righam park - city of madison, wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5...

7
BRIGHAM PARK MADISON, WI OPTION #2 VIEW A VIEW B

Upload: others

Post on 29-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

Brigham Parkmadison, Wi oPtion #2

VieW a

VieW B

Page 2: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

Brigham Parkmadison, Wi oPtion #2

Design Number:Use Zone:

# of Users:# of Active Play Events:

Age:

Colors Shown:

Green

Complies With:

ASTM F1487-01

ASTM F1487-98

CPSC #325

ADA-ADAAG

Blue Brownstone

PW113016-268’ x 43’39135 to 12

43’

72” 2-BayArch Swings(2 Belt, 2 Tot)

68’

36”

NuvoSpiralSlide

GlideSlide

TransferStation

ADAStairs

RibbonClimber

Pipe Wallw/ Telescope

(Above)ADA Driver

Panel (Below)

CabanaRoof

StalagmiteClimber

270 DegreeHorizontal

Loop Ladder

RopeBridge

36”

Sling Seat& Post-Mount

Scavenger HuntPanel (Below)

Page 3: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

Posts

ZZPM0016A 51 5in OD X 120in ALUMINUM POST W/ RIVETED CAP

ZZPM0026A 32 5in OD X 132in ALUMINUM POST W/ RIVETED CAP

ZZPM0129A 43 5in OD x 192in ALUMINUM POST W/O CAP

Decks & Kick Plates

ZZPM0616 34 SQUARE COATED DECK ASSEMBLY

ADA Items

ZZPM2006 15 TRANSFER STATION (36in DECK)

ZZUN2019 16 APPROACH STEP FOR TRANSFER STATION

Slides

ZZPM3127 17 GLIDE SLIDE (36in DECK)

ZZPM3537 18 SLIDE- NUVO 360 SPIRAL SLIDE

Activity Panels

ZZPM4406 19 ACCESSIBLE DRIVING PANEL

ZZPM4648 110 POST MOUNT SCAVENGER HUNT

ZZPM4896 111 SLING SEAT

ZZUN4280 112 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)

Barriers

ZZPM4090 113 CENTERLINE PIPE WALL BARRIER

ZZPM4288 314 ACCESS GATE

Climbers

ZZPM8310 115 RIBBON CLIMBER (72in DECK)

Ground Zer0 Climbers

ZZUN8246 116 ROCKBLOCKS STALAGMITE CLIMBER

Overhead Events

ZZPM5716 117 270 DEGREE HORIZONTAL LOOP LADDER

Bridges

ZZPM6398 118 6ft ROPE BRIDGE

Roofs & Arches

ZZPM9846 119 CABANA ROOF

Stairs and Ladders

ZZPM9177 120 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)

Part No. Description

Design Number: 2 - Bill Of Material

Brigham

Ref.No. Quantity

Wednesday, November 30, 2016 Page of1 1 Playworld.com

Page 4: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

CertifiedZZXX02601 BELT SEAT W/SILVER SHIELD CHAIN FOR 8ft TOP RAIL

2 17.60 108 2 0.50 0.00 2

CertifiedZZXX02652 INFANT SEAT W/SILVER SHIELD FOR 8ft TOP RAIL

2 22.62 179 2 0.50 0.00 2

CertifiedZZXX02873 5in OD 2-UNIT ALUMINUM ARCH SWING W-8ft TOP RAIL

1 213.00 1,166 0 3.00 0.52 0

CertifiedZZXX03704 5in OD ALUMINUM ARCH SWING 2-UNIT ADD-A-BAY

1 145.40 773 0 3.00 0.26 0

CertifiedZZPM0016A5 5in OD X 120in ALUMINUM POST W/ RIVETED CAP

5 147.05 548 0 5.00 0.65 0

CertifiedZZPM0026A6 5in OD X 132in ALUMINUM POST W/ RIVETED CAP

3 102.63 386 0 3.00 0.39 0

CertifiedZZPM0129A7 5in OD x 192in ALUMINUM POST W/O CAP4 186.04 615 0 4.00 0.48 0

