rfp for end to end reconciliation of debit card transactions … · jharkhand state cooperative...
TRANSCRIPT
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-1
NIT No-JSCB/06/17/722
END TO END Reconciliation
Solution for All type of
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-3
Contents Document Control Sheet ............................................................................................................ 6
Disclaimer .................................................................................................................................. 7
SECTION - I .............................................................................................................................. 8
Request for Proposal .............................................................................................................. 8
1.1 Background ............................................................................................................. 8
1.3 Bid Price ............................................................................................................... 10
1.4 Bid Security (Earnest Money Deposit [EMD]) .................................................... 11
1.7 Period of Validity of Bids ..................................................................................... 12
1.8 Format and Signing of Bid ................................................................................... 14
1.9 Bidder Qualification ............................................................................................. 15
1.10 Late Bids ............................................................................................................... 15
1.11 Signing of Contract ............................................................................................... 15
SECTION - II ........................................................................................................................... 16
Eligibility Criteria for the Bidder ......................................................................................... 16
SECTION – III ......................................................................................................................... 16
Scope of Work ..................................................................................................................... 16
3.0.3 Reconciliation Process ............................................................................................ 18
3.0.4 Record Management ............................................................................................... 18
3.0.7 Transaction Process................................................................................................. 19
3.1 ATM Transactions Reconciliation – ONUS and Acquirer ................................... 19
3.2 Cash in ATM Balancing ....................................................................................... 20
3.8 Point of Sale Transactions / E-commerce Transactions ....................................... 22
3.9 Accounting ............................................................................................................ 23
3.10 MIS ....................................................................................................................... 23
3.12 Deployment of Servers and Manpower ................................................................... 25
3.13 Backup Activities ..................................................................................................... 26
3.14 Time Frame .............................................................................................................. 26
3.15 UAT ......................................................................................................................... 26
SECTION – IV ........................................................................................................................ 27
Instructions to the Bidder ..................................................................................................... 27
4.2 Instructions to Bidders for Submission Of Bids ................................................... 27
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-4
4.3 Clarification of Bid Document ............................................................................. 29
4.4 Language of Bids .................................................................................................. 29
4.5 Submission Of Bids .............................................................................................. 29
ENVELOPE-I (Technical Offer): (1 Copy) ......................................................................... 29
ENVELOPE-II ( Indicative Commercial Offer): (1 Copy).................................................. 29
4.6 Evaluation Process ................................................................................................ 30
Terms and Conditions ...................................................................................................... 34
Compliance with RBI and other Regulatory requirements .............................................. 55
Statutory Requirements and Right of inspection by RBI ................................................. 56
Annexure – 1 (Offer Covering Letter) ............................................................................. 61
Functional Specifications ................................................................................................. 64
Technical Specifications .................................................................................................. 78
Annexure-4 Indicative Commercial Bid .......................................................................... 81
Annexure –5 ELIGIBILITY CRITERIA & Details of Bidder ........................................ 83
Details of the Bidder ........................................................................................................ 85
Annexure - Bank Details .................................................................................................. 87
Experience in Providing Reconciliation Solution .................................................................... 88
Annexure-8 Details of Support Centers ................................................................................... 89
Annexure 9 Format for Raising Pre-Bid Clarifications ........................................................... 90
Annexure-10 Undertaking........................................................................................................ 91
AGREEMENT/CONTRACT .................................................................................................. 93
Deed of Indemnity ................................................................................................................... 97
Non-Disclosure Agreement.................................................................................................... 100
TERMS & CONDITIONS OF THE RFP .............................................................................. 106
Performance Security ............................................................................................................. 107
GUARANTEE FOR PERFORMANCE OF CONTRACT ................................................... 107
Certificate regarding Change in Ownership ........................................................................... 111
Annexure – 18 CHECKLIST TO BE GIVEN BY THE BIDDER AT THE TIME
OF TECHNICAL BID ........................................................................................................... 112
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-6
Document Control Sheet
Name of the Company Jharkhand State Cooperative Bank Ltd.
Bid Ref No Ref. 722 Dated 23.06.2017
Date of commencement of issue
of tender document
23.06.2017
Cost of the BID Document
(non-refundable)
Rs. 10,000 (Ten Thousand) only
EMD (Earnest Money Deposit)
Amount
Rs. 10,00,000 (Ten Lakhs) only
Last date for submission of
Prebid queries
01.07.2017 till 4 PM.
Date of Pre-bid meeting with
Bidders
07.07.2017 at 3 PM. Venue:- Conference Hall, 3rd
Floor, Agriculture Marketing Board Building, Itki
Road, Hehal, Ranchi – 834005.
Last Date and Time for Receipt
/ Submission of Bids
15.07.2017 at 2 PM.
Date and Time of opening of
Technical Bids.
15.07.2017 at 3 PM.
Date and time of opening of
indicative Price /Indicative
Commercial Bid
Date and time will be duly communicated.
Place of Opening of bids /pre
bid meeting
Conference Hall, 3rd Floor, Agriculture Marketing
Board Building, Itki Road, Hehal, Ranchi – 834005.
Address for Communication Chief Executive Officer
3rd Floor, Agriculture Marketing Board Building, Itki
Road, Hehal, Ranchi – 834005.
Note:
1. This tender document is the property of JSCB Bank Ltd. & is not transferable.
2. If a holiday is declared on the dates mentioned above, the bids shall be received
/opened on the next working day at the same time specified above.
3. This tender document has [111] pages.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-7
Disclaimer
The information contained in this Request for Proposal (“RFP”) document or
information provided subsequently to Bidders or applicants whether verbally or in
documentary form by or on behalf of JSCB Bank Limited. (“JSCB Bank” or "Bank"), is
provided to the Bidder(s) on the terms and conditions set out in this RFP document and all
other terms and conditions subject to which such information is provided.
This RFP document is not an agreement and is neither an offer. This RFP is to invite
proposals from applicants who are qualified to submit the bids (hereinafter individually and
collectively referred to as “Bidder” or “Bidders” respectively). The purpose of this RFP is to
provide the Bidders with information and to assist the formulation of their proposals (Bids).
This RFP does not claim to contain all the information each Bidder may require. Each Bidder
should, at own costs without any right to claim reimbursement, conduct its own independent
investigations and analysis and is free to check the accuracy, reliability and completeness of
the information in this RFP. JSCB Bank makes no representation or warranty and shall incur
no liability under any law, statute, rules or regulations as to the accuracy, reliability or
completeness of this RFP. The information contained in the RFP document is selective and is
subject to updating, expansion, revision and amendment. JSCB Bank does not undertake to
provide any Bidder with access to any additional information or to update the information in
the RFP document or to correct any inaccuracies therein, which may become apparent. JSCB
Bank reserves the rights of discretion to change, modify, add to or alter any or all of the
provisions of this RFP and/or the bidding process, without assigning any reasons whatsoever.
Such change will be published on the Bank's website. Any information contained in this RFP
will be superseded by any later written information on the same subject made available by
JSCB Bank at its website.
Information provided in this RFP is on a wide range of matters, some of which may
depend upon interpretation of law. The information given is not intended to be an exhaustive
account of statutory requirements and should not be regarded as a complete or authoritative
statement of law. JSCB Bank does not own any responsibility for the accuracy or otherwise
for any interpretation or opinion on law expressed herein. Further, JSCB Bank also does not
accept liability of any nature whether resulting from negligence or otherwise howsoever
caused arising from reliance of any Bidder upon the statements contained in this RFP.
JSCB Bank in its absolute discretion, but without being under any obligation to do so,
update, amend or supplement the information in this RFP. JSCB Bank reserves the right to
reject any or all the expression of interest / proposals received in response to this RFP
document at any stage without assigning any reason whatsoever. The decision of JSCB Bank
shall be final, conclusive and binding on all the Bidders/parties directly or indirectly
connected with the bidding process.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-8
SECTION - I
Request for Proposal
1.1 Background
1.1.1 JSCB Bank Limited (“JSCB /Bank”) is a Bank incorporated and registered under
cooperative societies act, JSCB Bank is engaged in providing finance to industries
and banking business.
1.1.2 JSCB Bank, has card base of approximately 10 Lacs debit cards and has a daily
volume of approximately 50,000 ATM and POS (Point of Sale) transactions in a
day. JSCB Bank produces approximately 1000 debit cards in a day. JSCB Bank has
deployed 2000 ATMs Micro ATMs and POS devices at locations and various
networks like NPCI Net, Rupay, etc. through which approximately 50,000 financial
and non-financial transactions are processed on a normal day. JSCB Bank intends to
avail services of a Bidder of repute having proven expertise and competence in the
field of providing a solution for reconciliation of All type of Transactions and
ATMs.
1.1.3 JSCB Bank therefore, invites Request for Proposal (“RFP”) for providing a software
solution offering END-TO-END Reconciliation Solution for All type of
Transactions like APBS. MMS, ECS, etc. and ATMs at Bank’s primary and DR
(Disaster Recovery) site, from Bidders having proven past experience and
competence in the field of providing transaction reconciliation solutions in various
banks at different locations PAN India, as mentioned in the scope of services. The
RFP document may be downloaded from the Bank’s official website
www.jscb.gov.in The cost of the RFP document is Rs.10000/- (Rupees Ten
Thousand Only) and Bidder is required to submit the same in the form of Demand
Draft / Pay Order in favour of JSCB Bank Limited, payable at Ranchi at the time of
submission of the technical bid, failing which the bid of the concerned Bidder will
be rejected. The cost of this RFP is non-refundable. For avoidance of doubts it is
clarified that the amount so paid towards the cost of RFP is not earnest money /
security deposit and shall not be adjusted against any amounts paid/ payable by the
Bidder.
1.1.4All costs and expenses (whether in terms of time or money) incurred by the Bidder in
any way associated with the preparation and submission of responses, including but
not limited to attendance at meetings, discussions, demonstrations, etc. and
providing any additional information required by Bank, will be borne entirely and
exclusively by the Bidder. JSCB Bank shall in no case be held responsible or liable
for such costs, regardless of the conduct or outcome of the biding process including
but not limited to cancellation / abandonment / annulment of the bidding process.
1.1.5The RFP document is intended solely for the information of the party to whom it is
issued (“Recipient”). Each Recipient may notify the Bank of any error, fault,
omission, or discrepancy found in this RFP document as pre-bid query on or before
the last date of submission of pre-bid query. Deem a Recipient will, by responding
to this RFP document, to have accepted the terms as stated in this RFP.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-9
1.1.6The RFP cannot be sold and / or transferred / assigned. If the same is done, Bid shall
liable to be summarily rejected by JSCB Bank. Any decision of JSCB Bank in this
regard shall be final, conclusive and binding on the Bidder.
1.1.7The Bidder is expected to examine all instructions, forms, terms and specifications
contained in the RFP. Bid shall be deemed to have been made by the Bidder after
careful study and examination of this RFP with full understanding of its
implications. Each Bidder should, at its own costs without any right to claim
reimbursement, conduct its own investigations, analysis and should check the
accuracy, reliability and completeness of the information in this RFP and wherever
felt necessary obtain independent advice. The Bid should be precise, complete and
in the prescribed format, as per the requirement of this RFP. Failure to furnish all
information required by this RFP or non-submission of a Bid in accordance with this
RFP in each and every respect will be at the Bidder’s risk and may result in rejection
of the Bid for which JSCB Bank shall not be held liable or responsible. Any
decision taken by JSCB Bank as to completeness of the Bid or rejection of any / all
Bid(s) shall be final, conclusive and binding upon the Bidder(s) and shall not be
question / challenged by the Bidder(s).
1.1.8The RFP document is intended solely for the information of the party to whom it is
issued. Each recipient of the RFP (prospective Bidder) may notify the Bank of any
error, fault, omission, or discrepancy found in this RFP document as pre-bid query
on or before the last date of submission of pre-bid query.
1.1.9 A prospective Bidder requiring any clarification in relation to this RFP may in writing
or by way of an E-mail contact the following personnel. The address for
communication is mentioned in the Document Control Sheet.
Name of the officer Contact Particulars Contact Number
General Manager Email: [email protected] 0657-2510283
Further, JSCB Bank may hold a pre-bid meeting on any request or queries for
clarification of this RFP, from the prospective Bidder.
1.1.10 JSCB Bank reserves the sole right to amend / modify the RFP and/or to include any
addendum to this RFP. The Bidder shall not claim as a right for requiring JSCB to
do the aforesaid.
At any time before the deadline for submission of Bids, JSCB Bank may, for any
reason whatsoever, whether at its own initiative or in response to a clarification
requested by prospective Bidder, modify this RFP and all such modifications shall
be binding on them. The amendments/addendum made to this RFP shall be brought
to the notice of / made accessible to all prospective Bidders and all such
amendments shall be binding on them.
If required, in order to allow prospective Bidders reasonable time, to take into
account the amendment/addendum in preparing their Bids, JSCB Bank at its sole
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-10
discretion reserves the right (but shall not be bound) to extend the deadline for the
submission of Bids. However, no request from the Bidder, shall be binding on JSCB
Bank for the same. The decision of JSCB Bank shall be final, conclusive and
binding on all the Bidder(s) and shall not be questioned / challenged by the
Bidder(s).
1.1.11 Notwithstanding the above, JSCB Bank in its sole discretion, may amend /modify
the RFP after the deadline for submission of Bids and in such an event JSCB Bank
shall extend the deadline so fixed for submission of Bids.
1.1.12 Tender offers will be opened in the presence of the Bidders’ representatives who
choose to attend the opening of tenders on the above specified date, time and venue.
Technical Specifications, Terms and Conditions and various formats and pro-forma
for submitting the tender offer are described in this RFP document.
1.1.13 The RFP document is not recommendation, offer or invitation to enter into a
contract, agreement or any other arrangement, in respect of the services. The
provision of the services is subject to observance of selection process and
appropriate documentation being agreed between the JSCB Bank and successful
Bidders as identified by the JSCB Bank, after completion of the selection process as
detailed in this RFP document.
1.1.14 Decision as to any arithmetical error, manifest or otherwise in the response to Bid
Document shall be decided at the sole discretion of JSCB Bank and shall be binding
on the Bidder. Any decision of JSCB Bank in this regard shall be final, conclusive
and binding on the Bidder.
1.1.15 In case of reduction of prices due to technological obsolescence / change of product
model, the Bidder should pass on the price benefit to JSCB. Similarly, in case of any
increase in prices the Bidder has to continue to absorb the same and not charge any
additional amount other than the one arrived in the RFP.
1.1.16 The Prices must be indicated in Indian Rupees only. The price quoted by the bidder
will be an all-inclusive price i.e. it shall include all taxes, levies, duties, insurance,
transportation, freight, royalties, Installation and commissioning charges, if any, etc
excluding service tax and Octroi.
1.1.17 In case there is any difference in rate quoted given in words and figures, the rate
written in words shall be considered final & binding.
1.1.18 No extra cost shall be payable by JSCB for integration with all relevant
applications/systems for reconciliation.
1.1.19 Prices payable to the Bidder as stated in the Contract shall be firm and not subject to
adjustment during performance of the Contract, irrespective of reasons whatsoever,
including exchange rate fluctuations, changes in taxes, duties, levies, charges, etc
1.2 Bid Currency
Bids are to be quoted in Indian Rupees only.
1.3 Bid Price
Prices quoted by the Bidder shall be fixed during the Contract Period of 3years. The
per-transaction Bid price (indicative) should be quoted by the bidder as per format
given in Annexure 4 of the RFP. The indicative Price Bids of eligible and
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-11
technically responsive shortlisted bidders would be opened. The date and time of
opening of Price Bids (Indicative) will be communicated to such shortlisted Bidders.
The price quoted by the Bidder will be an all-inclusive price and should be inclusive
of applicable taxes, duties, levies, insurance, charges, Road Entry Tax,
transportation, freight, royalties, installation and commissioning charges etc., but
exclusive of Service Tax payable to Government Authorities and Octroi.. The price
quoted shall not be subject to variation on any account, including exchange rate
fluctuations, changes in taxes, duties, levies, charges etc. The Service tax as
applicable from time to time on the fees payable will be borne / paid by the JSCB
Bank. In case of any new tax on the fees payable for services rendered by the bidder
being introduced subsequently, the same will be borne by the JSCB Bank.
The Bank will pay for actual number of financial transactions (on us / issuer/
acquirer / POS/ e-commerce) recorded at the Switch level for a day. The payment
will be made on monthly basis for a particular month. The payment by JSCB Bank
to the Bidder will be made as per the payment terms specified in section5.31 of the
RFP.
No charges other than the cost arrived as L1 price excluding service tax will
be payable to the Bidder.
Prices that are not quoted as above will be summarily rejected. A bid
submitted with an adjustable price quotation will be treated as non-responsive
and will be rejected forthwith. Any decision of JSCB Bank in this regard shall
be final, conclusive and binding on Bidders.
Prices quoted must be firm and final and shall not be subject to any re-
openers or upward modifications, on any account whatsoever including
exchange rate fluctuations, revision in taxes, duties, levies, charges etc. The
Bid Prices shall be indicated in Indian Rupees (INR) only. Any decision in
this regard by JSCB Bank shall be final, conclusive and binding on the
Bidder.
1.4 Bid Security (Earnest Money Deposit [EMD])
The Bidder shall furnish, as part of its Bid, a bid security (EMD) as mentioned in
document control sheet by way of demand draft or pay order in favour of ‘JSCB
Bank Limited’ payable at Ranchi. The EMD shall be furnished in Indian National
Rupee [INR] only. Any Bid not secured by EMD as mentioned above, shall be
summarily rejected forthwith by JSCB, without any further correspondence, as
nonresponsive. Any decision of JSCB in this regard shall be final, conclusive and
binding on the Bidder.
The EMD will not bear any interest and this amount shall be forfeited in the event
of any evasion, avoidance, refusal or delay on the part of the Bidder to sign and execute the Contract/ agreements or any other document, as may be required by Bank in case the Bid is accepted by the Bidder.
The EMD of the Successful Bidder(s) will be returned within 90 days from date of
signing of the Contract and submission of performance guarantee and other
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-12
guarantee(s)/security in the form and manner satisfactory to JSCB Bank, within the
stipulated time. It is clarified that no interest shall be payable by JSCB Bank on the
EMD.
The EMD of the Unsuccessful Bidders’ will be returned to the Unsuccessful Bidder
through NEFT/RTGS or any other mode as may be decided by JSCB Bank as
promptly as possible but not later than 90 days after the expiration of the Bid
Validity Period prescribed by JSCB Bank. No interest will be payable on EMD.
The EMD will be forfeited:
a) If the Bidder withdraws its Bid during the Bid Validity Period; or
b) If the Bidder makes any statement or encloses any form which turns out to be
false, incorrect and/or misleading at any time prior to signing of
Contract and/or conceals or suppresses material information; or
c) In the case of the Successful Bidder, if the Successful Bidder evades / avoids /
refuses / delays / fails:
if.To sign the Contract in the form and manner to the satisfaction of JSCB
Bank.; or
ii.To furnish performance security in the form and manner to the satisfaction
of JSCB Bank.
Notwithstanding anything contained in the RFP, any decision in this regard
by JSCB Bank shall be final, conclusive and binding on the Bidders and shall
not be questioned / challenged by the Bidders
The Bidders shall submit their bids strictly in accordance with the terms and
conditions of this RFP document. Any Bidder, who stipulates conditions contrary to
the conditions given in this RFP document, is liable for rejection forthwith. Any
decision of JSCB Bank in this regard shall be final, conclusive and binding on the
Bidders.
1.5 Any decision as to compliance of the terms and conditions of this RFP document
and on rejection of any tender document or any part thereof shall be at the sole
discretion of JSCB Bank Ltd. and shall be final, conclusive and binding on the
tender /supplier/Bidder.
1.6 JSCB Bank reserves the right to adjust arithmetical or other errors in the bid, in the
manner in which JSCB Bank considers appropriate or deem fit. Any adjustments so
made by JSCB Bank shall be stated to the Bidder, if JSCB Bank makes an offer to
accept his bid. The final decision as to any error manifest or otherwise shall be at
the sole discretion of JSCB Bank and be final, conclusive and binding on the
Bidder.
1.7 Period of Validity of Bids
a) Bids should be valid for 180 (One hundred and eighty) days from the last date of
submission ( Bid Validity Period) A bid valid for a shorter period may be rejected by
Bank as non-responsive, without any correspondence. Any decision in this regard by
Bank shall be final, conclusive and binding on the Bidder.
b) In exceptional circumstances, Bank may solicit the Bidders' consent to an extension
of the period of validity. The request and the responses thereto shall be made in
writing. The refusal of the request for extension of the period of validity shall not
forfeit or affect the validity of the Bid Security. A Bidder granting the request will
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-13
not be permitted to modify its bid. Extension of Bid Validity Period by the Bidder
should be unconditional and irrevocable. The Bid Security provided shall also be
suitably extended by the Bidder
c) Any bid received by JSCB Bank after the last date for receipt of bids prescribed by
JSCB Bank, will be rejected and/or returned unopened to the Bidder. Any decision in
this regard by JSCB Bank shall be final, conclusive and binding on the Bidder(s).
d) The Bidder should also submit a copy of this RFP along with Corrigendum, if any,
duly signed and stamped by its authorized signatory as acceptance of all terms and
conditions including scope of work etc. mentioned in the RFP. The letter of
authorization/ board resolution (certified true copy) shall accompany the Bid. The
person or persons signing the Bid shall put his/her initial on all the pages of the Bid.
The Corrigendum, if any, will be published only on the Bank’s website.
e) There may be a pre bid meeting with the Bidders on the stipulated date and time to
address any queries in connection with the RFP document. It is essential that all
clarifications/queries be submitted to JSCB Bank before the date specified on
document control sheet and in the format given as per Annexure 9
f) A Bidder may modify or withdraw its Bid after its submission, provided that written
notice of the modification or withdrawal is received by JSCB Bank prior to the
closing date and time prescribed for submission of Bids. No Bid can be modified or
withdrawn by the Bidder, subsequent to the closing date and time for submission of
the Bid. The Bidder’s modification or withdrawal notice shall be prepared, sealed,
marked and delivered in accordance with the procedure set-out for submission of
Bids and shall be placed in an envelope marked as “MODIFICATION” or
“WITHDRAWAL” as appropriate. A duly signed withdrawal notice may also be sent
by fax or post so as to reach the designated office before the expiration of deadline
for submission of Bids.
g) No Bid may be withdrawn in the interval between the deadline for submission of Bids
and the expiry of Bid Validity Period. Withdrawal of a Bid during this interval may
result in the Bidder’s forfeiture of its EMD.
h) The Bidders shall submit their Bids strictly in accordance with the terms and
conditions of this RFP document. Any Bidder, who stipulates conditions contrary to
the conditions given in this RFP document, is liable for rejection forthwith. Any
decision of JSCB Bank in this regard shall be final, conclusive and binding on the
Bidders.
i) The Commercial Bids of Bidders will not be opened for bidders who are technically
disqualified and will not be taken up for further process and no discussions/interface
will be granted to such Bidders.
j) JSCB Bank will scrutinize the Bids to determine completeness, accurateness and
whether items are quoted as per the schedule etc. JSCB Bank may, at its discretion,
waive any minor non-conformity or any minor irregularity in the Bid. This shall be
final, conclusive and binding on all Bidders and JSCB Bank reserves the right for
such waivers.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-14
k) The Bid prepared by the Bidder, as well as all correspondence and documents relating
to the Bid exchanged by the Bidder and JSCB Bank and supporting documents and
printed literature shall be in English.
l) Technical details must be completely filled up. The Bid form and the documents
attached to it shall not be detached or removed one from the other and no
alteration(s) or mutilation(s) (other than filling in all the blank spaces) shall be made
in any of the Bid documents attached thereto. However, alterations or changes to the
entries in the attached documents shall be made by a separate covering letter, in the
absence of which it shall be rejected forthwith. Any decision in this regard by JSCB
Bank shall be final, conclusive and binding on the Bidder.
m) JSCB Bank will not entertain any enquiries from the Bidders post Bid opening on the
status of the Bid, nor allow any price reductions during the course of technical or
commercial evaluation, till the selected Bidder is notified. No Bidder shall contact
JSCB Bank on any matter relating to its Bid, from the time of offer opening to the
time the Contract is awarded. Any effort by a Bidder to influence JSCB Bank in its
decision on Bid evaluation, comparison or Contract award decisions may result in the
rejection of the Bidder’s Bid forthwith. Any decision of JSCB Bank in this regard
shall be final, conclusive and binding on the Bidder.
n) The Bank reserves the right to accept or reject any Bid/offer received in part or in full,
and to cancel the Bidding process and reject all Bids at any time prior to award of
Contract, without thereby incurring any liability to the affected Bidder or Bidders or
any obligation to inform the affected Bidder or Bidders of the grounds for the Bank’s
action. JSCB Bank shall not be bound to give any reasons or explain the rationale for
its actions/decisions to annul or abandon or cancel the bid process. JSCB Bank
further reserves the right to re-issue/re-commence the Bid or circulate new RFP
altogether on the subject matter or any activity or part thereof concerning thereto.
