revit and building information modeling (bim) presentation
DESCRIPTION
Fiedler Group's comprehensive Revit and Building Information Modeling (BIM) presentation. Free download also available.TRANSCRIPT
Revit and Building Information Modeling
(BIM)
1
“A change anywhere is a change everywhere”
-
Autodesk
2
Building Information Modeling - BIM
• What is BIM?• How we have implemented it.• What are the benefits?
3
What is BIM?• Building Information Modeling (BIM) is the process of
generating and managing building data during its life cycle. BIM uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction.
• To create a BIM, a modeler uses intelligent objects (Families) to build the model.
4
Some Key Terms:2-D/3-D CAD: Equivalent to conventional drafting, only performed on a
computer. Unintelligent.
3-D BIM: A model that includes 3-D shape information only.
4-D BIM: A 3-D BIM that has objects and assemblies that have schedule and time constraint data added to them. (4-D = 3-D + schedule (time))
5-D BIM: A 4-D BIM that has objects and assemblies that have a cost dimension added to them. (5-D = 4-D + cost.)
5
Fiedler Group’s Implementation of BIM
• Completely different than AutoCAD• New software-Revit• Retrained our design team• Re-Created office standards• Stepped implementation A-S-MEP
6
Challenges of BIM
• Limited availability of trained designers.• Consultants that use BIM.• Availability of ready-to-use BIM libraries from vendors
and suppliers.• Full implementation of Revit Electrical.
7
Benefits of BIM• Improved quality of the construction drawings (CDs).• Reduced time to prepare the initial drawings and final
CDs.• Quantities and shared properties of materials are easily
extracted for cost estimating.
8
Prototype Revit Model
• Architectural• Structural• Mechanical• Electrical• Plumbing• Automotive
Drawing Updating
9
Prototype Revit Model
10
Section
11
MEP Coordination
12
Mechanical Coordination
13
Mechanical Schedules/Takeoffs
14
Plumbing Coordination
15
Domestic Water
16
Domestic Water
17
Plumbing Schedules/Takeoffs
18
Automatic Updating
19
Automatic Updating
20
Case Study: Vaulted Tank System
21
Case Study: Vaulted Tank System
22
Case Study: Canopy
23
Case Study: Canopy
24
Case Study: Canopy
25
Rendering
26
Night Time Simulations
27
Model Graphics Styles
28
Renderings
29
Accurate Exteriors
Revit
Reality
30
Accurate Interiors
Revit
Reality
31
Contact Information
Patrick O. Fiedler P.E., LEED AP BD+CPresident, Fiedler Group
2322 W. Third StreetLos Angeles, CA 90057
213-381-3118E-Mail: [email protected]
www.fiedlergroup.com
32