Construction Portfolio By Pramod Thirunavukarasu B Arch (Usyd), Adv & Dip Arch Tech (SITU) CAD Proficency: - Revit Architecture 2008-2013 - Autocad 2007- 2013 - Sketch Up Pro 7 - Rhino Contact Email : [email protected] Contact Number: 0433735702

Upload: pramod-thiru

Post on 09-Mar-2016

245 views

Category:

Documents


7 download

DESCRIPTION

A range of DA and CC documentation i produced with either Revit Architecture 2013 or Autocad 2012.

TRANSCRIPT

  • Construction PortfolioBy Pramod ThirunavukarasuB Arch (Usyd), Adv & Dip Arch Tech (SITU)

    CAD Proficency: - Revit Architecture 2008-2013 - Autocad 2007- 2013 - Sketch Up Pro 7 - Rhino

    Contact Email : [email protected] Number: 0433735702

  • Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    COVER SHEET

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    1

    Drawing ListSheet

    Number Sheet Name Sheet Issue Date Drawn By

    1 COVER SHEET 06/13/08 Author2 UPPER BASEMENT

    FLOOR PLAN06/17/08 Author

    4 LEVEL 1 FL PLAN 06/19/08 Author3 GROUND FLOOR

    PLAN06/20/08 Author

    5 LEVEL 4 FL PLAN 06/20/08 Author6 LVL 5 ROOF DECK 06/20/08 Author7 GRD FL CEILING

    PLAN06/20/08 Author

    8 NORTH ELEVATION 06/20/08 Author9 SOUTH ELEVATION 06/20/08 Author10 WEST ELEVATION 06/20/08 Author11 EAST ELEVATION 06/20/08 Author12 SECTION A - A 06/20/08 Author13 SECTION B - B 06/20/08 Author14 SECTIONAL

    DETAILS06/20/08 Author

    15 SECTIONALDETAILS

    06/20/08 Author

    16 SECTIONALDETAILS

    06/20/08 Author

    17 SECTIONALDETAILS

    06/20/08 Author

    18 SECTIONAL DETAIL 06/20/08 Author19 AMENITY PLAN &

    ELEVATION06/20/08 Author

    20 STAIRS PLN & ELE 06/20/08 Author

    NORTH EAST PERSPECTIVE1

    SOUTH WEST PERSPECTIVE2

    PYRMONT MEDIUM RISE CC DOCUMENTS

    DIPLOMA IN ARCHITECTURALTECHNOLOGY

    STUDENT : PRAMOD THIRU

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    1

    13

    3

    4

    5

    6

    18

    63

    64 65

    66 67

    83

    84

    85

    100

    39860

    1495 8405 8400 8400 8400 3260 1500

    2100

    0

    1500

    6000

    6000

    6000

    1500

    280

    1137

    020

    085

    3514

    8

    5041

    2350

    4263

    50

    200

    50

    1675

    2415

    7180

    50

    50 5685 50 5710 50 5710 50 5710 50 5710 50 5685 50

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    190 4415

    5995

    960

    200

    190 190 4415

    1200

    3400

    2100

    0

    1500

    6000

    6000

    6000

    1500

    7160

    190

    1350

    110

    4390

    110

    1240

    110

    3466

    110

    2259

    210

    960

    3440

    113

    960

    168

    310

    960

    2416

    2259

    39860

    1495 8405 8400 8400 8400 3260 1500

    260

    255250

    245

    RL 10200

    260

    250

    250

    255

    GROUND FLOOR MAINENTRANCE

    600mmDIAMETERSTRUCTURALCONCRETECOLOUM

    OFFICE AREA

    GROUND FLOOR

    FIRE STAIR2

    CAFE AREA

    FIRESTAIR 1

    UP

    LIFTSHAFT

    6mm GLASS CURTAIN WALLS ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETE WALL

    EASY WALL PANEL

    200mm CONCRETEBLOCK WALL 110 CONCRETE

    WALLWITH CERMICTILE FINISH

    OFFICE AREA

    1239 238

    5

    102

    2799

    1249 1500

    1429 2500

    1239

    3500

    FB MB

    DB

    SS

    R R

    KITCHEN

    FIR

    E P

    ASSA

    GE

    WA

    Y

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    8400 2821 190 1160 170 1259 170 4015 190490100905 995 910110880 910110 1283 110 2922 110 11630

    8405 150 2666 190 1199 12785 110 4390 110 5000 210 4645

    119

    120

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    GROUND FLOOR PLAN

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    3

    1 : 100

    CC 02 Ground FL1

    NO

    RTH

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    7

    24

    69

    70 71

    72 73

    99

    39860

    1495 8405 8400 8400 8400 3260 1500

    2100

    0

    1500

    6000

    6000

    6000

    1500

    2100

    0

    1500

    6000

    6000

    6000

    1500

    RL 14700

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    RL 14700

    600mmDIAMETERSTRUCTURALCONCRETECOLOUM

    6mm GLASS CURTAIN WALLS ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETEBLOCK WALL 110 CONCRETE

