Rio Algom Mining LLC April 10, 2013 HAND DELIVERED Mr. David Mayerson Groundwater Quality Section New Mexico Environment Department P.O. Box 26110 Santa Fe, NM 87502 Re: Discharge Permit - 71 (DP-71) Report for First Quarter 2013 Dear Mr. Mayerson, Attached is the 2013 First Quarter Report summarizing activities and groundwater monitoring for Rio Algom Mining LLC. (RAML), Sectiorý 4 lined evaporation ponds located at the Ambrosia Lake mill facility. Also transmitted via e-mail (NMED copy only) is a Copy of the Summary Spreadsheet in PDF format for the 1 " quarter groundwater monitoring report, Section 4 lined evaporation ponds. This Copy meets the requirements of Condition 15B of DP-71. If you have any questions or need additional information, please call me at 505-236-1821. Sincerely, Billy Ray Site Manager Attachments: As stated cc: NRC (Mr. Tom McLaughlin) t•W;~cment control) K. Black D. Murray P.O. Box 218, Grants, NM, 87020 Tel: 505.287.8851 Fax: 505.285.5550

Upload: others

Post on 04-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • Rio Algom Mining LLC

    April 10, 2013

    HAND DELIVERED

    Mr. David MayersonGroundwater Quality SectionNew Mexico Environment DepartmentP.O. Box 26110Santa Fe, NM 87502

    Re: Discharge Permit - 71 (DP-71)Report for First Quarter 2013

    Dear Mr. Mayerson,

    Attached is the 2013 First Quarter Report summarizing activities and groundwater monitoring for RioAlgom Mining LLC. (RAML), Sectiorý 4 lined evaporation ponds located at the Ambrosia Lake millfacility.

    Also transmitted via e-mail (NMED copy only) is a Copy of the Summary Spreadsheet in PDF formatfor the 1 " quarter groundwater monitoring report, Section 4 lined evaporation ponds. This Copymeets the requirements of Condition 15B of DP-71.

    If you have any questions or need additional information, please call me at 505-236-1821.

    Sincerely,

    Billy Ray

    Site Manager

    Attachments: As stated

    cc: NRC (Mr. Tom McLaughlin)t•W;~cment control)

    K. Black

    D. Murray

    P.O. Box 218, Grants, NM, 87020 Tel: 505.287.8851 Fax: 505.285.5550

  • RIO ALGOM MINING LLC - AMBROSIA LAKE FACILITYDISCHARGE PERMIT - 71 (DP-71)

    FIRST QUARTER REPORT 2013

    This report presents the activities and results of the monitoring and sampling requirements associatedwith DP-71 for the 1st quarter of 2013. DP-71 permit renewal was approved on December 1, 2003and monitoring requirements were expanded from previous monitoring commitments listed in thepermit. This expansion has resulted in acquiring data that was not obtained in past monitoringprograms. In 2012, RAML submitted an updated application for DP-362 permit renewal that wouldinclude the DP-71 monitoring activities to New Mexico Environment Department, which is currentlyunder review.

    Section 15A:Activities that included the remediation of the Section 4 lined evaporation ponds were conducted from2005 through 2009. There were no operations or soil removal activities conducted at the Section 4pond area during the 1st quarter of 2013.

    Water was present in MW-32 and a sample was collected for analysis. Water was detected in MW-22and MW-23, but a sample was un-attainable due to insufficient depth of the water column. Theremaining wells associated with the permit were dry or contained insufficient water for sample.

    Exhibit 1 presents the time versus concentration plots and hydrographs for MW-22, MW-23, and MW-32. Because of the deficiency of alluvial water in the Section 4 pond area, development of apotentiometric map for the alluvium is not practical.

    Snow and or rain showers occurred on January 1st, 14 th, 26th, 28th, 29th & 30t", and snow flurriesoccurred on February 9th, 20e, 2 1st, and 24', and snow flurmes on March 2 "d.