1.8 Format and Signing of Bid
a) The Bidder shall submit Only One Original set of the bid.
b) The original bid shall be typed or written legibly. The original shall be signed by the
Bidder or a person or persons duly authorized to bind the Bidder to the Contract.
c) The bid shall contain no interlineations, erasures or overwriting except as necessary to
correct errors made by the Bidder, in which case such corrections shall be initialed by
the authorised person or persons signing the bid.
d) The bid should be a complete document and should be bound as a volume. The
document should be printed on one side only with page numbers and
appropriately flagged and contain the list of contents with page numbers. The
deficiency in documentation may result in the rejection of the Bid. Any decision in
this regard by Bank shall be final, conclusive and binding on the Bidder.
e) Each page should be stamped and initialed by authorized signatory.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-15
f) The Bidders shall seal and mark the Bid accordingly.
g) If the outer cover of the bid is not sealed and marked appropriately, JSCB Bank will
assume no responsibility for the bid's misplacement or premature opening.
1.9 Bidder Qualification
a) The "Bidder" as used in the Bid Documents shall mean the one who has signed the
Bid Form. The Bidder may be either the Principal Officer or his duly Authorized
Representative, in which case he/she shall submit a certificate of authority. All
certificates and documents (including any clarifications sought and any subsequent
correspondences) received hereby, shall, as far as possible, be furnished and signed
by the Authorized Representative and the Principal Officer.
b) It is further clarified that the individual signing the Bid or other documents in
connection with the bid must certify whether he/she signs as Constituted Attorney of
the firm / company.
c) The Bidder shall sign the bid with the exact name of the firm to whom the contract is
to be issued. The bid shall be duly signed and sealed by an authorised officer of the
Bidder’s organization. Each bid shall be signed by a duly authorized officer.
d) The Bidder shall clearly indicate their legal constitution and the person signing the
bid shall state his capacity and also source of his ability to bind the bidder.
e) The power or authorization, or any other document consisting of adequate proof of
the ability of the signatory to bind the Bidder shall be annexed to the bid. JSCB Bank
may reject outright any bid not supported by adequate proof of the signatory’s
authority.
1.10 Late Bids
Any bid received by Bank after the last date and time (as referred in the Document
Control Sheet) for receipt of bids prescribed by JSCB Bank, will be rejected. Any
decision in this regard by JSCB Bank shall be final, conclusive and binding on the
Bidder.
1.11 Signing of Contract
a) After Bank notifies the successful Bidder that its bid has been accepted; JSCB Bank
will issue a letter of intent to the selected bidder. After receiving the same the
selected bidder would send acceptance in writing within one week from the date of
the receipt
b) The Successful Bidder should sign the Agreement / Contract Form at Ranchi (as
given in Annexure 12) within 15 days of receipt of notification of award of contract.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-16
SECTION - II
Eligibility Criteria for the Bidder
The qualification for selecting a bidder will primarily depend upon the level of
expertise and experience, capacity and capability of the Bidder.
The Bidder submitting the offer should be a registered company in India.
The Bidder should be in the business of implementing for ATM, POS,
Networks, Bank and E-commerce transaction reconciliation for a minimum
period of three years as on the bid submission date.
The Bidder should have a minimum turnover of Rs.5 crores for each of the
previous 3 financial years as per the audited financial statement. i.e. FY
2014-2015, FY 2015- 2016 and FY 2016-2017. Copies of the last three
financial year's audited balance sheets along with other details should be
submitted along with the offer.
The Bidder shall have positive net worth and in profit for the last 3 financial
years viz., 2014-15, 2015-16 and 2016-2017.
The bidder should not have been put in the negative list or be blacklisted by
any Government Department / PSU / PSE or Bank for breach of any law or
violation of regulatory prescriptions or breach of agreement. The Bidder has
to submit self certification on its letterhead.
SECTION – III
Scope of Work
3.0.1 Background:
JSCB has connectivity with various financial networks like NPCI Net, and other
Bilateral Consortium Networks etc. through which JSCB issuer and acquirer
transactions are processed.
3.0.2 Brief Technical Scope of the Project:
1. The project is to be executed on CAPEX Model; where in the required application
reconciliation software and the training to our work force for doing the
reconciliation services is supplied by the bidder and sized to meet the current and
projected requirement.
2. In case the bidder does not own the software, the bidder needs to have back to back
arrangement with OEM for implementation, maintenance and customization of the
Transaction Reconciliation Software without any cost to JSCB Bank. The bidder
also needs to provide letter from OEM confirming that the software
implementation, maintenance, necessary customization will be carried out
specifically for JSCB Bank for the entire contract period. The copy of the ATS
agreement between the bidder and the OEM should also be given to JSCB.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-17
3. The Hardware, database, OS and security patches will be provided by JSCB. Any
other third party tools / applications required to run the application will have to be
provided by the bidder.
4. The bidder shall upgrade the systems and software application from time to time in
order to ensure the Service Levels are met and to meet the regulators instructions
and guidelines.
5. The bidder shall deploy adequate number of skilled & experienced work force to
carry out reconciliation of ATM/All type of transactions and ATM Balancing
considering fall back / disaster arrangements.
6. The space for hosting the solution and for carrying out the operations such as
telephone and PC Workstations will be provided by JSCB Bank at any of the JSCB
Banks premise in Ranchi or from any other location decided by the Bank from time
to time.
7. BCP & DR: The necessary hardware, database, OS and security patches will be
provided by JSCB and the Bidder shall do the like-to-like setup of the Hardware,
System Software, application Software, OS and Database with Real Time Data
Replication at the Disaster Recovery Site of the Bank or any other space provided
by JSCB Bank as a part of BCP, so that the reconciliation solution can easily be
commenced from the alternate location when the BCP is invoked.
8. The required connectivity between Data Center (DC) & Disaster Recovery (DR)
Site shall be provided by JSCB Bank.
9. The application software to be web enabled and RDBMS based.
10. The bidder should either own the software or hold license, with the right to
customize the solution if required during the tenure of the contract. No additional
cost for any form of customization to meet the scope will be paid by JSCB Bank.
11. The software should be efficient enough to upload and process minimum of 5 lacs
transactions per day with facility to upload partial data and give the pending status
branch wise/ number of records wise etc.
12. It should also be scalable for taking higher transaction volume in the future.
13. The RDBMS and the proposed software solution should be able to continue
uninterrupted in case of a failure of any system component including disk failure,
disk controller failure, node failure etc.
14. The bidder to ensure security and confidentiality of the data or information obtained
from JSCB Bank.
15. The data so received by the bidder shall be used for the sole purpose of
reconciliation and thereafter the same shall be the property of JSCB Bank and same
shall be in the custody of JSCB Bank.
16. The bidder to generate MIS reports in softcopy as well as printed hardcopy, the
formats and the frequency of submission of MIS shall be decided by JSCB Bank.
Any other details which may be required by JSCB Bank shall also be provided by
the successful bidder in the desired format.
17. It will be binding upon the bidder to install the solution and integrate it with related
systems. In case of problem, the same has to be settled by the bidder with the
concerned vendors.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-18
18. The bidder should provide all interfaces required with CBS, ATM Switch, DCMS,
Web services, other packages provided by the networks,
19. The turnaround time for reconciliation of any transaction shall be T+1 day.
20. The bidder will handle the reconciliation of other payment systems handled through
the ATM switch such as mobile recharge,
21. The bidder must have the provision to customize the solution if required during the
tenure of the contract.
22. The successful Bidder has to impart necessary basic training to the employees of the
bank to handle the system in case of need.
23. The successful Bidder has to provide the necessary resources available to manage
the application as per the policy of the Bank.
3.0.3 Reconciliation Process
1. 4-way reconciliation is to be done for ONUS and Acquirer transactions; 3-way
reconciliation is to be done for Issuer – ATM and POS transactions. ATM cash
balancing is to be done along with chargeback management / dispute resolution for
all transactions, preparation of settlement vouchers, generation of uploadable files
and exception reporting.
2. 3-way reconciliation is to be done for other products like APBS, ECS, MMS, etc.
3. The Application should have the provision to handle incoming Settlement & other
files for debit cards from Schemes (Visa/ Master card / Rupay), Cashnet, NFS
consortium and bilateral consortiums, Bancs, Amex etc. File formats differ for
schemes and consortiums. System should have the provision to define parameters
by users, report violations and exceptions handling by user intervention. System
should be capable of reconciling incoming and outgoing files with regard to
VISA/MasterCard/Rupay etc.
3.0.4 Record Management
1. Obtaining and preserving Electronic Journal (EJ) Log: Bidder will obtain the EJ
from the internal site of JSCB Bank for the purpose of reconciliation
2. Daily cash summary and cash balance report – these reports should tally with
individual ATM cash balances: Reports of various ATM vendors should be
matched with the ATM wise cash balances including reconciliation of suspect /
failed transactions.
3.0.5 Management Information System:
The bidder is supposed to provide all the reports as per the requirements of the
operations team, business team, regulatory authorities and any other report required time to
time from Bank/RBI / Network guidelines or other governing bodies at no additional cost.
The MIS shall form the basis of transaction level reconciliation, ATM Balancing
reports, settlement, exception reporting and . The details are given in the later part of the
document.
3.0.6 Right of Information Act:
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-19
The bidder is expected to provide the information necessary pertaining to the
transaction so that the Information can be submitted to the applicant of RTI.
3.0.7 Transaction Process
Reconciliation process should identify various types of failed and reversed
transactions so as to facilitate credit to customer accounts as well as release of credit
adjustment through various networks. The uploadable file has to be provided by the bidder
as per JSCB Bank provided format.
The broad scope of work/services to be provided by bidder is as detailed below:-
3.1 ATM Transactions Reconciliation – ONUS and Acquirer
3.1.1.The system should be capable of performing 4 way reconciliation (i.e. Switch, CBS,
EJ, and CBR) for ATM Transactions (ONUS and Acquirer Transactions- credit leg)
and 3 way reconciliation (i.e. Switch, CBS, and Network Switch) for Acquirer
transactions- debit leg.
3.1.2.Bank will receive Electronic Journal (EJ) from ATM MSP, raw files of Transactions
from Switch, CBS/Bank’s SFTP server on daily basis which are required to be
reconciled by the recon solution. There has to be an Interface to collect the
SWITCH data through secure FTP and upload and to identify mismatches and
duplicate transactions.
3.1.3.Bank will receive settlement files, Charge Back Claims file and Raw Data Files
received from NPCI Net, National Financial Switch (NFS), DFS, Master, Visa,
CashNet, Bancs, Bilateral consortium networks etc.
3.1.4. System should have an In-built reconciliation rule table to reconcile transactions
based on various parameters. The unmatched entries upon completion of the four
way reconciliation to force matched based on the parameters set by the Bank.
3.1.5.Generation of Reports like entries un-reconciled per ATM and ATM Network wise.
System should generate exception reports like:
1 Switch Outstanding
2 Core Outstanding
3 Tie-up Banks Outstanding 4 VISA/Master/NFS/ATM Outstanding.
3.1.6.Generation of uploadable files as per CBS format to post exception entries to CBS as
per Bank’s Accounting System.
3.1.7..For other Bank debit card transactions on our ATMs (Acquired), uploading of the
chargeback received in the system and generation of the report for the same citing
the status in the ATM and EJ. Generation of Accounting Entries for failed
transactions for which chargeback is received, upload files in DMS and
management of the chargeback received for various network, such as NFS, Visa,
Master, Bancs, Cashnet, Bilateral consortium networks etc. and MIS for the same.
3.1.8.In case of acquiring transaction on Bank ATM, if the claim is payable from
overage/excess amount for ATM, the overage has to be reduced by the amount for
which the claim was settled, and the reconciliation report for balance overage
should reflect the same.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-20
3.1.9.Reconciliation of acquiring Mobile Recharge Transactions through ATM. Generation
of exception reports, and preparation of settlement vouchers. Generation of
uploadable files for reversals, debit adjustments and credit adjustments.
3.1.10.The reconciliation of the Bank’s suspense account for the overages should include
the reduction of the amounts for the disputes settled cases and addition of fresh
excess / overages on a day to day basis.
3.1.11.Check for duplicate posting for single claim.
3.1.12.Uploading of reconciled and unreconciled files, on the basis of 4-way reconciliation
for ONUS and acquirer transactions and network credit adjustment files in the
Bidder’s Dispute Management System.
Providing uploadable file of unsuccessful transactions for recredit to cardholders
account of our Bank and other network separately for credit adjustments.
Providing uploadable file of successful transactions but not debited to accounts for
debit to cardholders account of our Bank and other network separately for debit
adjustments.
Generation of uploadable files for debiting of charges for transactions either fully
or partly for domestic and international transactions.
3.1.14.The bidder has to upload the reconciled and unreconciled files, proactive credit
adjustment files, network credit adjustment files in the Bidder’s Dispute
Management System.
3.2 Cash in ATM Balancing
3.2.1.Interface for Uploading Cash Balancing Report (CBR) received from the bidder and
branches or through direct integration with CBS system. The software should be
able to store / retrieve Cash Balancing Report CBR along with Switch, CBS and EJ
data and reconcile the same with the Bank records.
3.2.1. Update and Reconcile report from cash management services agencies with Bank
Records.
3.2.2.A Cross verification of actual cash loaded and logical cash loaded by comparing
ATM cash counters with admin transactions. Reconciliation of ATM cash, Switch
Cash Balance with Physical cash at ATM.
3.2.3. Computation of cash dispensation amount between EOD processes for all ATMs as
per Switch Data, CBS Data and EJ. Reconciliation and generation of mismatches
on a daily basis of the ATM transactions (EJ File) with banks CBS host, ATM
switch file, Network files.
3.2.4.Comparison of computed amount with dispensation report in CBR.
3.2.5.Reporting of overages and shortages of CBR dispensation vis-à-vis Switch Data,
CBS Data and EJ and storing in the system.
3.2.6.In case of shortages, analysis of Switch Data and EJ Data to identify transaction and
reason for shortage. Intimation to Bank of the reason and initiate the necessary
corrective action i.e. generate uploadable files for debiting customer’s account,
raise claims with other Banks as per Network TAT, report for claiming from ATM
Vendor, and debiting to shortages account.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-21
3.2.7.In case of overages, analysis of Switch Data and the EJ Data to identify the
transaction for settlement of chargeback claim received & proactive Credit
Adjustments generate uploadable files for parking of the overages for future dispute
settlement.
3.2.8.In case of loading differences, the same is to be resolved by contacting the branch, or
the MSP vendor or the MOF vendors in case of branch ATMs, offsite ATMs, and
MOF ATMs and any other vendor as appointed from time to time under ATM
Business Model.
3.2.9.Bank maintains one office account per ATM (Cash Account) in CBS. Bank also
maintains issuer office account and acquirer office account per ATM Network. On
daily basis the report needs to be generated providing balances of all these accounts
along with the receivables, payables, outstanding amount. Since these are running
accounts the balancing of the previous period is required to be done and such
outstanding balances will be taken as a cut off balance for the purpose of reporting
to the Bank.
3.2.10.System based computation of ATM cash dispense between ATM EODs.
3.2.11.Maintain mirror accounts of ATM Cash accounts, Network pool accounts and
Overages/ Shortages suspense accounts and balancing of the same with the credits
and debits received and reporting the same to the Bank.
3.2.12.Bank maintains settlement accounts with different banks for different ATM
Networks (For Visa, Master Card, Bancs settlements etc. Bank maintains account
with Bank of America, Bank of India and RBI for NFS Network). On daily basis,
the software has to provide reports for funding these accounts based on the
settlement files. The software should provide uploadable files in CBS format for
internal transfer of settlement amount to the different office accounts of the Bank.
3.2.13.Contacting the Branches for obtaining EJ files/ATM Cash tallying report where
cash tallying is done by the Branch for disputes resolution
3.2.14.Cash tallying certificate of individual ATMs on a daily basis and maintaining for
production to Ombudsman along with other documents to be produced before
Ombudsman or consumer forums in case of disputes.
3.3 Third Party Reconciliation and Accounting – Issuer Transactions & Coop Bank
Arrangement under NFS & others.
3.3.1The solution should be capable of doing the
a) 3-way reconciliation is to be done for Issuer – ATM and POS transactions by
checking bank switch, network switch and CBS.
b) Reconciliation of issuer transactions in various third party network to which bank is
associated like VISA, MasterCard, NFS, Rupay, Cashnet, Bancs, Amex, Bilateral
consortium networks, Visa C2C, etc
c) Reconciliation of non-financial transactions and off-line VMT (VISA Money
Transfer) transactions.
d) Reconciliation of all card products including (WCC and GCC) transactions in
various currencies, preparation of settlement vouchers, preparing of uploadable
files.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-22
e) Preparation of uploadable files for posting of entries related to Co brand products
where transactions will be authorized out of JSCB Bank’s system like ITZ cash
card/Prepaid card transactions.
f) Reconciliation of Mobile Recharge Transactions through ATM, Mobile and Internet
Banking. Generation of Exception Reports, and Preparation of Settlement
Vouchers. Generation of uploadable files for reversals, debit adjustments and credit
adjustments.
g) Reconciliation of Surcharge entries debited online and generation of difference of
Base1 Base 2 file after taking into account the online entries pertaining to
surcharge. Coop Bank’s ATM transactions Reconciliation
Presently the Bank has a tie up with 11 Cooperative Banks registered under
NFS network. The transactions of the cards issued by them are processed by
the ASP Switch. The reconciliation of transactions of the cards issued by
these coop Banks need to be done in the similar fashion as is being done for
bank’s own cards. For the purpose of Reconciliation Coop Bank’s customer
transactions on the Bank’s ATM would be treated as acquirer transaction,
and the transactions done on other Bank’s ATMS is to be treated as issuer
transactions,
3.3.2Capability to handle all types of settlements and reconciliation works related to
payments and receipts to the above networks,
3.3.3 For All type of Transactions on other bank ATMs, downloading and processing of
representments received and sending emails to branches for such representment
3.3.4Reconciliation and generation of unreconciled entries.
3.3.5 Reconciliation of incoming and outgoing files with regard to VISA / MasterCard
/Rupay.
3.3.6 Identification of Issuer fees, acquirer fees, and option to debit credit the respective
GL’s.
3.3.7 Tracking various fees/ Charges/ penalties by VISA/MasterCard/NFS/Rupay / ,
Bilateral consortium Networks.
3.8 Point of Sale Transactions / E-commerce Transactions
3.8.1 3 Way recon between Bank switch, network switch and CBS.
3.8.2 The unmatched entries upon completion of reconciliation to force matched based on
parameters set by the Bank.
3.8.3 Receiving Incoming Visa Base II settlement files, Incoming MasterCard IPM
settlement file, NPCI settlement files and match its authorization transaction Base I
database with incoming Base II and IPM files and NPCI Files. Reconciliation of
Card Transactions on Bank POS and other Bank POS. Full functionality of
processing of data provided in Visa Base II / MasterCard IPM / NPCI Settlement in
respect of all types of transactions provided in it.
3.8.4 The No Base 2 transaction records to be kept separately and matched on subsequent
days with the Base 2 records. In case the record in No Base2 exists even after 30
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-23
days, then the upload file is to be prepared for reversing the debit to the customer’s
account.
3.8.5 Mechanism should be there to identify No Base1 records, late presentments and
duplicate processing. Immediate action is required to be taken against such
transactions as per the Bank’s policy.
3.8.6 Generation of exception reports w.r.t entries matched /unmatched.
3.8.7 Generation of upload file as per CBS format to post exception entries to CBS as per
Bank’s Accounting System.
3.8.8 Provision for uploading for acceptance of claim received from Bank over email into
system. These claims should be assigned a unique identification number by the
software in the league with Bank’s identification numbering method.
3.8.9 Check for duplicate entry for a single claim.
3.8.10 Validate the transaction from database to confirm that such a transaction exists.
3.8.11 Downloading and processing of representments received, originator of disputes to
be informed with the status and provided the supporting documents. The same has
to be updated in the Dispute Tracker of the Bidder.
3.8.12 For card transactions on POS, adjustments of accepted claims with an upload able
file in CBS format as per Bank’s Accounting System.
3.8.13 Refund Received from any Networks are to be matched with the Chargeback cases
and with pending receivable entries and entries in No Base2. The entries from No
Base2 records to be deleted once the refund is processed so as to avoid double
credit to the customers.
3.8.14 Maintain mirror account of Network pool accounts and balancing of the same with
the credits and debits received and reporting the same to the Bank.
3.8.15 Monitoring and checking of fees/charges/penalties levied by VISA / MasterCard / Rupay in their Settlement, checking against reports and appropriate accounting as per Bank’s Accounting System.
3.8.16 The bidder should inform the Banks’ team in case of variations / exceptions.
3.9 Accounting
3.9.1 Maintenance of ledger account as per bank requirement
3.9.2 Transaction based accounting of all the transactions in: Switch, Branch, Tie-up
Bank, Third Party Network.
3.10 MIS
3.10.1Daily reports on reconciliation as per Bank’s Format
3.10.2Age-wise Daily reports on outstanding entries, receivables and payables.
3.10.3Age-wise Daily reports of claims received, settled and outstanding claim network
wise.
3.10.4Daily reports of claims paid late and penalty amount paid with reason.
3.10.5Daily report of exception in Cash Loading.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-24
3.10.6Daily reports of accounts with large Debit/Credit Balances.
3.10.7Daily report of ATM transactions with zero hits, abnormal frequency and below
normal hits.
3.10.8Daily Reconciliation and Balancing Reports.
3.10.9Day end report showing amount of chargeback/ pre-arbitration / arbitration / credit
adjustment / debit adjustment / representment as per different networks and
uploaded in database.
3.10.10Monthly and quarterly report of reconciliation, outstanding entries, receivables and
payables.
3.10.11Monthly and quarterly reports of chargeback received (accepted and rejected),
penalty paid, pending claims, good faith claims with other Banks and with Bank.
Monthly/Quarterly/half yearly/yearly details of chargeback report.
3.10.12 MIS on Break up of Interchange & No of transactions Network wise.
3.10.13Provision for generation of accepted and pending for recovery status cases for
Debit Adjustments. Generation of report of No Base1 cases wherein a chargeback /
recovery is to be done.
3.10.14Generation of exception reports like entries un-reconciled per ATM & ATM
Network wise.
• List of heavy cash drawing customers
• List of customers using the ATM heavily for drawing low amounts
• List of Cards frequently used for booking Railway tickets
• List of Cards sorted as per MCC sectors
• List of Cards frequently used abroad
3.10.15 Details of our cardholders using other banks ATMs.
3.10.16 Transaction Details based on Date / Card Number
• VISA/MasterCard/NFS ISSUER SETTLEMENT SUMMARY
• VISA/MasterCard/NFS ACQUIRER SETTLEMENT SUMMARY
• VISA/MasterCard/NFS INFLATED SETTLEMENT SUMMARY
• VISA/MasterCard/NFS Money Transaction Report
• VISA/MasterCard/NFS Credit Voucher Report
• VISA/MasterCard/NFS Petrol Transaction Difference Report
• VISA/MasterCard/NFS Railway Transaction Difference Report
• VISA/MasterCard/NFS Foreign Exchange Transaction Difference Report
• VISA/MasterCard/NFS TIPS/Other Transaction Difference Report
• VISA/MasterCard POS income Report
• Issuing/Acquirer POS fees Identification and Report generation
• Interchange Fee Identification and Report generation
• VISA/MasterCard/NFS Issuing/Acquiring Fees Identification and Report
generation.
• VISA/MasterCard/NFS Interchange Fee Identification and Report
Generation
• VISA/MasterCard/NFS Maintenance and Report generation
of all
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-25
Exceptional/dispute Transactions.
• VISA/MasterCard/NFS BOA/BOI/RBI Settlement
(Tallied) Report
Generation of VISA / MasterCard / NPCI Net.