    WALLWITH CERMICTILE FINISH

    OFFICE AREA

    FIRESTAIR 1

    UP

    LIFTSHAFT

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    SS

    SS

    STAFFAMENITIES

    R

    39860

    1495 8405 8400 8400 8400 3260 1500

    8400 50 4160 190 4298 960148

    770110

    895 905 910110

    880 910110

    1283110

    1440 110 13112

    LEVEL 1 FLOOR PLAN

    430

    5028

    4550

    4275

    5041

    0020

    050

    4263

    5041

    2850

    460

    50 5685 50 5710 50 5710 50 5710 50 5710 50 5685 50

    7405

    190

    5850

    110

    2338

    110

    4567

    430

    190

    4013

    190

    2827

    430

    8375 150 4085 190 1200 150 2050 150410 190

    1255 190 2143 110 2310 110 3570 110 8257 190 4665

    OFFICE AREA

    FIRESTAIR 2

    390

    960

    5995

    250

    190 3080 1585

    3090

    3000

    200mmCONCRETECLAD WALL

    190 1200 150 2050 150 1855 190 2143 1101147157960157 3570 110

    110

    2338

    110

    4567

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    LEVEL 1 FL PLAN

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    4

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    NO

    RTH

    1 : 100

    CC 02 Level 11

  • UPUP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    27

    93 94

    95

    96

    97 98

    RL 25500

    39860

    1495 8405 8400 8400 8400 3260 1500

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    RL 25500

    600mmDIAMETERSTRUCTURALCONCRETECOLOUM

    6mm GLASS CURTAIN WALLS ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETEBLOCK WALL 110 CONCRETE

    WALLWITH CERMICTILE FINISH

    OFFICE AREA

    FIRESTAIR 1

    LIFTSHAFT

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    SSSS

    RSTAFFAMENITIES

    2100

    0

    1500

    6000

    6000

    6000

    1500

    LEVEL 4 FLOOR PLAN

    50 5710 50 5710 50 5710 50 5710 50 5685 50

    19020

    096

    059

    95

    190 3090 1325

    390 50 5741

    39860

    1495 8405 8400 8400 8400 3260 1500

    5042

    1650

    4168

    50420

    280

    5022

    2850

    2122

    5010

    7550

    2995

    4620

    5050

    850

    40050 4125 50 2805 50895 4235 190 5405 190580110895 905 910110880119791110 1283 110 14662

    50 2527 50 2950 50 3923 50 4612 50 400

    2100

    0

    1500

    6000

    6000

    6000

    1500

    110

    2338

    110

    4567

    430 50

    310

    7595

    5017

    9050

    3680

    5042

    5050

    3120

    1750

    3000

    3090

    OFFICE AREA

    190 1200 150 2050 150 1855 190 2143 110 2310 110 3570 110

    FIRESTAIR 2

    190

    4013

    190

    2827

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    LEVEL 4 FL PLAN

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    5

    NO

    RTH

    1 : 100

    CC Level 41

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

  • UPUP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    27

    93 94

    95

    96

    97 98

    RL 25500

    39860

    1495 8405 8400 8400 8400 3260 1500

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    RL 25500

    600mmDIAMETERSTRUCTURALCONCRETECOLOUM

    6mm GLASS CURTAIN WALLS ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETEBLOCK WALL 110 CONCRETE

    WALLWITH CERMICTILE FINISH

    OFFICE AREA

    FIRESTAIR 1

    LIFTSHAFT

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    SSSS

    RSTAFFAMENITIES

    2100

    0

    1500

    6000

    6000

    6000

    1500

    LEVEL 4 FLOOR PLAN

    50 5710 50 5710 50 5710 50 5710 50 5685 50

    19020

    096

    059

    95

    190 3090 1325

    390 50 5741

    39860

    1495 8405 8400 8400 8400 3260 1500

    5042

    1650

    4168

    50420

    280

    5022

    2850

    2122

    5010

    7550

    2995

    4620

    5050

    850

    40050 4125 50 2805 50895 4235 190 5405 190580110895 905 910110880119791110 1283 110 14662

    50 2527 50 2950 50 3923 50 4612 50 400

    2100

    0

    1500

    6000

    6000

    6000

    1500

    110

    2338

    110

    4567

    430 50

    310

    7595

    5017

    9050

    3680

    5042

    5050

    3120

    1750

    3000

    3090

    OFFICE AREA

    190 1200 150 2050 150 1855 190 2143 110 2310 110 3570 110

    FIRESTAIR 2

    190

    4013

    190

    2827

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    LEVEL 4 FL PLAN

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    5

    NO

    RTH

    1 : 100

    CC Level 41

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

  • UPUP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    27

    93 94

    95

    96

    97 98

    RL 25500

    39860

    1495 8405 8400 8400 8400 3260 1500

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    RL 25500

    600mmDIAMETERSTRUCTURALCONCRETECOLOUM

    6mm GLASS CURTAIN WALLS ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETEBLOCK WALL 110 CONCRETE

    WALLWITH CERMICTILE FINISH

    OFFICE AREA

    FIRESTAIR 1

    LIFTSHAFT

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    SSSS

    RSTAFFAMENITIES

    2100

    0

    1500

    6000

    6000

    6000

    1500

    LEVEL 4 FLOOR PLAN

    50 5710 50 5710 50 5710 50 5710 50 5685 50

    19020

    096

    059

    95

    190 3090 1325

    390 50 5741

    39860

    1495 8405 8400 8400 8400 3260 1500

    5042

    1650

    4168

    50420

    280

    5022

    2850

    2122

    5010

    7550

    2995

    4620

    5050

    850

    40050 4125 50 2805 50895 4235 190 5405 190580110895 905 910110880119791110 1283 110 14662