    Section 15B:Exhibit 2 presents a table titled Section 4 Monitoring Wells, Analytical Results and Water LevelMeasurements for this reporting period. Exhibit 3 provides a table titled Section 4 Active MonitoringWells, Analytical Results and Water Level Measurements for a cumulative period since 2005.

    Section 15C:Exhibit 4 provides a copy of the signed laboratory analyses for this reporting period.

    Section 15D:Exhibit 1 presents the time versus concentration plots and hydrographs for MW-22, MW-23, and MW-32 since approximately 1995.

    Section 15E:Because of insufficient alluvial water in the Section 4 pond area and since many of the monitoringwells are dry, the development of a potentiometric map for the alluvium was not undertaken.

    RAML DP-71 First Quarter Report 2013 April2013

    RAML DP-71 First Quarter Report 2013 April 2013

  • Exhibit I

    DP-71 Time vs. Concentration Plots and Hydrographs

    MW-22, MW-23 and MW-32

    RAML DP-71 First Quarter Report 2013 April 2013

    RAML DP-71 First Quarter Report 2013 April 2013

  • MW-22Time Versus Concentration

    10000 , _9000

    CF 800041 70002m 6000

    5000w

    300020001000

    Date110 111411

    -- Chloride -- Sulfate -- TDS I

    MW-22Amount of Water in Well

    10

    S 6-

    i4'

    2-

    Jan-95 Jan-97 Jan-99 Jan-01 Jan-03 Jan-05 Jan-07 Jan-09

    Date

    Jan-- W Jan-13

    14--Water I

    RAML DP-71 Fir3t Quarter Report 2013 April2013

    RAML DP-71 First Quarter Report 2013 April 2013

  • MW-23-Time Versus Concentration

    6000E5000

    €P 4 3000oC

    S 20001a 0000

    Date

    -- Chloride --a-Sulfate - TDS

    MW-23

    12 Amount of Water in Well

    ~10 A

    M8

    .E6

    44

    2

    0

    Date

    * Water

    RAML DP-71 First Quarter Report 2013 April 2013

    RAML DP-71 First Quarter Report 2013 April 2013

  • MW-32

    8000 _Time Versus Concentrationýj 7000_ ___ __E 6000CA

    =0 5000Aa 3000 ---- _-- -_ _ _W 2000 -__-

    1000

    0

    Date

    -1- CL --- SO4 --*-TDS

    MW-32Amount of Water in Well

    Dec-05 Dec-06 Dec-07 Dec-08 Dec-09 Dec-10 Dec-li Dec-12 Dec-13

    Date

    • Water

    RAML DP-71 First Quarter Report 2013 April 2013

    RAML DP-71 First Quarter Report 2013 April 2013

  • Exhibit 2

    Section 4 Monitoring Wells, Analytical Results & Water Level

    Measurements

    RAML DP-71 First Quarter Report 2013 Apuil 2013

    RAIVIL DP-71 First Quarter Report 2013 April 2013

  • RIO ALGOM MINING LLCDISCHARGE PERMIT- DP-71

    MONITORING RESULTS - 1ST QUARTER 2013

    Depth to Total Water Well pH Spec. Termp. As Se U C0 NO3 (N) TDS So4Date Location Water (ft) Depth (ft) Level (ft) Status (s.u.) (uS) (C) (rag/L) (n-g/L) (rrg/L) (mg/L) (n-g/L) (ng/L) (rag/L)

    01/21/13 NMW-12 0 NS

    01/21/13 MVVW-13 0 NS

    01/21/13 MW-22 36.98 37.02 0.04 NS

    01121/13 MW-23 41.75 41.8 0.05 NS

    01/21/13 NMW-24 0 NS

    01/21/13 MVW-25 0 NS

    01/21/13 MTV-26 0 NS

    01/21/13 MW-27 0 NS01/21/13 MW-28 0 NS01/21/13 WV-29 0 NS

    01/21/13 NMV-30 0 NS

    01/21/13 MW-31 0 NS

    01/21/13 MW-32 68.23 71.66 3.43 7.16 5190.0 12.8 0.001 0.4203 0.0584 132 65.7 5170 2900

    01/21/13 1vMW-33 0 NS

    Notes:

