S:\Design Projects\1053 - Big O Tires - Falcon\DP\Plat\2nd Submittal\1053-Rev Resp Letter -SP- Sub 3.docx 1411 Woolsey Heights I Colorado Springs, Colorado 80915-5400 (719) 570-1599 I FAX (719) 570-7008 I www.hammersconstruction.com Steve Hammers, President [email protected] I SPECIALIZING IN DESIGN / BUILD I REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project Manager Development Review El Paso County Development Services 2880 International Circle, Suite 110 Colorado Springs, CO 80910 O: (719)-520-6313 F: (719)-520-6695 FROM: APPLICANT Hammers Construction, Inc. Lisa Peterson Designer 1411 Woolsey Heights Colorado Springs, CO 80915 O: (719)-570-1599 F: (719)-570-7008 Dear Kari Upon receipt and review of your comments provided to us on February 21, 2018, we offer the following response. We have incorporated comments received from the development services department into these minor revisions. Please review and call with any questions you might have.

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

S:\Design Projects\1053 - Big O Tires - Falcon\DP\Plat\2nd Submittal\1053-Rev Resp Letter -SP- Sub 3.docx

1411 Woolsey Heights I Colorado Springs, Colorado 80915-5400 (719) 570-1599 I FAX (719) 570-7008 I www.hammersconstruction.com

Steve Hammers, President [email protected]

I SPECIALIZING IN DESIGN / BUILD I

REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan

File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project Manager Development Review El Paso County Development Services

2880 International Circle, Suite 110 Colorado Springs, CO 80910 O: (719)-520-6313 F: (719)-520-6695

FROM: APPLICANT Hammers Construction, Inc. Lisa Peterson Designer 1411 Woolsey Heights Colorado Springs, CO 80915 O: (719)-570-1599 F: (719)-570-7008 Dear Kari

Upon receipt and review of your comments provided to us on February 21, 2018, we offer the following response. We have incorporated comments received from the development services department into these minor revisions. Please review and call with any questions you might have.

Page 2: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

EL PASO COUNTY PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT Planning Division This subdivision is being reviewed under the approval criteria identified in the El Paso County Land Development Code (2018) Sections 7.2.3.B. 2 and 7.2.1.D., and in the subdivision design standards of Chapter 8.

1. Please see red lines for the review comments. The red line documents have been uploaded into EDARP. Planning comments are in green, and engineering comments are in blue. Noted.

Engineering Department See red. Noted. ELPASO COUNTY ENVIRONMENTAL SERVICES The El Paso County Environmental Division has completed its review of the above noted submittal. Our review consisted of the following items: wetlands, federal and state listed threatened or endangered species, general wildlife resources and noxious weeds. We have reviewed the submittal and have no comments at this time. The applicant is hereby on notice that the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service have regulatory jurisdiction over wetland and threatened and endangered species issues, respectively. It is the applicant’s responsibility, and not El Paso County’s, to ensure compliance with all applicable county, state, and federal laws and regulations, including, but not limited to, the Clean Water Act, Endangered Species Act, Migratory Bird Treaty Act, Colorado Noxious Weed Act and El Paso County Weed Management Plan. We appreciate the opportunity to comment on this project. If you have any questions or concerns, please contact me at (719) 520-7879. No changes need to be made after reviewing the comments under this department. ELPASO COUNTY PARKS DEPARTMENT The Planning Division of the Community Services Department has reviewed the Largent Subdivision Final Plat commercial development application and has the following comments of behalf of El Paso County Parks. The El Paso County Parks Master Plan (2013) shows no parks, trails, or open space impacted by this project. The project site is located on the southeast corner of the intersection of East Highway 24 and Meridian Road, in the unincorporated town of Falcon. The existing Rock Island Regional Trail is located approximately 0.02 mile north of the property, on the northern side of East Highway 24. Furthermore, the proposed Meridian Road Bicycle Route is located immediately adjacent and west of the property. A dedicated public right-of-way already exists

Page 3: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

along the aforementioned bicycle route, so no easement requests are necessary at this location; however, the applicant is advised that multi-model transportation options may be developed within the right-of-way in the future.

The Board of County Commissioners has not elected to require park fees for commercial subdivisions, so none are recommended at this time.

These comments are being provided administratively, as this application does not require Park Advisory Board consideration. No changes need to be made after reviewing the comments under this department. FALCON FIRE PROTECTION DISTRICT Falcon Fire has no objections to this final plat request. Final Development plan and final water plans will be reviewed by Falcon Fire prior to construction. No changes need to be made after reviewing the comments under this department. MOUNTAIN VIEW ELECTRIC ASSOCIATION INC This area is within MVEA certificated service area. MVEA will continue to serve this area according to our extension policy. Information concerning connection requirements, fees and upgrades under MVEA line extension policy can be obtained by contacting the Engineering Department of MVEA. MVEA requests a twenty (20) foot utility easement along Highway 24 and North Meridian Road and a ten {10) foot side and rear lot line utility easement on the plat. MVEA also requests platting of existing MVEA facilities with easement on the plat. Additional easements may be required once a review of civil drawings with grading and erosion plan is provided to MVEA. MVEA has existing facilities within this parcel of land. If there is any removal or relocation of facilities it will be at the expense of the applicant. If additional information is required, please contact our office at {719) 495-2283. Easements are shown 911 AUTHORITY –EL PASO/TELLER COUNTY No new street names requested. No comment for 911 at this time. No changes need to be made after reviewing the comments under this department.

Page 4: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

COLORADO GEOLOGICAL SURVEY Colorado Geological Survey has reviewed the subject referral. For this review we received: Application (1.23.18), Letter of Intent (Hammers Construction, Undated), Plat (Ridgeline Land Surveying, 10.25.17), Final Drainage Report (JPS Engineering, 1.18.18), Erosion Control Plan and Map (JPS Engineering, 1.18.18), Subsurface Soil Investigation (Entech, 10.20.17), and various other documents. Geologic Hazards: The subsurface soils investigation submitted, while providing useful information for the project, is not a geology hazard report. There are several geologic hazards that CGS identifies within this site. However, our review is not a substitute for a lot-specific geologic hazard report with mapping of site geology and areas of identified geologic hazards. The hazards identified by CGS review include collapsible and/or loose soils, erosion, undocumented fill, and the potential for shallow groundwater and expansive clays. All of these identified geologic hazards can be mitigated with specific engineering as outlined in the soils and erosion reports. Per El Paso County Land Development Code 8.4.2 (B) “Lots or tracts subject to natural hazards which may be eliminated through specialized engineering shall be identified on the plat.” The plat should include the listing of these identified geologic hazards. The soils report includes engineering mitigation for loose soils, undocumented fill, and potential expansive clay and provides surface and subsurface drain recommendations for shallow groundwater. The erosion control plan and map includes design to control erosion. Shallow groundwater: Entech reports groundwater levels in their borings of 10 and 10.5 feet below the ground surface. One of the borings caved at 6 feet below ground surface between times of measurements. Caving is typical at groundwater level. The groundwater levels reported were measured in September, a typically dry time of year. This location is in an area generally known for shallow groundwater issues. Groundwater levels typically fluctuate throughout the year and are generally highest in the spring and summer months. Without specific groundwater monitoring throughout the year it cannot be determined what groundwater levels may be over the engineered life of the planned structures. However, groundwater should be expected to be shallower than 6 to 10 feet below existing ground level on a seasonal basis. Entech’s recommendations on perimeter drains must be strictly adhered to. Geotechnical observation: As stated on page 5 of Entech’s report, observation by the geotechnical engineer of overall foundation excavation and any overexcavated subgrade is critical to determine specific engineering requirements that may be necessary for the long-term performance of the foundation system. Provided the recommendations of this letter and those of the geotechnical engineer are followed, CGS has no objections to this plat request. See attached geological survey.

Page 5: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

PIKES PEAK REGIONAL BUILDING DEPARTMENT 1. Proposed Falcon Park & Ride is in the application process with the City of Colorado Springs for this area. From Hwy 24 and where Old Meridian Road & Meridian Road intersect crossing Hwy 24 will become Old Meridian Road going south in the location of this project for Largent Sub. I am not sure of the time line of this project. The address numbers can stay the same be the street name would have to change. Contact information for the City Planner is Hannah Van Nimwegen, Van Nimwegen, Hannah [email protected] or 385-5365. Noted. 2. Final plat stage: enumerations/floodplain will review the mylar prior to plat for address placement, road naming, title block, & floodplain statement. $10.00 per lot & tract fee will be due at the time of the review of the mylar. If an address in not needed on a tract then no fee applies. Check should be made out to pikes peak regional building department. Paid directly to enumerations department. A copy of the final recorded plat is required prior to plan submittal for residental. A copy of the final recorded plat is required prior to approval in enumerations department on any commerical plans submittal. Fees/copy will be provided before plot relocation. 3. Floodplain has no comment. Ok

If you have any further questions, please give me a call. Respectfully submitted, Lisa A. Peterson Designer/Applicant

Page 6: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Big O Tires Traffic Impact Study

(LSC #174890) January 9, 2018

Traffic Engineer’s Statement This traffic report and supporting information were prepared under my responsible charge and they comport with the standard of care. So far as is consistent with the standard of care, said report was prepared in general conformance with the criteria established by the County for traffic reports. __________________________________ __________________ Jeffrey C. Hodsdon, P.E., #31684 Date Developer’s Statement I, the Developer, have read and will comply with all commitments made on my behalf within this report. __________________________________ __________________ Date

LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210

Colorado Springs, CO 80903 (719) 633-2868

FAX (719) 633-5430 E-mail: [email protected]

Website: http://www.lsctrans.com

dsdlaforce
Text Box
Add "PCD File No. SF-18-003"
jchodsdon
Sticky Note
Completed set by jchodsdon
Page 7: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

January 9, 2018

Mr. Zack Crabtree Project Manager Hammers Construction 1411 Woosley Heights Colorado Springs, CO 80915 RE: Big O Tires (Falcon) El Paso County, Colorado Traffic Impact Study LSC #174890 Dear Mr. Crabtree,

LSC Transportation Consultants, Inc. has prepared this traffic impact study for the proposed Big O Tires shop to be located southeast of the intersection of US Highway 24 (US 24) and “Old” Meridian Road in El Paso County, Colorado. Site access would be to Old Meridian Road, with no direct site access to/from US 24. This report has been prepared for submittal to El Paso County, with anticipated review by the Colorado Department of Transportation (CDOT) following referral by the County. REPORT CONTENTS The preparation of this report included the following:

An inventory of existing road and traffic conditions near the intersection of US 24/Meridian Road adjacent to the site, including functional classification, traffic control, posted speed limits, intersection and access spacing, roadway and intersection alignments, auxiliary turn lanes and plans for roadway improvements and changes in the vicinity associated with the Meridian Road project.