    50 2527 50 2950 50 3923 50 4612 50 400

    2100

    0

    1500

    6000

    6000

    6000

    1500

    110

    2338

    110

    4567

    430 50

    310

    7595

    5017

    9050

    3680

    5042

    5050

    3120

    1750

    3000

    3090

    OFFICE AREA

    190 1200 150 2050 150 1855 190 2143 110 2310 110 3570 110

    FIRESTAIR 2

    190

    4013

    190

    2827

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    LEVEL 4 FL PLAN

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    5

    NO

    RTH

    1 : 100

    CC Level 41

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    76

    79 80

    82

    RL 29100

    39860

    1495 8405 8400 8400 8400 3260 1500

    50

    297350 50

    184950

    5026

    4950

    5033

    54

    RL 29100

    190 mmPARAPETCONCRETEWALL

    6mm GLASSCURTAINWALLS

    ALUMINUM 150mm X 50mmMULLION

    200mm CONCRETEBLOCK WALL

    110 CONCRETEWALLWITH CERMICTILE FINISH

    ROOF DECK

    OFFICE AREA

    FIRESTAIR 1

    LIFTSHAFT

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    RSTAFFAMENITIES

    SS

    SS

    103 104

    50 4725 50 6850 50 4850 50

    16925

    7135

    4505

    5042

    6550

    110

    2378

    132

    3435

    110

    960

    4495

    7145

    5042

    4550150

    5068

    9550

    8400 4210 190 4150 1255

    190

    490

    110

    985 905 910110

    880 910110

    1283 110 14662

    FIRESTAIR 2

    190 mmPARAPETCONCRETEWALL

    565

    2100

    0

    39860

    2100

    0

    1500

    6000

    6000

    6000

    1500

    1495 8405 8400 8400 8400 3260 1500

    1500

    6000

    6000

    6000

    1500

    250

    140

    472

    190

    1869

    819

    066

    514

    525

    0

    7405

    190

    1215

    519

    061

    514

    530

    0

    19020

    096

    059

    9525

    0

    190 3355 190675

    195

    1750

    3000

    3070

    UP

    300145

    565 190 33805 190 4665

    190

    4013

    190

    2827

    190 1200 150 2050 150 1855 193 2140 110 2310110

    600 960 2017 110

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    LVL 5 ROOF DECK

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    6

    NO

    RTH

    1 : 100

    CC of 02 Level 51

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    123456

    RL 00 PAD BASE4020

    84058400840084003260

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    3100

    1050

    2000

    Boundaryline

    Boundaryline

    METAL SHEETROOFING

    10mm PLANT ROOMCURTAIN WALL

    190mm CONCRETPARAPET WALL

    150 X 50 ALUMINUMMULLION

    6mm CURTAIN WALL

    EDGE FLANGE

    METAL SHEETROOFING

    GL

    BASEMENT WALL

    FIRE STAIR 2 EXIT

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    NORTH ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    8

    1 : 100

    NORTH ELEVATION1

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    123456

    RL 00 PAD BASE4020

    84058400840084003260

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    3100

    1050

    2000

    Boundaryline

    Boundaryline

    METAL SHEETROOFING

    10mm PLANT ROOMCURTAIN WALL

    190mm CONCRETPARAPET WALL

    150 X 50 ALUMINUMMULLION

    6mm CURTAIN WALL

    EDGE FLANGE

    METAL SHEETROOFING

    GL

    BASEMENT WALL

    FIRE STAIR 2 EXIT

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    NORTH ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    8

    1 : 100

    NORTH ELEVATION1

    RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    1 2 3 4 5 6

    RL 00 PAD BASE4020

    GL

    Boundaryline

    Boundaryline

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    1180

    8405 8400 8400 8400 3260

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    2000

    4150

    1100

    1100

    7700

    METAL SHEET ROOFING

    10mm PLANT ROOMCURTAIN WALL

    190mm CONCRETPARAPET WALL

    EASY CLAD WALL

    6mm CURTAINWALL

    150 X 50 ALUMINUMMULLION

    EDGE FLANGE

    600mm DIAMETERCONCRETE COLUMN

    200mm CONCRETEWALL CLAD

    METAL SHEET ROOFING

    BASEMENT WALL

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SOUTH ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    9

    1 : 100

    SOUTH ELEVATION1

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    A B C D

    6000 6000 6000

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    2000

    1050

    3100

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    1510 1510

    GL

    METAL SHEET ROOFMETAL SHEET ROOF

    UB STRUCTURALSUPPORT

    GARDEN BED PARAPETWALL

    BOUNDARY

    120mm CONCRETEBLOCK WALL

    ALUMINUM EDGEFLANGE

    CURATIN WALL DOUBLEGLASS SWING

    600mm DIAMETERCONCRETE COLUMN

    6mm GLASS CURTAINWALL

    1100

    1100

    BOUNDARY

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    WEST ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    10 1 : 100

    WEST ELEVATION1

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    A B C D

    6000 6000 6000

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    2000

    1050

    3100

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    1510 1510

    GL

    METAL SHEET ROOFMETAL SHEET ROOF

    UB STRUCTURALSUPPORT

    GARDEN BED PARAPETWALL

    BOUNDARY

    120mm CONCRETEBLOCK WALL

    ALUMINUM EDGEFLANGE

    CURATIN WALL DOUBLEGLASS SWING

    600mm DIAMETERCONCRETE COLUMN

    6mm GLASS CURTAINWALL

    1100

    1100

    BOUNDARY

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    WEST ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    10 1 : 100

    WEST ELEVATION1

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    ABCD

    6000 6000 6000

    FIRE STAIR2 RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    2000

    1050

    3100

    3600

    3600

    3600

    3600

    4500

    2500

    15101510

    GL

    METAL SHEET ROOF

    5mm THICK GLASSLOUVRES

    5mm ALUMINUMLOURVES

    UB STRUCTURALSUPPORT

    GARDEN BED PARAPETWALL

    150 X 50 ALUMINUMMULLION

    6mm GLASS CURTAINWALL

    ALUMINUM EDGEFLANGE

    METAL SHEET ROOF

    BOUNDARY

    BOUNDARY

    150 X 50 ALUMINUMMULLION

    6mm GLASS CURTAINWALL

    UPPERBASEMENTRAMP

    BASEMENT WALL

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    EAST ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    11 1 : 100EAST ELEVATION