    Well status listed as "NS" indicates the w ell w as either dry or contained insufficient water for sarmple collection

    Monitoring Wells PMA-1 through MVlW-1, 11MN-14 through MW-21 were plugged during the Section 4 reclamation project

    < Indicates "U" qualifier, analyte concentration not detected above MDL

    RAML DP-71 First Quarter Report 2013 April 2013

  • Exhibit 3

    Section 4 Active Monitoring WellsCumulative Analytical Results & Water Level Measurements

    RAML DP-71 First Quarter Report 2013 April 2013

    RAIVIL DP-71 First Quarter Report 2013 April2013

  • IUI I• I *sA/ I| •)•J A, I

    MonMrIn Well-22 Anal -11 Data

    Monitorng Date Well Statuf Depth to Total Water in Sp. Cond. Temp. (C) pH C lWe l Well (ft) iag/

    F NO3(N) SO1 TDS HCO3 1 CO3 Mg I Na K(rng/L) (ma/L) (ma/L I (mg/L) (ma/L) (ma/L) (mg/L) m(rg/L) (mg/L)

    Monitoring DateWell

    AI Cd I Cr I Co I Cu I As I U Fe I Pb I Mn I Mo I Ni TKN A1 I Zn "R3-M2 Ma-M5(m11L) (ma/LU (m/LI (ma./L) (mo./L, (ma./l (ma/e I (m/LU I (ma./L (ma/LL) I(ma/LU (ma/L) (maLU I (ma/L) (ma/L) I(mG/L) I (PCI/L) (pCi/L)

    Note: Well status listed as "NS" indicates the well was either dry or contained insufficient water for sample collection.

    RAML DP-71 First Quarter Report 2013 April2013

    RAML DP-71 First Quarter Report 2013 April2013

  • Monitoring Dote Wall Depth to Total Wter in . pHWell e el aI Water (ft) Deoth (f1) Wall (ft) P

    Ce CI F(0•a/L)

    NO.(N)(1c./L,

    so,(f- Lt ITis- HCO3 _D g N7 K(-a/L) (mo/L)

    Monitorn Date I ALWall (ma/L) C-d Cr ma/L I C(ma/L) (ma/ Im.L) I ( (na/L) Am 5e U(ma/L) I(n-r/L) I (ma/L_) F( L Pb I ( Mn MO NI TKN Ag £0( m L ( e / I m arL ) )a(n -( rL ) II ( o / L ) ( .L I ( m a / L ) (:-ILO I HIOCfl)(DCi/L) (PCI/L)

    Note: Well status listed as "NS" indicates the well was either dry or contained insufficient water for sample collection.

    RAML DP-71 First Quarter Report 2013 April 2013

  • Exhibit 4

    DP-71 Analytical Report

    RAML DP-71 First Quarter Report 2013 April 2013

    RAMIL DP-71 First Quarter Report 2013 April 2013

  • ACZ Laboratories, Inc.2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334-5493

    February 04, 2013

    Report to:

    Doug MurrayRio Algom Mining Company

    P.O. Box 218

    Grants, NM 87020

    Bill to:

    Accounts Payable

    Rio Algom Mining Company

    P.O. Box 218

    Grants, NM 87020

    Project ID: 58459/620156018ACZ Project ID: L10348

    Doug Murray:

    Enclosed are the analytical results for sample(s) submitted to ACZ Laboratories, Inc. (ACZ) on January 23,2013. This project has been assigned to ACZ's project number, LI 0348. Please reference this number in allfuture inquiries.