Weekday morning and late afternoon peak-hour turning movement traffic counts at the intersection of US 24/Meridian Road.

CDOT annual average daily traffic volumes. Projections of long-term background traffic volumes on US 24 and adjacent to the proposed

site access on Meridian Road. Proposed site land use and access location.

LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210

Colorado Springs, CO 80903 (719) 633-2868

FAX (719) 633-5430 E-mail: [email protected]

Website: http://www.lsctrans.com

Page 8: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 2 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study

Estimates of average weekday and peak-hour trip generation for the proposed Big O store. Estimated directional distribution of site-generated vehicle-trips at US 24/Meridian Road and

south of the proposed site access on Meridian Road. Projected site-generated traffic volumes and resulting total traffic. Intersection level of service analysis. Auxiliary left-/right-turn lane needs analysis based on the projected volumes and criteria in

the Colorado State Highway Access Code. Findings and recommendations.

LAND USE AND ACCESS The site is located southeast of the intersection of US 24/ Old Meridian Road in the Falcon area of unincorporated El Paso County, Colorado. Full-movement access to Meridian Road is proposed approximately 100 feet south of US 24. A vicinity map is attached in Figure 1, while the site plan for the tire shop is attached in Figure 2. Currently, the intersection of US 24/Meridian Road is signalized. However, the signal will be removed and the minor street approaches will be converted to right-in-right-out (RI/RO) access in the short term. All site traffic and long-term analysis assumes this updated lane geometry. ROAD AND TRAFFIC CONDITIONS Area Roads and Streets Figure 1 shows the roads in the vicinity of the site. Major roads are identified below followed by a brief description of each: US Highway (US) 24 is a two-lane paved US Highway extending east/west across the state of Colorado. Locally, US 24 connects the City of Colorado Springs to Calhan and Limon to the east. In the future, US 24 in the Falcon area is planned to be widened to four lanes. The section of US 24 in the vicinity of the site is classified as an Expressway (EX) by the Colorado Department of Transportation (CDOT), and is shown as an Expressway on the El Paso County Major Transportation Corridors Plan (MTCP). Meridian Road is a two-lane or four-lane roadway extending north from Blaney Road to County Line Road. Meridian Road has a posted speed limits of 35 miles per hour (mph) south of US Highway 24. Meridian Road will be realigned to the west and the section adjacent to the site will be renamed. It has been commonly referred to as “Old” Meridian Road. The existing US 24/Meridian Road intersection will be converted to a right-in/right-out intersection in the future.

Page 9: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 3 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study Traffic Volumes Turning movement traffic counts were conducted on Thursday, December 14, 2017 from 6:30 to 8:30 a.m. and on Thursday, November 9, 2017 from 4:00 to 6:00 p.m. at the intersection of US 24/Meridian Road, as shown in Figure 3. Raw count volume data sheets are attached for reference. FUTURE TRAFFIC VOLUMES Estimated future traffic volumes, including projected background and site-generated volumes, are summarized by intersection in Figure 3 through Figure 7. 2040 Background (Long-Term) Traffic Figure 4 shows 2040 background/baseline through traffic volumes estimate on US 24, based on the CDOT 20-year growth factor. Future background volumes on Meridian Road at the projected site access are estimates by LSC based on the Meridian Road corridor study and projected future land uses adjacent to this site. These estimates could potentially be higher depending on the extent and trip generation intensity of other area future development in the vicinity of the site. TRIP GENERATION Estimates of the vehicle-trips projected to be generated by the proposed site have been made using the nationally published trip generation rates from Trip Generation, 10th Edition, 2017 by the Institute of Transportation Engineers (ITE). Land use code 848 – Tire Store was categorized using the Trip Generation Manual, 10th Edition, 2017 by the Institute of Transportation Engineers (ITE) and has been used to estimate the trip generation estimate for the site. A detailed trip generation estimate for the development, including ITE rates for the proposed land use is presented in Table 3 (attached).

Table 1: Estimated Site Vehicle-Trip Generation

Analysis Period Weekday

In Out Total A.M. Peak Hour 11 6 17 P.M. Peak Hour 11 15 26 Daily 24-Hour 93 93 185

Page 10: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 4 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study Driveway Trips During the morning peak hour, approximately 11 vehicles would enter and 6 vehicles would exit the site at the proposed access point. During the evening peak hour, approximately 11 vehicles would enter and 15 vehicles would exit the site. TRIP DISTRIBUTION AND ASSIGNMENT Trip Directional Distribution An estimate of the directional distribution of site-generated vehicle-trips to the study area roads and intersections is a necessary component in determining the site’s traffic impacts. Figure 5 shows the directional distribution estimate for the site-generated trips and the percentages of the site-generated vehicle-trips projected to be oriented to and from the site’s major approaches. Additionally, Figure 5 shows the estimated directional distribution. Estimated percentages have been based on the following factors: the site’s proposed land use, the planned area roadway system following the Meridian Road project, the anticipated service area of the store, and the existing and projected peak-hour traffic volumes. Site-Generated Traffic Site-generated traffic volumes at the proposed site accesses and the intersection of US 24/Meridian Road have been calculated by applying the directional distribution percentages estimated by LSC (from Figure 5) to the trip generation estimates (from Table 3). Figure 6 shows the projected site-generated traffic volumes for the weekday morning and evening peak hours. 2040 Total Traffic (20-Year) Figure 7 shows the sum of 2040 background traffic volumes (from Figure 4) plus the site-generated traffic volumes (from Figure 6). Projected site-generated traffic is not included in the 2040 background traffic volumes. Total 2040 traffic volumes are calculated as the sum of 2040 background traffic volumes plus the site-generated traffic volumes. These total volumes represent the projected long-term total traffic including the site-generated traffic. LEVEL OF SERVICE ANALYSIS Level of service (LOS) is a quantitative measure of the level of congestion or delay at an intersection and is indicated on a scale from “A” to “F.” LOS A is indicative of little congestion or delay. LOS F indicates a high level of congestion or delay. Table 2 shows the level of service delay ranges for signalized and unsignalized intersections.

Page 11: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 5 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study

Table 2: Intersection Levels of Service Delay Ranges

Level of Service Signalized Intersections Unsignalized Intersections

Average Control Delay (seconds/vehicle)

V/C(1) Average Control Delay

(seconds/vehicle)(2) A ≤ 10.0 < 0.60 ≤ 10.0 B 10.1 – 20.0 0.60 – 0.69 10.1 – 15.0 C 20.1 – 35.0 0.70 – 0.79 15.1 – 25.0 D 35.1 – 55.0 0.80 – 0.89 25.1 – 35.0 E 55.1 – 80.0 0.90 – 0.99 35.1 – 50.0 F ≥ 80.1 ≥ 1.00 ≥ 50.1

(1) Source: Transportation Research Circular 212 (2) For unsignalized intersections, if V/C is > 1.00, then LOS is LOS F regardless of the projected average control delay per vehicle.

The proposed site access intersection on Meridian Road and the US 24/Meridian Road intersection have been analyzed to determine the projected control delay and corresponding levels of service and for the key turning movements. As the site access intersection will be stop sign-controlled (TWSC), SimTraffic methodology was used to calculate control delay for TWSC intersections. As previously mentioned, the existing US 24/Meridian Road intersection will be converted from a full-movement, signalized intersection to a right-in/right-out (RI/RO) intersection in the future. Short-term simulations were based on the existing signal, while long-term analysis assumed RI/RO lane geometry. Morning Peak Hour A summary of current and projected 2040 background traffic conditions during the morning peak hour—both with and without considering site-generated traffic—are described below, by intersection. Detailed Synchro and SimTraffic reports containing additional LOS results are attached. US 24/Meridian Road Overall, this intersection currently operates at LOS D during the short-term morning peak hour upon site buildout. Both the northbound and southbound shared left-through turning movements currently operate at LOS E or worse, while all other individual turning movements operate LOS D or better.

Page 12: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 6 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study During the long-term morning peak hour, the intersection of US 24/Meridian Road will be converted to a RI/RO intersection. Both right-out, stop-controlled approaches on Meridian Road are projected to operate at LOS A during all long-term traffic scenarios. Meridian Road/Site Access All approaches at the site access are projected to operate at LOS B or better for all short-term and long-term morning peak-hour traffic conditions upon site buildout. Evening Peak Hour A summary of current and projected 2040 background traffic conditions during the evening peak hour—both with and without considering site-generated traffic—are described below, by intersection. Detailed Synchro reports containing additional LOS results are attached. US 24/Meridian Road Overall, this intersection currently operates at LOS F during the short-term evening peak hour upon site buildout. Both the northbound and southbound shared left-through turning movements and the eastbound and westbound through turning movements currently operate at LOS F, while all other individual turning movements operate LOS D or better. During the long-term evening peak hour, the intersection of US 24/Meridian Road will be converted to a RI/RO intersection. Both right-out, stop-controlled approaches on Meridian Road are projected to operate at LOS A during all long-term traffic scenarios. Meridian Road/Site Access All approaches at the site access are projected to operate at LOS B or better for all short-term and long-term evening peak-hour traffic conditions upon site buildout. VEHICLE QUEUING ANALYSIS A queuing analysis was performed for the westbound approach between the proposed site access and intersection of US 24/Meridian Road for the northwest-bound right-turn lane (long-term). Analyses have been run utilizing the projected existing plus site-generated and 2040 background plus site-generated traffic volumes. Detailed queuing reports are attached. The distance along Meridian Road separating the proposed site access and US 24 is approximately 100 feet. Available stacking distance between these two intersections is projected to be sufficient during the long-term morning peak-hour background-plus-site scenario. Westbound right-turn exiting vehicles from the site are projected to be briefly blocked due to upstream queue approximately 1 percent of the time during the long-term evening peak hour.

dsdlaforce
Callout
Clarify this sentence. Westbound does not have a turn movement at the RI/RO intersection.
dsdlaforce
Callout
Describe what's happening for the southbound left going into the side during the long-term evening peak hr.
jchodsdon
Sticky Note
Completed set by jchodsdon
jchodsdon
Sticky Note
Completed set by jchodsdon
Page 13: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 7 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study FINDINGS AND CONCLUSIONS Trip Generation

The site is projected to generate about 185 vehicle-trips on the average weekday. Approximately 11 vehicles would enter the site during the weekday morning peak hour, while

6 vehicles are projected to exit. During the weekday evening peak hour of adjacent street traffic, 11 vehicles would enter the site while 15 vehicles would exit.