3.10.17 Preparation and submission of various reports /information to Sharing Networks /
Service Providers about Cards Transactions / ATMs etc, as required at
Monthly / Quarterly or other such intervals.(QMR & QOC /SAFE etc.)
3.10.18 Age-wise summary of unreconciled transactions based on the parameters specified
by the Bank with number of transactions and amount.
3.10.19 Audit trail of the entire application with periodical backup of the data to be
provided to the Bank in a format readable by the Bank and specified by the Bank.
3.10.20 Age-wise Daily Report giving the Details of ATMs for which CBR is not obtained.
3.10.21 Age-wise Daily Report giving the Details of ATMs for which EOD is not done.
3.10.22 Age-wise Daily Report giving the Details of ATMs for which the GL level
reconciliation of ATM is not done.
3.10.23 Age-wise Details of differences in ATMs.
3.10.24 Monthly/Quarterly/Half yearly report to Board of directors/VISA/, MasterCard.
Preparation and submission of various reports /information to Sharing Networks /
Service Providers about Cards Transactions / ATMs etc, as required at
Monthly / Quarterly or other such intervals.(QMR& QOC /SAFE etc.)
3.10.25 Report on number of ATMS which are not tallied for more than 15 days.
3.11 Compliance
3.11.1 The reconciliation process proposed to be implemented as per the scope should
follow PCI DSS guidelines and be compliant with PCI DSS standards.
3.11.2 The software should be upgraded/ enhanced to comply with any new directives and
guidelines that will be issued by RBI/NPCI or any other regulatory authority.
3.11.3 The solution should be capable of incorporating and handling changes in procedures
in terms with Bank’s policies during the tenure of contract.
3.11.4 Bank reserves the right to get software audited by Bank’s Internal/External team.
3.12 Deployment of Servers and Manpower
1. The bidder is required to provide the detailed list of hardware / software
required for implementation and maintenance of END-TO-END Reconciliation
Solution for All type of Transactions and ATMs. The Bank will provide the
Hardware. The bidder should also inform the Bank about the sizing of the
server required to run the reconciliation software. Bank will also be
maintaining Hardware (OS, DB) for Primary and Backup Servers required for
undertaking the activity. The sizing of the servers will be carried out by the
bank in consultation with vendor. However, insurance is the responsibility of
the Bank. The Bank would Upgrade and enhance the Server Hardware and
bidder would upgrade the Software as required during the contract period to
maintain the Service levels. The server would be located at Bank’s premises.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-26
2. Adequate manpower resources training for reconciliation and balancing of the
transactions, cash in ATM, processing chargeback claims and other activities
covered in above in Scope of Work.
3.13 Backup Activities
The bidder will inform the Bank about the configuration required for the
back-up Server. Bank will implement backup of the Primary Server on
daily basis as per the standard policy adopted by the Bank.
Bank will also backup on removable or any other storage media as per the
internal policy. The Bank will provide removable Storage media.
Maintenance of milestone / adhoc backup will also be the responsibility of
the Bank.
3.14 Time Frame
a) The bidder should complete the Cash in ATM Balancing and Reconciliation
of All type of transactions within One day of receipt of Settlement files,
Cash Balance Report, Fincraft Report and Switch Transaction Log. The
Daily Report for the same should be submitted to the Bank’s team.
b) The bidder should report the incidences of non-availability of CBR reports
to the Bank team and send e-mail to ATM bidder as first level follow up.
c) The settlement of claims should be done within the stipulated period as per
directive of RBI and other settlement agencies from time to time.
d) Reporting of shortages upon Reconciliation and Ledger Balancing or errors
in Cash Balance Report is required to be done to the Bank’s team within
maximum period 1 day from the receipt of Cash Balance Report.
e) Reporting of error and differences in the CBR submitted by the ATM
Vendor is to be done within 2 working days of receipt of the CBR.
f) The raising of disputes in the dispute module and their resolution is to be
done within the TAT as prescribed by the respective network guidelines.
g) If the activities are not done in the prescribed time frame, bidder may be
subject to levying of penalties (described under section of penalties).
3.15 UAT
3.15.1 The Bank proposes to conduct “User Acceptance Testing” (UAT) of the Solution
for the purpose of ensuring that all the functionalities requested for by the Bank are
available and are functioning accurately.
3.15.2 The Bank expects the Bidder to help set up the required infrastructure setup at the
desired testing center of the Bank for the purpose of testing.
3.15.3 The Bidder will be responsible for preparing detailed test cases including test data.
3.16.4 The Bidder will assist the Bank in conducting all the tests and analyzing/comparing
the results. Bidder shall provide adequate full time resources conversant in all
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-27
business areas, for trouble-shooting and resolving defects during the entire UAT
process.
3.16.5 Any deviations/discrepancies/errors observed during the testing phase will be
formally reported to the Bidder and the Bidder will have to resolve them
immediately or within the UAT approach and guidelines, formulated between the
Bidder and the Bank. The resolution timelines will be completely aligned to the
project timeline of this RFP.
3.16.6 The Bidder will be responsible for maintaining appropriate program change control
and version control for all the modifications/enhancements carried out during the
implementation/testing phase.
3.16.7 The Bidder will be responsible for providing and updating system & user
documentation as per the modifications.
3.16.8 Once the system is made available by the successful bidder, the Bank will perform
the following tests as part of the UAT acceptance. However, these tests are only
indicative, and Bank reserves the right to conduct any test of the functionality as
mentioned in the scope of the RFP Document.
SECTION – IV
Instructions to the Bidder
4.1The tender documents cannot be sold and / or transferred / assigned. If the same is done,
tender documents are liable to be summarily rejected by JSCB Bank Any decision
of JSCB Bank in this regard shall be final, conclusive and binding on the Bidder.
The Bid prepared by Bidder, as well as all correspondence and documents relating
to the Bid exchanged by the Bidder and JSCB Bank, shall be in English only.
4.2 Instructions to Bidders for Submission Of Bids
a) Before bidding, the Bidders are requested to carefully examine the Bid Documents
and the terms and conditions of the contract thereof, and if there appears to be any
ambiguity, gap(s) and/or discrepancy between any of the Bid Documents they should
forthwith refer the matter to Bank for necessary clarifications and / or confirmation.
b) The Bidder shall complete in all respects, form(s) annexed to the Bid Documents,
quote the prices, furnish the information called for therein, and sign and date each of
the documents in the relevant space provided therein for the purpose. The Bidder
shall initial each page of the Bid Documents.
c) The bid shall be properly signed by a person or persons duly authorized by the Bidder
with signature duly attested. In the case of a body corporate, the bid shall be signed
by the duly authorized officers and supported by requisite internal corporate
authorizations. The bid submitted in case of a consortium shall be rejected without
assigning any reason thereof.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-28
d) The bid shall contain the full name, address, telephone no.(mobile no and landline),
fax no. and E-mail ID, if any, of Bidder for facilitating communications including
notices to be given to the Bidder in connection with the bid transaction.
e) The Bid forms and the Documents attached to it shall not be detached or removed one
from the other and no alteration (s) or mutilation (s) (other than filling in all the blank
spaces) shall be made in any of the Bid Documents attached thereto. Any alterations
or changes to the entries in the attached documents shall be made by a separate
covering letter, in the absence of which it shall be rejected. Any decision in this
regard by Bank shall be final, conclusive and binding on the Bidder.
f) The Bidder shall bear all costs for the preparation and submission of the Bid
Documents. Bank shall not be responsible or liable for reimbursing/compensating
these costs, regardless of the conduct or outcome of the bidding process.
g) The Bid Security as specified in Section I should be paid along with the Bid
Document during submission. Bids without the Bid Security shall be rejected.
h) The Bidder, irrespective of his/her participation in the bidding process, shall treat the
details of the documents as secret and strictly confidential.
i) Bank reserves the right to adjust arithmetical or other errors in the bid, in the manner
in which Bank considers appropriate or deem fit. Any adjustments so made by Bank
shall be stated to the Bidder, if Bank makes an offer to accept his bid. The final
decision as to any error manifest or otherwise shall be at the sole discretion of Bank
and shall be final, conclusive and binding on the Bidder.
j) The bid prepared by the Bidder, as well as all correspondence and documents relating
to the bid exchanged by the Bidder and Bank and supporting documents and printed
literature shall be in English.
k) The Bidder shall submit their offers strictly in accordance with the terms and
conditions of the Bid Documents. Any Bid, which stipulates conditions contrary to
the terms and conditions given in the Bid Documents, shall be rejected. Any decision
in this regard by Bank shall be final, conclusive and binding on the Bidder.
l) The Bidder cannot quote for the services in part.
m) The Bidder is expected to examine and follow all instructions, forms, terms &
conditions, and scope of work in the Bid Document. Failure to furnish complete
information in all respects required by the Bid Document or submission of a bid not
substantially responsive to the Bid Document in every respect will be at the Bidder's
risk and may result in the rejection of the Bid by Bank. Any decision in this regard
by Bank shall be final, conclusive and binding on the Bidder.
n) The Bidder shall prepare the bid based on details provided in the Bid documents. It
must be clearly understood that the quantities, specifications and drawings are
intended to give the Bidder an idea about the order, type, scale and magnitude of the
work and are not in any way exhaustive and guaranteed by Bank.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-29
o) Bank reserves the sole right to itself for including any addendum to this entire bid
process. The Bidders shall not claim as a right for requiring Bank to do the aforesaid.
4.3 Clarification of Bid Document
Any prospective Bidder requiring clarification of the Bid Document may notify Bank
in writing at the mailing address indicated in Section I. Bank will respond in writing,
to any request for clarification of the Bid Document, received not later than the dates
prescribed in Section I of this Bid Document. Bank’s response (including an
explanation of the query but without identifying the source of inquiry) will be posted
on Bank’s website.
4.4 Language of Bids
The Bids prepared by the Bidder and all correspondence and documents relating to
the bids exchanged by the Bidder and Bank, shall be written in the English language.
4.5 Submission Of Bids
The bid should be submitted in 2 separate envelopes. The details thereof are as
follows:
ENVELOPE-I (Technical Offer): (1 Copy)
The Technical bid (TO) should be completed and complied with in all respects and
contains all information asked for, except commercial quote. The technical bids
should also contain conformity to eligibility criteria.
The Technical bid should be accompanied by all the documents in the serial order as
mentioned in Annexure 18. The above details are MANDATORY, without which
the Bids are liable to be rejected. JSCB Bank at its sole discretion may not evaluate a
Technical Offer in case of non-submission or partial submission of technical details.
The copy of Technical Bid should also be submitted in soft copy (DVD/CD) clearly
marked as “Technical Bid- soft copy”.
ENVELOPE-II ( Indicative Commercial Offer): (1 Copy)
The Indicative Commercial bid (CO) (Annexure-4) should give all relevant price
information and should not contradict the TO in any manner.
These two envelopes containing the Technical Offer and Indicative Commercial
Offer should be separately dropped in the Tender Box at address mentioned in the
document control sheet. Please note that if any envelope is found to contain both
TO and CO, then that bid will be rejected summarily by JSCB Bank. Any decision
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-30
of JSCB Bank in this regard shall be final, conclusive and binding on the Bidder.
The prices quoted in the indicative commercial bid should be without any
conditions.
Bids Technical & Indicative Commercial must be submitted at the same time,
giving full particulars in separate sealed envelopes at JSCB Bank address, as per
document control sheet.
Signed copy of RFP along with Corrigendum if any, should be signed by
authorized signatory as acceptance of all terms and conditions including scope of
work etc mentioned in the RFP.
Any deficiency in documentation may result in the outright rejection of the Bid
and the JSCB Bank shall not be liable for the same in any manner whatsoever.
Any decision in this regard by JSCB Bank shall be final, conclusive and binding
on the Bidders and shall not be questioned / challenged by the Bidders.
JSCB Bank may, at its own discretion, extend the period for submission of Bids
by amending this RFP, in which case all rights and obligations of JSCB Bank and
Bidders shall stand extended. However, no request for extension of time from the
Bidders shall be binding upon JSCB Bank.
The envelopes shall indicate the name and address of the Bidder to enable the Bid
to be returned unopened in case it is declared "late". Any bid received by JSCB
Bank after the time prescribed by JSCB Bank for receipt of Bids, will be rejected
and returned unopened to the Bidder. Any decision in this regard by JSCB Bank
shall be final, conclusive and binding on the Bidder.
4.6 Evaluation Process
i. The evaluation of the responses would be a two-stage process i.e. technical
and commercial.
ii. The Bidders will be shortlisted based on the eligibility criteria. Thereafter
they will be subject to technical evaluation.
iii. The Bidders who qualify the technical evaluation – their indicative
commercial bids will be opened.
iv. Thus, any bidder failing the stage 1 evaluation (i.e eligibility criteria) will
disqualify and their proposals will not be subjected to any further
evaluation (technical or commercial).
v. Similarly, those bidders failing the stage 2 evaluations (i.e. technical
evaluation criteria) will disqualify and their proposals will not be subjected
to further evaluation.
vi. The commercial bids of only those bidders will be opened who get qualified
under both stage 1 and stage 2 evaluations.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-31
The technical evaluation criterion is explained as under:-
Technical Evaluation Criteria:
The technical evaluation process is as under:-
a. Self-Assessment response as per Annexure-2.
b. Experience in providing transaction reconciliation solution and services as per
Annexure-7.
c. Presentation and demonstration to the Bank’s team for the software offered to the
Bank by the Bidder. The bidders will be asked to make presentations at the
Banks desired location. These presentations should cover cases of undertaking
similar services in an architecture environment similar to the one described in
this RFP document. The presentations will also give JSCB Bank an opportunity
to clarify issues arising out of the review of the Bidders response to this RFP.
JSCB Bank shall not be under any obligation to bear any part of the expenses
incurred by the bidder for the presentations.
d. In addition to the above, Bidder shall arrange for site visits for Bank’s team,
where the Bidder’s software is already functional/implemented.
The following table gives the breakup of the marks allocated for Technical
Evaluation.
Sr
No
Particulars Max Marks Scoring
Mechanism
1 All Functional
Requirements
Under Annexure 2. (
Total Marks of all
requirements 300)
Marks allotted
to each
individual
requirement
If Status is
Available
Full Marks
allotted against that
requirement
If Status is
Customizable
Free of cost
75% Marks
allotted against that
requirement
If Status is
Not Available
0 Marks
2 Software
Services Running
in Banks
20 4 or more
Banks
20 marks
3 or more
Banks
15 marks
2 or more
Banks
10 marks
4 Software
Services Running
in Banks since
number of years
20 More than 3
years
20 marks
More than 2
years
15 marks
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-32
More than 1
years
10 marks
5 The software has
the Ability to
Process Volume of
Transactions
20 More than
400,000
transactions
20 marks
More than
300,000
transactions
15 marks
More than
100,000
transactions
10 marks
6 Presentation,
Demonstration of
the Product,
Structured
Walkthrough &
Site visit
40
The Bidders who scores 75% or more marks in technical evaluation will be
declared technically qualified and indicative commercial offers of these Bidders
will be opened.
4.7 There will be a meeting with all the Bidders on the stipulated date and time as may
be informed by the Bank, to address any queries in connection with the RFP
document. It is essential that all clarifications / queries be submitted to JSCB Bank
before the date specified on document control sheet.
4.8 Technical offer will be opened as per the date mentioned in document control sheet.
The Indicative commercial offers of Bidders will not be opened who are technically
disqualified and will not be taken up for further process and no discussions /
interface will be granted to such Bidders.
4.9 JSCB Bank reserves the right to accept or reject in part or full any or all the bids
without assigning any reasons thereof. Any decision of JSCB Bank in this regard
shall be final, conclusive and binding on the Bidders.
4.10 JSCB Bank will scrutinize the bids to determine whether they are complete, whether
any errors have been made in the bid, whether required technical documentation has
been furnished, whether the documents have been properly signed, and whether
items are quoted as per the schedule. JSCB Bank. may, at its sole discretion, waive
any minor non-conformity or any minor irregularity in a bid. This shall be final,
conclusive and binding on all Bidders and JSCB Bank. reserves the right for such
waivers.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-33
4.11 To assist in the scrutiny, evaluation and comparison of bids, JSCB Bank may, at its
sole discretion, ask some or all Bidders for clarification of their bid. The request for
such clarifications and the response will necessarily be in writing and no change in
the price or substance of the bid shall be sought, offered or permitted. Any decision
of JSCB Bank in this regard shall be final, conclusive and binding on the Bidder/
4.12 The Bank will request the Bidder for conducting walkthrough of the application
proposed by the Bidder, give presentations and witness demos and verify
functionalities and response time etc. at the cost of Bidder.
4.13 The Bank’s team shall visit the reference sites of the Banks listed in the Bid
submitted by the Bidder for veracity of the response of the Bidder in its Bid as well
as verifying Functionality and Services provided by the Bidder in live environment.
The observations of Bank’s team at reference sites and interaction with the officials
concerned of such banks at the time of site visit will be taken into account for the
purpose of technical evaluation of the Bids.
4.14 If the Bidders’ claims pertaining to the eligibility with respect to the track record of
the Services provided are not substantiated at Site Visits of Bank’s team the Bank
will treat such Bid as non-responsive. Further, the Bidders who do not meet the
eligibility criteria and other terms of submission of the required documents as
evaluated during the Technical Bid evaluation process will be treated as
nonresponsive and their Bid will not be taken up for further evaluation.
4.15 The bid prepared by the Bidder, as well as all correspondence and documents
relating to the bid exchanged by the Bidder and JSCB Bank and supporting
documents and printed literature shall be in English.
4.16 Technical details must be completely filled up. Correct technical information of the
product being offered must be filled in. Filling up of the information using terms
such as “OK”, “accepted”, “noted”, “as given in brochure/manual” is not
acceptable. JSCB Bank may treat bids not adhering to these guidelines as
unacceptable. The bid form and the documents attached to it shall not be detached
or removed one from the other and no alteration(s) or mutilation(s) (other than
filling in all the blank spaces) shall be made in any of the bid documents attached
thereto. However, alterations or changes to the entries in the attached documents
shall be made by a separate covering letter, in the absence of which it shall be
rejected forthwith. Any decision in this regard by JSCB Bank shall be final,
conclusive and binding on the Bidder.
4.17 JSCB Bank will not entertain any enquiries from the Bidders post tender opening on
the status of the bid, nor allow any price reductions during the course of technical
or commercial evaluation, till the selected Bidder is notified. No Bidder shall
contact JSCB Bank on any matter relating to its bid; from the time of bid opening to
the time the contract is awarded. Any effort by a Bidder to influence JSCB Bank in
its decision on /bid evaluation, comparison or contract award decisions may result
in the rejection of the Bidder’s bid forthwith. Any decision of JSCB Bank in this
regard shall be final, conclusive and binding on the Bidder.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-34
4.18 JSCB Bank reserves the right to alter the quantities specified in the bid. JSCB Bank
also reserves the right to delete one or more items from the list of items specified in
bid. Any decision of JSCB Bank in this regard shall be final, conclusive and
binding on the Bidder.
4.19 This RFP document may undergo change by either additions or deletions or
modifications before the actual award of the contract by the Bank. The Bank also
reserves the right to change any terms and conditions of the RFP document and its
subsequent addendums as it deems necessary at its sole discretion. The Bank will
inform all bidders about changes, if any.
4.20 The Bank reserves the right to extend the dates for submission of responses to this
RFP document.
4.21 Bidders shall have the opportunity to clarify doubts pertaining to the RFP document
in order to clarify any issues they may have, prior to finalizing their responses. All
questions are to be submitted at the address mentioned in earlier, and should be
received by the point of contact no later than the time specified in Section 1 of this
document. Responses to inquiries and any other corrections and amendments will
be distributed to all the bidders in the form of electronic mail or hardcopy or
updated on the Banks website or newspaper journals; the preference for distribution
would be with the Bank. The bidder, who posed the question, will remain
anonymous.
4.22 Bids that are rejected during the Bid opening process shall not be considered for
further evaluation, irrespective of the circumstances.
SECTION - V
Terms and Conditions
5.1This RFP is not an offer by the Bank, but an invitation to offer for Bidder responses. No
contractual obligation on behalf of the Bank, whatsoever, shall arise from the RFP
process unless and until a formal contract is signed and executed by duly authorized
officers of the Bank and the successful Bidder. The Bank reserves the rights to
amend, modify, add, delete, accept or cancel in part or full any conditions or
specification of all proposals/ bids, without assigning any reason thereof at any time
during the bid process. Each bidder shall be entirely responsible for its own costs
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-35
and expenses that are incurred while participating in the RFP, subsequent
presentations and contract negotiation processes.
5.2The tender documents cannot be sold and / or transferred / assigned. If the same is done,
tender documents are liable to be summarily rejected by JSCB Bank Ltd. Any
decision of JSCB Bank Ltd. in this regard shall be final, conclusive and binding on
the Bidder.
5.3 Definitions
In this RFP/ Contract, the following terms shall have the following meanings and
shall be interpreted accordingly:
5.3.1“Applicable Law” means with respect to any person all Laws, Statutes, Treaties, Rules,
Regulations, Determinations, Orders, Notifications, Writs, Processes, Decrees,
Injunctions, Judgments or Awards of an Arbitrator, a court or any other governmental
authorities and all governmental authorizations binding upon or applicable to such
person or to any of its property or assets. “Acceptance of Bid” means the letter/fax or
any memorandum communicating to the Bidder the acceptance of its Bid.
5.3.2“Site” means the place in which the operations/Service(s) are to be carried out or places
approved by JSCB Bank for the purposes of the Contract together with any other
places designated in the Contract as forming part of the Site.
5.3.3“Good/Best Industry Practice” means the exercise of degree of skill, diligence and
prudence which is expected from a highly skilled experienced and internationally
recognised and reputed service provider engaged in the same type of undertaking
engaged in similar activity under similar circumstances and acting generally in
accordance with the prevailing laws, rules, regulations codes and industry standards.
5.3.4"The Contract" means the agreement to be entered into between JSCB Bank and the
Successful Bidder as recorded in the contract form duly signed by the parties
(Annexure 12), including all annexure, schedules, exhibits, supplements, appendices,
amendments, revisions, notations and modifications thereof , as indicated/spelt out in
this RFP.
5.3.5“Bidder" means and includes any company who has/have participated in the bidding
process.
5.3.6Successful Bidder" means any person(s) whose Bid has been accepted by JSCB Bank
and to whom work has been awarded and shall include its authorized representatives,
successors and permitted assigns.
5.3.7"JSCB Bank/Bank" means JSCB Bank Limited including its successors and assigns.
5.3.8"The Contract Price" means the price/compensation, payable to the Successful Bidder
under and in accordance with the Contract, for the due performance and observance
of its contractual obligations under and in accordance with the Contract.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-36
5.3.9"Confidential Information" means, (i) intellectual property information and information
relating to Intellectual Property Rights; (ii) technical or business information or
material not covered in (i); (iii) proprietary or internal information related to the
current, future and proposed products or service(s) of the Bank including, financial
information, process/flow charts, business models, designs, drawings, data
information related to products and service(s), procurement requirements,
purchasing, customers, investors, employees, business and contractual relationships,
business forecasts, business plans and strategies, information the Parties provide
regarding third parties; (iv) information disclosed pursuant to the Contract and (v) all
such other information which by its nature or the circumstances of its disclosure is
confidential.
5.3.10“Intellectual Property Rights” means any patent, copyright, trademark, trade name,
design, trade secret, permit, service marks, brands, propriety information, knowledge,
technology, licenses, databases, computer programs, software, know how or other
form of intellectual property right, title, benefits or interest whether arising before or
after the execution of this Contract and the right to ownership and registration of
these rights.
5.3.11“Parties” means JSCB Bank and the Successful Bidder and “Party” means either of the
Parties.
5.3.12“Service(s)” means services required to be performed by the Bidder under the
Contract, as specified in Scope of Work in compliance with the Service Level
Requirements.
5.3.13“Service Level Requirements” means the level of service and other performance
criteria which will apply to the Service(s) and the Bidder undertakes to perform as
per scope of work or as may be agreed between the parties.
5.4 Interpretation
In this RFP/ in the Contract, unless a contrary intention is evident:
5.4.1Time is the essence in the performance of the Parties’ respective obligations, if any time
period specified herein is extended, such time shall also be of the essence.
5.4.2The clauses/headings are for convenient reference(s) only and do not form part of this
RFP/ the Contract;
5.4.3unless otherwise specified, a reference to a clause number is a reference to all of its sub-
clauses;
5.4.4unless otherwise specified, a reference to a clause, sub-clause or section is a reference
to a clause, sub-clause or section of this RFP/ the Contract including any amendments
or modifications to the same from time to time.