    All analyses were performed according to ACZ's Quality Assurance Plan. The enclosed results relate only tothe samples received under Li 0348. Each section of this report has been reviewed and approved by theappropriate Laboratory Supervisor, or a qualified substitute.

    Except as noted, the test results for the methods and parameters listed on ACZ's current NELAC certificateletter (#ACZ) meet all requirements of NELAC.

    This report shall be used or copied only in its entirety. ACZ is not responsible for the consequences arisingfrom the use of a partial report.

    All samples and sub-samples associated with this project will be disposed of after March 04, 2013. If thesamples are determined to be hazardous, additional charges apply for disposal (typically $1 1/sample). If youwould like the samples to be held longer than ACZ's stated policy or to be returned, please contact your ProjectManager or Customer Service Representative for further details and associated costs. ACZ retains analyticalraw data reports for ten years.

    If you have any questions or other needs, please contact your Project Manager.

    Scott Habermehl has reviewedand approved this report.

    REPAO.01 .06.05.02 Page 1 oflOREPAD.01.06.05.02 Page 1 of 10

  • ACZ Laboratories, Inc.2773 Downhill Drive Steamboat Spnngs, CO 80487 (800) 334-5493

    In rai Anltia

    Rio Algom Mining CompanyProject ID: 58459/620156018Sample ID: MW-32

    ACZ Sample ID: L10348-01Date Sampled: 01t21/13 10:25Date Received: 01/23/13Sample Matrix: Ground Water

    Metals AnalysisParamete,0,,r EPA-,, M od Resultu. l "- Ui Dtlys

    Arsenic, dissolved

    Selenium, dissolved

    Uranium, dissolved

    Wet Chemistry

    M200.8 ICP-MSM200.8 ICP-MS

    M200.8 ICP-MS

    0.42030.0584

    U mg/L 0.001 0.005mg/L 0.0005 0.001

    mg/L 0.0005 0.003

    01/31/13 21:0201/31/13 21:02

    01/31/13 21:02

    mashmsh

    msh

    *~rmee EPA Meho Reul Qua XQ Unit MD..te Aals

    ChlorideNitrate/Nitrite as N

    Residue, Filterable(TDS) @180CSulfate

    SM4500CI-EM353.2 - H2SO4 preserved

    SM2540C

    D516-02 - Turbidimetric

    132

    65.7

    5170

    2900

    mg/L 5* mg/L 0.5

    * mg/L 10

    30

    3

    20

    01/31/13 18:21

    02/02/13 1:17

    01/23/13 17:39

    lhbpjbIjr

    * mg/L 200 1000 01/30/13 17:48 mpb

    REPIN.02.06.05.01 * Please refer to Qualifier Reports for details.

    Page 2 of 10

  • AC Z Laboratories, Inc.277 Donhf DrveSteamboat 4:vihgs. CO 80487 (800) 3459

    InorganicReference

    I Report Header Explanations

    Batch

    Found

    Limit

    Lower

    MDL

    PCN/SCN

    PQL

    0C

    Rec

    RPD

    Upper

    Sample

    A distinct set of samples analyzed at a specific time

    Value of the DC Type of interestUpper imit for RPD. in %.

    Lower Recovery Limit, in % (except for LCSS, mg/Kg)

    Method Detection Limit. Same as Minimum Reporting Limit Allows for instrument and annual fluctuations.