    1

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    1 2 3 4 5 6

    RL 00 PAD BASE4020

    400

    250

    Boundaryline

    Boundaryline

    8405 8400 8400 8400 3260

    950

    3000

    FIRE STAIR1

    FIRE STAIR2

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    1180

    2000

    1050

    3100

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    PLANT ROOM

    LEVEL 4

    LEVEL 3

    LEVEL 2

    LEVEL 1

    CAFE AREA

    UPPER BASEMENT

    LOWER BASEMENT

    GROUND FLOORENTRANCE

    ROOF LEVEL

    BALCONY

    FEMALEWC

    MALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    MALEWC

    MALEWC

    MALEWC

    MALEWC

    1170

    2430

    1170

    2430

    1070

    3600

    2530

    748

    3752

    220

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTION A - A

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    12 1 : 100

    LONG SECTION A - A1

  • RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    1 2 3 4 5 6

    RL 00 PAD BASE4020

    400

    250

    Boundaryline

    Boundaryline

    8405 8400 8400 8400 3260

    950

    3000

    FIRE STAIR1

    FIRE STAIR2

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    1180

    2000

    1050

    3100

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    PLANT ROOM

    LEVEL 4

    LEVEL 3

    LEVEL 2

    LEVEL 1

    CAFE AREA

    UPPER BASEMENT

    LOWER BASEMENT

    GROUND FLOORENTRANCE

    ROOF LEVEL

    BALCONY

    FEMALEWC

    MALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    FEMALEWC

    MALEWC

    MALEWC

    MALEWC

    MALEWC

    1170

    2430

    1170

    2430

    1070

    3600

    2530

    748

    3752

    220

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    FIRE STAIR1

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTION A - A

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    12 1 : 100

    LONG SECTION A - A1

    RL 01 Lower Basement5200

    RL 02 FL UPPER BASEMENT7700

    RL 02 Ground FL10200

    RL 02 Level 114700

    RL 02 Level 218300

    RL 02 Level 321900

    RL 02 Level 425500

    RL 02 Level 529100

    ABCD

    RL 00 PAD BASE4020

    6000 6000 6000

    3600

    3600

    3600

    3600

    4500

    2500

    2500

    FIRE STAIR 2

    FIRESTAIR 1

    RL 02 Lvl 6 plant room32200

    RL 02 Lift Shaft33250

    RL 02 Roof35250

    2000

    1050

    3100

    LEVEL 4

    LEVEL 3

    LEVEL 2

    LEVEL 1

    CAFE AREA

    FIRESTAIR 1

    PLANT ROOM

    LVL 5 ROOF DECK

    UPPPERBASEMENT

    LOWERBASEMENT

    3000

    950

    230

    400

    270

    400

    BOUNDARY

    BOUNDARY

    260

    260

    1070

    2530

    1045

    2555

    1070

    2530

    1070

    2530

    748

    3752

    FIRE STAIR 2

    FIRE STAIR 2

    FIRE STAIR 2

    FIRE STAIR 2

    FIRE STAIR 2

    FIRESTAIR 1

    FIRESTAIR 1

    FIRESTAIR 1

    FIRESTAIR 1

    FIRESTAIR 1

    LIFTSHAFT

    LIFTSHAFT

    LIFTSHAFT

    LIFTSHAFT

    LIFTSHAFT

    LIFTSHAFT

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTION B - B

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    13

    1 : 100

    SECTION B - B1

  • RL 01 Lower Basement5200

    1

    RL 00 PAD BASE4020

    Waterproofing Membrane

    Sub - Soil

    150 RC Slab1100 Depth

    1200

    CONCRETE BLOCKWALL - 190mm

    MEMBRANE- 20mm

    CONCRETE BLOCK- 90mm

    DRAINAGECELL - 30mm

    1200 X 300 STRUCTURAL COLUNM

    RUBBLE FILL WITH30mm FABRICCOVEREDDRAINAGE CELL

    160

    2940

    1100

    BOUNDARY

    DRAINAGEPIPE

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTIONAL DETAILS

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    14

    1 : 15

    DETAIL OF BASEMENT FOOTING, FLOOR SLAB AND WALL1

  • RL 01 Lower Basement5200

    1

    RL 00 PAD BASE4020

    Waterproofing Membrane

    Sub - Soil

    150 RC Slab1100 Depth

    1200

    CONCRETE BLOCKWALL - 190mm

    MEMBRANE- 20mm

    CONCRETE BLOCK- 90mm

    DRAINAGECELL - 30mm

    1200 X 300 STRUCTURAL COLUNM

    RUBBLE FILL WITH30mm FABRICCOVEREDDRAINAGE CELL

    160

    2940

    1100

    BOUNDARY

    DRAINAGEPIPE

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTIONAL DETAILS

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    14

    1 : 15

    DETAIL OF BASEMENT FOOTING, FLOOR SLAB AND WALL1

    RL 02 Ground FL10200

    DRAIN

    BOLTS

    CONCRETEFLOOR SLAB

    LOADBEARINGBASEMENTWALL

    STONE PAVERS

    200 STONE CLAD WALL

    DRAINFLASHING

    RL 02 Level 529100

    1

    1100

    270

    BOUNDARY

    DRAINAGE CELL

    VAPOURBARRIER

    FLANGE EDGE

    50 X 150 MULLION

    6mm CURTAIN WALL

    270mm CONCRET FLOOR SLAB

    200mm CONCRETEBLOCK WALL

    PARAPET WALL

    GRAVEL

    DRAINAGE PIPEDIA - 90mm

    190

    DRIP GROOVE

    PARAPET CAPPING

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    SECTIONAL DETAILS

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    15

    1 : 10

    Callout of ENTRY JUNCTION1

    1 : 10

    Callout of ROOF GARDEN PARAPET WALL2