5.4.5A word in the singular includes plural and a word in the plural includes singular;
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-37
5.4.6a word importing a gender includes any other gender;
5.4.7a reference to a person includes a body corporate;
5.4.8a reference to legislation includes legislation repealing, replacing or amending that
legislation;
5.4.9where a word or phrase is given a particular meaning, it includes the appropriate
grammatical forms of that word or phrase, which have corresponding meanings;
5.4.10Reasonability and materiality of "doubt" and "controversy" shall be at the sole
discretion of JSCB Bank.
5.4.11The words not expressly defined herein shall have meanings ascribed to them in the
General Clauses Act, 1897 or such other relevant applicable law as amended from
time to time.
In case of a difference of opinion on the part of the Bidder in comprehending and /or
interpreting any clause/provision of this RFP after submission of the Bid, the
interpretation by JSCB Bank and decision of JSCB Bank in this behalf shall be final,
conclusive and binding on the Bidder(s).
5.5 Customization and Test run
5.5.1On final selection of the bidder the Bank will issue a letter of intent to the selected
bidder. After receiving the same the selected bidder would send acceptance in
writing within one week from the date of the receipt. Acceptance date will be the
effective date. The bidder will install the customized version of All type of
Reconciliation System software at Bank’s office. Necessary testing will be done by
Bank in association with bidder's representative(s). The bidder will update the
programs to remove any deficiencies observed by the Bank. The testing and
updating will be repeated until the Bank finally accepts the customized software.
The package should be made LIVE within 3 months from the effective date.
5.5.2The installation of the copy of the software is purely for testing, evaluation &
customization purpose only and therefore, no payment shall be made.
5.6 Delivery and Installation
5.6.1On receiving the order the bidder shall submit the acceptance of the order within one
week from the date of receipt of the order. The delivery and installation of
customized software solution through license, media and operational manual in
English are to be made available within two weeks of the date of acceptance
(Effective Date) of the order. The Bank reserves the right to consider the late
acceptance of the order, if any, at its discretion.
5.6.2It is obligatory for the bidder to submit a certificate of delivery of software solution
(through media, license & operational manual) and certificate of installation of the
software solution signed by Bank's personnel along with the bill for payment
5.6.3The software must be delivered and installed on DR (Backup) servers after successful
implementation at Primary site.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-38
5.7 Call Resolution
5.7.1The bidder shall provide technical support either on site or atleast through helpdesk,
telephone / fax / e-mail to resolve any problem immediately on the same day of
complaint and to maintain an uptime of 99.5%. This service is to be provided on all
working days of the Bank, notwithstanding the fact whether on such days the
bidder’s office remains open or not. The bidder also has to ensure that the
reconciliation work is not affected and in case of technical problem, the work is
continued from the Disaster recovery site.
5.7.2There must be designated point of contact from the Bidder side who in turn will
coordinate at his end internally relating to maintenance of the solution
5.8 Award of Contract
The successful bidder would need to accept the offer within 7 days from the date of
issue of the offer.
In case the selected Bidder does not accept/respond within 7 days, the said offer
shall stand cancelled and it will be passed on to L2/L3/L4/L5 Bidders.
5.9 Cancellation of the contract & compensation
JSCB Bank reserves the right to cancel the contract placed on the selected Bidder
and recover expenditure incurred by JSCB Bank and compensation under the
following circumstances: -
a) The selected Bidder commits a breach of any of the terms and conditions of this
RFP document and Service Level Agreement.
b) The selected Bidder commits a breach of any of the representations and services as
stipulated in Contract / Agreement, to be entered in the form as provided in
Annexure-12.
a) The Bidder goes into liquidation, voluntarily or otherwise.
b) An attachment of legal nature or otherwise is levied or continues to be levied for a
period of seven days upon effects of the bid.
c) The progress regarding execution of the order accepted, made by the selected
Bidder is found to be unsatisfactory.
d) Serious discrepancy in functionality of any service, which has an impact on the
Banks equipments in production environment;
e) If for any reason, the Contract is cancelled, JSCB Bank reserves the right to get the
works executed through alternate sources at the risk, cost and responsibility of the
Successful Bidder. JSCB Bank reserves the right to recover any dues payable by
the selected Bidder from any amount outstanding to the credit of the selected
Bidder, including the pending bills and/or invoking the Bank guarantee under this
RFP as well as blacklisting the Bidder.
5.10After the award of the contract, if the selected Bidder does not perform satisfactorily
or delays execution of the contract/violates the contract, JSCB Bank reserves the
right to get the balance/ full contract executed by another party of its choice by
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-39
giving one month’s notice for the same. In this event, the selected Bidder is bound
to make good the additional expenditure, which JSCB Bank may have to incur in
executing the balance/ full contract. This clause is applicable, if for any reason, the
contract is cancelled.
In case the software solution supplied is not in accordance with the requirement,
and/or do not achieve the guaranteed performance as specified herein, the selected
bidder shall forthwith replace/provide such software solution at no extra cost to the
Bank without prejudice to the other remedies as may be available to the Bank under
the contract.
5.11 Performance Security
5.11.1The successful Bidder shall furnish the performance security within 10 days of the
receipt of acceptance by Bank, as per the format in Annexure-16.
The value of the Performance Bank Guarantee to be submitted will be Rs 50 lacs.
The performance security shall be denominated in Indian Rupees and shall be in the
Form of a Bank Guarantee issued by a scheduled commercial Bank and directly
forwarded by the issuing Bank to JSCB Bank.
5.11.2The proceeds of the performance security shall be payable to Bank as compensation
for any loss or damage resulting from the Bidder's failure to complete its
obligations under and in accordance with the Contract.
5.11.3The Performance Bank Guarantee should be valid for a period of contract period +
180 days from the date of expiry of the Contract period.
5.11.4Failure of the successful Bidder to comply with the requirement of the Performance
Bank Guarantee shall constitute sufficient grounds for the annulment of the contract
and forfeiture of the Bid Security, in which event Bank may award the Contract to
the next best evaluated Bidder or call for new bids. Any decision in this regard by
Bank shall be final, conclusive and binding on the Bidder.
5.12 Indemnity
The Selected/successful Bidder shall unconditionally and irrevocably, (jointly and
severally in case of partnership concerns) indemnify JSCB Bank, its affiliates,
subsidiaries, successors, assigns, officers, directors and employees, against any
claims, losses, costs, actions, suits, damages and or otherwise including but not
limited to those from third parties or liabilities of any kind howsoever suffered
arising out of or incurred inter alia during and after the Contract period including
but not limited to third-party claims due to unauthorized disclosure of Confidential
Information, violation of any trademarks, patents, copyrights, permissions,
consents, approvals and license from all authorities, both regulatory / statutory and
nonregulatory, and shall always keep JSCB Bank ,its affiliates, subsidiaries,
successors, assigns, officers, directors and employees, indemnified at all times,
from and against all claims, losses, damages, costs, actions, suits, compensation or
expenses or otherwise, if any, that JSCB Bank may incur by reason of any action,
proceedings which may be brought by or against or taken against JSCB Bank by
anybody including the customers for anything of any nature whatsoever. This
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-40
clause shall survive the termination of the Contract for any reason whatsoever. The
Selected Bidder shall execute a Deed of Indemnity in the form and manner as given
in Annexure-13.
5.13 Intellectual Property Rights and Patent Rights
The bidder should ensure all the products / services / technology platforms etc
should be owned or should have rights to use & distribute to their customers.
5.13.1The successful bidder shall indemnify the Bank against all third party claims of
infringement of patent, trademark or industrial design rights arising from use of the
Goods, or any part thereof in India.
5.13.2The successful Bidder shall ensure that while it uses any software, hardware,
processes or material in the course of performing the Services, it does not infringe
the Intellectual Property Rights of any person and the Bidder shall keep the
Purchaser indemnified against all costs, charges, expenses, liabilities, claims,
damages, litigations, suits, judgments and/or otherwise howsoever, arising out of
any illegal or unauthorized use (piracy) or in connection with any claim or
proceedings relating to any breach or violation of any permission/license terms or
infringement of any Intellectual Property Rights by the Bidder or any sub-Bidder
during the course of performance of the Services.
5.13.3In the event of any claim asserted by a third party of infringement of trademark,
trade names, copyright, patent, intellectual property rights or industrial
drawing/design rights arising from the use of the Services/Systems or any part
thereof in India, the Bidder shall act expeditiously to extinguish such claim. If the
Bidder fails to comply and Purchaser is required to pay compensation to a third
party resulting from such infringement, the Bidder shall be responsible for the
compensation including all expenses, court costs and lawyer fees. Purchaser will
give notice to the Bidder of such claim, if it is made, without delay.
5.14 Support from the Bidder
5.14.1Additional software support like Modifications / updates / enhancements as per the
industry standard, to the package, if any, is to be provided to the Bank free of cost
during contract period.
5.14.2The Bank reserves the right to modify/update the parameter files/configuration with
required awareness of its consequences and any such modification/ updation will be
recorded for information of the selected bidder.
5.14.3Any corruption in the Software or media shall be rectified during the full period of
the contract, if contracted, at no extra cost to the Bank. In case of any upgradations
to Hardware, O/S, RDBMS, application software result in recompilation / necessary
modification of the END TO END Reconciliation Solution for All type of
Transactions and ATMs, then the bidder has to re-compile and re-install the entire
solution, without Compromising any of the features of the running version of the
software without any additional cost to the Bank during the contract period.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-41
5.14.4The Bidder shall provide a proven / tested Business Continuity Plan for END TO
END Reconciliation Solution for All type of Transactions and ATMs so that Banks
interests are not jeopardized in case of disruption in working.
5.14.5The bidder shall furnish list of their service/support centers along with contact
person, contact nos. and address, e-mail id etc. The bidder shall also provide the
escalation chart with the details of contact persons to enable the Bank to escalate
the problems for speedy resolution. The bidder shall specify the availability and
details of Technical expertise (personnel). Bidder to support the Bank, with
additional manpower during smooth implementation of the solution.
5.15 Important instructions to be adhered to by the bidder:
All tools, testing instruments etc., as required during all operations, shall be
provided by the selected bidder at no extra cost to the Bank for completing the
scope of work as per this RFP.
The selected Bidder shall take all steps to ensure safety of their and the Bank’s
personnel during execution of the contract and also be liable for any consequences
due to omission or act of the selected bidder. The selected bidder shall also ensure
cleanliness of the site (work area) during execution of the contract.
Only licensed copies of the software shall be supplied and all software supplied
shall be of latest version with latest patches.
The selected bidder should take all care not to hamper the working of our Bank.
Any interruption in the working of the office has to be foreseen by the selected
bidder and the same has to be brought to the notice of the Bank in writing and only
on approval by the Bank, the selected bidder shall proceed ahead.
The selected bidder shall always take prior permission of the premises in charge of
the Bank before starting any work. The selected bidder shall supply identity cards
to all their employees scheduled to work in the Bank’s premises and formally
submit request letter to the Bank’s official for permitting access.
The selected bidder shall abide by the security rules & procedures of the Bank. Any
requirement of working after office-hours and on holidays of the Bank shall be
foreseen and a request in writing shall be made to the Bank in advance and obtain
permission from the Bank.
The selected bidder shall be fully responsible for supply, installation, migration,
commissioning and maintenance of the solution including testing.
The Bidder shall specify in the Technical bid the necessary space and facilities
required by them at the time of installation and also other facilities required.
The bidder shall submit details of such performance parameters for the modules /
services offered by them along with the Technical bid, otherwise, the bid is liable
for rejection. The bidder shall furnish the performance parameters of the solution
(Modules and services) and certify the same. They shall submit documentary
evidence for the same. However, the bidder is bound to demonstrate the
performance to the bank, if requested.
The Bank will not be obliged to meet and have discussions with any bidder and / or
to entertain any representations.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-42
5.16 Responsibilities of the selected bidder
The selected bidder shall own the responsibility to demonstrate that the product
offered are as per the specification/performance stipulated in this RFP and as
committed by the bidder, either at site or in his works without any extra cost to the
Bank. However the Bank will bear the travelling, boarding and lodging cost related
to its own personnel.
The selected bidder shall provide all other required softwares, as per the intent of
this RFP, whether or not explicitly mentioned in this RFP, to ensure the intent of
specification, completeness, operability, maintainability and upgradeability of the
END TO END Reconciliation Solution for All type of Transactions and ATMs.
Publicity of any kind by the bidder in which the name of the Bank is to be used will
be done only with the explicit written permission of the Bank.
The bidder shall guarantee that Software and other such items supplied to the Bank
are licensed and are legally obtained and that they will not require further licensing
costs, any other costs or any other software/hardware purchase to meet the above
mentioned guarantees.
Selected Bidder shall submit PAN number, Service Tax number/Sales Tax number
etc.
Wherever applicable the selected Bidder shall submit the relevant test certificate /
guarantee Certificate/ licenses along with the supplies, installation and acceptance,
as applicable.
5.17 Execution Of Non Disclosure Agreement
The Successful Bidder should execute Non- Disclosure Agreement (NDA) as per
Annexure-14 at the time of signing of the contract.
5.18 Dispute Resolution
5.18.1All disputes arising out of or in respect of this bid shall be deemed to have arisen in
Ranchi and only the Courts in Ranchi alone shall have the jurisdiction to determine
the same. The governing law shall be Indian Law.
5.18.2The disputes or differences whatsoever arising between the JSCB Bank, Bidder /
successful Bidder, out of or relating to the Service(s) construction, meaning and
operation or effect of the contract or the breach thereof which cannot be settled
amicably, shall be settled by arbitration in accordance with Arbitration and
Conciliation Act, 1996 or any statutory modification or re-enactment thereof and the
award made in pursuance, shall be binding on them.
5.18.3The arbitration shall be in English language. The venue of arbitration shall be at
Ranchi. The Bidder agrees that pending arbitration, contract and related services
shall continue. The arbitration expenses shall be shared equally between parties.
Each
Party to the dispute shall appoint 1 arbitrator each and the two arbitrators shall
jointly appoint the third or the presiding arbitrator. In case, the Bidder/Successful
Bidder fails to appoint its arbitrator or any conflict in the appointment of the
arbitrator, sole arbitrator appointed by JSCB Bank will arbitrate the matter and
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-43
decision of such arbitrator shall be binding on the parties. Each Party shall bear the
cost of preparing and presenting its case, and the cost of arbitration, including fees
and expenses of the arbitrators, shall be shared equally by the Parties unless the
award otherwise provides. Subject to the above, the courts of law at Ranchi alone
shall have the jurisdiction in respect of all matters connected with the Contract.
5.18.4The Successful Bidder(s) shall not be entitled to suspend the Service(s) or the
completion of the job under the Contract, pending resolution of any disputes
between the Parties, unless otherwise directed in writing by the Bank or unless the
matter is such that the Service(s) cannot possibly be continued until the decision of
the arbitrator is arrived at. However during such a contingency, the Bank shall be
entitled to make alternative arrangements to tackle the situation in any manner it
deems fit, at the cost of the Bidder, so that the business of the Bank is not disrupted.
The venue for arbitration shall be the sole discretion of the Bank. The provision
under this section shall survive the Contract
5.19 Execution of Service Level Agreement
The Bidder should execute a Service Level Agreement in the form and manner as
may be given by Bank, which would include all the services and terms and
conditions of the services to be extended as detailed herein and as may be
prescribed by the Bank. The Bidder will execute SLA within 15 days from the date
of acceptance of contract. This RFP document and subsequent corrigendum/s (if
any) will become integral part of SLA.
5.20The Bidder should ensure payment of minimum wages to their employees who are
engaged in Bank’s establishment sites in consonance with the rules prescribed by
Central Government from time to time. The duty hour of the employee should also
be in conformity with the Central Government Minimum Wages Act. A declaration
to this effect has to be submitted by the Bidder while responding to this RFP.
5.21 Audit
The bidder shall allow the Bank, its authorized personnel, its auditors (internal and
external), authorized personnel from RBI / NPCI, other regulatory & statutory
authorities to conduct the audit of the operations and grant unrestricted right to
inspect and audit the operations and records directly related to the services.
5.22 Reference Checks
Bidders are required to provide reference of the clients for whom they have
provided similar solution. All the details of references mentioned in Annexure-3
should be provided along with the names and contact details of persons who will be
available for discussions.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-44
The Bank may contact these reference sites to obtain information on Services and
Support being provided by the Bidder.
Bidders will co-ordinate with the reference sites and arrange the visits on request
from the Bank. The cost incurred by the evaluation team representing the Bank, for
the reference site visits, will be borne by the Bank.
5.23 Solicitation of Employees
Both the parties agree not to hire, solicit, or accept solicitation (either directly,
indirectly, or through a third party) for their employees directly involved in this
contract during the period of the contract and one year thereafter, except as the
parties may agree on a case-by-case basis. The parties agree that for the period of
the contract and one year thereafter, neither party will cause or permit any of its
directors or employees who have knowledge of the agreement to directly or
indirectly solicit for employment the key personnel working on the project
contemplated in this proposal except with the written consent of the other party.
The above restriction would not apply to either party for hiring such key personnel
who (i) initiate discussions regarding such employment without any direct or
indirect solicitation by the other party (ii) respond to any public advertisement
placed by either party or its affiliates in a publication of general circulation or (iii)
has been terminated by a party prior to the commencement of employment
discussions with the other party.
5.24 Publicity
Any publicity by the Bidder in which the name of JSCB Bank is to be used should
be done only with the explicit written permission of JSCB Bank.
5.25 Force Majeure
The Bidder shall not be liable for forfeiture of its performance security, liquidated
damages or termination of contract for default, if and to the extent that it’s delay in
performance or other failure to perform its obligations under the contract is the
result of an event of force Majeure. For purposes of this Clause, "Force Majeure"
means an event beyond control of the Bidder and not involving the Bidder's fault or
negligence and not foreseeable. Such events may include, but are not limited to,
Acts of God or of public enemy, acts of Government of India in their sovereign
capacity, acts of war, fires, floods and freight embargoes. If a Force Majeure
situation arises, the Bidder shall promptly notify JSCB Bank in writing of such
conditions and the cause thereof within 15 (fifteen) calendar days. Unless otherwise
directed by JSCB Bank in writing, the Bidder shall continue to perform its
obligations under the Contract as far as it is reasonably practical, and shall seek all
reasonable alternative means for performance not prevented by the Force Majeure
event. In such a case, the time for performance shall be extended by a period(s) not
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-45
less than the duration of such delay. If the duration of delay continues beyond a
period of one month, JSCB Bank and the Bidder shall hold consultations with each
other in an endeavor to find a solution to the problem. Notwithstanding the above,
decision of JSCB Bank shall be final and binding upon the Bidder.
5.26 Ownership and Retention of Documents
a) JSCB Bank shall own the documents, prepared by or for the Bidder arising out of or
in connection with the Contract.
b) Forthwith upon expiry or earlier termination of the Contract and at any other time
on demand by JSCB Bank Ltd, the Bidder shall deliver to JSCB Bank all
documents provided by or originating from JSCB Bank and all documents
produced by or from or for the Bidder in the course of performing the Service(s),
unless otherwise directed in writing by JSCB Bank at no additional cost.
c) The Bidder shall not, without the prior written consent of JSCB Bank, store, copy,
distribute or retain any such Documents.
d) Bidder shall preserve all documents provided by or originating from JSCB Bank
and all documents produced by or from or for the Bidder in the course of
performing the Service(s) in accordance with the legal, statutory, regulatory
obligations of JSCB Bank in this regard.
5.27 Tenure of the Contract
The contract shall be for a period of 3 years (unless terminated by the Bank before
that date). However, after completion of initial contract, Bank reserves its right to
extend the contract on the terms and conditions mutually agreed between the Bank
and the Successful Bidder, for further period of one to three years at mutually
agreed terms.
During shifting of the services to new agency, the Bidder shall provide necessary
help for smooth switch over, and necessary training to Bank’s staff.
In case the contract is shifted to another bidder after the expiry or termination of the
contract, the bidder will ensure smooth migration of the database / data tables to a
different platform or server if required or as deemed necessary by the new bidder at
no additional cost to our Bank.
5.28 Payment terms
The terms of payment will be as follows:
i. No Advance will be paid.
ii. The bidder is expected to raise invoice giving daily break-up of transactions
by first week of every month
iii. The payments will be on monthly billing basis and will be settled within 30
days of receipt of invoice/bills with complete details.
iv. All taxes and levies shall be deducted at source as per applicable/current tax
rate while making any payment, unless the Service Provider produces the
certificates to the contrary from the Income Tax authorities.
v. No order or bill payment on sister concern/associate company would be
released by JSCB Bank.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-46
5.30 Taxes
5.30.1 The quoted prices shall be excluding service tax, Octroi and treated inclusive of
exchange rate fluctuations, all other taxes, statutory liabilities, etc. If any tax is
levied by virtue of law in force after awarding of the Contract, it will be borne by
the Bidder and Bank will not incur any liability. In case Bank has to pay such
taxes/dues for restoration of Services, it will have right to deduct the same from the
amount payable to the Bidder.
5.30.2Bidder will be entirely responsible for all applicable taxes, duties, levies, imposts,
costs, charges, license fees, road permits etc., in connection with delivery of
equipment at site including incidental services and commissioning. Payment of
octroi /entry tax, if applicable, will be made at actual, on production of suitable
evidence of payment by the Bidder.
5.30.3Income / Corporate taxes in India: The Bidder shall be liable to pay all corporate
taxes and income tax that shall be levied according to the laws and regulations
applicable from time to time in India and the Price Bid by the Bidder shall include
all such taxes in the Contract price.
5.30.4Tax deduction at Source: Wherever the laws and regulations require deduction of
such taxes at the source of payment, Purchaser shall effect such deductions from the
payment due to the Bidder. The remittance of amounts so deducted and issuance of
certificate for such deductions shall be made by Purchaser as per the laws and
regulations in force. Nothing in the Contract shall relieve the Bidder from his
responsibility to pay any tax that may be levied in India on income and profits made
by the Bidder in respect of this Contract.
5.30.5The Bidder’s staff, personnel and labour will be liable to pay personal income taxes
in India in respect of such of their salaries and wages as are chargeable under the
laws and regulations for the time being in force, and the Bidder shall perform such
duties in regard to such deductions thereof as may be imposed on him by such laws
and regulations.
5.30.6The Bidder agrees that he shall comply with the Income-tax Act in force from time
to time and pay Income -tax, as may be imposed / levied on them by the Indian
Income Tax Authorities, for the payments received by them for the works under the
Contract.
5.30.7Should the Bidder fail to submit returns/pay taxes in times as stipulated under the
Income -tax Act and consequently any interest or penalty is imposed by the
Incometax authority, the Bidder shall indemnify Purchaser against any and all
liabilities or claims arising out of this Contract for such taxes including interest and
penalty any such Tax Authority may assess or levy against the Purchaser/ Bidder.
5.30.8The Purchaser shall if so required by applicable laws in force, at the time of
payment, deduct income tax payable by the Bidder at the rates in force, from the
amount due to the Bidder and pay to the concerned tax authority directly.
5.31 Project Timelines:
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-47
The entire project is to be implemented within 3 months from the date of acceptance
of the contract. The selected bidder has to submit the project plan accordingly in
consultation with the Bank and get it approved.
5.31.1System Requirements Study
The selected Bidder, with the assistance of the Bank shall conduct a detailed study
of System requirements vis-a–vis the features in the solution offered by them for
configuring the solution in tune with the Bank’s present and future requirements as
specified in this document.
The Bank will review the SRS and suggest changes, if any, to be incorporated for
finalizing the customisation required.
5.31.2Gap Analysis And Resolution
After completing the System requirements study, the selected Bidder will conduct
the gap analysis between the solution and the requirements of the Bank.
During the Gap analysis, the Selected Bidder and the Bank jointly walk through the
application software to ascertain the extent of gaps between the Bank’s
requirements and the features available in the application software and thereafter
list out the extent of customisation required.
The selected Bidder in this regard will be guided by the scope of the RFP
document. The selected Bidder to provide the Bank with the gap identification
report along with the necessary customisation required to bridge the gaps within the
time frame of the project.
5.31.3 Customisation:
The selected bidder to ensure that they have the necessary infrastructure and people
in place to complete the customisation.
The selected Bidder after customizing Software as per SRS will deliver the
customized software to the Bank for conducting Acceptance Test.