    A number assigned to reagenta/standards to trace to the manufacturers certificate of analysis

    Practc Quanttation Limit. typically 5 t1mes the MDLTrue Value of the Control Sample or the amount added to the Spike

    Recovered amount of the true value or spile added, in % (except for LCSS, mg/Kg)Relative Percent Difference, calculation used for Duplicate 0C Types

    Upper Recovery Limit, in % (except for LCSS, mg/Kg)

    Value of the Sample of interest

    CSaml ye

    AS

    ASD

    CCB

    CCV

    DUP

    ICB

    ICV

    ICSAB

    LCSS

    LCSSD

    LCSW

    Analytical Spike (Post Digestion)Analytical Spike (Post Digestion) Duplicate

    Cornuing Caliration Blank

    Continuing Caixation Verification standard

    Sample Duplicate

    Initial Calibration Blank

    Initial Calbration Verification standard

    Inter-element Corrction Standard - A plus B solutions

    Laboratory Control Sample - SolLaboratory Control Sample - Sol Duplicate

    Laboratory Control Sample - Water

    LCSWD

    LFB

    LFM

    LFMD

    LRB

    MS

    MSD

    PBS

    PBW

    PQV

    SDL

    Laboratory Control Sample - Water Duplicate

    Laboratory Fortified Blank

    Laboratory Forlified Matrix

    Laboratory Fordfied Matrix Duplicate

    Laboratory Reagent Blank

    Matrix Spike

    Matrix Spkce Duplicate

    Prep Blank - Sol

    Prep Blank - Water

    Practical Quanttation Verification standard

    Serial Dilution

    CSaml yeEpaain

    Blanks

    Control Samples

    DuplatesSpikes/Fortified Matrix

    Standard

    Verifies that there is no or minimal contamination In the prep method or calibration procedure.

    Verifies the accuracy of the method, including the prep procedure.

    Verifies the precision of the instrument end/or method.Determines sample matrix interferences, If any.

    Verifies the validity of the calextio.

    IA .Oulfes (Qa

    B

    H

    L

    U

    Analyte concentration detected at a value between MDL and POL. The associated value is an estimated quantity.Analysis exceeded method hold tine. pH is a field test with an Immediate hold time.

    Target anelyte response was below the laboratory defined negative threshold.

    The material was analyzed for, but was not detected above the level of the associated value.

    The associated value is either the sample quanltation Nmit or the sample detection kmni.

    [Method Reftirences

    (1)(2)(3)(4)(5)

    EPA 600/4-83-020. Methods for Chemical Analysis of Water and Wastes, March 1983.EPA 600/R-93-100. Methods for the Determination of Inorganic Substances In Environmental Samples, August 1993.

    EPA 600/R-94-1 11. Methods for the Determination of Metals in Environmental Samples - Supplement I, May 1994.

    EPA SW-846. Test Methods for Evaluating Solid Waste.

    Standard Methods for the Examination of Water and Wastewater.

    (1) QC results calculated from raw data. Results may vary slightly If the rounded values are used In the calculations.

    (2) Soll. Sludge, and Plant matrices for Inorganic analyses am reported on a dry weight basis.

    (3) Animal matrices for Inorganic analyses are reported on an "as recalved" basis.

    (4) An asterisk in the "XQ" column indicates there is an extended qualifier and/or certification qualifierassociated with the result.

    (5) If the MDL equals the POL or the MDL column is omitted, the P0L is the reporting liif.

    For a complete let of ACZ's Extended Qualifiers, please click: http://www.acz.comn/public/extqual Iist.pdf

    REPOO11.09.112.01

    Page 3 of 10

  • ACZLaboratories, Inc.2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334-5493

    Inrgni Q

    Rio Algom Mining Company ACZ Project ID: L10348

    Arsenic, dissolved M200.8 ICP-MS

    ID Typ Anlye PC/C ac Sapl Fon Unit *.m Loe pepPDLmt

    WG338250

    WG3382501CV ICV 01/31/13 19:26 MS130102-2 .05 .05194 mg/L 103.9 90 110

    WG3382501CB ICa 01/31/13 19:29 U mg/L -0.0006 0.0006WG338250LFB LFB 01/31/13 19:32 MS130108-1 .05005 .05003 mg/L 100 85 115

