring NTS Exit Capacity Arrangements’
Things to consider
• Should any conditions in OAD be amended to reflect a more relevant condition?
• Are there any absent conditions which should be included?
• What are the benefits for both parties (NTS and DNO) by adhering to existing OAD clauses (which may create additional workloads) to warrant full compliance?
OFFTAKE PROFILE NOTICES (OPNs)
• Implications of any changes to OPN requirements
– Relevant usage & requirements by Networks
– Differing interpretation of existing OPN requirements
– Map to current OAD (Amend as required)
– IS issues
– Implementation timeframes
Pressure Requirements
• Why DNs need pressure requirements and WHEN!
– Not every day?
– Key times between 22.00 & 06.00
– What constrains NTS? Compressor costs? Other?
– Impact on DNs – Linepack depletion...
– Reporting of current OAD requirements.
Offtake tolerances
• Is the 10% (Offtake) and 3% (LDZ) measure correct?
– Differentiation by offtake
– Measurement by exit zones?
– X% plus X metre tolerance?
– Reporting requirements?
TimelineJuly 9th
Agree T.O.R and work plan
15 July - Take review Proposal to UNC Modification Panel for formal
constitution of Review Group
August 6th – Offtake WS / Review Group
OPNS
Exit zone vs LDZ measures
September 3rd – Offtake W/S / Review Group
Low demand Days
Pressure Commitments
October 8th – Offtake W/S / Review Group
Sweep up