The Bank may during the process of implementation identify gaps that may not
have come to light earlier and the Bidder must also undertake
modification/customisation of such gaps that may be brought to the notice of
Bidders during project implementation.
The Bidder must carry out all such modifications, customisation at no additional
cost.
5.31.4 System Acceptance Testing:
Each module function would be evaluated by the Bank in detail and therefore the
bank would require sufficient time period to evaluate the complete solution. The
evaluation period will not commence until the selected bidder has installed the fully
customized product at the production site.
The Bank retains the right to reject the system in its entirety during the contract
period for a full refund in case of unsatisfactory performance of the bidder software
solution. Any penalties arising on account of unsatisfactory performance will be
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-48
recovered by invoking the Performance Guarantee submitted. During the
acceptance test to be conducted on END TO END Reconciliation Solution for All
type of Transactions and ATMs, the supplier must provide at least two expert
personnel at the site on a full time basis at no extra cost. These personnel will be
responsible for all the necessary support to complete the acceptance test on the
solution.
5.31.5 Acceptance Test Procedure:
The Acceptance Test Procedures (ATP) to demonstrate the feature and capabilities
of solution supplied and installed by the selected bidder for END TO END
Reconciliation Solution for All type of Transactions and ATMs as detailed in
Annexure-2 and 3 and as committed in the bid and as agreed upon after final bid
evaluation, shall be submitted by the selected bidder within two weeks from the
effective date for the Bank's review and clearance. The ATP shall be finalized on
mutual agreement with the selected bidder.
The Bank reserves the right to audit the software by external/internal auditors and
any gaps/discrepancies found during the audit are to be rectified by the bidder.
5.31.6 Pilot Implementation:
After completing the Test in simulated environment, the selected Bidder will port
the fully customized software solution in the live server at Production Site to take
the project forward for pilot implementation. The selected Bidder shall set all the
parameters in the applications as accepted in the test environment.
The Bidder shall fix the Bugs detected during pilot implementation and carry out
the necessary rectifications wherever necessary and deliver patches/version towards
changes effected. The Bank shall test patches / version to ascertain the changes
made, bugs fixed and to ensure that there is no regression in the software solution.
Proper documentation is to be maintained.
5.31.7 Roll Out
After successful completion of pilot implementation, Bank with the assistance of
selected bidder, shall commence rollout of solution
5.31.8 Project Completion
The project will be deemed as completed only after
1. The project scope and requirements are met in full and the deployment of END TO
END Reconciliation Solution for All type of Transactions and ATMs is completed
in all respects as per RFP and SRS.
2. Seven full cycle for each module is completed in LIVE environment.
5.31.9 Acceptance By The Bank
The acceptance tests as detailed above shall be conducted for END TO END
Reconciliation Solution for All type of Transactions and ATMs. Pending completion
of acceptance tests, the bank reserves the right to use the software solution and such
usage shall not be deemed as acceptance of the system by the selected bidder. If any
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-49
errors / bugs detected during acceptance testing, schedule to be revised at the cost of
the selected bidder. The date on which the acceptance certificate is signed shall be
deemed to be the date of successful commissioning of the Systems.
5.32 Operationalization of Services:
The Contract period will commence from the next calendar day of signing off the
UAT by the Bank.
The UAT signing will be treated as cut-off date from which the services of bidder
will be operationalized. The payment to the bidder shall commence from the
next calendar day of signing of the UAT by the Bank.
The Bank would continue its existing activities of reconciliation, balancing etc. till
the cut-off date i.e. date of signing of the UAT that is the date of taking over of the
operations by the bidder. The backlog of reconciliation, balancing if any, prior to
the cut-off date would be cleared by Bank’s team.
The Bank may consider cancellation of the contract in case of undue delay on part
of the bidder for completing the activities. Under such circumstances the contract
will be offered to L2 bidder if the L1 price is matched by him.
5.33 Payment Terms:
In consideration of the Successful Bidder providing deliverables and services and
performance of the obligations as set out in this RFP/the Contract, the Bank shall pay
to the Successful Bidder the fees as agreed. The Successful Bidder shall raise
monthly invoices. It is agreed that the Bank shall make payments for all undisputed
invoices to the Successful Bidder in accordance with the payment terms. The Bank
shall make the payment to the Bidder deducting penalties, if any, within a period of
30 days. All the payments to the Successful Bidder shall be subject to the
performance of the Services to the satisfaction of JSCB Bank.
5.34 Sole Responsibility of the bidder:
The bidder should provide detailed information of the manpower proposed during
the contract period to be deployed for delivery of services and performing contract
terms. Further, the bidder would be solely responsible for delivering the services
Scoped as per Service Level Agreement and for the acts of the personnel engaged
for delivering such services to the Bank and would indemnify for the losses
incurred by the Bank due to the acts and omissions of such personnel whether
employed by the bidder or sub-contracted.
5.35 Notices:
Notice or other communications given or required to be given under the Contract
shall be in writing and shall be hand-delivered with acknowledgement thereof, or
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-50
transmitted by pre-paid registered post, or by facsimile, provided that where such
notice is sent by facsimile, a confirmation copy shall be sent by pre-paid registered
post within five days of the transmission by facsimile, to the address of the
receiving party by the other in writing.
Any notice or other communications shall be deemed to have validly given on date
of delivery if hand-delivered; if sent by registered post, then on the expiration of
seven days from the date of posting; and if transmitted by facsimile, then on the
next business date after the date of transmission.
For the purpose of all notices, the following shall be address of the Bank and the
selected bidder:
The Bank:
The General Manager,
3rd flor marketing board building,
Hehal, near ITI bus stand
Ranchi
Selected bidder:
(To be filled in at the time of contract)
5.36 Assignment
The Successful Bidder shall not assign to anyone, in whole or in part, its obligations to
perform under the Contract/RFP, except with the Bank’s prior written consent
5.37 Insurance
The Successful Bidder shall take adequate insurance cover against all kinds of risks
including fidelity clause for the loss arising from acts of omission / commission /
dishonesty of its employees and / or agents and would be required to keep the
insurance policy alive at all times during the currency of the Contract.
5.38 Expenses for the Contract
The incidental expenses of execution of Contract including but not limited to payment of
proper stamp duty shall be borne by the Successful Bidder.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-51
5.39 Representations and Warranties
5.39.1In order to induce JSCB Bank to enter into the Contract, the Bidder hereby represents
and warrants the following:
5.39.2It is duly organized and validly existing company under Indian Laws.
5.39.3It has power and authority to execute and deliver the Contract/the presents and has
taken all necessary steps to authorise execution, delivery and performance of the
presents.
5.39.4It meets the requisite eligibility criteria as set out in the RFP.
5.39.5It is not involved in any major litigation and no litigation and/or investigation is
threatened against it. That the existing or threatened litigations or investigations do
not have an impact of affecting or compromising the performance and delivery of
Service(s) under the presents.
5.39.6The representations made by it in its Bid are and shall continue to remain true and
fulfil all the requirements as are necessary for executing the duties, obligations and
responsibilities as laid down in the Contract and RFP and unless JSCB Bank specifies
to the contrary. It has not suppressed any information, which is within the knowledge
of the Bidder.
5.39.7The execution of the Service(s) herein is and shall be strictly in accordance and in
compliance with all applicable laws, as amended from time to time, the regulatory
framework governing the same and the Good Industry Practice. It has all permissions,
consents, approvals and license from all authorities, both regulatory/statutory and
nonregulatory, for executing the Service(s);
5.39.8It is authorized and legally eligible and otherwise entitled and has power and authority
to do all things necessary and appropriate and to consummate the Service(s).
5.39.9neither the execution and delivery of the Contract nor the Bidder’s compliance with or
performance of terms and provisions of the Contract shall contravene any provisions
of law or any order, writ, injunction or decree of any Court or Government authority
nor shall it violate any provisions of its constitutional documents or any agreement
or arrangement to which the it is a party.
5.39.10That the Bidder shall procure all the necessary permissions and requisite authorities
approvals, consents, no objections and licenses for use of various software and any
copyrighted process/product free from all claims, titles, interests and liens thereon,
and shall keep JSCB Bank, its directors, officers, employees, representatives,
consultants and agents indemnified in relation thereto.
5.39.11That the Bidder certifies that all registrations, recordings, filings and notarizations of
the Contract and all payments of any tax or duty, including without limitation stamp
duty, registration charges or similar amounts which are required to be effected or
made by the Bidder which is necessary to ensure the legality, validity, enforceability
or admissibility in evidence of the Contract have been made by him/her/it.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-52
5.39.12That the Bidder confirms that there has not and shall not occur any execution,
amendment or modification of any agreement/contract without the prior written
consent of JSCB Bank, which may directly or indirectly have a bearing on the
Contract or Service(s).
5.39.13The Services under outsourced model offered to the Bank under this RFP do not
violate any provisions of the applicable laws, regulations or guidelines including laws
relating to intellectual property rights, legal and environmental. In case there is any
violation of any law, rules or regulation, which is capable of being remedied the same
will be got remedied immediately during the implementation, maintenance and
contract period to the satisfaction of the Bank;
5.39.14If it having been notified fails to remedy the defect(s) within the period specified,
Bank may proceed to take such remedial action as may be necessary, at the Bidder’s
risk and expense and without prejudice to any other rights which Bank may have
against the Bidder under and in accordance with the Contract.
5.39.15It has made or shall make all necessary arrangement for delivery of the Service(s). In
case of failure on the part of Bidder to provide any material/service as mentioned,
Bank has a right not to pay for such particular part of material/service and has also
right to deduct penalties for such damages. Any decision of Bank in this regard shall
be final, conclusive and binding on the Bidder.
5.40 Standard of Performance
The Successful Bidder shall perform the Service(s) and carry out its obligations under the
Contract/ this RFP with due diligence, efficiency and economy, in accordance with
generally globally accepted techniques and practices used in industry and with
professional engineering standards recognized by the international professional
bodies as per Best Industry Practices. The Successful Bidder shall safeguard JSCB
Bank's legitimate interests in any dealing with third parties.
5.41 Liquidated Damage/Penalty:
5.41.1 If the Successful Bidder fails to deliver or perform the Services as stipulated in the
Contract, JSCB Bank shall, without prejudice to its other remedies available under
the RFP/Contract, deduct as liquidated damages a sum equivalent to 0.50% of the
billing amount for the preceding month subject to maximum of 10%, for each week
of delay until satisfactory performance is ensured JSCB Bank reserves all the rights
to levy the penalties under the Contract in case satisfactory services are not restored.
5.41.2Bank is entitled to withhold or deduct liquidated damages from the price under the
Contract or any other amount, which is due to Bidder from this Contract, or any other
contract.
5.41.3Any loss caused to the Bank or claims made against the Bank owing to
nonperformance of the Services by the Successful Bidder as per the Contract, or
noncompliance of regulatory guidelines, will attract liquidated damages to the extent
that the claim is made against the Bank. The Bank reserves the right to recover this
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-53
amount from any dues payable or accrue to the Successful Bidder in future in any
form.
5.41.4Any financial loss to the Bank on account of fraud taking place due to Successful
Bidder, its employees or their service providers negligence shall be recoverable from
the Successful Bidder along with damages if any with regard to Bank’s reputation
and goodwill.
5.42 Confidentiality:
5.42.1The Bidder agrees that it shall hold in trust any Confidential Information received by
it, under the RFP/Contract, and the strictest of confidence shall be maintained in
respect of such Information. The Bidder also agrees:
5.42.1.1to maintain and use the Information only for the purposes of the RFP/Contract and
only as permitted by JSCB Bank;
5.42.1.2to make copies of only such documents/paper as specifically authorized by the prior
written consent of JSCB Bank and with the same confidential or proprietary notices
as may be printed or displayed on the original;
5.42.1.3to restrict access and disclosure of Information to such of their employees, agents,
vendors, and Bidders strictly on a "need to know" basis, to maintain confidentiality of
the information disclosed to them in accordance with this Clause and
5.42.1.4to treat all Information as Confidential Information for a period of [3] years from the
date of receipt. In the event of earlier termination of the Contract, the Parties hereby
agree to maintain the confidentiality of the Confidential Information for a further
period of [5] years from the date of such termination.
5.42.2Confidential Information in oral form must be identified as confidential at the time of
disclosure and confirmed as such in writing within [30] days of such disclosure.
Confidential Information does not include information which:
a the Bidder knew or had in its possession, prior to disclosure, without limitation on its
confidentiality; b is independently developed by the Bidder without breach of the
Contract/RFP c information in the public domain as a matter of law;
d is received from a third party not subject to the obligation of confidentiality with respect to
such information; e is released from confidentiality with the written consent of the JSCB
Bank.
5.42.3 The Bidder shall have the burden of proving that all Clauses above are applicable to
the information in the possession of the Bidder.
5.42.4Notwithstanding the foregoing, the Bidder acknowledge that the nature of the
service(s) to be performed under the Contract/RFP may require the Successful
Bidder(s)’ personnel to be present on premises of JSCB Bank or may require the
Successful Bidder(s)’ personnel to have access to computer networks of JSCB Bank
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-54
while on or off premises of JSCB Bank. It is understood that it would be impractical
for JSCB Bank to monitor all information made available to the Successful Bidder(s)
under such circumstances and to provide notice to the Successful Bidder(s) of the
confidentiality of all such information. Therefore, the Successful Bidder(s) agree(s)
that any technical or business or other information of the Bank that the Successful
Bidder(s)’ personnel, sub Bidders or agents acquire while on the JSCB Bank’s
premises, or through access to JSCB Bank’s computer systems or databases while on
or off JSCB Bank’s premises, shall be deemed Confidential Information.
Confidential Information shall at all times remain the sole and exclusive property of
JSCB Bank Upon termination of the Contract. Confidential Information shall be
returned to JSCB Bank or destroyed, if incapable of return. The destruction shall be
witnessed and so recorded, in writing, by an authorized representative of each of
JSCB Bank and the Successful Bidder(s). Nothing contained herein shall in any
manner impair rights of JSCB Bank in respect of the service(s), and documents, etc.
5.42.5All the information relating to the Account holders (including but not limited to any
information pertaining to the applicants) shall at all times remain Confidential
Information and shall be held in trust by the Successful Bidder on behalf of JSCB
Bank and the Bidder shall not use the same for any purpose other than for the
performance of the Services and towards compliance of obligations under RFP/the
Contract.
5.42.6In the event that the Successful Bidders becomes legally compelled to disclose any
Confidential Information, then such Bidder shall give sufficient notice to JSCB Bank
to enable JSCB Bank to obtain protective order in order to prevent or minimize to the
extent possible, such disclosure. Neither party shall disclose to a third party any
Confidential Information or the contents of the Contract without the prior written
consent of the other Party. The obligations of this Clause shall be satisfied by
handling Confidential Information with the same degree of care, which the receiving
Party applies to its own similar confidential information but in no event less than
reasonable care. The obligations of this Clause shall survive the expiry, cancellation
or termination of the Contract till such Confidential Information enters public domain
or as stated above.
5.42.7The provision of this clause shall survive termination of the Contract till such
Confidential Information enters public domain.
5.43 Authorized Signatory
The Successful Bidder shall indicate the authorized signatories who can discuss and
correspond with JSCB Bank with regard to the obligations under the Contract/RFP.
The Successful Bidder shall at the time of signing the Contract submit a certified
copy of the resolution of their board, authenticated by the company secretary,
authorizing an official or officials of the Bidder to discuss, sign agreements/contracts
with JSCB Bank , raise invoice and accept payments and also to correspond. The
Bidder shall provide proof of signature identification for the above purposes as
required by JSCB Bank.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-55
5.44 Signing of Bid
Each Bid will be submitted in the legal name of the Bidder and shall be signed and duly
stamped by the Bidder or a person duly authorized to sign on behalf of the Bidder.
5.45 Inspection & audit of the services
5.45.1 JSCB Bank shall at all reasonable times have access to any site where the Successful
Bidders are performing any of the Services and such person shall have the right to
inspect such performance and all documentation related thereto and to make and
retain copies of the aforesaid documentation.
5.45.2The Successful Bidder shall be required to keep complete and accurate records of all
the operations and expenses in connection with the Services provided to JSCB Bank.
All such records shall be kept on file by the Successful Bidder for a minimum period
of 3 (three) years from the date of the transaction. However the Bank may consider
taking over the records from the Successful Bidder from time to time at its sole
discretion.
5.45.3The Successful Bidder shall, co-operate with JSCB Bank’s, internal or external auditor
to assure a prompt and accurate audit. The Successful Bidder shall also co-operate in
good faith with JSCB Bank to correct any practices which are found to be deficient
as a result of any such audit within a reasonable time after receipt of JSCB
Bank 's audit report. Such audits or reviews will be at the expenses of JSCB Bank.
However, if the audit discovers discrepancies or overcharges, then upon completion
of such audit or review, the Successful Bidder shall be bound and liable to reimburse
to JSCB Bank such discrepancies or overcharges and for the cost of the audit.
The Successful Bidder agrees to allow officers of JSCB Bank to inspect and make
copies at their own cost, of the records relating to the Services performed/delivered
by the Successful Bidder, maintained by Successful Bidder pursuant to the
Contract/this RFP. The Bank reserves the right to inspect and satisfy itself with the
arrangements made for proper & secure storage, usage and handling of data.
In regards to the above, the Regulators and Government Authorities including RBI
officials shall be entitled to conduct audits of the Successful Bidder at any point of
time.
Compliance with RBI and other Regulatory requirements
JSCB Bank / Bidder shall individually obtain the necessary regulatory and statutory
approvals from the RBI or other regulatory/statutory bodies, if any required, for the
Services. Any demand for information regarding any of the matters to the extent
mutually agreeable under this Agreement called for by the RBI or any other
regulatory body shall be promptly responded to by the concerned Party. The Bidder
undertakes to comply all the statutory and regulatory requirements under the
Applicable Laws in connection with Services including Labour and Industrial Laws.
All RBI guidelines on outsourcing shall ipso-facto form integral part of this
Agreement and should be read as forming part of this Agreement and the Agreement
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-56
will stand amended to be in conformity with RBI guidelines or guidelines applicable
issued by any other Regulator.
Statutory Requirements and Right of inspection by RBI
a) The Agreement will be executed by abiding laws and the directive, instructions,
guidelines issued by the Regulators (including RBI) and competent authority from
time to time. During the tenure of the Agreement nothing shall be done by the Bidder
in contravention of any law, act and/ or rules/regulations, there under or any
amendment thereof governing inter-alia customs, foreign exchange, etc., and shall
keep JSCB Bank, its directors, officers, employees, representatives, agents and
consultants indemnified in this regard.
b) During the tenure of the Agreement, Reserve Bank of India or one or more of its
officers or any person authorized by it shall have the right to inspect the books and
account of the Bidder including but not limited to the documents provided by JSCB
Bank, record of transactions, and other necessary information given to, stored or
processed by the Bidder within a reasonable time. The Bidder shall preserve the
information, documents and records in accordance with the legal, statutory,
regulatory obligations as per applicable laws.
5.46 Relationship between the Parties:
5.46.1 Nothing in the Contract constitutes any fiduciary relationship between JSCB Bank
and Successful Bidder/its team or any relationship of employer - employee, principal
and agent, or partnership, between JSCB Bank and the Successful Bidder.
5.46.2 No Party has any authority to bind the other Party in any manner whatsoever, except
as agreed under the terms of the Contract.
5.46.3 JSCB Bank has no obligation to the Successful Bidder’s except as agreed under the
terms of the Contract.
5.46.4 All employees/personnel/ representatives/agents etc., engaged by the Successful
Bidder for performing its obligations under the Contract/RFP shall be in sole
employment of the Successful Bidder and the Successful Bidder shall be solely
responsible for their salaries, wages, statutory payments etc. Under no
circumstances, shall JSCB Bank be liable for any payment or claim or compensation
(including but not limited to any compensation on account of any
injury/death/termination) of any nature to the
employees/personnel/representatives/agent etc. of the Successful Bidder.
5.46.5 The Successful Bidder shall not make or permit to be made a public announcement or
media release about any aspect of the Contract unless JSCB Bank first gives the
Successful Bidder its prior written consent.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-57
5.47 Conflict of interest
5.47.1The Bidder should not be owned or controlled by any Director or officer/ employee of
the Bank or their relatives having the same meaning as assigned under the provisions
of the Companies Act, 2013.
5.47.2The Successful Bidder shall disclose to JSCB Bank in writing, all actual and potential
conflicts of interest that exist, arise or may arise (either for the Successful Bidder or
its team/agents/representatives/personnel etc.) in the course of performing the
Services as soon as practical after it becomes aware of that conflict.
5.48 Contract Amendments
No variation in or modification of the terms of the Contract shall be made except by
written mutual consent signed by both the Parties i.e. the Successful Bidder and
JSCB Bank. The Successful Bidder, however, agrees it shall be bound to amend the
Contract, if so required by JSCB Bank, for giving effect to any amendment,
modification etc. in the applicable laws including but not limited to
amendment/modification etc. in the Reserve Bank of India Act, 1934/ the Banking
Regulations Act, 1949 and/or to give effect to any modifications, amendments or
fresh guidelines issued/imposed by RBI.
5.49 Termination
5.49.1JSCB Bank may, without assigning any reasons, terminate the Contract by giving
Successful Bidder, a prior and written notice of 3 months indicating its intention to
terminate the Contract.
5.49.2Bidder will provide all necessary assistance in ensuring a smooth transition of
services, all data to the alternate Service Provider identified by the Bank in case of
termination of contract or expiry of the contract period.
5.49.3In the event of the happening of any events of the above nature, JSCB Bank shall
reserve the right to take any steps as are necessary, to ensure the effective transition
of the Service(s) to the next successor Bidder, and to ensure business continuity.
Termination for Insolvency:JSCB Bank may at any time terminate the Contract by
giving written notice of [30] days to the Successful Bidder, indicating its intention of
termination the Contract without compensation to the Successful Bidder, if the
Successful Bidder becomes bankrupt or otherwise insolvent, provided that such
termination will not prejudice or affect any right of action or remedy which has
accrued or will accrue thereafter to JSCB Bank.
Termination for Default: JSCB Bank, without prejudice to any other right or
remedy for breach of Contract, by a written notice of default sent to the Successful
Bidder, may terminate the Contract in whole or in part.
Termination for other than Default: JSCB Bank, without prejudice to any other
right or remedy and without assigning any reason, may at its sole discretion, serve
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-58
upon the Successful Bidder a written notice of 30 (thirty) days, indicating its
intention to terminate the Contract and may terminate the Contract in whole or in
part without being liable or responsible to the Bidder in any manner whatsoever.
5.50 Consequences of Termination
5.50.1In the event of termination of the Contract due to any cause whatsoever, [whether
consequent to the stipulated term of the Contract or otherwise], JSCB Bank shall be
entitled to impose any such obligations and conditions and issue any clarifications as
may be necessary to ensure an efficient transition and effective business continuity of
the Service(s) which the Successful Bidder shall be obliged to comply with and take
all available steps to minimize loss resulting from that termination/breach, and further
allow the next successor Bidder to take over the obligations of the erstwhile
Successful Bidder in relation to the execution/continued execution of the scope of the
Contract.
5.50.2In the event of termination of the Contract due to efflux of time where the term is not
extended by JSCB Bank, the Successful Bidder shall be obliged to provide all such
assistance to the next successor Bidder or any other person as may be required and as
JSCB Bank may specify including training, where the successor(s) is a
representative/personnel of JSCB Bank, to enable the successor to provide adequately
the Service(s) hereunder, even where such assistance is required to be rendered for a
reasonable period that may extend beyond the term/earlier termination hereof.
5.50.3Where the termination of the Contract is prior to its stipulated term on account of a
default on the part of the Successful Bidder or due to the fact that the survival of the
Successful Bidder as an independent corporate entity is threatened/has ceased, JSCB
Bank shall pay the Successful Bidder for that part of the Service(s) which have been
authorized by JSCB Bank and satisfactorily performed by the Successful Bidder up to
the date of termination. Without prejudice to any other rights, JSCB Bank may retain
such amounts from the payment due and payable by JSCB Bank to the Successful
Bidder as may be required to offset any losses caused to JSCB Bank as a result of any
act/omissions of the Successful Bidder. In case of any loss or damage due to default
on the part of the Successful Bidder in performing Services or any failure to perform
any of its obligations under the Contract, the Successful Bidder shall compensate
JSCB Bank for any such loss, damages or other costs, incurred by JSCB Bank.