    L10336-O4AS AS 01/31113 20:26 MS130108-1 .05005 .0002 .05184 mg/L 103.2 70 130

    L10336-O4ASD ASD 01/31/1320:29 MS130108-1 .05005 .0002 .05482 mg/L 109.1 70 130 5.59 20

    Chloride SM4500CI-E

    4 I - T p A S Q S Fo n Unt pI Lowe Upper .P, Lim it HIl

    WG338280

    WG3382801CB ICa 01/31/13 15:49 U mg/L -3 3

    WG3382801CV ICV 01/31/1315:49 W130131-1 54.945 57.6 mg/L 104.8 90 110

    WG338280LFB1 LFS 01/31/13 18:21 W1130201-8 30 31 mg/L 103.3 90 110

    L10341-02DUP DUP 01/31/13 18:21 84 83.3 mg/L 0.8 20

    WG338280LFB2 LFB 01/31/13 18:25 WI130201-8 30 31.3 mg/L 104.3 90 110

    L10341-OIAS AS 01/31/13 18:41 5XCL 30 85 116.8 mg/L 106 90 110

    NitrateJNitrite as N M353.2 - H2SO4 preserved*;+ l .'' .*i• .5 ,- p+ ' *IU .+- . ... ' ... .. ".. ...... :I"-] . .. *]

    WG338356

    WG3383561CV ICV 02/01/1322:43 W130110-1 2.416 2.418 mg/L 100.1 90 110

    WG3383561CB ICB 02/01/13 22:44 U mg/L -0.06 0.06

    WG338358

    WG338358LFB1 LFB 02/02/13 0:18 WI120814-9 2 2.032 mg/L 101.6 90 110

    WG338388LFB2 LFB 02/02/13 0:53 W1120814-9 2 2.017 mg/L 100.9 90 110

    L10340-02AS AS 02/02/131:11 W1120814-9 20 14.5 34.75 mg/L 101.3 90 110

    L10347-OIDUP DUP 02/02/131:15 .1 .098 mg/L 2 20 RA

    Residue, Filterable (TDS) i180C SM2540C

    WG337829

    WG337829PBW PBW 01/23/13 17:21 U mg/L -20 20

    WG337829LCSW LCSW 01/23/13 17:21 PCN41147 260 262 mg/L 100.8 80 120

    L10348-O0DUP DUP 01/23/13 17:40 5170 5236 mg/L 1.3 20

    Selenium, dissolved M200.8 ICP-MS

    WG338250

    WG3382501CV ICV 01/31/1319:26 MS130102-2 .05 .051 mgIL 102 90 110

    WG3382501CB ICB 01/31113 19:29 U mg/I -0.0003 0.0003

    WG338250LFB LFB 01/31/1319:32 MS130108-1 .05005 .05067 mg/L 101.2 85 115

    L10336-04AS AS 01/31/13 20:26 MS130108-1 .05005 .0004 .0538 mg/L 106.7 70 130

    L10336-04ASD ASD 01/31/1320:29 MS130108-1 .05005 .0004 .05482 mg/L 108.7 70 130 1.88 20

    REPIN.01 .06.05.01 Page 4 of 10REPIN.01.06.05.01 Page 4 of 10

  • ACZ Laboratories, Inc.2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334-5493

    I 0C

    Rio Algom Mining Company ACZ Project ID: L10348

    Sulfate D516-02 - TurbidimetrcI_•,P 1 ,,. -.•I' '.. p"•' '+i .Il,+ ..... e m+ < . ... "• 'r.. . -+-U,, ,