Level of Service

Please refer to the Level of Service section above and to the attached Synchro and SimTraffic

reports for detailed LOS summaries at all signalized intersections adjacent to the site.

All approaches at the proposed site access intersection with Meridian Road are projected to operate at LOS B or better during all short- and long-term scenarios during both the weekday morning and evening peak hour following the addition of this development.

The intersection of US 24/Meridian Road, currently signalized, operates at LOS D during the morning peak hour and LOS F during the evening peak hour. During the long-term evening peak hour, after the intersection of US 24/Meridian Road is converted to a RI/RO intersection, both minor street right-turn-only approaches are projected to operate at LOS A.

Vehicular Queuing

Please refer to the Vehicular Queuing Analysis section above and to the attached SimTraffic

reports for detailed queuing summaries at the intersection of US 24/Meridian Road and at the proposed site access on Meridian Road.

Auxiliary Lanes

Left-turning movements into the site from US 24 (southwest-bound) or exiting the site (northwest-bound) will not be permitted on Meridian Road as the intersection of US 24/Meridian Road will be converted to a RI/RO intersection.

US Highway 24 is categorized as E-X: Expressway. According to the criteria contained in

Section 3.7 (4(b)) in the Colorado State Highway Access Code, “a right-turn lane with deceleration and taper lengths” shall be provided (when allowed) for accesses on Expressways with a projected peak-hour ingress right-turning volume of greater than 10 vehicles per hour (vph). As shown in Figure 4, the projected eastbound right-turn ingress

dsdlaforce
Callout
Identify the time line for construction of the site and the construction to convert the intersection into a RI/RO movement. Discuss what steps can be taken to mitigate the LOS F in the interim. Contact/coordinate with John Andrews at EPC DPW (719-520-6842) for information regarding the Meridian Road Improvements.
jchodsdon
Sticky Note
Completed set by jchodsdon
jchodsdon
Callout
As the Meridian project will be underway when this development is completed, the interim scenario wouldn't apply.
Page 14: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Mr. Zack Crabtree Page 8 January 9, 2018 Big O Tires (Falcon) Traffic Impact Study

volume at the intersection of US 24/Meridian Road is 120 vehicles per hour during both the morning and evening peak hour, before accounting for additional site-generated traffic. The State Highway Access Code threshold is currently exceeded and is anticipated to continue to be exceeded in the future by background traffic alone. A right-turn deceleration lane currently exists on US Highway 24. It extends back to the gas station access and the taper is upstream of the gas station access. According to the criteria contained in Section 3.7 (4(c)) in the Colorado State Highway Access Code, “a right-turn lane with acceleration and taper lengths” shall be provided (when allowed) for accesses on Expressways with a projected peak-hour ingress right-turning volume of greater than 10 vehicles per hour (vph). As shown in Figure 4, the projected eastbound right-turn ingress volumes at the intersection of US 24/Meridian Road are 125 and 163 vehicles per hour during the morning and evening peak hour, respectively, before accounting for additional site-generated traffic. The State Highway Access Code threshold will be exceeded by background traffic alone. A right-turn acceleration lane currently exists on US Highway 24. This lane is currently about 400 feet plus a long taper. These lengths do not meet Colorado State Highway access code criteria. This is an existing deficiency and the site traffic is projected to increase the current right turning traffic by only 6.2 percent.

* * * * *

Please contact me if you have any questions regarding this report. Sincerely, LSC TRANSPORTATION CONSULTANTS, INC. By Jeffrey C. Hodsdon, P.E., PTOE Principal JCH:JAB:bjwb Enclosures: Table 3 Figure 1 – Figure 7 Traffic Count Reports Level of Service Reports

dsdlaforce
Callout
Does the planned reconfiguration of the intersection address the deficiency? Contact John Andrews for a copy of the current design.
dsdlaforce
Text Box
1. State whether the access meets sight distance. 2. State what the current applicable Traffic Impact Fees are and what option the developer will be selecting for payment. 3. List all deviations that the applicant will be making. Per comments on the Grading and Erosion Control, the proposed driveway width is greater than the ECM criteria. The applicant shall revise or submit a deviation request.
jchodsdon
Sticky Note
Completed set by jchodsdon
dsdlaforce
Callout
Does the planned reconfiguration of the intersection address the deficiency? Contact John Andrews for a copy of the current design.
dsdlaforce
Callout
Does the planned reconfiguration of the intersection address the deficiency? Contact John Andrews for a copy of the current design.
jchodsdon
Polygon
jchodsdon
Callout
This paragraph has been updated in the revised TIS.
Page 15: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Table 3: Detailed Trip Generation Estimate ITE Trip Generation Rates (1) Driveway Trips Generated

Code Description Value Units(2) Avg Weekday Traffic

A.M. P.M. Avg Weekday Traffic

A.M. P.M. In Out In Out In Out In Out

848 Tire Store 6.474 KSF 28.52 1.74 0.98 1.71 2.27 185 11 6 11 15

(1) Source: Trip Generation, 10th Edition, 2017 by the Institute of Transportation Engineers (ITE) (2) KSF = 1,000 square feet

Page 16: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Counts by LSC

File Name : Hwy 24 - Meridian Rd AMSite Code : 00174890Start Date : 12/14/2017Page No : 1

LSC Transportation Consultants, Inc.

Groups Printed- UnshiftedHwy 24

From NorthMeridian RdFrom East

Hwy 24From South

Meridian RdFrom West

Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left PedsInt.

TotalFactor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

06:30 AM 2 175 19 0 40 21 2 0 1 58 15 0 142 16 0 0 49106:45 AM 6 119 34 0 34 19 1 0 4 50 28 0 171 29 1 0 496

Total 8 294 53 0 74 40 3 0 5 108 43 0 313 45 1 0 987

07:00 AM 13 96 39 0 43 30 8 0 2 41 30 0 217 29 1 0 54907:15 AM 15 105 51 0 59 36 3 0 1 50 39 0 209 40 2 0 61007:30 AM 4 117 37 0 45 42 5 0 7 66 24 0 175 45 0 0 56707:45 AM 2 127 40 0 39 43 5 0 8 77 31 0 107 38 0 0 517

Total 34 445 167 0 186 151 21 0 18 234 124 0 708 152 3 0 2243

08:00 AM 4 102 26 0 33 34 2 0 2 52 39 0 84 47 3 0 42808:15 AM 1 111 22 0 57 39 3 0 3 61 31 0 86 44 0 0 458

Grand Total 47 952 268 0 350 264 29 0 28 455 237 0 1191 288 7 0 4116Apprch % 3.7 75.1 21.2 0.0 54.4 41.1 4.5 0.0 3.9 63.2 32.9 0.0 80.1 19.4 0.5 0.0

Total % 1.1 23.1 6.5 0.0 8.5 6.4 0.7 0.0 0.7 11.1 5.8 0.0 28.9 7.0 0.2 0.0

Page 17: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Counts by LSC

File Name : Hwy 24 - Meridian Rd AMSite Code : 00174890Start Date : 12/14/2017Page No : 2

Hwy 24From North

Meridian RdFrom East

Hwy 24From South

Meridian RdFrom West

StartTime

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Int.Total

Peak Hour From 06:30 AM to 08:15 AM - Peak 1 of 1Intersecti

on07:00 AM

Volume 34445

167

0 646186

151

21 0 358 18234

124

0 376708

152

3 0 863 2243

Percent 5.368.

925.

90.0

52.0

42.2

5.9 0.0 4.862.

233.

00.0

82.0

17.6

0.3 0.0

07:15Volume

15105

51 0 171 59 36 3 0 98 1 50 39 0 90209

40 2 0 251 610

PeakFactor

0.919

High Int. 07:15 AM 07:15 AM 07:45 AM 07:15 AM

Volume 15105

51 0 171 59 36 3 0 98 8 77 31 0 116209

40 2 0 251

PeakFactor

0.944

0.913

0.810

0.860

Hwy 24

Mer

idia

n R

d M

eridian Rd

Hwy 24

Right34

Thru445

Left167

Peds0

InOut Total423 646 1069

Right186

Thru151

Left 21 P

eds 0

Out

Total

In337

358 695

Left124

Thru234

Right18

Peds0

Out TotalIn1174 376 1550

Left3

Thru152

Rig

ht70

8 P

eds0

Tot

alO

utIn

309

863

1172

12/14/2017 7:00:00 AM12/14/2017 7:45:00 AM Unshifted

North

Page 18: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Counts by LSC

File Name : Hwy 24 - Meridian Rd PMSite Code : 00174890Start Date : 12/14/2017Page No : 1

LSC Transportation Consultants, Inc.

Groups Printed- UnshiftedHwy 24

From NorthMeridian RdFrom East

Hwy 24From South

Meridian RdFrom West

Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left PedsInt.