  • 3C

    D

    192

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    63

    64 65

    66 67

    83

    102

    190 2143 110 1147 110 1053 110 2020 110

    280

    1510

    110

    1590

    110

    1247

    110

    2338

    110

    190 490 110 895 995 910 110 880 910 110 1283 110

    280

    960

    110

    2140

    110

    1247

    110

    988

    110

    1240

    110

    600

    249

    600

    251

    600

    1620

    1283

    600

    300

    600

    780

    1400 687

    930

    930 930

    930

    930

    32

    14

    19

    3

    RL 02 Ground FL10200

    RL 02 Level 114700

    CD

    5981

    119

    1180

    699

    130

    271

    3213

    8593

    127

    0

    GLAZED CERAMIC WALL TILES

    270MM FLOOR SLABCEILING HANGERS

    GLAZED CERAMIC WALL TILES

    SAFETY GRIP BAR

    CONCRET WALL WITH WALL TILE FINISH

    VM

    VB

    STRUCTURAL COLUMN

    CEMENT RENDERCEMENT RENDERCEMENT RENDER

    VB VB

    RL 02 Ground FL10200

    RL 02 Level 114700

    3

    40

    270MM FLOOR SLABCEILING HANGERS

    UR

    SS

    PO1 PO2 PO3 PO4 PO5

    SUSPENDED CEILING

    CONCRET COLUMN

    2702

    2829

    8712

    85

    2000

    CEMENTRENDER

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    AMENITY PLAN & ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    19

    1 : 50

    Callout of PLAN AMENTIES1

    1 : 50

    ELEVATION 42

    1 : 50

    ELEVATION 23

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    NO

    RTH

  • 3C

    D

    192

    FB MB

    DB

    SS

    FWFW

    FW

    FW

    FW

    UR

    FW

    FW

    SS

    63

    64 65

    66 67

    83

    102

    190 2143 110 1147 110 1053 110 2020 110

    280

    1510

    110

    1590

    110

    1247

    110

    2338

    110

    190 490 110 895 995 910 110 880 910 110 1283 110

    280

    960

    110

    2140

    110

    1247

    110

    988

    110

    1240

    110

    600

    249

    600

    251

    600

    1620

    1283

    600

    300

    600

    780

    1400 687

    930

    930 930

    930

    930

    32

    14

    19

    3

    RL 02 Ground FL10200

    RL 02 Level 114700

    CD

    5981

    119

    1180

    699

    130

    271

    3213

    8593

    127

    0

    GLAZED CERAMIC WALL TILES

    270MM FLOOR SLABCEILING HANGERS

    GLAZED CERAMIC WALL TILES

    SAFETY GRIP BAR

    CONCRET WALL WITH WALL TILE FINISH

    VM

    VB

    STRUCTURAL COLUMN

    CEMENT RENDERCEMENT RENDERCEMENT RENDER

    VB VB

    RL 02 Ground FL10200

    RL 02 Level 114700

    3

    40

    270MM FLOOR SLABCEILING HANGERS

    UR

    SS

    PO1 PO2 PO3 PO4 PO5

    SUSPENDED CEILING

    CONCRET COLUMN

    2702

    2829

    8712

    85

    2000

    CEMENTRENDER

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    AMENITY PLAN & ELEVATION

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    19

    1 : 50

    Callout of PLAN AMENTIES1

    1 : 50

    ELEVATION 42

    1 : 50

    ELEVATION 23

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    NO

    RTH

    UP

    2 3

    D

    2185

    960

    1815

    190 1160 170 1239 259 1961 150315190 1350

    1240

    250

    1280

    1500

    1250

    1239

    UP

    202122232425

    29 30 31 32 33

    26

    27

    28

    1518

    RL 02 Level 114700

    RL 02 Level 218300

    3

    1255

    1220

    270

    1350

    315

    1665

    2130

    180

    272

    1200

    930

    7

    CONCRETE STAIRTO ENGINEERS DETAIL

    BALUSTRADES 1200TO BCAREQUIREMENT

    CONCRETE STAIRTO ENGINEERSDETAIL

    RISER 180 TOBCA REQUIREMENTS

    GOINGS 272 TOBCA REQUIREMENTS

    FIRE RATEDDOOR

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    STAIRS PLN & ELE

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    20

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    NO

    RTH

    1 : 50

    Callout of STAIR 11

    1 : 30

    FIRE STAIR 12

  • ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    22/01/2013 1:12:47 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    COVER SHEET 14

    Drawing ListSheet

    Number Sheet Name Sheet Issue Date Drawn By

    1 LOWER BASEMENT 04/10/08 PRAMOD2 UPPER BASEMENT

    FLOOR PLAN04/10/08 PRAMOD

    3 GROUND FLOORPLAN

    04/10/08 PRAMOD

    4 LEVEL 1 FLOORPLAN

    04/10/08 PRAMOD

    6 LEVEL 4 FLOORPLAN

    04/11/08 PRAMOD

    7 LEVEL 5 ROOFDECK

    04/30/08 PRAMOD

    8 NORTH ELEVATION 04/30/08 PRAMOD9 SOUTH ELEVATION 04/30/08 PRAMOD10 EAST ELEVATION 04/30/08 PRAMOD11 WEST ELEVATION 05/02/08 PRAMOD12 SECTION A - A 05/16/08 PRAMOD13 SECTION B - B 06/13/08 PRAMOD14 COVER SHEET 06/13/08 Author

    NORTH EAST PERSPECTIVE1

    SOUTH WEST PERSPECTIVE2

    PYRMONT MEDIUM RISE DA DOCUMENTS

    DIPLOMA IN ARCHIETCURALTECHNOLGY

    STUDENT : PRAMOD THIRU

  • ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    22/01/2013 1:12:47 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    COVER SHEET 14