    WG338203

    WG3382031CB ICB 01/30/13 12:02 U mg/L -3 3

    WG3382031CV ICV 01/30/13 12:02 W1130130-2 20 19.7 mg/L 98.5 90 110

    WG338203LFB LFB 01/30/13 17:12 W1121025-3 10 9.9 mg/L 99 90 110

    L10343-01DUP DUP 01/30/13 17:48 800 880 mg/L 7.2 20 RA

    L10348-01AS AS 01/30/1317:49 SO4TURB1O 20 2900 2950 mg/L 250 90 110 M3

    Uranium, dissolved M200.8 ICP-MS

    WG338250

    WG3382501CV iCV 01/31/13 19:26 MS130102-2 .05 .05167 mg/L 103.3 90 110

    WG3382501CB ICB 01/31/13 19:29 U mg/L -0.0003 0.0003

    WG338250LFB LFB 01/31/13 19:32 MS130108-1 .05 .05015 mg/L 100.3 85 115

    L10336-04AS AS 01/31/13 20:26 MS130108-1 .05 0008 .05064 mg/L 99.7 70 130

    L10336-04ASD ASD 01/31/13 20:29 MS130108-1 .05 .0008 .05121 mg/I. 100.8 70 130 1.12 20

    REPIN.01 .06.05.01 Page 5 of 10

    REPIN.01.06.05.01 Page 5 of 10

  • ACZ Laboratories, Inc.2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334-5493

    * i.fSInogaic[ ~ Exten[edQuaifir Rpor

    Rio Algom Mining Company ACZ Project ID: L10348

    AC ID ~ -OKU PAAMTE MEHO Q DESRIPIOL1034861 WG338358 NibratelNitrite as N

    WG337829 Residue, Filterable (TDS) @180C

    WG338203 Sulfate

    M353.2 - H2SO4 preserved

    SM2540C

    D516-02 - Turbidimetric

    D516-02 - Turbidimetric

    RA Relative Percent Difference (RPD) was not used for datavalidation because the sample concentration is too low foraccurate evaluation (< 1Ox MDL).

    ZO Concentration is based on a final residue greater than 200mg.

    M3 The spike recovery value is unusable since the analyteconcentration in the sample is disproportionate to the spikelevel. The recovery of the associated control sample (LCSor LFB) was acceptable.

    RA Relative Percent Difference (RPD) was not used for datavalidation because the sample concentration is too low foraccurate evaluation (< 1Ox MDL).

    REPAD.15.06.05.01

    Page 6 of 10

  • ArDZ Laboratories, Inc.2773 Downhill Drive Steamboat Springs, CO 80487 (800) 334-5493

    CertificationQualifiers

    Rio Algom Mining Company ACZ Project ID: L10348

    No certification qualifiers associated with this analysis

    REPAD.05.06.05.01

  • A rZ Laboratories, Inc.2773 Downhill Drive Steamboat Spnngs, CO 80487 (800) 334-5493

    Sampl

    Reep

    Rio Algom Mining Company58459/620156018

    ACZ Project ID: Li 0348

    Date Received: 01/23/2013 10:12

    Received By: ksj

    Date Printed: 1/24/2013Receipt Verification

    1) Is a foreign soil permit included for applicable samples?

    2) Is the Chain of Custody or other directive shipping papers present?

    3) Does this project require special handling procedures such as CLP protocol?

    4) Are any samples NRC licensable material?

    5) If samples are received past hold time, proceed with requested short hold time analyses?

    6) Is the Chain of Custody complete and accurate?

    7) Were any changes made to the Chain of Custody prior to ACZ receiving the samples?

    YES NO NA

    x_ Jx]

    __ Jx

    [x[ I_mples/Containers

    8) Are all containers intact and with no leaks?

    9) Are all labels on containers and are they intact and legible?

    10) Do the sample labels and Chain of Custody match for Sample ID, Date, and Time?

    11) For preserved bottle types, was the pH checked and within limits?

    12) Is there sufficient sample volume to perform all requested work?

    13) Is the custody seal intact on all containers?

    14) Are samples that require zero headspace acceptable?

    15) Are all sample containers appropriate for analytical requirements?

    16) Is there an Hg-1631 trip blank present?

    17) Is there a VOA trip blank present?

    18) Were all samples received within hold time?