TotalFactor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

04:00 PM 3 55 14 0 34 46 1 0 1 147 105 0 49 46 5 0 50604:15 PM 3 59 15 0 35 47 2 0 1 144 109 0 50 48 7 0 52004:30 PM 4 69 20 0 47 36 1 0 3 156 121 0 48 56 4 0 56504:45 PM 1 58 21 0 53 42 0 0 2 147 104 0 48 49 6 0 531

Total 11 241 70 0 169 171 4 0 7 594 439 0 195 199 22 0 2122

05:00 PM 4 67 14 0 40 52 2 0 2 154 122 0 70 52 10 0 58905:15 PM 1 74 15 0 52 35 1 0 1 157 126 0 36 58 2 0 55805:30 PM 2 81 21 0 30 31 3 0 0 165 98 0 46 54 6 0 53705:45 PM 2 79 19 0 29 33 2 0 1 159 96 0 44 53 4 0 521

Total 9 301 69 0 151 151 8 0 4 635 442 0 196 217 22 0 2205

Grand Total 20 542 139 0 320 322 12 0 11 1229 881 0 391 416 44 0 4327Apprch % 2.9 77.3 19.8 0.0 48.9 49.2 1.8 0.0 0.5 57.9 41.5 0.0 45.9 48.9 5.2 0.0

Total % 0.5 12.5 3.2 0.0 7.4 7.4 0.3 0.0 0.3 28.4 20.4 0.0 9.0 9.6 1.0 0.0

Page 19: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Counts by LSC

File Name : Hwy 24 - Meridian Rd PMSite Code : 00174890Start Date : 12/14/2017Page No : 2

Hwy 24From North

Meridian RdFrom East

Hwy 24From South

Meridian RdFrom West

StartTime

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Right

Thru

Left

Peds

App.Total

Int.Total

Peak Hour From 04:00 PM to 05:45 PM - Peak 1 of 1Intersecti

on04:30 PM

Volume 10268

70 0 348192

165

4 0 361 8614

473

0 1095202

215

22 0 439 2243

Percent 2.977.

020.

10.0

53.2

45.7

1.1 0.0 0.756.

143.

20.0

46.0

49.0

5.0 0.0

05:00Volume

4 67 14 0 85 40 52 2 0 94 2154

122

0 278 70 52 10 0 132 589

PeakFactor

0.952

High Int. 04:30 PM 04:45 PM 05:15 PM 05:00 PM

Volume 4 69 20 0 93 53 42 0 0 95 1157

126

0 284 70 52 10 0 132

PeakFactor

0.935

0.950

0.964

0.831

Hwy 24

Mer

idia

n R

d M

eridian Rd

Hwy 24

Right10

Thru268

Left70

Peds0

InOut Total828 348 1176

Right192

Thru165

Left 4 P

eds 0

Out

Total

In293

361 654

Left473

Thru614

Right8

Peds0

Out TotalIn474 1095 1569

Left22

Th

ru215

Rig

ht20

2 P

eds0

Tot

alO

utIn

648

439

1087

12/14/2017 4:30:00 PM12/14/2017 5:15:00 PM Unshifted

North

Page 20: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 21: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
dsdlaforce
Callout
The maneuver is encroaching into the opposing traffic with no room to maneuver back into the correct lane. Identify the design vehicle used and describe the findings and recommendations in the narrative section of the report.
dsdlaforce
Callout
Identify the minimum driveway width and radius required so the design vehicle does not track onto the curbs. The site plan shall incorporate these recommendations.
dsdlaforce
Text Box
Provide a second AutoTurn exhibit based on the RI/RO configuration. Based on Figure 2, the vehicle would not be able to make the right turn onto US 24.
jchodsdon
Sticky Note
Rejected set by jchodsdon
jchodsdon
Sticky Note
Completed set by jchodsdon
jchodsdon
Sticky Note
Completed set by jchodsdon
jchodsdon
Sticky Note
Completed set by jchodsdon
Page 22: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 23: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 24: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 25: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 26: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
Page 27: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Lanes, Volumes, Timings 2017 Existing3: US 24 & Old Meridian Rd AM

3: US 24 & Old Meridian Rd Synchro 10 Report2017 Existing AM JAB

Lane Group NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWRLane ConfigurationsTraffic Volume (vph) 124 234 130 167 445 34 21 151 186 3 152 708Future Volume (vph) 124 234 130 167 445 34 21 151 186 3 152 708Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 75 0 75 550 450 600 500Storage Lanes 0 1 0 1 1 1 1 1Taper Length (ft) 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.850 0.850Flt Protected 0.983 0.987 0.950 0.950Satd. Flow (prot) 0 1831 1583 0 1839 1583 1770 1863 1583 1770 1863 1583Flt Permitted 0.983 0.987 0.575 0.623Satd. Flow (perm) 0 1831 1583 0 1839 1583 1071 1863 1583 1160 1863 1583Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 169 169 216 721Link Speed (mph) 40 40 55 55Link Distance (ft) 570 969 913 1102Travel Time (s) 9.7 16.5 11.3 13.7Peak Hour Factor 0.81 0.81 0.81 0.94 0.94 0.94 0.86 0.86 0.86 0.91 0.91 0.91Adj. Flow (vph) 153 289 160 178 473 36 24 176 216 3 167 778Shared Lane Traffic (%)Lane Group Flow (vph) 0 442 160 0 651 36 24 176 216 3 167 778Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Turning Speed (mph) 15 9 15 9 15 9 15 9Number of Detectors 1 2 1 1 2 1 1 2 1 1 2 1Detector Template Left Thru Right Left Thru Right Left Thru Right Left Thru RightLeading Detector (ft) 20 100 20 20 100 20 20 100 20 20 100 20Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 0Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 0Detector 1 Size(ft) 20 6 20 20 6 20 20 6 20 20 6 20Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(ft) 94 94 94 94Detector 2 Size(ft) 6 6 6 6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Split NA Perm Split NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 2 2 6 6 7 4 3 8Permitted Phases 2 6 4 4 8 8

Page 28: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Lanes, Volumes, Timings 2017 Existing3: US 24 & Old Meridian Rd AM

3: US 24 & Old Meridian Rd Synchro 10 Report2017 Existing AM JAB

Lane Group NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWRDetector Phase 2 2 2 6 6 6 7 4 4 3 8 8Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 23.5 23.5 23.5 23.5 23.5 23.5 11.0 25.0 25.0 11.0 25.0 25.0Total Split (s) 29.0 29.0 29.0 35.0 35.0 35.0 11.0 25.0 25.0 11.0 25.0 25.0Total Split (%) 29.0% 29.0% 29.0% 35.0% 35.0% 35.0% 11.0% 25.0% 25.0% 11.0% 25.0% 25.0%Maximum Green (s) 23.5 23.5 23.5 29.5 29.5 29.5 5.0 18.0 18.0 5.0 18.0 18.0Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 5.0 5.0 5.0 5.0 5.0 5.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 1.0 2.0 2.0 1.0 2.0 2.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 7.0 7.0 6.0 7.0 7.0Lead/Lag Lead Lag Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Max Max Max Max Max Max None None None None None NoneWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 23.7 23.7 29.7 29.7 18.9 17.0 17.0 17.8 15.0 15.0Actuated g/C Ratio 0.26 0.26 0.33 0.33 0.21 0.19 0.19 0.20 0.17 0.17v/c Ratio 0.92 0.30 1.08 0.06 0.09 0.50 0.46 0.01 0.54 0.90Control Delay 61.7 6.1 91.8 0.2 26.8 38.6 8.2 25.3 42.4 19.8Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 61.7 6.1 91.8 0.2 26.8 38.6 8.2 25.3 42.4 19.8LOS E A F A C D A C D BApproach Delay 46.9 87.0 22.2 23.8Approach LOS D F C C

Intersection SummaryArea Type: OtherCycle Length: 100Actuated Cycle Length: 90.5Natural Cycle: 115Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.08Intersection Signal Delay: 45.1 Intersection LOS: DIntersection Capacity Utilization 84.0% ICU Level of Service EAnalysis Period (min) 15

Splits and Phases: 3: US 24 & Old Meridian Rd

Page 29: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Lanes, Volumes, Timings 2017 Existing3: US 24 & Old Meridian Rd AM

3: US 24 & Old Meridian Rd Synchro 10 Report2017 Existing AM JAB

Lane Group NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWRLane ConfigurationsTraffic Volume (vph) 473 614 130 70 268 10 4 165 192 22 215 202Future Volume (vph) 473 614 130 70 268 10 4 165 192 22 215 202Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Storage Length (ft) 0 75 0 75 550 450 600 500Storage Lanes 0 1 0 1 1 1 1 1Taper Length (ft) 25 25 25 25Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 0.850 0.850 0.850 0.850Flt Protected 0.979 0.990 0.950 0.950Satd. Flow (prot) 0 1824 1583 0 1844 1583 1770 1863 1583 1770 1863 1583Flt Permitted 0.979 0.990 0.466 0.514Satd. Flow (perm) 0 1824 1583 0 1844 1583 868 1863 1583 957 1863 1583Right Turn on Red Yes Yes Yes YesSatd. Flow (RTOR) 169 169 223 222Link Speed (mph) 40 40 55 55Link Distance (ft) 570 969 913 1102Travel Time (s) 9.7 16.5 11.3 13.7Peak Hour Factor 0.81 0.81 0.81 0.94 0.94 0.94 0.86 0.86 0.86 0.91 0.91 0.91Adj. Flow (vph) 584 758 160 74 285 11 5 192 223 24 236 222Shared Lane Traffic (%)Lane Group Flow (vph) 0 1342 160 0 359 11 5 192 223 24 236 222Enter Blocked Intersection No No No No No No No No No No No NoLane Alignment Left Left Right Left Left Right Left Left Right Left Left RightMedian Width(ft) 0 0 12 12Link Offset(ft) 0 0 0 0Crosswalk Width(ft) 16 16 16 16Two way Left Turn LaneHeadway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Turning Speed (mph) 15 9 15 9 15 9 15 9Number of Detectors 1 2 1 1 2 1 1 2 1 1 2 1Detector Template Left Thru Right Left Thru Right Left Thru Right Left Thru RightLeading Detector (ft) 20 100 20 20 100 20 20 100 20 20 100 20Trailing Detector (ft) 0 0 0 0 0 0 0 0 0 0 0 0Detector 1 Position(ft) 0 0 0 0 0 0 0 0 0 0 0 0Detector 1 Size(ft) 20 6 20 20 6 20 20 6 20 20 6 20Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 1 ChannelDetector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Detector 2 Position(ft) 94 94 94 94Detector 2 Size(ft) 6 6 6 6Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+ExDetector 2 ChannelDetector 2 Extend (s) 0.0 0.0 0.0 0.0Turn Type Split NA Perm Split NA Perm pm+pt NA Perm pm+pt NA PermProtected Phases 2 2 6 6 7 4 3 8Permitted Phases 2 6 4 4 8 8