    Drawing ListSheet

    Number Sheet Name Sheet Issue Date Drawn By

    1 LOWER BASEMENT 04/10/08 PRAMOD2 UPPER BASEMENT

    FLOOR PLAN04/10/08 PRAMOD

    3 GROUND FLOORPLAN

    04/10/08 PRAMOD

    4 LEVEL 1 FLOORPLAN

    04/10/08 PRAMOD

    6 LEVEL 4 FLOORPLAN

    04/11/08 PRAMOD

    7 LEVEL 5 ROOFDECK

    04/30/08 PRAMOD

    8 NORTH ELEVATION 04/30/08 PRAMOD9 SOUTH ELEVATION 04/30/08 PRAMOD10 EAST ELEVATION 04/30/08 PRAMOD11 WEST ELEVATION 05/02/08 PRAMOD12 SECTION A - A 05/16/08 PRAMOD13 SECTION B - B 06/13/08 PRAMOD14 COVER SHEET 06/13/08 Author

    NORTH EAST PERSPECTIVE1

    SOUTH WEST PERSPECTIVE2

    PYRMONT MEDIUM RISE DA DOCUMENTS

    DIPLOMA IN ARCHIETCURALTECHNOLGY

    STUDENT : PRAMOD THIRU

    UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    1

    2

    8100

    150 190

    120

    1199 2749

    2725

    14

    1 3 4 5 6 7 8 9 10 11 12

    1314151617181920

    1200

    300

    8405 8400 8400 8400 3260

    LOWER BASEMENT FLOOR PLAN

    2500

    FIRE STAIR 1

    FIRE STAIR 2 6000

    6000

    6000

    1300

    3310

    375

    960

    RL 5200

    LIFTSHAFT

    150

    2385

    190

    2827

    190

    1450

    330

    1500

    1500

    1495

    1500

    LEGEND

    VEHICALE ACCES

    FIRE STAIRS 1 = 14m2

    LIFT SHAFT = 5m2

    FIRE STAIRS 2 = 6m2

    FIRE STAIRS 2 =

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2088

    0

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:10:29 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    LOWER BASEMENT 1

    1 : 100

    LOWER BASEMENT FLOOR PLAN1

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    9

    10

    1516

    17

    21 23 24 26 27 28 29 30 31 32

    3335363839414243

    25

    40

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    2725

    6300 1800

    150

    1295

    150

    2340

    273

    2795

    184

    1375

    2500

    300

    1200

    330

    120

    UPPER BASEMENT FLOOR PLAN

    FIRE STAIR 1

    FIRE STAIR 2

    960

    RL 7700

    1200

    330

    120

    2289

    1200

    1495 1500

    1500

    1500

    LEGEND

    VEHICAL ACCES

    FIRE STAIR 2 = 26m2

    STORAGE AREA = 6M2

    FIRE STAIRS 1= 14m2

    LIFT SHAFT = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2088

    0

    CARPARK ENTRANCE

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:10:34 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    UPPER BASEMENT FLOOR PLAN 2

    1 : 100

    UPPER BASEMENT FLOOR PLAN2

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    3

    4

    5

    6

    18

    Firestairs 1

    Firestairs 2

    8405 8400 8400 8400 3260

    CAFEAREA

    GROUND FLOORENTRANCE

    1321190

    1199 3590 150 1950

    190

    807

    1550

    190

    4655

    1250 1499 1266 190

    LIFTSHAFTGROUNDFLOOR FIRE

    STAIRS EXIT

    BASEMENTFLOORSFIRE STAIR 1 EXIT

    RL 10200

    KITCHEN

    DISABLEDWC

    FEMALEWC

    MALEWC

    2400

    2947

    2448

    2238 110 2310 110

    OFFICE AREA26

    0

    STAFFAREA

    BARENTRANCE

    PR

    EPE

    RAT

    ION

    /S

    ERVI

    NG

    TOILET ACCESS

    900

    1800

    1000

    6000

    6000

    6000

    GROUND FLOOR PLAN

    UP

    1500

    1500

    15001495

    190 3400 110 3183 110

    1390

    LEGEND

    OFFICE AREA = 340m2

    MIAN ENTRANCE

    COMMON SPACE = 34m2

    FIRE STAIRS 2 = 18m2

    WET AREAS = 37m2

    STAFF AMENTIES = 12m2

    WET AREA = 37m2

    CAFE KITCHEN = 19m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2078

    5

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:10:45 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    GROUND FLOOR PLAN 3

    1 : 100

    GROUND FLOOR PLAN3

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    7

    24

    1500

    200

    4300

    6905 4400 5405

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    MALEWC

    DISABLEDWC STAFF

    AMENITIES

    FEMALEWC

    LIFTSHAFT

    FIRESTAIR 1

    FIRESTAIR 2

    OFFICESPACE

    RL 14700

    2947

    2448

    250

    250

    250

    250

    1505 1500

    1500

    1500

    190 3400 110 3183 110

    1540 2050 2005

    1390

    3590 150 1950 2238110

    2310110

    LEVEL 1 FLOOR

    LEGEND

    OFFICE SPACE = 309m2

    COMMON SPACE = 51m2

    FIRE STAIRS = 20m2

    WET AREAS = 37m2

    FIRE STAIRS 2 = 18 m2

    STAFF AMENTIES = 8m2

    LIFT SHAFT = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2078

    5

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:11:13 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    LEVEL 1 FLOOR PLAN 4