Additionally, the sub Bidder (if any) other members of its team shall continue to
perform all its obligations and responsibilities under the Contract in an identical
manner as were being performed hitherto before in order to execute an effective
transition and to maintain business continuity. All permitted third parties shall
continue to perform all/any functions as stipulated by JSCB Bank and as may be
proper and necessary to execute the Service(s) under the Contract in terms of the
Successful Bidder’s bid and the Contract.
5.50.4Nothing herein shall restrict the right of JSCB Bank to invoke the performance Bank
guarantee and/or other guarantees, securities furnished, enforce the Deed of
Indemnity and pursue such other rights and/or remedies that may be available to
JSCB Bank under law or otherwise.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-59
5.50.5The termination hereof shall not affect any accrued right or liability of either Party nor
affect the operation of the provisions of the Contract that are expressly or by
implication intended to come into or continue in force on or after such termination.
5.50.6In the event of termination of this Contract for any reason whatsoever, JSCB Bank
shall have the right to publicize such termination to caution the customers/public
from dealing with the Successful Bidder.
5.51 Survival
Any provision of the Contract/ this RFP (if any) which, either expressly or by
implication, survive the termination or expiry of the Contract, shall be complied
with by the Parties including that of the provisions of arbitration, indemnity,
confidentiality, non-disclosure in the same manner as if the Contract/ RFP is valid,
subsisting and in full force and effect.
The provisions of the clauses of the Contract/ RFP in relation to documents, data,
processes, property, Intellectual Property Rights, indemnity, publicity and
confidentiality and ownership survive the expiry or termination of the Contract/ this
RFP and in relation to confidentiality, the obligations continue to apply unless JSCB
Bank notifies the Bidder(s) (including Successful Bidder) of its release from those
obligations.
5.52 No Agency
The Service(s) of the Successful Bidder herein shall not be construed as any agency
of JSCB Bank and there shall be no principal agency relationship between JSCB
Bank and the Successful Bidder in this regard.
5.53 No Set-off, counter-claim and cross claims.
In case the Successful Bidder has any other business relationship with JSCB Bank,
no right of set-off, counter-claim and cross-claim and /or otherwise will be available
to the Successful Bidder. However, JSCB Bank shall have such rights against the
Successful Bidder.
5.54 Key Performance Measurements
Unless specified by JSCB Bank to the contrary (in writing), the Successful Bidder
shall perform the Service(s) and carry out the Service(s) under and in accordance
with the terms of the Contract and/or RFP.
5.55 Commencement and Progress
The Successful Bidder shall proceed to carry out the Service(s) with diligence and
care in accordance with any stipulation as to the time, manner, mode, and method of
execution contained in the Contract/ RFP and shall meet the standards of good
industry practice.
5.56 Start of Installation:
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-60
Prior to taking up installation of any major component of work, the Successful
Bidder shall submit to JSCB Bank his proposed procedures and obtain JSCB Bank's
approval in writing.
5.57 Entire Contract
The terms and conditions laid down in this RFP/the Contract and all annexure thereto shall
be read in consonance with and form an integral part of the Contract. The Contract
supersedes any prior contract, understanding or representation of the Parties on the
subject matter.
5.58 Opening a Current account
The successful Bidders shall agree to open a current account with the specified
Branch of JSCB Bank Ltd. and all the payments to be made by JSCB Bank under this
contract shall ordinarily be routed through the said current account.
5.59 Governing Law
The Contract and any non-contractual obligations arising out of or in connection
with the Contract shall be governed by the laws of Republic of India. This
provisions shall survive the Contract.
5.60 Jurisdiction of Courts
The courts at Ranchi shall have non-exclusive jurisdiction to determine any
proceeding in relation to the Contract/this RFP. The provisions shall survive the
Contract.
5.61 Suspension of Payment to the Successful Bidder
JSCB Bank may by a written notice of suspension, suspend all payments to the Successful Bidder under the Contract, if the Successful Bidder fails to perform any
of its obligations under the Contract, (including the carrying out of the Services)
provided that such notice of suspension:
i. Shall specify the nature of the failure and
ii. Shall request the Successful Bidder to remedy such failure within a specified
period from the date of issue of such notice of suspension.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-61
Annexure – 1 (Offer Covering Letter)
(To be included in Technical Bid)
Date: ______
Place: ______
JSCB Ltd.
General Manager –Ranchi,
3RD Floor, Marketing Board Building,
Hehal, Ranchi, Jharkhand
Sir,
Sub: Your RFP for “END TO END Reconciliation Solution for All type of Transactions
and ATMs”
After having gone through the RFP document and annexure thereto, for the aforesaid job, we
in conformity with the RFP, offer to provide the Services(s) as described and defined in the
RFP on the terms and conditions set for the same in the RFP document and for the sum /
price indicated as per Financial Bid.
We agree to abide by this RFP and it shall remain binding on us.
We note that (i) JSCB Bank reserve the right to offer the same type of services to
L2/L3/L4/L5 bidder (ii) We also certify that the information/data/particulars furnished in
our bid are factually correct. We also accept that in the event of any
information/data/particulars proving to be incorrect, JSCB Bank Limited will have the
right to disqualify us from the bid and (iii) JSCB Bank reserves the right to reject lowest
and/or all other offers without assigning any reasons thereof.
i. We declare that our Enterprise/Unit has never been involved in any kind of frauds.
ii. We have read the terms and conditions of the RFP document bearing Ref No.
………dated ……………. and accept the same.
iii. We agree to enter into agreement to perform the aforesaid contract in the manner
and to the satisfaction of the JSCB Bank.
iv. The PRICE quoted in Financial Bid is total cost of providing the END TO END
Reconciliation Solution for All type of Transactions and ATMs and Sufficient
Manpower to run the daily operations using the system to submitted as per the
format provided in Annexure 4 inclusive of taxes, levies, duties, insurance,
transportation, freight, royalties, Installation and commissioning charges, if any,
etc excluding service tax and Octroi if any.
v. I/We agree to execute a contract in the form to be communicated by JSCB Bank,
incorporating all agreements with such alterations or additions thereto as may be
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-62
necessary to adapt such agreement to the circumstances of the standard and notice
of the award within time prescribed after notification of your intention to accept
this proposal.
vi. Until a formal contract is prepared and executed, this offer, together with Bank’s
written acceptance thereof and Bank’s notification of award shall constitute a
final, conclusive and binding contract upon us.
vii. If any action is brought against JSCB Bank for infringement / violation, of the
applicable laws in respect of the Service(s)/ our obligations, I/we shall defend the
same at my/our cost and consequences and will indemnify JSCB Bank and shall
hold JSCB harmless of all the costs and other expenses that JSCB Bank may incur
or suffer in this connection.
viii. I/We undertake to you that, if my/our Bid/Proposal is accepted, I/we shall provide
the Service(s) comprised in the Contract within timeframe specified, starting from
the date of receipt of notification of award from JSCB Bank.
ix. We enclose a Demand Draft /Bank Guarantee in lieu of EMD for Rs. 10,00,000/- in
favour of JSCB as EMD.
x. In the event of our selection by the Bank for undertaking the Services set out in this
RFP document , we will submit a Performance Guarantee for a sum equivalent
to Rs. 50 Lacs for contract period and additional 180 days effective from the date
of signing of the contract.
xi. We agree that any decision of JSCB Bank Ltd. with regard to disqualification and
rejection of our bid / offers shall be final, conclusive and binding on us and we
shall not seek any clarification/reason and/or raise any objection thereto.
xii. We enclose the following Demand Draft:
I) DD Number Dated for Rs.10,000/- (Rupees Ten thousand only) as Cost of
RFP Document &
II) DD Number Dated for Rs.10,00,000/-(Rupees Ten lacs only) as EMD .
Demand Drafts are issued in favour of JSCB
by…………………………………………………………..Bank
………………………………………………………………………………………
………………Branch payable at Ranchi.
Dated this day of 20xx
Signature of the authorized person
Name of the signatory (in block capital letters)
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-63
Seal of the company1In accordance with the provisions for affixation of common seal as provided in the
Articles of Association and to be supported by board resolution.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-64
Annexure- 2
Functional Specifications
(To be included in Technical Bid)
The number of marks attributable against various parameters is indicated in column –
Marks
Description Marks
General 20
ATM Transaction Reconciliation 40
Cash in ATM Balancing 40
Third party Reconciliation and Accounting 50
Point of Sale Transactions / E-Commerce Transactions 40
MIS / Reports 60
250
Marks Sr.
No.
Description Bidder
Response
(A/C/N) *
Detailed
Explanation
About
Deviation, If
Not Complied
20
1 General
5 1.1 License based software for in house reconciliation of ATM transactions, Cash in ATM Balancing, Third Part Transactions Reconciliation, Chargeback Management, Dispute and Claim Management, Point of Sale transactions on various financial networks, MIS etc. 4-way reconciliation is to be done for ONUS
and Acquirer transactions; 3-way reconciliation
is to be done for Issuer – ATM and POS
transactions. ATM cash balancing is to be done
along with chargeback management / dispute
resolution for all transactions, preparation of
settlement vouchers, generation of uploadable
files and exception reporting.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-65
1 1.2 The software should have the provision to
provide extensive financial reporting and
Management Reporting.
5 1.3 The software should support existing financial network (Visa/MasterCard/Rupay/NFS/DFS/ Bancs/Cashnet/ Amex/Visa Card to card transfer/ Visa Money Transfer/ Cooperative Banks tie ups under NFS/
1 1.4 The software should include Safety features like
password to users at different
levels to enter/modify various
parameters at different security levels should be
available
1 1.5 The software should provide for Perfect matching of entries and Forced Matching (ignoring specified parameters)
1 1.6 Provision for matching of entries with any
selected period (Day/Week//Month/Year etc.)
either forward or backward and/or all periods
should be available
1 1.7 Audit trails at the application level based on
user, events, access to records and files etc.
1 1.8 Application user passwords should be internally
encrypted.
1 1.9 If a wrong password is entered a predefined
number of times (configurable), typically three,
the login-id should be automatically deactivated
for a significant period of time.
1 1.10 The software should force users to change their
passwords after the expiry of a configurable
period.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-66
1 1.11 The software should automatically disconnect a
log-on session if no activity has occurred for a
period of time (configurable).
1 1.12 Modules meant for a particular level of authority
should be available for operation to the user with
that level of authority only. The software should
allow giving module wise rights
(add/delete/modify/view/print) for each user/
user group.
30 2 ATM Transactions Reconciliation
4 2.1 The software should be able to receive settlement files, chargeback claim file and raw data file and any other available required files from NPCI Net, NFS, DFS, Visa, Master, Rupay, Cashnet, Bancs, Amex
1 2.2 The software should be able to store/retrieve the
data received from Branches/Switch/GL &
financial networks in specified File format with
proper validation.
2 2.3 The system should be capable of performing 4
way reconciliation (i.e. Switch, CBS, EJ, and CBR) for ATM Transactions (ONUS and Acquirer Transactions- credit leg) and 3 way
reconciliation ( i.e. Switch, CBS, and Network Switch) for Acquirer transactions- debit leg.
2 2.4 The unmatched entries upon completion of the
four way reconciliation to force matched based
on the parameters set by the Bank
1 2.5 Generation of un-reconciled entries report per
ATM and ATM Network wise on daily basis.
2 2.6 Generation of uploadable files as per CBS
format to post exception entries to CBS as per
Bank’s Accounting System
2 2.7 For acquired transactions, uploading of the chargeback received in the system and generation of the report for the same citing the status in the
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-67
ATM and EJ
2 2.8 Generation of Accounting Entries for failed
transactions for which chargeback is received
from various financial networks
2 2.9 In case of acquiring transaction on Bank ATM,
if the claim is payable from overage/excess
amount for ATM for the day, the system should
be capable to reduce the available balance after
claim settlement (ATM suspense account).The
system should also be capable of adding the
fresh excess/ overages on a day to day basis
1 2.10 Check for duplicate posting for single claim,
and also check to stop processing the same file
more than once.
2 2.11 Reconciliation of acquiring Mobile Recharge
Transactions through ATM. Generation of
Exception Reports, and Preparation of
Settlement Vouchers. Generation of uploadable
files for reversals, debit adjustments and credit
adjustments.
5 2.12 Upload of reconciled and unreconciled files,
Raising of proactive credit adjustments, debit
adjustments, and technical chargebacks on the
basis of 4-way reconciliation for ONUS and
acquirer transactions and network credit
adjustments files in the Bidder’s Dispute
Management System.
4 2.13 Generation of Uploadable files for :
a) Re-credit to cardholders of our bank and other banks for credit adjustments.
b) Successful transactions not debited to cardholders of our bank and other banks for debit adjustments
c) Recovery of charges / surcharge/ tips not
debited in cases of issuer transactions at
other network ATMs or POS terminals.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-68
40 3 Cash in ATM Balancing
3 3.1 The software should be able to upload,
store/retrieve Cash Balancing Report (CBR)
along with Switch, CBS & EJ data, and
reconcile the same with Bank records.
5 3.2 A Cross verification of actual cash loaded and
logical cash loaded by comparing ATM cash
counters with admin transactions. Reconciliation
of ATM GL cash, Switch Cash Balance with
Physical cash at ATM.
2 3.3 Reporting of overages and shortages of CBR
dispensation vis-à-vis Switch Data, CBS Data
and EJ and storing the same in the system
5 3.4 In case of shortages, analysis of Switch Data
and EJ Data to identify transaction and reason
for shortage. Intimation to Bank of the reason
and initiate the necessary corrective action i.e.
generate uploadable files for debiting
customer’s account, raise claims with other
Banks within Network TAT, report for claiming
from ATM Vendor
4 3.5 In case of overages, analysis of Switch Data and
the EJ Data to identify the transaction for
settlement of chargeback claim received &
proactive Credit Adjustments.
4 3.6 In case of loading differences, the same have to
be resolved by contacting the branch, or the
MSP vendor or the MOF vendors in case of
branch ATMs, offsite ATMs and MOF ATMs
and any other vendor as appointed from time to
time under ATM business model.
4 3.7 On a daily basis, report needs to be generated
providing balances of all ATM Cash accounts,
issuer office accounts & acquirer office account
of particular network along with the receivables,
payables, outstanding amount
2 3.8 System based computation of ATM cash dispense
between 2 TI’s.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-69
4 3.9 Maintain mirror accounts of ATM Cash
accounts and Network pool accounts and
balancing of the same with the credits and debits
received and reporting the same to the Bank
4 3.10 Bank maintains settlement accounts with different banks for different ATM Networks (For Visa, Master Card, settlements, Bank maintains account with Bank of America, Bank of India and RBI for NFS Network). On daily basis, the software has to provide reports for funding these accounts based on the settlement files. The software also has to provide the files for
FCY USD reporting to be done to Treasury in
cases of settlements received in Foreign
currency.
3 3.11 The software should provide uploadable files in
CBS format for internal transfer of settlement
amount to the different office accounts of the
Bank
40 4 Third Party Reconciliation and Accounting
4 4.1 3-way reconciliation is to be done for Issuer –
ATM and POS transactions by checking bank
switch, network switch and CBS. Capability to
do reconciliation of Issuer Transactions,
generation of unreconciled entries and capability
to handle all types of settlements and
reconciliation works related to payments and
receipts to these networks (Visa / Mastercard/
Rupay/ NFS/DFS/Cashnet/ Bancs/ Amex/
Bilateral Consortium Networks/ Visa C2C/
VMT etc) including but not limited to
chargebacks, dispute resolution as per
mechanism set out by these networks.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-70
3 4.2 Reconciliation of Sponsored / Associate Bank – reconciliation of issuer and transactions, automated accounting entries for tie-up/ sponsored/ Associate Bank transactions, Generation of settlement files bank wise, Transaction Based accounting and computation of fees for Issuer /Acquirer transactions. Communication to be sent to co-operative banks
(settlement voucher / raw data etc) on daily basis to concerned staff of co-operative banks.
4 4.3 Reconciliation of all card products including
WCC and GCC card transactions in various
currencies, preparation of settlement vouchers,
preparing of uploadable files, raising of
chargebacks and responding to disputes raised
by customers within the prescribed TAT
guidelines of the respective network.
Appropriate action to be taken for incoming
debits on account of Late presentments, no
authorisation and duplicate processing, cash fee,
tips and exchange fluctuations.
3 4.4 Preparation of uploadable files for posting of entries related to ITZ cash card transactions. System should also allow raising of chargeback for ONUS and OFFUS ATM Transactions of ITZ Cash card holders. Updating of MIS from TT-140 file received from
Itz Cash Card. Submitting report of Itz Cash
ONUS transaction report on a daily basis to Itz
Cash Card Team. Handling any other activities
pertaining to ITZ Cash Card Transactions.
3 4.5 Reconciliation of Mobile Recharge Transactions
of our customers through ATM, Mobile and
Internet Banking. Generation of Exception
Reports, and Preparation of Settlement
Vouchers. Generation of uploadable files for
reversals, debit adjustments and credit
adjustments.
1 4.6 For All type of Transactions on other bank
ATMs, downloading and processing of
representments received and updation of the
same in Dispute Tracker of the Bidder.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-71
1 4.7 Generation of settlement vouchers (after
reconciliation) for posting the entries in
FincraftCBS of respective networks.
1 4.8 Reconciliation of incoming and outgoing files
w.r.t VISA / Master/ Rupay/NFS/ DFS.
2 4.9 Creation of outgoing files for raising chargeback
for VISA / Master/NFS/ Rupay / Cashnet/
Bancs/ Amex/ Bilateral Consortium Networks in
the specified formats of BaseII /IPM / xml and
as per requirement of the network.
2 4.10 Reconciliation of Surcharge entries debited
online and generation of difference of Base1
Base 2 file after taking into account the online
entries pertaining to surcharge.
2 4.11 Computation of the settlement amounts and verification of the same with the settlement received from various networks.
1 4.12 Cross tallying of Settlement Bank A/c foreign
and local for VISA and MasterCard transactions with GL advice.
1 4.13 Computation of foreign exchange fluctuation,
difference for international transactions and
appropriate accounting in the respective network
settlement voucher as per Bank’s Accounting
System.
1 4.14 Tracking of inflated transactions such as: Petrol,
Railways, Tip adjustments, Other Option’s and
Option to debit/Credit the respective GL’s
1 4.15 Tracking various fees/ Charges/ penalties by VISA/MasterCard/NFS/DFS/Rupay / Cashnet, Bancs, Amex, Bilateral consortium networks.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-72
1 4.16 Computation of Issuer fees, acquirer fees, balance enquiry fees and any other charges/difference in charges for debiting to
cardholders account
4 4.17 Balancing of acquirer and issuer pool accounts,
settlement accounts, chargeback accounts
2 4.18 Uploading of new and modified customer mobile
numbers in Enstage Software for verification of
OTP during e-commerce transactions, and also
any other activity related to the same in future.
3 4.19 Processing of VISA Card to Card Transactions on
a Daily Basis within TAT reconciliation and
reconciliation and balancing of the VISA card to
card transactions
3 7.10 Preservation and Retrieval of records for production before ombudsman/ any other
authority.
3 7.11 Resolving the disputes within the period
specified by RBI /network regulations at present and if modified in future.
40 8 Point of Sale (POS) Transactions / E-commerce Transactions
5 8.1 Three Way recon between bank switch, network switch and CBS. The unmatched entries upon completion of reconciliation to force matched based on parameters set by the Bank
4 8.2
The software should be able to store/retrieve
network settlement files (Visa Base II,
MasterCard IPM, NPCI, RuPay etc) and match
its authorization transaction.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-73
4 8.3 The No Base 2 transaction records to be kept
separately and matched on subsequent days with
the Base 2 records. In case the record in No
Base2 exists even after 30 days, then the upload
file is to be prepared for reversing the debit to
the customer’s account.
5 8.4 Mechanism should be there to identify No
Base1 records, late presentments and duplicate
processing. Immediate action is required to be
taken against such transactions as per the Bank’s
policy.
2 8.5 Reconciliation of POS transactions done on
JSCB POS terminals as well as other network
POS terminals (Visa/MasterCard/NPCI etc)
1 8.6 Generation of exception reports w.r.t entries
matched / unmatched.
2 8.7 Generation of upload file as per CBS format to
post exception entries to CBS as per Bank’s
Accounting System
2 8.8 Provision for uploading for acceptance of claim received from Bank. These claims should be assigned a unique identification number by the software in the league with Bank’s identification numbering method. The software must validate the claim/transaction
in system whether it exists.
1 8.9 Check for duplicate entry for a single claim.
4 8.10 Downloading and processing of representments
received, originator of disputes to be informed
with the status and provided the supporting
documents. The same has to be updated in the
Dispute Tracker of the Bidder.
1 8.11 Adjustments of accepted claims with an
uploadable file in CBS format as per Bank’s
Accounting System
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-74
4 8.12 Refund Received from any Networks are to be
matched with the Chargeback cases and with
pending receivable entries and entries in No
Base2. The entries from No Base2 records to be
deleted once the refund is processed so as to
avoid double credit to the customers.
5 8.13 Monitoring and checking of fees / charges/
penalties levied by VISA / Mastercard/ Rupay in
Settlement, checking against reports,
preparation of settlement vouchers and
appropriate accounting as per Bank’s accounting
system.
50 9 MIS/Reports
2 9.1 Daily reports on outstanding entries, receivables
and payables
2 9.2 Daily reports of claims received, settled and
outstanding claim network wise
1 9.3 Daily reports of claims paid late and penalty
amount paid with reason
1 9.4 Daily report of exception in Cash Loading.
1 9.5 Daily reports of accounts with large Debit/Credit
Balances
1 9.6 Daily report of ATM transactions with zero hits,
abnormal frequency and below normal hits
2 9.7 Monthly and quarterly report of reconciliation,
outstanding entries, receivables and payables
1 9.8 Monthly reports of chargeback received
(accepted and rejected), penalty paid; pending
claims, good faith claims with other Banks and
with Bank. Monthly/Quarterly/half yearly/yearly
details of chargeback report
1 9.9
MIS on Break up of Interchange & No of
transactions Network wise
3 9.10 Generation of reports – entries unreconciled per ATM and ATM Network wise and also POS/ ecommerce entries. Exception reports on Switch O/s, Core O/s, Tie
Up Bank O/s, Visa/Master/NFS O/s.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-75
2 9.11 Daily Reconciliation and balancing reports.
2 9.12 Provision for creation of reports for funding the
settlement accounts of VISA/ Master/ NFS/
Rupay any other network based on the
settlement files.
3 9.13 Day end report showing amount of chargeback/ pre-arbitration / arbitration / credit adjustment / debit adjustment / re-presentment as per
different networks and uploaded in database.
Provision for generation of accepted and
pending for recovery status cases for Debit
Adjustments. Report for No Base1 cases where
chargeback is to be initiated or recovery is to be done.
2 9.14 List of heavy cash drawing customers
List of customers using the ATM heavily for
drawing low amounts
List of Cards frequently used for booking
Railway tickets
List of Cards sorted as per MCC sectors
List of Cards frequently used abroad
2 9.15
Age-wise summary of unreconciled transactions based on the parameters specified by the Bank with number of transactions and amount.
4 9.16 Age wise Daily Report giving the Details of ATMs for which CBR is not obtained.
Age wise Daily Report giving the Details of
ATMs for which EOD is not done.
Age wise Daily Report giving the Details of
ATMs for which the GL level reconciliation of ATM is not done.
Age wise Details of differences in ATMs.
1 9.17 Audit trail of the entire application with
periodical backup of the data to be provided to
the Bank in a format readable by the Bank and
specified by the Bank
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-76
5 9.19 Monthly/Quarterly/Half yearly report to Board
of directors/VISA/MasterCard.
Preparation and submission of various reports
/information to Sharing Networks / Service
Providers about Cards Transactions / ATMs etc,
as required at Monthly / Quarterly or other such
intervals.(QMR& QOC /SAFE etc.)
5 9.20 Report on number of ATMS which are not tallied for more than 15 days.
4 9.21 Monthly reports on Number of Disputes
Received, Resolved, Carried over to next month. MIS reports for Disputes Received along with status ( per day / per month / per network) :
• ATM wise
• Date wise
• Branch wise
• Tie-up bank wise
• Others (As required by bank)
• Day end report showing amount of
chargeback/
prearbitration/arbitration/credit
adjustment/debit
adjustment/representment as per
different networks and uploaded in
database.
5 9.22 Should be able to generate periodical as well as ad- hoc reports as per the requirements of the
Bank
Any other report required time to time from
Bank/RBI or other governing bodies at no
additional cost.