Page 30: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Lanes, Volumes, Timings 2017 Existing3: US 24 & Old Meridian Rd AM

3: US 24 & Old Meridian Rd Synchro 10 Report2017 Existing AM JAB

Lane Group NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWRDetector Phase 2 2 2 6 6 6 7 4 4 3 8 8Switch PhaseMinimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0Minimum Split (s) 23.5 23.5 23.5 23.5 23.5 23.5 11.0 25.0 25.0 11.0 25.0 25.0Total Split (s) 40.5 40.5 40.5 23.5 23.5 23.5 11.0 25.0 25.0 11.0 25.0 25.0Total Split (%) 40.5% 40.5% 40.5% 23.5% 23.5% 23.5% 11.0% 25.0% 25.0% 11.0% 25.0% 25.0%Maximum Green (s) 35.0 35.0 35.0 18.0 18.0 18.0 5.0 18.0 18.0 5.0 18.0 18.0Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 5.0 5.0 5.0 5.0 5.0 5.0All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 1.0 2.0 2.0 1.0 2.0 2.0Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Lost Time (s) 5.5 5.5 5.5 5.5 6.0 7.0 7.0 6.0 7.0 7.0Lead/Lag Lead Lag Lag Lead Lag LagLead-Lag Optimize? Yes Yes Yes Yes Yes YesVehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0Recall Mode Max Max Max Max Max Max None None None None None NoneWalk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0Flash Dont Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 0 0Act Effct Green (s) 35.3 35.3 18.1 18.1 18.1 15.3 15.3 19.2 17.3 17.3Actuated g/C Ratio 0.39 0.39 0.20 0.20 0.20 0.17 0.17 0.21 0.19 0.19v/c Ratio 1.90 0.22 0.98 0.02 0.02 0.61 0.49 0.10 0.67 0.46Control Delay 430.8 4.1 80.7 0.1 25.5 45.0 9.2 26.9 44.5 8.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 430.8 4.1 80.7 0.1 25.5 45.0 9.2 26.9 44.5 8.2LOS F A F A C D A C D AApproach Delay 385.4 78.3 25.7 26.9Approach LOS F E C C

Intersection SummaryArea Type: OtherCycle Length: 100Actuated Cycle Length: 90.8Natural Cycle: 145Control Type: Actuated-UncoordinatedMaximum v/c Ratio: 1.90Intersection Signal Delay: 227.7 Intersection LOS: FIntersection Capacity Utilization 109.7% ICU Level of Service HAnalysis Period (min) 15

Splits and Phases: 3: US 24 & Old Meridian Rd

Page 31: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 BackgroundAM

SimTraffic Performance Report SimTraffic Report2040 Background AM JAB

1: Old Meridian Rd & Site Access Performance by movement Interval #1 7:00

Movement EBL EBR NBL NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 0.1 0.0 0.0 0.3Total Del/Veh (s) 5.5 2.3 3.8 1.0 0.1 0.0 1.4

1: Old Meridian Rd & Site Access Performance by movement Interval #2 7:15

Movement EBL EBR NBL NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 0.2 0.0 0.0 0.3Total Del/Veh (s) 7.0 2.9 0.6 1.6 0.0 0.1 1.4

1: Old Meridian Rd & Site Access Performance by movement Interval #3 7:30

Movement EBL EBR NBL NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.9 0.2 0.0 0.0 0.2Total Del/Veh (s) 3.8 2.4 0.6 1.4 0.1 0.2 1.0

1: Old Meridian Rd & Site Access Performance by movement Interval #4 7:45

Movement EBL EBR NBL NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 0.1 0.0 0.0 0.3Total Del/Veh (s) 4.1 2.7 0.6 1.1 0.1 0.0 0.9

1: Old Meridian Rd & Site Access Performance by movement Entire Run

Movement EBL EBR NBL NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 3.6 0.1 0.0 0.0 0.3Total Del/Veh (s) 5.3 2.5 1.1 1.3 0.1 0.1 1.1

34: US 24 & Old Meridian Rd Performance by movement Interval #1 7:00

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.1 0.2 0.0 0.1Total Del/Veh (s) 1.1 2.4 1.5 2.8 2.5

34: US 24 & Old Meridian Rd Performance by movement Interval #2 7:15

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.2 0.1 0.0 0.1Total Del/Veh (s) 1.1 2.0 0.7 1.7 1.8

34: US 24 & Old Meridian Rd Performance by movement Interval #3 7:30

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 1.0 2.8 1.2 3.4 3.0

Page 32: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 BackgroundAM

SimTraffic Performance Report SimTraffic Report2040 Background AM JAB

34: US 24 & Old Meridian Rd Performance by movement Interval #4 7:45

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 1.1 2.4 1.3 3.6 2.9

34: US 24 & Old Meridian Rd Performance by movement Entire Run

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 1.1 2.4 1.2 2.9 2.6

Total Zone Performance By Interval

Interval Start 7:00 7:15 7:30 7:45 AllDenied Del/Veh (s) 0.3 0.2 0.2 0.2 0.2Total Del/Veh (s) 9.1 6.1 8.8 8.5 8.6

Page 33: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundAM

Queuing and Blocking Report SimTraffic Report2040 Background AM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #1

Movement EB EB NBDirections Served LT R LMaximum Queue (ft) 50 29 23Average Queue (ft) 26 8 395th Queue (ft) 49 30 16Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #2

Movement EB EBDirections Served LT RMaximum Queue (ft) 27 29Average Queue (ft) 15 495th Queue (ft) 34 21Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #3

Movement EB EBDirections Served LT RMaximum Queue (ft) 28 30Average Queue (ft) 8 895th Queue (ft) 28 31Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Page 34: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundAM

Queuing and Blocking Report SimTraffic Report2040 Background AM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #4

Movement EB EBDirections Served LT RMaximum Queue (ft) 27 30Average Queue (ft) 15 895th Queue (ft) 37 30Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, All Intervals

Movement EB EB NBDirections Served LT R LMaximum Queue (ft) 50 30 23Average Queue (ft) 16 7 195th Queue (ft) 40 28 8Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #1

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 32 32 19 51 65 71Average Queue (ft) 12 15 5 10 27 3195th Queue (ft) 25 33 17 40 70 81Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 35: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundAM

Queuing and Blocking Report SimTraffic Report2040 Background AM JAB

Intersection: 34: US 24 & Old Meridian Rd, Interval #2

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 33 42 22 28 29Average Queue (ft) 8 9 11 6 7 495th Queue (ft) 10 27 41 22 27 21Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #3

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 53 46 26 106 110Average Queue (ft) 8 19 14 13 52 4695th Queue (ft) 10 51 40 31 121 103Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #4

Movement NW NE NE SW SWDirections Served R T R T TMaximum Queue (ft) 24 33 27 71 94Average Queue (ft) 11 12 10 41 4395th Queue (ft) 20 28 28 80 97Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 36: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundAM

Queuing and Blocking Report SimTraffic Report2040 Background AM JAB

Intersection: 34: US 24 & Old Meridian Rd, All Intervals

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 32 53 46 51 106 110Average Queue (ft) 9 14 8 10 32 3195th Queue (ft) 18 36 30 31 85 86Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Zone SummaryZone wide Queuing Penalty, Interval #1: 1Zone wide Queuing Penalty, Interval #2: 0Zone wide Queuing Penalty, Interval #3: 0Zone wide Queuing Penalty, Interval #4: 0Zone wide Queuing Penalty, All Intervals: 0

Page 37: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 BackgroundPM

SimTraffic Performance Report SimTraffic Report2040 Background PM JAB

1: Old Meridian Rd & Site Access Performance by movement Interval #1 4:30

Movement EBL EBR NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.3 0.0 0.0 0.2Total Del/Veh (s) 9.9 2.9 2.9 0.2 0.1 2.7

1: Old Meridian Rd & Site Access Performance by movement Interval #2 4:45

Movement EBL EBR NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 0.0 0.0 0.2Total Del/Veh (s) 4.3 2.6 2.2 0.1 0.1 1.5

1: Old Meridian Rd & Site Access Performance by movement Interval #3 5:00

Movement EBL EBR NBT SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 0.1 0.0 0.1Total Del/Veh (s) 8.2 2.7 1.7 0.1 0.2 1.5

1: Old Meridian Rd & Site Access Performance by movement Interval #4 5:15

Movement EBL EBR NBT SBT SBR AllDenied Del/Veh (s) 0.4 0.6 0.1 0.0 0.0 0.1Total Del/Veh (s) 13.2 2.9 2.7 0.1 0.1 3.4

1: Old Meridian Rd & Site Access Performance by movement Entire Run

Movement EBL EBR NBT SBT SBR AllDenied Del/Veh (s) 0.2 3.5 0.2 0.0 0.0 0.2Total Del/Veh (s) 9.2 2.7 2.4 0.1 0.1 2.3

34: US 24 & Old Meridian Rd Performance by movement Interval #1 4:30

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.1 0.0 0.1Total Del/Veh (s) 1.7 1.4 3.2 0.9 2.8 2.8