    YES NO NA

    Ill-

    W

    x

    mm-IxwmmIx

    I I I x Imm-Ix

    Cooler Id Temp (OC) Rad (pR/Hr) Custody Seal Intact?

    NA16969 1.5 13 Yes

    Client must contact an ACZ Project Manager if analysis should not proceed for samples receivedoutside of their thermal preservation acceptance criteria.

    REPAD LPII 2012-03

    Page 8 of 10

  • FI lZ Laboratories, Inc. ((03 VI9

    E-mail:

    jdrs: 4-, 41l

    1 1 1 1 1 m

    ITelep :role: 5 r - -"?- 7- 4"•VP"

    Name: I IE-maiI ~-

    Coman: I ITeleforne:

    Name:

    Company:

    E-mail:

    Adress:

    Tehowne:

    If sample(s) received past holding time (HT). or if insufficient HT remains to completeanalysis before expiration, shall ACZ proceed with requested short HT analyses?l1NO"10 uwACZvwMJl(owct iu fo fuadirmnstims. 1( "eapusYES" Sf aND"

    sindimfte ACZ Mil I~ With 11.0 r'std araiyWAS e~w if ItT Is *"lWett and data *'I be Quaified

    YES

    NOH

    Are samples for SDWA Compliance Monitoring? Yes LJ No [__If yes, please inc, u914 state forms. .ersults will be reported to PQL for Colorado.

    Saplr~~aecop--ý-!/4*ll,--ftnpe'ssie nor ntin State Zip code Time Zone

    Repwoing stats for omplianos tetNg

    Check boxc tf samples Includes FMC Iensed matrkla?0

    1-K

    -ý aME

    ___11L 1-1 W1LLIMatri JSl (Surboa Water) -GW (Ground Water). WW (Waad Wowe) -DW (MftkV Wate) -SIL (Sludge) 80 (SO ) -01. (04). Othe (Specif)

    egor j#/ I- 0-3 pV~W~ ~/j

    /

    Please refr-to ACZrs terms & conditionrs kocate on the reverse skle of this COC. AS

    4440A '9-VeI I _ ____ 1 1_40q

    [ ~ ~~I r-L/~ ~FRMAD050.02.11.11 White - Return with sample. Yellow - Retain for your records.

    Page 9 of 10

  • RIO ALGOM MINING LLC - PROJECT CODES

    ACL-ALL ACL-TRB ACL-TRA ACL-KD DP-71-Q SEC 4 DP-71-S• ~PONDS' ~

    50/year /year 5/ear 35/ye • 10/year 20/year 10/.ear'$ ChlorChlodeildd Chloride Chloride Chloride

    SSuifate Sulfate Sulfate S te Sulfate Sulfate Sulfate

    4 D D I T____________ TDS TDSfN ate + Nitrite rate + Nitrite + Nitrite ate + Nitrite, Nitrate + Nitrite ate + Nitrite

    NO~deu .. Cyanide j~anide f_ Wntimony Arsenic IAsncIAnseltNickel - bdenum 1bdenm _rsenic Selenium elenium n*enium •Vickel icfell lium I Uranium ranium imGr*ss Alph e "i __ate (COO _ (CO3)

    Grs Apha Gr ha anide _aBi te (HCO3) Bi nate (HC3O)

    ___ m-m.226 R -226e 2de6 cium __mj~m-230 ' _m-22 3denum eum3iumLeV210 77or nt2 3 go m-30 ikel Ma esiuUmI IM &siNum

    Urture L a -1Z eat2"0e urn . l m I o um

    Urakum r ha inin

    ' _ C•Coba_

    , ~ ~ ~ ~ ai 8 uim26 Rdu-2

    Led2 Raiu-28R diue2

    .- it" Zinc ZincZuI1*Z _

    ..... ~~~~~~~~ ~o IIOf .. .. e""-r II_ IIl II I

    "00

    0_.Wednesday, August 08,2007versions.

    The Wednesday, August 08, 2007 product code replaces all previous