    1 : 100

    LEVEL 1 FLOOR PLAN4

  • UP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    7

    24

    1500

    200

    4300

    6905 4400 5405

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    MALEWC

    DISABLEDWC STAFF

    AMENITIES

    FEMALEWC

    LIFTSHAFT

    FIRESTAIR 1

    FIRESTAIR 2

    OFFICESPACE

    RL 14700

    2947

    2448

    250

    250

    250

    250

    1505 1500

    1500

    1500

    190 3400 110 3183 110

    1540 2050 2005

    1390

    3590 150 1950 2238110

    2310110

    LEVEL 1 FLOOR

    LEGEND

    OFFICE SPACE = 309m2

    COMMON SPACE = 51m2

    FIRE STAIRS = 20m2

    WET AREAS = 37m2

    FIRE STAIRS 2 = 18 m2

    STAFF AMENTIES = 8m2

    LIFT SHAFT = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2078

    5

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:11:13 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    LEVEL 1 FLOOR PLAN 4

    1 : 100

    LEVEL 1 FLOOR PLAN4

    UPUP

    UP

    1 2 3 4 5 6

    A

    B

    C

    D

    27

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    2385

    1660

    190

    2570

    RL 25500

    LEVEL 4 FLOOR PLAN

    Firestairs 1

    STAFFAMENITIES

    DISABLEDWC

    FEMALEWC

    MALEWC

    LIFTSHAFT

    1495 1500

    1500

    1500

    190 3400 110 3183 110

    1390

    3590 150 1950 2238 110 2310 110

    4400 5405

    2558

    4747

    LEGEND

    OFFICE AREA = 584m2

    BALCONY = 45m2

    COMMON SPACE = 24m2

    FIRE STAIRS 1 = 24m2

    WET AREAS = 37m2

    STAFF AMENTIES = 12m2

    FIRE STAIR 2 = 18m2

    LIFT SHAFT = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39750

    2078

    5

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:12:35 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    SECTION A - A 12

    1 : 100

    LEVEL 4 FLOOR PLAN5

  • UP

    1 2 3 4 5 6

    A

    B

    C

    D

    76

    79 80

    82

    RL 29100

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    2238 110 2310 110 3577 110

    2620

    6000

    1600

    2835

    110

    2532

    Firestairs 1

    KITCHENDISABLEDWC

    FEMALEWC

    MALEWC

    LIFTSHAFT

    FIRESTAIR 2

    UP

    ROOF LEVEL FLOOR

    OUTDOORGARDEN AREA

    Firestairs 1

    KITCHENDISABLEDWC

    FEMALEWC

    MALEWC

    LIFTSHAFT

    1500

    1500

    1505

    1500

    190 3400 110 3183 110

    1390

    3590 150 1950 2238 110 2310 110

    LEGEND

    OUT DOR AREA

    ROOF OPEN SPACE = 488m2

    LIFT SHAFT = 5m2

    FIRE STAIRS 2 = 18m2

    WET AREAS = 37m2

    STAFF AMENTIES = 12m2

    FIRE STIARS 1 = 21m2

    GARDEN BED = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39860

    2100

    0

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:12:26 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    WEST ELEVATION 11

    1 : 100

    LEVEL 5 ROOF DECK FLOOR PLAN6

  • UP

    1 2 3 4 5 6

    A

    B

    C

    D

    76

    79 80

    82

    RL 29100

    8405 8400 8400 8400 3260

    6000

    6000

    6000

    2238 110 2310 110 3577 110

    2620

    6000

    1600

    2835

    110

    2532

    Firestairs 1

    KITCHENDISABLEDWC

    FEMALEWC

    MALEWC

    LIFTSHAFT

    FIRESTAIR 2

    UP

    ROOF LEVEL FLOOR

    OUTDOORGARDEN AREA

    Firestairs 1

    KITCHENDISABLEDWC

    FEMALEWC

    MALEWC

    LIFTSHAFT

    1500

    1500

    1505

    1500

    190 3400 110 3183 110

    1390

    3590 150 1950 2238 110 2310 110

    LEGEND

    OUT DOR AREA

    ROOF OPEN SPACE = 488m2

    LIFT SHAFT = 5m2

    FIRE STAIRS 2 = 18m2

    WET AREAS = 37m2

    STAFF AMENTIES = 12m2

    FIRE STIARS 1 = 21m2

    GARDEN BED = 5m2

    BOUNDARY

    BOUNDARY

    BOU

    ND

    ARY

    BOU

    ND

    ARY

    39860

    2100

    0

    ScaleCommencement Date :

    For :

    Date :Amendment :

    Drawing Number :Drawing Name : A2Sheet Name :