34: US 24 & Old Meridian Rd Performance by movement Interval #2 4:45

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 1.4 3.3 1.1 2.0 2.6

34: US 24 & Old Meridian Rd Performance by movement Interval #3 5:00

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 0.0 1.2 3.5 0.8 3.0 3.1

Page 38: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 BackgroundPM

SimTraffic Performance Report SimTraffic Report2040 Background PM JAB

34: US 24 & Old Meridian Rd Performance by movement Interval #4 5:15

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 0.4 1.4 3.3 1.2 2.4 2.7

34: US 24 & Old Meridian Rd Performance by movement Entire Run

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 1.1 1.4 3.4 1.0 2.6 2.9

Total Zone Performance By Interval

Interval Start 4:30 4:45 5:00 5:15 AllDenied Del/Veh (s) 0.3 0.3 0.3 0.2 0.3Total Del/Veh (s) 8.6 7.8 8.7 9.1 9.0

Page 39: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundPM

Queuing and Blocking Report SimTraffic Report2040 Background PM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #1

Movement EB EB NBDirections Served LT R TRMaximum Queue (ft) 75 30 25Average Queue (ft) 35 4 1095th Queue (ft) 74 22 30Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%) 0Queuing Penalty (veh) 0

Intersection: 1: Old Meridian Rd & Site Access, Interval #2

Movement EB EB NBDirections Served LT R TRMaximum Queue (ft) 48 30 24Average Queue (ft) 29 8 395th Queue (ft) 42 30 18Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #3

Movement EB EB NBDirections Served LT R TRMaximum Queue (ft) 27 30 24Average Queue (ft) 15 4 395th Queue (ft) 37 22 18Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Page 40: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundPM

Queuing and Blocking Report SimTraffic Report2040 Background PM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #4

Movement EB EB NBDirections Served LT R TRMaximum Queue (ft) 51 30 24Average Queue (ft) 26 4 1095th Queue (ft) 49 22 30Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, All Intervals

Movement EB EB NBDirections Served LT R TRMaximum Queue (ft) 75 30 25Average Queue (ft) 26 5 795th Queue (ft) 55 24 25Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%) 0Queuing Penalty (veh) 0

Intersection: 34: US 24 & Old Meridian Rd, Interval #1

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 46 80 40 49 71 77Average Queue (ft) 14 17 8 11 21 2995th Queue (ft) 35 60 32 41 66 85Link Distance (ft) 27 622 622Upstream Blk Time (%) 1Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 41: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundPM

Queuing and Blocking Report SimTraffic Report2040 Background PM JAB

Intersection: 34: US 24 & Old Meridian Rd, Interval #2

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 34 63 21 50 29Average Queue (ft) 8 11 8 6 18 795th Queue (ft) 10 35 32 22 52 27Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #3

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 66 39 23 94 54Average Queue (ft) 8 19 5 9 30 2295th Queue (ft) 9 48 20 27 91 58Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #4

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 27 57 43 27 96 95Average Queue (ft) 11 20 15 10 21 2695th Queue (ft) 22 52 46 29 75 78Link Distance (ft) 27 622 622Upstream Blk Time (%) 1Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 42: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 BackgroundPM

Queuing and Blocking Report SimTraffic Report2040 Background PM JAB

Intersection: 34: US 24 & Old Meridian Rd, All Intervals

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 46 80 63 49 96 95Average Queue (ft) 10 17 9 9 23 2195th Queue (ft) 23 50 34 31 73 66Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Zone SummaryZone wide Queuing Penalty, Interval #1: 1Zone wide Queuing Penalty, Interval #2: 1Zone wide Queuing Penalty, Interval #3: 1Zone wide Queuing Penalty, Interval #4: 1Zone wide Queuing Penalty, All Intervals: 1

Page 43: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 Background + SiteAM

SimTraffic Performance Report SimTraffic Report2040 Background + Site AM JAB

1: Old Meridian Rd & Site Access Performance by movement Interval #1 7:00

Movement EBL EBR WBL WBR NBL NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 4.2 4.2 0.2 0.0 0.0 0.0 0.4Total Del/Veh (s) 8.7 2.6 3.8 19.8 1.2 1.4 0.6 0.1 0.0 1.9

1: Old Meridian Rd & Site Access Performance by movement Interval #2 7:15

Movement EBL EBR WBR NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 0.1 0.0 0.0 0.0 0.3Total Del/Veh (s) 7.5 2.6 8.5 0.5 0.0 0.1 0.0 1.1

1: Old Meridian Rd & Site Access Performance by movement Interval #3 7:30

Movement EBL WBR NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 0.0 0.0 0.0 0.5Total Del/Veh (s) 8.6 4.5 1.2 0.1 0.1 0.1 1.8

1: Old Meridian Rd & Site Access Performance by movement Interval #4 7:45

Movement EBL EBR WBL WBR NBL NBT SBL SBT SBR AllDenied Del/Veh (s) 0.3 3.7 0.1 4.2 4.2 0.1 0.0 0.0 0.0 0.3Total Del/Veh (s) 12.5 3.5 3.6 2.8 2.5 2.2 1.8 0.1 0.0 2.6

1: Old Meridian Rd & Site Access Performance by movement Entire Run

Movement EBL EBR WBL WBR NBL NBT SBL SBT SBR AllDenied Del/Veh (s) 0.2 4.1 0.1 4.2 4.2 0.1 0.0 0.0 0.0 0.4Total Del/Veh (s) 9.8 2.9 3.7 8.5 1.9 1.4 0.6 0.1 0.0 1.9

34: US 24 & Old Meridian Rd Performance by movement Interval #1 7:00

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.1 0.1 0.0 0.1Total Del/Veh (s) 0.1 1.1 2.5 0.8 2.8 2.5

34: US 24 & Old Meridian Rd Performance by movement Interval #2 7:15

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.1 0.0 0.1Total Del/Veh (s) 0.3 1.1 2.1 0.5 1.6 1.7

34: US 24 & Old Meridian Rd Performance by movement Interval #3 7:30

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.1 0.2 0.0 0.1Total Del/Veh (s) 0.4 1.3 3.0 1.6 4.4 3.6

Page 44: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 Background + SiteAM

SimTraffic Performance Report SimTraffic Report2040 Background + Site AM JAB

34: US 24 & Old Meridian Rd Performance by movement Interval #4 7:45

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 0.3 1.3 1.6 0.1 3.6 2.5

34: US 24 & Old Meridian Rd Performance by movement Entire Run

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.2 0.2 0.0 0.1Total Del/Veh (s) 0.2 1.2 2.3 0.7 3.1 2.6

Total Zone Performance By Interval

Interval Start 7:00 7:15 7:30 7:45 AllDenied Del/Veh (s) 0.3 0.2 0.3 0.3 0.3Total Del/Veh (s) 8.1 5.8 11.3 8.0 8.7

Page 45: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SiteAM

Queuing and Blocking Report SimTraffic Report2040 Background + Site AM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #1

Movement EB EB WB WB NBDirections Served LT R LT R TRMaximum Queue (ft) 27 30 30 52 22Average Queue (ft) 13 8 4 12 395th Queue (ft) 34 30 21 44 16Link Distance (ft) 181 175 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #2

Movement EB EB WBDirections Served LT R RMaximum Queue (ft) 46 29 30Average Queue (ft) 18 8 1395th Queue (ft) 46 29 37Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #3

Movement EB WBDirections Served LT RMaximum Queue (ft) 45 30Average Queue (ft) 22 2195th Queue (ft) 47 42Link Distance (ft) 181Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75Storage Blk Time (%)Queuing Penalty (veh)

Page 46: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SiteAM

Queuing and Blocking Report SimTraffic Report2040 Background + Site AM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #4

Movement EB EB WB WB NB SBDirections Served LT R LT R TR LTRMaximum Queue (ft) 46 30 29 30 24 21Average Queue (ft) 21 8 4 4 8 395th Queue (ft) 46 29 21 21 25 15Link Distance (ft) 181 175 803 27Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, All Intervals

Movement EB EB WB WB NB SBDirections Served LT R LT R TR LTRMaximum Queue (ft) 46 30 30 52 24 21Average Queue (ft) 19 6 2 12 3 195th Queue (ft) 44 25 14 39 15 7Link Distance (ft) 181 175 803 27Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #1

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 53 19 27 69 72Average Queue (ft) 8 13 8 10 31 2295th Queue (ft) 11 47 23 28 76 67Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 47: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SiteAM

Queuing and Blocking Report SimTraffic Report2040 Background + Site AM JAB

Intersection: 34: US 24 & Old Meridian Rd, Interval #2

Movement NW NE NE NE SWDirections Served R T T R TMaximum Queue (ft) 27 78 40 27 47Average Queue (ft) 10 16 11 7 1495th Queue (ft) 22 62 34 25 43Link Distance (ft) 27 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #3

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 33 40 22 147 113Average Queue (ft) 7 17 8 12 59 4195th Queue (ft) 11 41 32 30 138 108Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #4

Movement NW NE SW SWDirections Served R T T TMaximum Queue (ft) 9 9 50 52Average Queue (ft) 8 1 29 3095th Queue (ft) 11 7 63 65Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 48: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SiteAM

Queuing and Blocking Report SimTraffic Report2040 Background + Site AM JAB

Intersection: 34: US 24 & Old Meridian Rd, All Intervals

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 27 78 40 27 147 113Average Queue (ft) 8 12 7 7 33 2395th Queue (ft) 15 44 26 24 91 74Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Zone SummaryZone wide Queuing Penalty, Interval #1: 0Zone wide Queuing Penalty, Interval #2: 0Zone wide Queuing Penalty, Interval #3: 0Zone wide Queuing Penalty, Interval #4: 1Zone wide Queuing Penalty, All Intervals: 0

Page 49: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 Background + SitePM

SimTraffic Performance Report SimTraffic Report2040 Background + Site PM JAB

1: Old Meridian Rd & Site Access Performance by movement Interval #1 4:30

Movement EBL EBR WBR NBL NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 4.2 0.2 0.0 0.0 0.0 0.4Total Del/Veh (s) 20.5 2.9 13.3 2.4 4.1 1.1 0.1 0.0 5.6

1: Old Meridian Rd & Site Access Performance by movement Interval #2 4:45

Movement EBL EBR WBR NBL NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 4.2 4.2 0.2 0.0 0.0 0.0 0.4Total Del/Veh (s) 10.2 2.9 8.2 2.8 2.4 0.1 0.2 0.1 2.7