(*) = The bidder should mention in the Column under ‘Bidder’s Response’ whether
modules for all the required features/specifications as mentioned above are:
A – Readily Available
C – Customizable, free of cost, in the current version itself, before acceptance of the
Software by the Bank
N – Not available / cannot be made available
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-78
Annexure- 3
Technical Specifications
(To be included in Technical Bid)
Sr. No. Description Bidder’s
Response
Comments
1 The proposed software is readily available for in
house processing of ATM, POS/e-commerce
transactions, Cash balancing other financial networks
for Reconciliation.
2 Software is in use at two scheduled commercial
Bank (attach additional sheets if the number of
Banks is more than one)
Name of the Bank
Scope of the project
Date of installation
Whether under warranty/ATS
Volume of data (No. of records)
Number of ATMs of the Bank
3 Software & Database details
Software front-end/programming language
Name & version of DBMS
Details of other system software required other than
OS
4 Hardware & OS details
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-79
Broad server requirement details.
Sizing has to be given for 3 years.
OS
Backup Details
5 Software features
Security features for preventing unauthorized
access
Various level of access/authorization/approval
with password
Audit-trail & logs
Faster data storage/retrieval
On-line help
Query module
Day begin/day end procedure
Disaster handling & recovery
Data export/import, download/upload facility
Parameterization
Maker/Checker concept
Audited & Certified by third party
Benchmarking
6 If desired by the bank, whether the bidder agree
to supply/provide all required system software
and other related utility software to run the
proposed software (other than hardware & OS)
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-80
7 Agree to provide to the Bank the configuration
details of hardware & OS required
Adequate HR and other resources to be provided
by the bidder for reconciliation activity.
The Solution offered by the Bidder should be
Payment Card Industry Data Security Standard
(PCI-DSS) compliant solution.
The Solution offered should be compatible with
all guidelines issued by the regulatory / government bodies from time to time. In case of
disruption of services at the Primary Site, the Bidder should be capable of providing continuous services at an
alternate location/ Disaster Recovery Site of the
Bank without the disruption of services. Disaster
Recovery Site has to be verified by the bank's
officials after enabling for the primary site.
8 Project deliverables
Software executable code
Source code to the Bank under escrow
agreement
User Manual
System documentation
9 Training
User training
System administration training
10 Software support
Warranty support
If desired by the bank, ATS support to the
software & minimum period of ATS
commitmentLocation of the Support Team
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-81
Annexure-4 Indicative Commercial Bid
(To be included in Indicative Commercial Bid)
Bidder must take care in filling price information in the indicative commercial offer/
indicative commercial bid, to ensure that there are no typographical or arithmetic errors.
The Prices must be indicated in Indian Rupees only. The price quoted by the bidder will be
an all-inclusive price i.e. it shall include all taxes, levies, duties, insurance, transportation,
freight, royalties, Installation and commissioning charges, if any, etc excluding service tax.
Name of the Bidder : ____________
Sr.No. Service Offered
Rate per transaction.
(Excluding enquiry and system
reversal transactions) in Paisa (it
shall include all taxes, levies,
duties, insurance, transportation,
freight, royalties, Installation and
commissioning charges, if any,
etc excluding service tax and
Octroi.
1
END TO END Reconciliation
Solution for All type of Transactions
and ATMs as per the RFP
Reconciliation Activity (up to the
Logical closure of the transaction including Resolution of the
Complaint, if any)
Paise Per Financial Transaction
In figures-
In words-
1. Assumptions:
a. Average number of financial transactions per day: 4.25Lacs
b. Average number of financial transactions per month: 1.30crores
c. Average number of financial transactions per year: 16 crores
d. Projected Number of ATMs at the end of 3 years: 4000 by end of March 2015.
However, the volumes mentioned above are the present volume which may change during
the period of the contract of RFP.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-82
2. The bidder has to submit the price bid only in the above format. Any other format
would be summarily rejected at the time of opening the bid.
3. In case there is any difference in rate quoted given in words and figures, the rate written
in words shall be considered final & binding.
4. No extra cost shall be payable by the Bank for integration with all relevant
applications/systems for reconciliation.
5. The rates to be quoted shall be inclusive of it shall include all taxes, levies, duties,
insurance, transportation, freight, royalties, Installation and commissioning charges, if
any, etc excluding service tax and Octroi.
6. Prices payable to the Bidder as stated in the Contract shall be firm and not subject to
adjustment during performance of the Contract, irrespective of reasons whatsoever,
including exchange rate fluctuations, changes in taxes, duties, levies, charges, etc.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-83
Annexure –5 ELIGIBILITY CRITERIA & Details of Bidder
Sr.
No.
Eligibility Criteria Documents required Complied
Y/N
1 The Bidder submitting the offer should be a registered company in
India
Certified copy of Certificate
of Incorporation, Certificate
of Commencement of
Business, PAN
Card and other
Relevant Documents.
2 Bidder should be in the business of
implementing or providing
outsourcing services for ATM Cash
Balancing and ATM, POS, Networks
and E-commerce transaction
reconciliation for a minimum period
of three years as on the bid
submission date.
To be supported with
certificate / reference letters
from the respective banks.
3 Bidder should have Transaction
Reconciliation software or OEM
license and is providing
reconciliation services in at least in
two scheduled commercial Bank in
India (including one PSU Bank in
India) for atleast one year.
To be supported with
certificate / reference letters from the respective banks.
4 The bidder should have the software
or license and provide the
reconciliation services to a bank
which has atleast a transaction
volume of 3 Lac transactions per day.
To be supported with
certificate / reference letters
from the respective banks.
5 The Bidder should not have been put
in the negative list or be blacklisted
by any Government Department /
PSU / PSE or Bank for breach of any
law or violation of regulatory
prescriptions or breach of agreement
Self Certification on the
Letter Head of the Bidder.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-84
6 Shall have a minimum average annual Net Sales Turnover of Rs.20
crores (Rupees Twenty
Crores) during last three financial
years viz. 2011-12, 2012-13 and
2013-14.
Copy of audited Balance
Sheet and P&L statement for
the financial years 2011-12,
2012-13 and 2013-14.
7 Shall have made positive net worth
and in profit for the last 2 financial
years viz. 2012-13 and 2013-14.
Copy of audited Balance
Sheet and P&L statement for
the financial years 2012-13
and 2013-
14.
8 The applicant bidder should have all
necessary licenses,
permissions, consents, no
objections, approvals as required under
the law for carrying out its business.
Self-Certification on the
Letter Head of the Bidder.
9 The bidder must comply with
government’s rules and regulations
like minimum wages Act, Provident fund and ESIC facility standard. (Proof of compliance and
labour license needs to be submitted
along with the quotation)
Self-Certification on the
Letter Head of the Bidder.
10 Bidder should comply with all
applicable Union, State and local
laws, ordinance, regulations in
performing its obligations including
the procurement of licenses,
permissions, certificates, etc.
payment of taxes, if required.
Self-Certification on the
Letter Head of the Bidder.
11 The Bidder should have trained
/experienced personnel and
manpower to the reconciliation
services as per the scope of this
RFP.
Self-Certification on the
Letter Head of the Bidder.
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-85
Details of the Bidder
(To be included in Technical Bid)
Details filled in this form must be accompanied by sufficient documentary evidence, in
order to verify the correctness of the information.
S.
No
Item Details
1. General Details
1.1 Name of Company (Bidder)
1.2 Postal Address
1.3 Telephone and Fax numbers
1.4 Constitution of the Company
1.5 Details of ownership
1.6 Nature of activity
1.7 Name and designation of the person
authorized to make commitments to JSCB
Bank Ltd
1.8 Email Address of Authorized
Representative.
1.9 Year of commencement of Business &
number of years in business
1.10 Sales Tax Number
1.11 Income Tax Number (PAN)
1.12 Brief Description of facilities for
undertaking the services.
2 Financial Details
2.1 Annual Turnover ( 2011-12)
2.2 Annual Turnover (2012-2013)
2.3 Annual Turnover (2013-2014)
2.4 Net Worth (2012-2013)
Net Profit (2012-2013)
JHARKHAND STATE COOPERATIVE BANK Ltd. Page-86
2.5 Net Worth (2013-2014)
Net Profit (2013-2014)
Copy of audited Balance Sheet and P&L statement for the financial years 2011-12, 2012-
13 and 2013-14 are to be submitted.
Place: Signature:
Date: Seal
RFP for All type of Reconciliation System
Annexure - Bank Details
(To be included in Technical Bid)
1. Name of the Bank
2. Address of the Bank
3. Contact Person
4. Telephone No.
5. Fax No E-
6. IFSC Code
7. Account Number
8. Remarks, if any
Corporate Authorization details.
Note: This statement has to be duly attested by the banker.
Signature: Signature:
Name of the Authorized Person: Name of the Authorized Person:
Designation: Designation:
Company Seal Banker Seal
All authorizations should be collected
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-88
JSCB BANK Ltd. Page-85
Annexure-7
Experience in Providing Reconciliation Solution
(To be included in Technical Bid)
Experience in providing hardware, software having the functionalities as per scope defined in
Annexure-5 and undertaking reconciliation activities of END TO END Reconciliation Solution for
All type of Transactions and ATMs.
Sr.
No
Bank’s
Name
Scope of
Work/
Magnitude of
Work
Period From
– To/
Installation
Date
Contact
person -
Name
/Address
- Tel. No./
Fax No
Additional
Information
1
2
3
4
5
The bidder to provide documentary evidence (certificates from customers/clients) in support of
the experience/scope of services delivered (ATM/All type of transaction reconciliation & Cash
in ATM reconciliation) and magnitude of work undertaken.
The Bidder should also provide the purchase order copies issued by Banks.
The Bidder should also provide a write-up on the work experience, expertise in supply,
Installation, Implementation and Maintenance of Card Reconciliation Software
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-89
Annexure-8 Details of Support Centers
(To be included in Technical Bid)
No City Postal
Address
Contact
numbers
No. of
Technical
Support
Team
Next Level
Escalation
1
2
3
4
5
6
7
8
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-90
Annexure 9 Format for Raising Pre-Bid Clarifications
Bidder Name:
Contact Person:
Contact Number / Email ID:
Sr
No
RFP
Page
No
RFP
Clause
No
Original RFP
Clause
Subject Clarification Sought /
Suggestion of Bidder
1.
2.
3
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-91
Annexure-10 Undertaking
(To be included in Technical Bid Envelope)
We, [•] (name and designation) on behalf of [•] having its registered office at [•] have submitted a
Bid proposal to JSCB Bank for END TO END Reconciliation Solution for All type of
Transactions and ATMs in response to the Request for Proposal (RFP) dated issued[02-12-2014]
by JSCB Bank.
a. We are duly authorized persons to submit this undertaking
b. We have read and understood the aforesaid RFP and we hereby convey our absolute
and unconditional acceptance to the aforesaid RFP.
c. We do not have any business relationship with JSCB Bank including its directors
and officers which may result in any conflict of interest between us and JSCB
Bank. We shall on occurrence of any such event immediately inform the concerned
authorities of the same
d. We have submitted our Bid in compliance with the specific requirements as
mentioned in this RFP.
e. We have provided with all necessary information and details as required by JSCB
Bank and shall provide with such additional information’s may be required by
JSCB Bank from time to time.
f. Neither we nor any of our employee/director has been barred from providing the
Services nor are we in negative list/blacklisted by any public sector banks, statutory
or regulatory or investigative agencies in India or abroad.
g. All the information furnished here in and as per the document submitted is true and
accurate and nothing has been concealed or tampered with. We have gone through
all the conditions of Bid and are aware that we would be liable to any punitive
action in case of furnishing of false information / documents.
h. We certify that we have carefully examined the Scope of Work stipulated in Part 3
and Annexure 2 of the captioned RFP floated by you
i. We commit to provide services as per the Scope of Work for a minimum period of
3 years. . We hereby undertake to deliver services in its entirety as per the Scope
stipulated and adhere to the time frame mentioned therein inter-alia under following
descriptions:-
a) ATM Transactions Reconciliation
b) Cash in ATM balancing
c) Third Party Reconciliation and Accounting
d) Monitoring of Interchange and Switching fees
e) Other Services
f) Point of Sale Transactions
g) Accounting
h) MIS Report generation
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-92
It is further certified that we have not modified or deleted any text/matter in this RFP.
Dated this _____ day of ____________________ 20..
Signature
(Company Seal)
__________________
In the capacity of
Duly authorized to sign bids for and on behalf of:
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-93
Annexure-12
AGREEMENT/CONTRACT
THIS AGREEMENT made at………………… the ………day of……………………. 20..
Between,
JSCB Limited , a banking organisation within the meaning of Section 5 (c) of the Banking
Regulation Act, 1949 (10 of 1949) and having its registered office at JSCB, 3rd floor marketing
Board Building, Hehak, Ranchi – 8431004 (hereinafter called “the JSCB Bank/Bank” which
expression shall unless it be repugnant to the subject, context or meaning thereof shall be deemed
to mean and include its successors and assigns) of the ONE PART
AND
……………. (Name of Successful Bidder) of …………………… (Please specify the registered
office of the Successful Bidder (hereinafter called “the Successful Bidder” which expression
shall unless it be repugnant to the subject, context or meaning thereof shall be deemed to mean
and include its successors and permitted assigns) of the OTHER PART;
The Bank and Successful Bidder are hereinafter collectively referred to as "Parties" and
individually as Party-
WHEREAS, the Bank called for the bids for engagement of Bidder for END TO END
Reconciliation Solution for All type of Transactions and ATMs for JSCB Bank and provide
services as mentioned in the Bid/RFP Document bearing Reference No....................... (RFP) for
(END TO END Reconciliation Solution for All type of Transactions and ATMs) [hereinafter
referred to as “the Contract” or “the Service(s)”] and has accepted a bid by the Successful
Bidder for rendering of the Service(s) at a unit price of …….. paise per financial transaction for
next 3 years (Contract Price in Words and Figures) (hereinafter called “the Contract Price”).
NOW THIS AGREEEMENT WITNESSETH AND IT IS HEREBY AGREED BY AND
BETWEEN THE PARTIES HERETO AS FOLLOWS:
1. In this Agreement words and expressions shall have the same meanings as are respectively
assigned to them in the aforesaid RFP Document bearing Reference No.................
2. The RFP Document bearing Reference No._________________________ or Corrigendum/s
(if any) including the following and the annexures thereto, shall be deemed to form and be
read and construed as part of these presents.
i. Request for Proposal ii. Eligibility Criteria for the Bidder iii. Scope of Work
iv. Instructions to the Bidder
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-94
v. Terms and Conditions vi.
Commercial's accepted by Bank.
vii. Service level agreement
3. In consideration of the payments to be made by the Bank to the Successful Bidder as
hereinafter mentioned, the Successful Bidder hereby agrees and covenants with the Bank to
provide/render the Service(s) and to remedy defects, if any therein, strictly in conformity in
all respects with the provisions of the Contract/ RFP.
4. The Successful Bidder hereby represents that :
i. It is duly organized and validly existing organization under Indian Laws.
ii. It has power and authority to execute and deliver this Agreement and has taken all
necessary steps to authorize execution, delivery and performance of this
Agreement.
iii. It has all permissions, consents, approvals and license from all authorities, both
regulatory / statutory and non-regulatory, for executing the Service(s);
iv. It is authorized and legally eligible and otherwise entitled and has power and
authority to do all things necessary and appropriate and to consummate the
Service(s) contemplated under this Agreement.
v. Neither the execution and delivery of this Agreement to the Bank nor the Successful
Bidder s compliance with or performance of terms and provisions of this
Agreement shall contravene any provisions of law or any order, writ, injunction or
decree of any Court or Government authority nor shall it violate any provisions of
memorandum and articles of association affixation/bye laws/partnership deed or
any agreement or arrangement to which the supplier is party.
vi. The Service(s) offered to the Bank do not violate any provisions of the applicable
laws, regulations or guidelines including laws relating to intellectual property
rights, legal and environmental. In case there is any violation of any law, rules or
regulation, which is capable of being remedied the same will be got remedied
immediately during the implementation, maintenance and contract period to the
satisfaction of the Bank;
vii. It shall supply to the Bank all the items of equipment(s), tools and machinery free
from manufacturing defects. Defective items, if any, shall be removed and
replaced as contemplated in the aforesaid bid document, free of charge.
viii. It shall appoint adequate manpower resources for undertaking the activity of END
TO END Reconciliation Solution for All type of Transactions and ATMs within
the TAT criteria specified by the Bank under the RFP.
ix. If the Service Provider having been notified fails to remedy the defect(s) within the
period specified, Bank may proceed to take such remedial action as may be
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-95
necessary, at the suppliers risk and expense and without prejudice to any other
rights which Bank may have against the service provider under and in accordance
with the contract.
5. The Successful Bidder shall enter into service level agreement which will include all terms &
conditions, provisions, covenants, scope of work, penalties, and payment terms but not
limited to above within one month along with this agreement as addendum or otherwise as
decided by the Bank.
6. In case we offer system and/or software with OEM license, such software operates
effectively on the system offered by us and we are willing to accept responsibility for its
successful operations.
7. Thee Bank hereby agrees and covenants to pay the Successful Bidder in consideration of the
rendering of the Service(s) and the remedying of defects, if any therein, the Contract price or
such other sum as become payable under the provisions of the Contract at the times and in
the manner prescribed by the Contract.
IN WITNESS WHEREOF the parties hereto have caused these presents to be executed on the day,
month and year first above written.
Signed and Delivered by
The within named
Signature:
Name:
Date: -..........................
IN THE PRESENCE OF
1. Signature
Name: .......................
Address: .......................
..................................
2. Signature
Name: .......................
Address: .......................
..................................
Signed and Delivered by..................................
The within named
M/s. ..................................
.................................. Date:
.......................
IN THE PRESENCE OF:
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-96
1. Signature
Name: .......................
Address: .......................
..................................
2. Signature
Name: .......................
Address: .......................
..................................
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-97
Annexure-13
Deed of Indemnity
This Deed of Indemnity executed at Ranchi on the ______ day of _______ by
________________________________________ (hereinafter referred to as “the Obligor”
which expression shall unless it be repugnant to the context, subject or meaning thereof, shall be
deemed to mean and include successors and permitted assigns);
IN FAVOUR OF
JSCB Bank Limited, a banking company within the meaning of section 5 (c) of the Banking
Regulation
Act, 1949 (10 of 1949) having its registered office at JSCB, 3rd floor, Marketing Board Building,
Hehal, Ranchi (hereinafter referred to as “JSCB Bank” which expression shall, unless it be
repugnant to the subject or context or meaning thereof, be deemed to mean and include its
successors and assigns)
WHEREASJSCB Bank vide its RFP No [CPU-TN-DC-04/December 2014] dated [02-12-2014]
(RFP) had invited Bids from the eligible Bidders for END TO END Reconciliation Solution for
All type of Transactions and ATMs for JSCB Bank.
WHEREAS
(1) The Obligor has
(a) offered to JSCB Bank to outsource the END TO END Reconciliation Solution for All type of
Transactions and ATMs of JSCB Bank (hereinafter referred to as “the Services”),. as per the
specifications provided under Request for Proposal bearing Reference No............... (hereinafter
referred to as “RFP /Bid Document”);
(b) represented and warranted that they have all permissions, consents, approvals and license
from all authorities, both regulatory / statutory and non-regulatory, for executing the Service(s)
as stated in the Contract dated……… to JSCB Bank;
(c) Represented and warranted that the aforesaid Service(s) offered to JSCB Bank do not violate
any provisions of the applicable laws, regulations or guidelines including laws relating to
intellectual property rights, legal and environmental. In case there is any violation of any law,
rules or regulation, which is capable of being remedied the same will be got remedied
immediately during the implementation, maintenance and contract period to the satisfaction of
JSCB Bank;
(d) Represented and warranted that they are authorised and legally eligible and otherwise entitled
and competent to enter into such contract(s) with JSCB Bank;
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-98
(2) JSCB Bank, relying and based on the aforesaid representations and warranties of the Obligor,
has agreed to avail the Service(s) of the Obligor on the terms and conditions contained in its
Contract dated ____________________ (the Contract) with the Obligor;
(3) One of the conditions of the aforesaid Contract is that the Obligor is required to furnish an
indemnity in favour of JSCB Bank indemnifying the latter against any loss, damages or claims
arising out of any violations of the applicable laws, regulations, guidelines during the execution
and rendering of its Service(s) to JSCB Bank over the contract period as also for breach committed
by the Obligor on account of misconduct, omission or negligence or otherwise by the Obligor.
(4) In pursuance thereof, the Obligor has agreed to furnish an indemnity in the form and manner
and to the satisfaction of JSCB Bank as hereinafter appearing;
NOW THIS DEED WITNESSETH AS UNDER: -
In consideration of JSCB Bank having agreed to award the aforesaid Service(s) / job to the
Obligor, more particularly described and stated in the aforesaid Contract, the Obligor do hereby
unconditionally, absolutely and irrevocably agree and undertake that: -
(1) The Obligor shall, at all times hereinafter, save and keep harmless and indemnified JSCB
Bank, including its respective directors, officers, employees, agents and representatives and
keep them indemnified from and against any claim, costs, charges, damages, demand, losses,
liabilities or expenses of any nature and kind whatsoever and by whomsoever made in respect
of the said Contract and any loss or damage caused from and against all suits and other
actions that may be instituted taken or preferred against JSCB Bank by whomsoever and all
losses, damages, costs, charges and expenses that JSCB Bank may incur by reason of any
claim made by any claimant for any reason whatsoever or by anybody claiming under them
or otherwise for any losses, damages or claims arising out of all kinds of accidents,
destruction, deliberate or otherwise, direct or indirect, from those arising out of violation of
applicable laws including those relating to intellectual property rights, rules, regulations,
guidelines and also from the environmental damages, if any, which may occur or result from
the terms of the Agreement.
(2) the Obligor shall, ensure that all the permissions, authorisations, consents and licenses are
obtained and renewed from the local and/or municipal and/or governmental authorities, as
may be required under the applicable laws, rules, regulations, guidelines, orders framed or
issued by any appropriate authorities.
(3) The Obligor hereby indemnifies and keeps indemnified JSCB Bank including its respective
directors, officers, employees, agents and representatives against any levies / penalties /
claims / demands litigations, suits, actions, judgments, and or otherwise on account of any
default and or breach and or otherwise in this regard.
(4) If any additional approval, consent or permission is required by the Obligor to execute and
perform the Contract during the currency of the Contract, they shall procure the same and/or
comply with the conditions stipulated by the concerned authorities without any delay.
(5) The obligations of the Obligor herein are irrevocable, absolute and unconditional, in each
case irrespective of the value, genuineness, validity, regularity or enforceability of the
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-99
aforesaid Contract or other agreement, or the insolvency, bankruptcy, reorganization,
dissolution, liquidation or change in ownership of JSCB Bank or Obligor or any other
circumstance whatsoever which might otherwise constitute a discharge or defence of an
indemnifier.
(6) The obligations of the Obligor under this deed shall not be affected by any act, omission,
matter or thing which, would reduce, release or prejudice the Obligor from any of the
indemnified obligations under this indemnity or prejudice or diminish the indemnified
obligations in whole or in part, including in law, equity or contract (whether or not known to
it, or to JSCB Bank).
(7) This indemnity shall survive the aforesaid Contract.
(8) Any notice, request or other communication to be given or made under this indemnity shall
be in writing addressed to either party at the address stated in the aforesaid Contract and or as
stated above.
(9) This indemnity and other non-contractual obligations arising out of this indemnity, shall be
governed by, and construed in accordance with, the laws of India. The Obligor irrevocably
and unconditionally agrees that any legal action, suit or proceedings arising out of or relating
to this indemnity may be brought in the Courts/Tribunals at Ranchi. Final judgment against
the Obligor in any such action, suit or proceeding shall be conclusive and may be enforced in
any other jurisdiction, by suit on the judgment, a certified copy of which shall be conclusive
evidence of the judgment, or in any other manner provided by law. By the execution of this
indemnity, the Obligor irrevocably submits to the exclusive jurisdiction of such
Court/Tribunal in any such action, suit or proceeding.
(10) JSCB Bank may assign or transfer all or any part of its interest herein to any other
person. Obligor shall not assign or transfer any of its rights or obligations under this
indemnity, except with the prior written consent of JSCB Bank.
IN WITNESS WHEREOF the Obligor has signed these presents on the day, month and year first
above written.