CertifiedZZPM06168 SQUARE COATED DECK ASSEMBLY 3 271.08 662 12 3.00 0.00 0

CertifiedZZPM20069 TRANSFER STATION (36in DECK) 1 151.24 324 2 2.00 0.09 0

CertifiedZZUN201910 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZPM312711 GLIDE SLIDE (36in DECK) 1 111.54 399 2 2.00 0.03 1

CertifiedZZPM353712 SLIDE- NUVO 360 SPIRAL SLIDE 1 680.00 1,449 2 6.00 0.15 1

CertifiedZZPM440613 ACCESSIBLE DRIVING PANEL 1 31.59 237 1 0.50 0.00 1

CertifiedZZPM464814 POST MOUNT SCAVENGER HUNT 1 17.30 271 3 2.00 0.00 1

CertifiedZZPM489615 SLING SEAT 1 23.26 167 1 0.50 0.00 1

CertifiedZZUN428016 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)

1 12.33 61 1 0.50 0.00 1

CertifiedZZPM409017 CENTERLINE PIPE WALL BARRIER 1 37.22 95 0 0.50 0.00 0

CertifiedZZPM428818 ACCESS GATE 3 103.14 275 0 1.50 0.00 0

CertifiedZZPM831019 RIBBON CLIMBER (72in DECK) 1 63.78 145 2 1.50 0.06 1

CertifiedZZUN824620 ROCKBLOCKS STALAGMITE CLIMBER 1 144.00 540 3 1.75 0.09 1

CertifiedZZPM571621 270 DEGREE HORIZONTAL LOOP LADDER1 174.24 339 3 2.00 0.06 1

CertifiedZZPM639822 6ft ROPE BRIDGE 1 86.38 1,802 0 1.00 0.00 0

CertifiedZZPM984623 CABANA ROOF 1 123.05 527 0 0.50 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 2 - Compliance and Technical Data

Brigham

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

Wednesday, November 30, 2016 Page of1 3 Playworld.com

Page 5: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

CertifiedZZPM917724 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)

1 286.99 640 2 1.50 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 2 - Compliance and Technical Data

Brigham

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

714 575 11,779 39 46.75 2.823,187.31 13Totals:

12 Metric Tons259 Kg321 Kg1,434.29 Kg 2.14 m3

Wednesday, November 30, 2016 Page of2 3 Playworld.com

Page 6: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 2 - Compliance and Technical Data

Brigham

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 2, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Wednesday, November 30, 2016 Page of3 3 Playworld.com

Page 7: righam Park - City of Madison, Wisconsin · 4 zzpm0616 square coated deck assembly 3 ada items 5 zzpm2006 transfer station (36in deck) 1 6 zzun2019 approach step for transfer station

809 Bluebird Pass Cambridge, WI 53523 Phone: 800-775-8937 Fax: 608-423-7655 Email: [email protected]

QQUUOOTTAATTIIOONN DATE: Dec. 1, 2016

TO: Sarah Lerner

City of Madison Parks

215 ML King, Jr. Blvd. Madison, WI 53703

FROM: Lana Lee

RE: Brigham Playground Project – Option #2 – 5 to 12 Year Olds

PLAYWORLD SYSTEMS: 1-#PW113016-2 PlaymakersTM Modular Playstructure $21,600.00

1-#5ARCH Arched Swing Unit – 2 Bay $ 2,830.00 with 2 Belt, 2Infant/Tot Seats Freight $ 570.00 TOTAL $25,000.00

Colors: Posts: Blue Components: Green Rotomolded Plastics: Brownstone Decks: Brown Swings: Blue

Roof: Brownstone See attached list of components, Site Plan and 3D color rendering Accepted by: _____________________________________Date:____________________ Printed name

____________________________________ Signature

______________________________________________________________________ TERMS: Net 30 Lead-Time: 4-5 weeks upon receipt of order Site Preparation, Assembly/Installation, Resilient Surfacing is the responsibility of City of Madison Quote effective: Until 5-01-17