1: Old Meridian Rd & Site Access Performance by movement Interval #3 5:00

Movement EBL EBR WBL WBR NBT NBR SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 4.2 0.1 0.1 0.0 0.0 0.0 0.4Total Del/Veh (s) 11.9 6.6 9.4 4.1 1.5 0.0 0.0 0.2 0.1 2.7

1: Old Meridian Rd & Site Access Performance by movement Interval #4 5:15

Movement EBL EBR WBL WBR NBT SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 4.2 0.1 0.0 0.0 0.0 0.2Total Del/Veh (s) 10.0 3.3 3.7 2.9 2.0 0.1 0.2 0.2 1.8

1: Old Meridian Rd & Site Access Performance by movement Entire Run

Movement EBL EBR WBL WBR NBL NBT NBR SBL SBT SBR AllDenied Del/Veh (s) 0.1 4.2 0.1 4.2 4.2 0.2 0.1 0.0 0.0 0.0 0.4Total Del/Veh (s) 14.1 3.9 6.6 7.6 2.6 2.6 0.0 0.5 0.2 0.1 3.2

34: US 24 & Old Meridian Rd Performance by movement Interval #1 4:30

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 0.1 1.6 2.8 0.7 2.8 2.6

34: US 24 & Old Meridian Rd Performance by movement Interval #2 4:45

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.3 0.3 0.0 0.2Total Del/Veh (s) 1.4 4.0 2.2 2.4 3.1

34: US 24 & Old Meridian Rd Performance by movement Interval #3 5:00

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 0.0 1.4 3.5 1.0 2.3 2.8

Page 50: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

SimTraffic Performance Report 2040 Background + SitePM

SimTraffic Performance Report SimTraffic Report2040 Background + Site PM JAB

34: US 24 & Old Meridian Rd Performance by movement Interval #4 5:15

Movement NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 1.3 3.4 2.7 2.1 2.8

34: US 24 & Old Meridian Rd Performance by movement Entire Run

Movement NWT NWR NET NER SWT AllDenied Del/Veh (s) 0.0 0.0 0.3 0.2 0.0 0.1Total Del/Veh (s) 0.0 1.4 3.5 1.8 2.4 2.9

Total Zone Performance By Interval

Interval Start 4:30 4:45 5:00 5:15 AllDenied Del/Veh (s) 0.3 0.3 0.3 0.3 0.3Total Del/Veh (s) 8.5 9.5 8.9 8.4 9.3

Page 51: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SitePM

Queuing and Blocking Report SimTraffic Report2040 Background + Site PM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #1

Movement EB EB WB NB SBDirections Served LT R R TR LTRMaximum Queue (ft) 75 30 52 64 20Average Queue (ft) 28 4 12 16 395th Queue (ft) 78 22 44 52 14Link Distance (ft) 181 803 27Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft) 75 75Storage Blk Time (%) 1 0Queuing Penalty (veh) 0 0

Intersection: 1: Old Meridian Rd & Site Access, Interval #2

Movement EB EB WB NBDirections Served LT R R TRMaximum Queue (ft) 49 30 30 24Average Queue (ft) 22 4 19 795th Queue (ft) 49 22 40 24Link Distance (ft) 181 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, Interval #3

Movement EB EB WB WB NB SBDirections Served LT R LT R TR LTRMaximum Queue (ft) 45 29 30 30 24 21Average Queue (ft) 28 4 4 17 7 395th Queue (ft) 51 21 21 41 25 15Link Distance (ft) 181 175 803 27Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Page 52: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SitePM

Queuing and Blocking Report SimTraffic Report2040 Background + Site PM JAB

Intersection: 1: Old Meridian Rd & Site Access, Interval #4

Movement EB EB WB WB NBDirections Served LT R LT R TRMaximum Queue (ft) 46 27 29 30 24Average Queue (ft) 23 4 4 4 795th Queue (ft) 38 20 21 21 24Link Distance (ft) 181 175 803Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 75 75Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 1: Old Meridian Rd & Site Access, All Intervals

Movement EB EB WB WB NB SBDirections Served LT R LT R TR LTRMaximum Queue (ft) 75 30 30 52 64 21Average Queue (ft) 25 4 2 13 9 195th Queue (ft) 57 21 14 39 34 10Link Distance (ft) 181 175 803 27Upstream Blk Time (%) 0Queuing Penalty (veh) 0Storage Bay Dist (ft) 75 75Storage Blk Time (%) 0 0Queuing Penalty (veh) 0 0

Intersection: 34: US 24 & Old Meridian Rd, Interval #1

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 56 55 19 21 94 73Average Queue (ft) 15 17 5 6 36 2895th Queue (ft) 43 48 20 22 105 82Link Distance (ft) 27 622 622Upstream Blk Time (%) 1Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 53: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SitePM

Queuing and Blocking Report SimTraffic Report2040 Background + Site PM JAB

Intersection: 34: US 24 & Old Meridian Rd, Interval #2

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 9 76 19 68 50 75Average Queue (ft) 9 30 13 20 18 3195th Queue (ft) 9 74 26 58 55 78Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #3

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 27 57 56 27 51 51Average Queue (ft) 13 21 10 13 22 1195th Queue (ft) 28 54 43 32 50 42Link Distance (ft) 27 622 622Upstream Blk Time (%) 1Queuing Penalty (veh) 2Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Intersection: 34: US 24 & Old Meridian Rd, Interval #4

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 24 35 40 68 48 55Average Queue (ft) 11 14 6 19 11 1295th Queue (ft) 20 36 29 62 40 45Link Distance (ft) 27 622 622Upstream Blk Time (%) 0Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Page 54: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Queuing and Blocking Report 2040 Background + SitePM

Queuing and Blocking Report SimTraffic Report2040 Background + Site PM JAB

Intersection: 34: US 24 & Old Meridian Rd, All Intervals

Movement NW NE NE NE SW SWDirections Served R T T R T TMaximum Queue (ft) 56 76 56 68 94 75Average Queue (ft) 12 21 9 15 22 2095th Queue (ft) 29 55 31 47 68 65Link Distance (ft) 27 622 622Upstream Blk Time (%) 1Queuing Penalty (veh) 1Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)

Zone SummaryZone wide Queuing Penalty, Interval #1: 2Zone wide Queuing Penalty, Interval #2: 1Zone wide Queuing Penalty, Interval #3: 2Zone wide Queuing Penalty, Interval #4: 1Zone wide Queuing Penalty, All Intervals: 1

Page 55: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Markup Summary

Subject: Text BoxPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 12:02:09 PMColor:

Add "PCD File No. SF-18-003"

dsdlaforce (9)

Subject: CalloutPage Label: 7Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:15:11 AMColor:

Clarify this sentence. Westbound does not have aturn movement at the RI/RO intersection.

Subject: CalloutPage Label: 7Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:19:11 AMColor:

Describe what's happening for the southbound leftgoing into the side during the long-term eveningpeak hr.

Subject: CalloutPage Label: 8Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 12:01:42 PMColor:

Identify the time line for construction of the site andthe construction to convert the intersection into aRI/RO movement. Discuss what steps can betaken to mitigate the LOS F in the interim.

Contact/coordinate with John Andrews at EPCDPW (719-520-6842) for information regarding theMeridian Road Improvements.

Subject: CalloutPage Label: 9Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:57:42 AMColor:

Does the planned reconfiguration of theintersection address the deficiency?Contact John Andrews for a copy of the currentdesign.

Subject: Text BoxPage Label: 9Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 12:00:54 PMColor:

1. State whether the access meets sight distance.

2. State what the current applicable Traffic ImpactFees are and what option the developer will beselecting for payment.

3. List all deviations that the applicant will bemaking. Per comments on the Grading andErosion Control, the proposed driveway width isgreater than the ECM criteria. The applicant shallrevise or submit a deviation request.

c Impact Study LSC #174890) nuary 9, 2018

were prepared under my responsible charge and istent with the standard of care, said report wasshed by the County for traffic reports.

Add "PCD File No. SF-18-003"

ak hour, the intersection of US 24/Meridian Road will be Both right-out, stop-controlled approaches on Meridian Road

during all long-term traffic scenarios.

re projected to operate at LOS B or better for all short-term raffic conditions upon site buildout.

or the westbound approach between the proposed site access n Road for the northwest-bound right-turn lane (long-term). e projected existing plus site-generated and 2040 background Detailed queuing reports are attached.

eparating the proposed site access and US 24 is approximately e between these two intersections is projected to be sufficient

Clarify this sentence. Westbound does nothave a turn movement at the RI/ROintersection.

A queuing analysis was performed for the westbound approach between the proposedand intersection of US 24/Meridian Road for the northwest-bound right-turn lane (lAnalyses have been run utilizing the projected existing plus site-generated and 2040 bplus site-generated traffic volumes. Detailed queuing reports are attached. The distance along Meridian Road separating the proposed site access and US 24 is app100 feet. Available stacking distance between these two intersections is projected to beduring the long-term morning peak-hour background-plus-site scenario. Westboundexiting vehicles from the site are projected to be briefly blocked due to upstreapproximately 1 percent of the time during the long-term evening peak hour.

Describe what's happening for the southbound leftgoing into the side during the long-term evening peakhr.

ected to generate about 185 vehicle-trips on the average weekday.

11 vehicles would enter the site during the weekday morning peak hour, while projected to exit. During the weekday evening peak hour of adjacent street cles would enter the site while 15 vehicles would exit.

the Level of Service section above and to the attached Synchro and SimTraffic ailed LOS summaries at all signalized intersections adjacent to the site.

at the proposed site access intersection with Meridian Road are projected to B or better during all short- and long-term scenarios during both the weekday vening peak hour following the addition of this development.

on of US 24/Meridian Road, currently signalized, operates at LOS D during the hour and LOS F during the evening peak hour. During the long-term evening

er the intersection of US 24/Meridian Road is converted to a RI/RO intersection, eet right-turn-only approaches are projected to operate at LOS A.

Identify the time line for construction of the siteand the construction to convert the intersectioninto a RI/RO movement. Discuss what stepscan be taken to mitigate the LOS F in theinterim.