Signed and Delivered on behalf of)
___________________)
By the hand of ___________________,)
_________, the authorised official of the Obligor)
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-100
Annexure -14
Non-Disclosure Agreement
This Non-Disclosure Agreement ("Agreement") is made on this_____ day of_______________,
2014.
BETWEEN
JSCB Bank Limited, a banking company within the meaning of Section 5 (c) of the Banking
Regulation
Act, 1949 (10 of 1949) and having its registered office at JSCB, 3rd floor,Marketing Board
Building, Hehal, Ranchi (hereinafter called “the JSCB Bank/Bank” which expression shall unless
it be repugnant to the subject, context or meaning thereof shall be deemed to mean and include
its successors and assigns) of the ONE PART;
AND
_____________________________ (Name of successful Bidder) of _______________ (please
specify the registered office of the (successful Bidder) (hereinafter called “the successful
Bidderr” which expression shall unless it be repugnant to the subject, context or meaning thereof
shall be deemed to mean and include its successors) of the OTHER PART;
JSCB Bank and Successful Bidder wherever the context so permits, shall hereinafter collectively
refer to as the “Parties” and individually as a “Party”.
WHEREAS, JSCB Bank vide its RFP No. [CPU-TN-DC-04/December 2014] dated [02-12-
2014] (RFP) had invited for the bids from eligible bidders for END TO END Reconciliation
Solution for All type of Transactions and ATMs of JSCB Bank.
The Successful Bidder after going through the RFP and being interested to perform/deliver the
Services participated in the bidding process and submitted its Bid.
WHEREAS the Successful Bidder had represented that it is engaged in the business of providing the
Services and has all the requisite skills, expertise, experience and necessary facilitates for
providing/rendering/delivering the Service(s) to JSCB Bank.
WHEREAS JSCB Bank based upon the representation and warranties made by the Successful
Bidder had entered into a contract dated [●] (the Contract) for the performance/delivery of Services
by the Successful Bidder.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-101
WHEREAS, the Successful Bidder is aware and confirms that the information, data, technical
specification and other documents made available in the Bid Documents / the Contract and
thereafter regarding the Services as furnished by the Bidder in their Request For Proposal or
otherwise and all the Confidential Information under the Bid Documents/the Contract is
privileged and strictly confidential and/or proprietary to JSCB Bank,
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-102
NOW THEREFORE, in consideration of the foregoing, the Bidder agrees to all of the following
conditions, for JSCB Bank, to grant the Successful Bidder specific access to JSCB Bank’s
property/information and other data. In connection with this Agreement,
“Confidential Information” includes all intellectual property information; technical or business
information or material not covered; proprietary or internal information related to the current,
future and proposed products or services of the Parties including, financial information,
process/flow charts, business models, technical specification, data information related to
products and services, procurement requirements, purchasing, customers, investors, employees,
business and contractual relationships, business forecasts, business plans and strategies,
information the Parties provide regarding third parties; information disclosed pursuant to this
Contract; documents, accounts, business plans, information or documents whatsoever,
concerning business, policies, strategy, property, contracts, trade secrets, transactions, or
interested parties of JSCB Bank or its Subsidiaries or Affiliates and/or any other information of
either Party whether disclosed to the other Party in oral, graphic, written, electronic or machine
readable form, and whether or not the information is expressly stated to be confidential or
marked as such, all Trade Secrets and other proprietary information including but not limited to
customer list, financial information, and pricing information, except that the following shall not
be considered Confidential Information:-
i. that which is in the public domain;
ii. that which was previously received from a third party not subject to the obligation of
confidentiality with respect to such information; iii. that is developed independently without
any aid from the disclosing Party;
iv. that which is required to be disclosed pursuant to any request/demand by statutory or
regulatory or governmental agencies or any applicable law, judgment or otherwise, provided
that unless prohibited by law the disclosing Party shall give adequate notice of such disclosure
to the other Party.
v. that is released from confidentiality with the written consent of the other Party.
"Subsidiaries / Affiliates" means and includes the holding company, subsidiary and any other
entity directly or indirectly "managed" or "controlled" by the Company/JSCB Bank. The term
"managed" or "controlled" shall include ability to appoint and remove majority of the directors,
partners or the like in the entity by whatever name called.
It is hereby agreed as under:
The words and expressions not specifically defined shall have the same meanings as are
respectively assigned to them in the RFP/the Contract.
a. The parties agree that they shall hold in trust any Confidential Information received by either
party, under this Contract, and the strictest of confidence shall be maintained in respect of
such Confidential Information. The parties also agree and undertake to:
• maintain and use the Confidential Information only for the purposes of this Contract and
only as permitted herein;
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-103
• make copies as specifically authorized by the prior written consent of the other party and
with the same confidential or proprietary notices as may be printed or displayed on the
original;
• Not, without the prior written consent of the disclosing Party which consent, the
disclosing Party shall not be under any obligation to provide, disclose the Confidential
Information to any third party, save and except to, restrict access and disclosure of
confidential information to such of their employees, agents, vendors, and Successful Bidders
strictly on a "need to know" basis, to maintain confidentiality of the Confidential Information
disclosed to them in accordance with this clause; and
• Treat Confidential Information as confidential for a period of three (3) years from the
date of receipt. In the event of earlier termination of this Contract, the Parties hereby agree to
maintain the confidentiality of the Confidential Information for a further period of two (2)
years from the date of such termination;
• Not at any time either during the continuance of this Agreement or upon termination of
this Agreement, publish or divulge either directly or indirectly to any person, firm or
company any Confidential Information, save and except to its Affiliates;
• To keep the Confidential Information as strictly confidential;
• This Agreement shall commence on the date of execution of this Agreement and treat
Confidential Information as confidential for a period of three years from the date of last such
disclosure of the Confidential Information. In the event of earlier termination of this
Agreement, the Parties hereby agree to maintain the confidentiality of the Confidential
Information for a further period of five years from the date of such termination. Further, any
term or provision of this Agreement that by its nature is intended to survive termination or
expiration hereof will so survive and apply.
b. Confidential Information in oral form must be identified as confidential at the time of
disclosure and confirmed as such in writing within 30 days of such disclosure. Confidential
Information does not include information which:
i. the recipient knew or had in its possession, prior to disclosure, without limitation
on its confidentiality;
ii. is independently developed by the recipient without breach of this Contract; iii.is
the public domain;
iv. is received from a third party not subject to the obligation of confidentiality with respect
to such information;
v. is released from confidentiality with the prior written consent of the other party.
Provided that if receiving Party is required to disclose any Confidential Information by order of
any court or regulatory authority, receiving Party will immediately upon receipt of such order
intimate the disclosing Party of such order to enable the disclosing Party to challenge such order
or to allow the disclosing Party a reasonable opportunity to seek an appropriate protective order
or other means to protect the confidentiality of such Confidential Information; provided further
that the disclosure in such case shall be only to the extent required by law and subject to
consultations with the disclosing Party with view to agreeing to the timing and content of such
disclosure.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-104
The recipient shall have the burden of proving hereinabove are applicable to the information in
the possession of the recipient.
c. Notwithstanding the foregoing, the parties acknowledge that the nature of the Services to be
performed under this Contract may require the Successful Bidder’s personnel to be present
on premises of JSCB Bank or may require the Successful Bidder’s personnel to have access
to computer networks and databases of JSCB Bank while on or off premises of JSCB Bank.
It
is understood that it would be impractical for JSCB Bank to monitor all information made
available to the Successful Bidder’s personnel under such circumstances and to provide
notice to the Successful Bidder’s of the confidentiality of all such information. Therefore, the
Successful Bidder agrees and undertakes that any technical or business or other information
of JSCB Bank that the Successful Bidder’s personnel, or agents acquire while on JSCB Bank
premises, or through access to JSCB Bank computer systems or databases while on or off
JSCB Bank premises, shall be deemed Confidential Information.
d. Confidential Information shall at all times remain the sole and exclusive property of the
disclosing party. Upon termination of this Contract, confidential information shall be
returned to the disclosing party or destroyed, if incapable of return. The destruction shall be
witnessed and so recorded, in writing, by an authorized representative of each of the parties.
Nothing contained herein shall in any manner impair or affect rights of JSCB Bank in respect
of the Confidential Information.
e. In the event that any of the parties hereto becomes legally compelled to disclose any
Confidential Information, such party shall give sufficient notice to the other party to enable
the other party to prevent or minimize to the extent possible, such disclosure. Neither party
shall disclose to a third party any Confidential Information or the contents of this Contract
without the prior written consent of the other party. The obligations of this Clause shall be
satisfied by handling Confidential Information with the same degree of care, which the
receiving party applies to its own similar confidential information but in no event less than
reasonable care. The obligations of this clause shall survive the expiration, cancellation or
termination of this Contract.
f. The receiving Party acknowledges the confidential nature of Confidential Information and
damage could result to the disclosing Party if the receiving Party breaches any provision of
the agreement and agrees that, if the receiving Party or any of the directors, officers or
employees should engage or cause or permit any other person to engage in any act in
violation of any provision hereof, the disclosing Party may suffer immediate irreparable loss
for which monetary compensation may not be adequate. The disclosing Party shall be
entitled, in addition to such other remedies, damages & relief as may be available to it, to an
injunction or similar relief prohibiting the receiving Party, its directors, officers etc from
engaging in any such act.
g. This Agreement shall be governed, interpreted and enforced in accordance with the laws of
India.
h. The provisions hereunder shall survive termination of the Contract.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-105
i. Any dispute arising out of or in relation to this Agreement shall be referred to arbitration by a
sole arbitrator appointed by both the parties. The arbitration shall be governed by the
Arbitration and Conciliation Act 1996. Each Party shall pay and bear its own cost of
arbitration. The Arbitration shall be held in the city of Ranchi.
j. This document contains the entire agreement between the Parties with respect to the subject
matter hereof. Any failure to enforce any provision of this Agreement shall not constitute a
waiver thereof or of any other provision. This Agreement may not be amended, nor any
obligation waived, except by a writing signed by both Parties hereto. If any part of this
Agreement is found invalid or unenforceable, that part will be amended to achieve as nearly
as possible the same economic and legal effect as the original provision and the remainder of
this Agreement will remain in full force.
k. This Agreement shall bind and inure to the benefit of the Parties hereto and their successors
and assigns. Neither Party assigns any of its rights or obligations under this Agreement
without the prior written consent of the other Party.
Authorized Signatory Name:
Designation:
Office Seal:
Place: Accepted –
Date:
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-106
Annexure - 15
FORMAT FOR UNCONDITIONAL ACCEPTANCE OF
TERMS & CONDITIONS OF THE RFP
(To be submitted on the Company’s Letter Head)
To,
The General Manager,
The General Manager,
3rd flor marketing board building,
Hehal, near ITI bus stand
Ranchi
Ref: RFP for END TO END Reconciliation Solution for All type of Transactions and
ATMs
This is to confirm that we unconditionally accept all the terms and conditions as mentioned in
the RFP No. [CPU-TN-DC-04/December 2014] dated [02-12-2014] floated for JSCB Bank
Ltd. For END TO END Reconciliation Solution for All type of Transactions and ATMs for
JSCB Bank.
Authorized Signatory
( )
Designation
Company Stamps
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-107
ANNEXURE-16
Performance Security
Bank Guarantee No.
Bank Guarantee Amount
Expiry Date
Claim Amount
Account: M/s.
GUARANTEE FOR PERFORMANCE OF CONTRACT
THIS GUARANTEE AGREEMENT executed at ___________ this ________ day of
_____________ Two Thousand __________
BY:
______________________ Bank, a body corporate constituted under _______________, having
its Registered Office/ Head Office at ______________, and a Branch Office at
_____________________________________________________ (hereinafter referred to as “the
Guarantor”, which expression shall, unless it be repugnant to the subject, meaning or context
thereof, be deemed to mean and include its successors and assigns)
IN FAVOUR OF:
JSCB Bank Limited, a banking company within the meaning of Section 5 (c) of the Banking
Regulation Act, 1949 (10 of 1949) and having its registered office at JSCB, 3rd floor, Marketing
Board Building, Hehal, Ranchi – 400 005 (hereinafter referred to as “JSCB Bank” or “Bank”
which expression shall unless it be repugnant to the subject, meaning or context thereof, be
deemed to mean and include its successors and assigns).
WHEREAS, JSCB Bank through Request for Proposal bearing reference no............ (hereinafter
referred to as “RFP”) invited the bids for engagement of bidder to undertake END TO END
Reconciliation Solution for All type of Transactions and ATMs workof the JSCB Bank.
M/s.……………………… have been appointed as the Successful Bidder (hereinafter referred to
as " Successful Bidder ") and accordingly the Successful Bidder and the Bank has entered into
contract on ......................., as per the terms and conditions contained therein and in the bid
document bearing reference no................. [hereinafter referred to as “the Contract"]. The
Successful Bidder has strictly agreed to abide with the terms of Contract and the said documents.
AND WHEREAS pursuant to the RFP, the Contract, and the other related documents
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-108
(hereinafter collectively referred to as “the said documents”, the Bank has agreed to avail from
…………………. and ……………………………. has agreed to provide to the Bank
…………………. , more particularly described in the RFP documents (hereinafter collectively
referred to as “the Service(s)”), subject to payment of the Contract price, as stated in the said
documents and also subject to the terms, conditions, covenants, provisions and stipulations
contained the said documents.
AND WHEREAS the Successful Bidder has duly signed the said documents.
AND WHEREAS in terms of the Contract, the Successful Bidder has agreed to provide the
Service(s) and to procure an unconditional and irrevocable performance bank guarantee, in
favour of the Bank, from a Bank acceptable to the Bank for securing the faithful observance and
performance by the Successful Bidder of the terms, conditions, covenants, stipulations,
provisions of the Contract/the said documents.
AND WHEREAS at the request of the Successful Bidder , the Guarantor has agreed to
guarantee the Bank, payment of amounting to Rs 10 lacs. (Rupees Ten lacs only) towards faithful
observance and performance by the Successful Bidder of the terms of the Contract and the said
documents.
NOW THEREFORE THIS AGREEMENT WITNESSETH AS FOLLOWS:
In consideration of the above premises, the Guarantor hereby unconditionally, absolutely and
irrevocably guarantees to the Bank as follows:
The Guarantor hereby guarantees and undertakes to pay, on demand, to the Bank at its office at
Ranchi forthwith, the sum of Rs.……………………………………….or any part thereof, as the
case may be, as aforesaid due to the Bank from the Successful Bidder , towards any loss, costs,
damages, etc. suffered by the Bank on account of default or breach of the Successful Bidder in
the faithful observance and performance of the terms, conditions, covenants, stipulations,
provisions of the Contract and the said documents, without any demur, reservation, contest,
recourse or protest or without any reference to the Successful Bidder . Any such demand or
claim made by the Bank, on the Guarantor shall be final, conclusive and binding,
notwithstanding any difference or any dispute between the Bank and the Successful Bidder or
any dispute between the Bank and the Bidder pending before any Court, Tribunal, Arbitrator, or
any other authority.
The Guarantor agrees and undertakes not to revoke this Guarantee during the currency of these
presents, without the previous written consent of the Bank and further agrees that the Guarantee
herein contained shall continue to be enforceable until and unless it is discharged earlier by the
Bank, in writing.
The Bank shall be the sole judge to decide whether the Successful Bidder has failed to perform
and/or observe the terms of the Contract of the said document for providing the Services by the
Successful Bidder to the Bank, and on account of the said failure what amount has become
payable by the Successful bidder to the Bank under this Guarantee. The decision of the Bank in
this behalf shall be final, conclusive and binding on the Guarantor and the Guarantor shall not be
entitled to demand the Bank to establish its claim under this Guarantee, but shall pay forthwith,
the sums demanded, without any objection, whatsoever.
To give effect to this Guarantee, the Bank, may act as though the Guarantor was the principal
debtor to the Bank
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-109
The liability of the Guarantor, under this Guarantee shall not be affected by:
(a) any change in the constitution or winding up of the Successful Bidder or any absorption,
merger or amalgamation of the Successful Bidder with any other company, corporation
or concern; or
(b) any change in the management of the Successful Bidder or takeover of the management
of the Successful Bidder by the Government or by any other authority; or
(c) acquisition or nationalisation of the Successful Bidder and/or of any of its undertaking(s)
pursuant to any law; or
(d) any change in the constitution of JSCB Bank / Successful Bidder; or
(e) any change in the set up of the Guarantor which may be by way of change in the
constitution, winding up, voluntary or otherwise, absorption, merger or amalgamation or
otherwise; or
(f) the absence or deficiency of powers on the part of the Guarantor to give Guarantees
and/or Indemnities or any irregularity in the exercise of such powers.
(g) any variance in the terms and conditions of the said documents.
JSCB Bank shall be at liberty to make any modification or otherwise vary or alter the said terms
& conditions and / or rules or regulations concerning the said documents and the same will not in
any way discharge or otherwise vitiate or affect this Guarantee. Notwithstanding anything
contained hereinabove, the liability of the Guarantor hereunder shall not exceed Rs 50 Lacs.
Any act or omission, time or indulgence granted by JSCB Bank to the Successful Bidder and / or
Guarantor if any will also not discharge this Guarantee or otherwise vitiate or affect or prejudice
this Guarantee. The Guarantor shall on demand make the payment without set-off and free and
clear of any deductions, charges, fees, or withholding of any nature presently or in the future
imposed, levied, collected, withheld or assessed by the Government or any political subdivision or
authority and therein and thereof.
The Guarantor confirms that a mere letter from JSCB Bank that there has been a default/failure on
the part of the Successful bidder in faithfully observing and performing the terms, conditions,
covenants, stipulations, provisions, of the Contract/ the said documents, shall without any other or
further proof be final, conclusive and binding on the Guarantor.
This Guarantee will expire on _______________(expiry date). ( Contract Period + 6 months)
Any demand or claim under this Guarantee must be received by the Guarantor by ………. (Date)
(6 months after the expiry date).
Notwithstanding anything to the contrary, the Guarantor hereby agree and undertake to extend the
validity period of this guarantee for a further period as decided by JSCB Bank when such request
is received at least 15 days before the expiry of validity period of the Guarantee.
This Guarantee shall be binding upon us and successors –in -interest and shall be irrevocable. For
all purposes connected with this Guarantee and in respect of all disputes and differences under or
in respect of these presents or arising there from the courts of Bombay city/ Ranchi city where the
Bank has its Registered Office shall alone have jurisdiction to the exclusion of all other courts.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-110
For all purposes connected with this Guarantee and in respect of all disputes and differences
under or in respect of these presents or arising therefrom the courts of Bombay city/ Ranchi city
where the Bank has its Registered Office shall alone have jurisdiction to the exclusion of all
other courts.
IN WITNESS WHEREOF the Guarantor has caused these presents to be executed on the day,
month and year first herein above written as hereinafter appearing.
SIGNED AND DELIVERED BY
the within named Guarantor,
______________________, by
the hand of Shri.__________, its
authorised official.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-111
ANNEXURE – 17
Certificate regarding Change in Ownership
(To be submitted by the bidder)
Date:
Place:
JSCB Bank Ltd.
General Manager,
The General Manager,
3rd flor marketing board building,
Hehal, near ITI bus stand
Ranchi
Sir,
Sub: Proposal for Software Solution to Card Division
Referring to the subject proposal submitted by us, we would like to inform you that, as on date,
we do not anticipate any change in the ownership of our Company during the next 3 years.
In case of any change in ownership, we shall inform you in advance.
Thanking you,
Yours faithfully,
Authorised Signatory Remark:
Please give details, in case you anticipate any change in your ownership during next 3 years.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-112
Annexure – 18 CHECKLIST TO BE GIVEN BY THE BIDDER AT THE TIME OF
TECHNICAL BID
The following documents have to be given along with the Technical Bid.
1. Demand Draft / Pay Order for the cost of RFP in the manner specified herein.
2. EMD of Rs 10 lakhs, in the manner specified herein.
3. Offer Covering letter as per Annexure 1.
4. Duly signed Bidder’s status to meet out Functional Requirements of Bank as per
Annexure 2.
5. Duly signed Bidder’s status to meet the Technical Specifications as per Annexure 3.
6. Supporting documents / copies in support of Bidder’s eligibility as per Eligibility Criteria
and Details of Bidder as per Annexure 5.
a. Certified copy of Certificate of Incorporation, Certificate of Commencement
of Business, PAN Card and other Relevant Documents to show that the
Bidder submitting the offer is a Registered Company in India.
b. Certificate / Reference Letter and purchase order copy from the respective
banks showing that the bidder is in the business of implementing or providing
outsourcing services for ATM Cash Balancing and ATM, POS, Networks and
E-commerce transaction reconciliation for a minimum period of three years as
on the bid submission date.
c. Certificate / Reference Letter and purchase order copy from the respective
banks showing that the Bidder having the Transaction Reconciliation software
or OEM license is providing reconciliation services in at least in two
scheduled commercial Bank in India (including one PSU Bank in India) for at
least one year.
d. Certificate / Reference Letter from the respective banks showing that the
bidder having Transaction Reconciliation software or OEM license is
providing reconciliation services to a bank which has at least a transaction
volume of 3 Lac transactions per day.
e. Self-declaration stating that the Bidder has not been put in the negative list or
be blacklisted by any Government Department / PSU / PSE or Bank for
breach of any law or violation of regulatory prescriptions or breach of
agreement. The letter should be on a letter head of the Bidder and duly signed
by its authorized signatory.
f. Self-Certification on the Letter Head of the Bidder duly signed by its
authorized signatory confirming that the bidder has all necessary licenses,
permissions, consents, no objections, approvals as required under the law for
carrying out its business.
g. Self-Certification on the Letter Head of the Bidder duly signed by its
authorized signatory confirming that the bidder complies with government’s
rules and regulations like minimum wages Act, Provident fund and ESIC
facility standard. (Proof of compliance and labour license needs to be
submitted along with the quotation)
h. Self-Certification on the Letter Head of the Bidder duly signed by its
authorized signatory confirming that the bidder complies with all applicable
Union, State and local laws, ordinance, regulations in performing its
obligations including the procurement of licenses, permissions, certificates,
etc. payment of taxes, if required.
RFP for Debit Card Reconciliation System
JSCB BANK Ltd. Page-113
i. Self-Certification on the Letter Head of the Bidder duly signed by its
authorized signatory confirming that the Bidder has trained /experienced
personnel and manpower required for doing the reconciliation services as per
the scope of this RFP.
j. Audited Balance Sheet & Profit & Loss A/c Statement for the Financial.
Years 2011-12, 2012-13 and 2013-14.
7. Bank details as per Annexure 6.
8. Bidder’s Experience in providing the Reconciliation Software as per Annexure 7.
9. Details of Support Centers of the Bidder as per Annexure 8.
10. Format of Power of Attorney for signing of bid as per Annexure 10
11. Undertaking as per Annexure 11.
12. Certificate regarding Change in Ownership as per Annexure 17.
13. Format for Unconditional Acceptance of Terms and Conditions of the RFP as per
Annexure 15.
14. Two copies of RFP including corrigendum(s) with Seal & Signature on each page
15. Copy of all permissions, consents, approvals and license from all authorities, regulatory /
statutory and non-regulatory, for executing the Service(s).
16. Letter permitting and authorizing JSCB Bank and its officials to visit and inspect its
premises before/after opening of the Bids.
17. The following Documents to be submitted by the Bidder
a. Detailed list of the other hardware / software required for implementation and
maintenance of END TO END Reconciliation Solution for All type of
Transactions and ATMs to be enclosed.
b. Write up on Performance Guaranteed for the END TO END Reconciliation
Solution for All type of Transactions and ATMs
c. Technical write-up on END TO END Reconciliation Solution for All type of
Transactions and ATMs explaining system architecture, design and
implementation strategy and also various features/functions of the
system/sub-system covering the functional requirements given in RFP.
d. Tested Business Continuity Plan for END TO END Reconciliation Solution
for All type of Transactions and ATMs so that Banks interests are not
jeopardized in case of disruption in working
18. In case the bidder is having OEM license of the Transaction Reconciliation Software, the
bidder needs to provide letter from OEM confirming that the software implementation,
maintenance, necessary customization will be carried out specifically for JSCB Bank for
the entire contract period. The copy of the ATS agreement between the bidder and the
OEM should also be given to the bank. The ATS agreement must be valid for the entire
contract period plus 6 months.
19. Any other document/ information prescribed in the RFP to be submitted as part of the
Bid.
20. Any other document which Bidder wants to enclose to be considered by the Bank for
evaluation of this RFP may be annexed along with the Bid.