    1 : 100

    22/01/2013 1:12:26 PMHARRIS STREET, PYRMONT

    G:\Tafe work 2008\2012 revit TAFE WORK\DA PRAMOD THIRU2012.rvt

    Pramod Thiru

    7/03/2008 DA

    AMid Rise DA

    WEST ELEVATION 11

    1 : 100

    LEVEL 5 ROOF DECK FLOOR PLAN6

    1100

    0

    4900

  • LEGEND

  • LEGEND

    Unit 12

    Unit 14

    Unit 15

    PROPOSED SITE

    ENTRANCE FROM STREET FRONTAGE

  • LEGEND

    Unit 12

    Unit 14

    Unit 15

    PROPOSED SITE

    ENTRANCE FROM STREET FRONTAGE

    Commcerical Fitout Completed

  • Construction Drawings for Scouts Hall

  • PIER SUPPORT400mm Diameter

    REINFORCED CONCRETE SLAB ON GROUND

    BASE PLATE BOLTED TO FOUNDATIONWITH HOLDING DOWN BOLTS

    STEEL SHOE

    10 mm THICK GLASS BALUSTRADE

    GLUE LAMINATED ARCH BEAM

    10mm GLAZING

    30mm HARDWOOD PANELS

    COLOR BOND STEEL DOWNPIPE

    CUSTOM BLUE ORB ROOF SHETTNIG

    PERFERATED MINI ORB INTERNAL ROOF LINING

    TRANSLUCENT COLOR BOND ROOF SHEETING

    TRANSLUCENT GLAZING TRANSLUCENT GLAZING

    PIN JOINT

    STAINLESS STEEL PLATE BOLTES TO GLUE LAMINATEDMEMBER WITH STAINLESS STEEL COUNTER SUNK BOLT

    VENT HOLE BATTERNS300x75mm

    ROOF VENT

    300 X 150 STRUCTURAL LINTEL

    INSULATION

    ROLL FORMED METAL EAVE GUTTER

    ISOLATED PEIR SUPPORT150 50 mm BEARERS100 X 50 mm FLOOR JOIST

    100 X 50 TIMBER MULLIONS

    SCREED BED

    PVC FOAM

    HARDWOOD VINYL FLOORING

    MINERAL WOOL INSULATION 70mm

    6MM CURTAIN WALL PANEL

    ALUMINUM CASEMENT FOR CURTAIN WALL

    MATERIAL CONTAINER BAFFLE

    10MM PLYWOOD INTERNAL LINING

    RETRACTABLESEATS

    HARDWOOD VINYL FLOORING

    6mm FROSTED GLASSPANEL

    ALUMINUM CASEMENT

    175x75mm PURLINS

    WEIL PARK SCOUTS HALL SECTIONCONSTRUCTION CERTIFICATE DRAWING A1.0

    DRAWING NO.

    AREV.

    SERIES

    SCALEDATE

    SECTION DRAWING

    1:5006/10/2011

    A DEVELOPMENT APPLICATION ISSUE 14/9/11REV ISSUE DATE

  • PIER SUPPORT400mm Diameter

    REINFORCED CONCRETE SLAB ON GROUND

    BASE PLATE BOLTED TO FOUNDATIONWITH HOLDING DOWN BOLTS

    STEEL SHOE

    10 mm THICK GLASS BALUSTRADE

    GLUE LAMINATED ARCH BEAM

    10mm GLAZING

    30mm HARDWOOD PANELS

    COLOR BOND STEEL DOWNPIPE

    CUSTOM BLUE ORB ROOF SHETTNIG

    PERFERATED MINI ORB INTERNAL ROOF LINING

    TRANSLUCENT COLOR BOND ROOF SHEETING

    TRANSLUCENT GLAZING TRANSLUCENT GLAZING

    PIN JOINT

    STAINLESS STEEL PLATE BOLTES TO GLUE LAMINATEDMEMBER WITH STAINLESS STEEL COUNTER SUNK BOLT

    VENT HOLE BATTERNS300x75mm

    ROOF VENT

    300 X 150 STRUCTURAL LINTEL

    INSULATION

    ROLL FORMED METAL EAVE GUTTER

    ISOLATED PEIR SUPPORT150 50 mm BEARERS100 X 50 mm FLOOR JOIST

    100 X 50 TIMBER MULLIONS

    SCREED BED

    PVC FOAM

    HARDWOOD VINYL FLOORING

    MINERAL WOOL INSULATION 70mm

    6MM CURTAIN WALL PANEL

    ALUMINUM CASEMENT FOR CURTAIN WALL

    MATERIAL CONTAINER BAFFLE

    10MM PLYWOOD INTERNAL LINING

    RETRACTABLESEATS

    HARDWOOD VINYL FLOORING

    6mm FROSTED GLASSPANEL

    ALUMINUM CASEMENT

    175x75mm PURLINS

    WEIL PARK SCOUTS HALL SECTIONCONSTRUCTION CERTIFICATE DRAWING A1.0

    DRAWING NO.

    AREV.

    SERIES

    SCALEDATE

    SECTION DRAWING

    1:5006/10/2011

    A DEVELOPMENT APPLICATION ISSUE 14/9/11REV ISSUE DATE

  • UP

    2 3

    D

    2185

    960

    1815

    190 1160 170 1239 259 1961 150315190 1350

    1240

    250

    1280

    1500

    1250

    1239

    UP

    202122232425

    29 30 31 32 33

    26

    27

    28

    1518

    RL 02 Level 114700

    RL 02 Level 218300

    3

    1255

    1220

    270

    1350

    315

    1665

    2130

    180

    272

    1200

    930

    7

    CONCRETE STAIRTO ENGINEERS DETAIL

    BALUSTRADES 1200TO BCAREQUIREMENT

    CONCRETE STAIRTO ENGINEERSDETAIL

    RISER 180 TOBCA REQUIREMENTS

    GOINGS 272 TOBCA REQUIREMENTS

    FIRE RATEDDOOR

    Scale

    Checked by

    Drawn by

    Date

    Project number

    PT DESIGNS

    COLLEGE

    COURSE

    DOCUMENTS

    STUDENT

    SYDNEY INSTITUTE OFTECHNOLOGYULTIMO 2007 NSW

    DIPLOMA IN ARCHITECTURALTECHNOLOGYCC DRAWINGS

    PRAMOD THIRU

    STAIRS PLN & ELE

    CC

    MID RISE CC

    Pramod Thiru

    7/03/2008

    Author

    20

    NOTES

    K = KITCHENMB = MALE BATHROOMFB = FEMALE BATHROOMDB = DISABLED BATHROOMSS = SERVICE SHAFTUR = URINALVM = VANITY MIRRORVB = VANITY BASINR = REFRIGERATORFW = FLOOR WASTECFT = CERAMIC FLOOR TILES

    NO

    RTH

    1 : 50

    Callout of STAIR 11

    1 : 30

    FIRE STAIR 12

    Contact DetailsName : Pramod ThirunavukarasuContact Email : [email protected] Number: 0433735702