Contact/coordinate with John Andrews at EPCDPW (719-520-6842) for information regardingthe Meridian Road Improvements.

volume of greater than 10 vehicles per hour (vph). As shown in Figure 4,eastbound right-turn ingress volumes at the intersection of US 24/Meridian Ro163 vehicles per hour during the morning and evening peak hour, respeaccounting for additional site-generated traffic. The State Highway Access Codebe exceeded by background traffic alone. A right-turn acceleration lane currenHighway 24. This lane is currently about 400 feet plus a long taper. These lengtColorado State Highway access code criteria. This is an existing deficiency andis projected to increase the current right turning traffic by only 6.2 percent.

* * * * *

ease contact me if you have any questions regarding this report.

ncerely,

C TRANSPORTATION CONSULTANTS, INC.

Does the planned reconfiguration of the intersectionaddress the deficiency?Contact John Andrews for a copy of the current design.

* * * * *

Please contact me if you have any questions regarding this report. Sincerely, LSC TRANSPORTATION CONSULTANTS, INC. By Jeffrey C. Hodsdon, P.E., PTOE Principal JCH:JAB:bjwb Enclosures: Table 3 Figure 1 – Figure 7 Traffic Count Reports Level of Service Reports

1. State whether the access meets sight distance.

2. State what the current applicable Traffic Impact Fees are andwhat option the developer will be selecting for payment.

3. List all deviations that the applicant will be making. Percomments on the Grading and Erosion Control, the proposeddriveway width is greater than the ECM criteria. The applicantshall revise or submit a deviation request.

Page 56: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Subject: Text BoxPage Label: 16Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:51:56 AMColor:

Provide a second AutoTurn exhibit based on theRI/RO configuration. Based on Figure 2, thevehicle would not be able to make the right turnonto US 24.

Subject: CalloutPage Label: 16Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:41:19 AMColor:

Identify the minimum driveway width and radiusrequired so the design vehicle does not track ontothe curbs.The site plan shall incorporate theserecommendations.

Subject: CalloutPage Label: 16Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 10:38:35 AMColor:

The maneuver is encroaching into the opposingtraffic with no room to maneuver back into thecorrect lane.

Identify the design vehicle used and describe thefindings and recommendations in the narrativesection of the report.

Provide a second AutoTurn exhibitbased on the RI/RO configuration. Based on Figure 2, the vehicle wouldnot be able to make the right turn ontoUS 24.

Identify the minimum driveway width andradius required so the design vehicle does nottrack onto the curbs.The site plan shall incorporate theserecommendations.

The maneuver is encroaching into the opposingtraffic with no room to maneuver back into thecorrect lane.

Identify the design vehicle used and describethe findings and recommendations in the narrative section of the report.

Page 57: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project
dsdlaforce
Callout
Final Drainage Report, and Traffic Impact Study.
dsdlaforce
Callout
replace with "No driveway shall be established unless an access permit has been granted by El Paso County Planning and Community Development Department.
dsdlaforce
Callout
PCD File No SF-18-003
dsdlaforce
Text Box
Add the following note: 1. All property owners are responsible for maintaining proper storm water drainage in and through their property. Public drainage easements as specifically noted on the plat shall be maintained by the individual lot owners unless otherwise indicated. Structures, fences, materials or landscaping that could impede the flow of runoff shall not be placed in drainage easements. 2. The subdivider(s) agrees on behalf of him/herself and any developer or builder successors and assigns hat subdivider and/or said successors and assigns shall be required to pay traffic impact fees in accordance with the countywide transportation improvement fee resolution (Resolution 16-454), as amended, at or prior to the time of building permit submittals. The fee obligation, if not paid in full at final plat recording, shall be on all sales documents and on plat notes to ensure that a title search would find the fee obligation before sale of the property.
dsdlaforce
Highlight
dsdlaforce
Callout
revise to "... and as amended by the FEMA approved Letter of Map Revision (LOMR) case number 01-08-226P dated May 14, 2002."
dsdlaforce
Callout
area does not mach
dsdlaforce
Text Box
Show an as platted and as-replatted exhibit.
dsdlaforce
Callout
Show all the existing easements.
dsdparsons
Callout
Natural features Report, water and waste water reports
dsdparsons
Callout
You have a commitment letter for central sewer.
dsdparsons
Callout
There is a commitment from Woodmen Hills for central water. The well would need to be closed.
dsdparsons
Callout
Identify all utility providers Identify the easements to be platted as requested by providers
dsdparsons
Callout
President
dsdparsons
Callout
Planning and Community Development Department
dsdparsons
Callout
Only necessary if your going into the PID
dsdparsons
Callout
This can be a small inset as it was done prior to subdivision regs in 1888. Any existing easement as described in title work should be vacated with this if they are no longer valid.
dsdparsons
Callout
Utilize the standard notes. Please provide surveyor email and I will email him the notes in Word.
dsdparsons
Callout
Are you platting streets?
dsdparsons
Callout
Vacation of lots X, in the subdivision
dsdlaforce
Callout
Identify whether or not the developer is electing to be within a Public Improvement District (PID).
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Line
jimlenz
Callout
NOT ELECTING TO BE IN PID
jimlenz
Line
jimlenz
Line
jimlenz
Callout
NOT ELECTING TO BE IN PID
Page 58: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Markup Summary

Subject: Text BoxPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 11:55:52 AMColor:

Add the following note:1. All property owners are responsible formaintaining proper storm water drainage in andthrough their property. Public drainage easementsas specifically noted on the plat shall bemaintained by the individual lot owners unlessotherwise indicated. Structures, fences, materialsor landscaping that could impede the flow of runoffshall not be placed in drainage easements.

2. The subdivider(s) agrees on behalf ofhim/herself and any developer or buildersuccessors and assigns hat subdivider and/or saidsuccessors and assigns shall be required to paytraffic impact fees in accordance with thecountywide transportation improvement feeresolution (Resolution 16-454), as amended, at orprior to the time of building permit submittals. Thefee obligation, if not paid in full at final platrecording, shall be on all sales documents and onplat notes to ensure that a title search would findthe fee obligation before sale of the property.

dsdlaforce (10)

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:41:55 AMColor:

replace with "No driveway shall be establishedunless an access permit has been granted by ElPaso County Planning and CommunityDevelopment Department.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:50:47 AMColor:

revise to "... and as amended by the FEMAapproved Letter of Map Revision (LOMR) casenumber 01-08-226P dated May 14, 2002."

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:35:25 AMColor:

Final Drainage Report, and Traffic Impact Study.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/21/2018 11:57:53 AMColor:

Identify whether or not the developer is electing tobe within a Public Improvement District (PID).

Add the following note:1. All property owners are responsible for maintaining proper storm water drainage in andthrough their property. Public drainage easements as specifically noted on the plat shall bemaintained by the individual lot owners unless otherwise indicated. Structures, fences,materials or landscaping that could impede the flow of runoff shall not be placed indrainage easements.

2. The subdivider(s) agrees on behalf of him/herself and any developer or buildersuccessors and assigns hat subdivider and/or said successors and assigns shall berequired to pay traffic impact fees in accordance with the countywide transportationimprovement fee resolution (Resolution 16-454), as amended, at or prior to the time ofbuilding permit submittals. The fee obligation, if not paid in full at final plat recording, shallbe on all sales documents and on plat notes to ensure that a title search would find the feeobligation before sale of the property.

replace with "No driveway shall be establishedunless an access permit has been granted by ElPaso County Planning and CommunityDevelopment Department.

revise to "... and as amended by the FEMA approved Letter ofMap Revision (LOMR) case number 01-08-226P dated May 14,2002."

Final Drainage Report, and Traffic Impact Study.

Identify whether or notthe developer iselecting to be within aPublic ImprovementDistrict (PID).

Page 59: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Subject: HighlightPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:49:24 AMColor:

Subject: Text BoxPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/20/2018 2:38:23 PMColor:

Show an as platted and as-replatted exhibit.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:52:34 AMColor:

area does not mach

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/20/2018 2:02:20 PMColor:

Show all the existing easements.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdlaforceDate: 2/15/2018 9:32:56 AMColor:

PCD File No SF-18-003

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:21:06 PMColor:

Natural features Report, water and waste waterreports

dsdparsons (11)

Show an as platted and as-replattedexhibit.

area does not mach

Show all the existingeasements.

PCD File No SF-18-003

Natural featuresReport, water andwaste water reports

Page 60: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:30:20 PMColor:

Are you platting streets?

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:25:46 PMColor:

Only necessary if your going into the PID

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:28:22 PMColor:

This can be a small inset as it was done prior tosubdivision regs in 1888. Any existing easementas described in title work should be vacated withthis if they are no longer valid.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/21/2018 7:48:42 AMColor:

Vacation of lots X, in the subdivision

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:29:43 PMColor:

Utilize the standard notes. Please providesurveyor email and I will email him the notes inWord.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:21:52 PMColor:

You have a commitment letter for central sewer.

Are you plattingstreets?

Only necessary if your going into the PID

This can be a small inset as it was done prior to subdivision regs in1888. Any existing easement as described in title work should bevacated with this if they are no longer valid.

Vacation of lots X, inthe subdivision

Utilize the standard notes. Please providesurveyor email and I will email him the notes inWord.

You have acommitment letter forcentral sewer.

Page 61: REVISION RESPONSE LETTER - Microsoft · 2018. 4. 25. · REVISION RESPONSE LETTER RE: Big O Tires Site Development Plan File Number SF-183 DATE: April 19, 2018 TO: Kari Parsons Project

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:25:26 PMColor:

Planning and Community DevelopmentDepartment

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:24:05 PMColor:

Identify all utility providersIdentify the easements to be platted as requestedby providers

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:28:37 PMColor:

There is a commitment from Woodmen Hills forcentral water. The well would need to be closed.

Subject: CalloutPage Label: 1Lock: UnlockedStatus: Checkmark: UncheckedAuthor: dsdparsonsDate: 2/20/2018 4:24:54 PMColor:

President

Planning and Community Development Department

Identify all utility providersIdentify the easements to be plattedas requested by providers

There is a commitment from Woodmen Hillsfor central water. The well would need to beclosed.

President