Location: Terga Date of Assessment:
Assessor(s): A.FRIDI
Y. BENOTMANE
System/Activity:
INTRODUCTION
The table below provides a simplified representation of the methodology used and the processes(Risk Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage projectConstruction Phase.
IDENTIFICATION - Pre planning, Methodstatement , Job safety analysis.
ASSESSMENTMitigation meas
Identify activities , Identify hazards Assess Impacts, Analyze Risk ,Establish Mitigation Measures.
Pro
bab
ili
ty&
Fre
qu
en
cy
Definite 5 5 10 15 20High 4 4 8 12 16
Moderate 3 3 6 9 12
Low 2 2 4 6 8Negligible 1 1 2 3 4
1 2 3 4
Minor Serious Major Catastrophic
Severity
Key to Priorities
Medium Priority (5 days) High Priority (2-3 days) Immediate
RISK ASSESSMENT FORM
Date of Assessment: 27-03-2010 Assessment No:
System/Activity: Offloading and Erection of 31BBT20
The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedureall Subcontractors in order to initiate, act on, review and effectively manage project
ASSESSMENT – Impact, Risk factor,Mitigation measure, Residual risk
IMPLEMENTATION &COMMUNICATION
REVIEW & UP DATE
Assess Impacts, Analyze Risk ,Establish Mitigation Measures.
Communication & Training Audit, Inspection & Up dating of Log.
Page 2 of 6
061
involved in this Hazard Identification & Risk Analysis Procedureall Subcontractors in order to initiate, act on, review and effectively manage project -related risks throughout the
REVIEW & UP DATE
Audit, Inspection & Up dating of Log.
Tasks Hazards Identified (include
the exposed groups)
Probability
1 - 5
Transfer ofequipment
Transfer device collidewith other things;
Oil leakage
4
Locate the crane Hitting injury 4
Transport Traffic risk Collision with person Collision device
3
Movement oftraffic Slip/trip/all
3
RISK ASSESSMENT FORM
Probability
5
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 -
3 12 Chose a qualified driver before
work
Check the calibration of all tools
Make sure the transport device in
good condition
2
3 12 Solid the ground
Reinforce the pads beneath the
outriggers
Check the around circumstance
before working
2
3 9 The trucks must respect:
The limited speed in the site
The circulation signs
The circulation plan (updated)
2
3 9 All hose/ropes/cables in use shall
be secured to the side of
walkways and handrails
All unnecessary materials and
equipment to be immediately
removed from site
All exits and walkways to be kept
clear for use of personnel
High standard of housekeeping to
be maintained at all times
2
Page 3 of 6
Probability
5
Severity
1 - 4
Risk
1 - 20
ResidualRisk
DateAction
Completed
1 2
1 2
3 6
2 4
Tasks Hazards Identified (include
the exposed groups)
Probability
1 - 5
Lifting Fall from height andhurt workers
Component fall down
Component collidewith other thingssurrounded
collision with person
falling materials
Poor visibility for thedriver
4
RISK ASSESSMENT FORM
Probability
5
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 -
4 16 Lifting crane, forklift wiresshould be regularly calibrated,safe working loads are announcedmax speed at site is respected forall vehicle
It is not allowed to work underloads
Handling by qualified riggersworn the related PPE and undersupervision
Qualified crane operator andqualified rigger to operate liftingwork
Crane in calibrated period Barricade the lifting area Proper lifting tools Make sure lifting wok operated in
good weather mark the area of operations of the
crane officer commanding the ship
maneuver through regulatoryactions to avoid accidents
Control of the safety catch hookthe slings
Ensure the crane on hisdashboard that the load weightdoes not exceed the maximumallowed
Ban the person be under asuspended load
defining the radius of the rotarycrane
prohibit the movement of people
around the handling
stop the lifting operation in
strong winds exceed the 50km /h
2
Page 4 of 6
Probability
5
Severity
1 - 4
Risk
1 - 20
ResidualRisk
Date ActionCompleted
3 6
Tasks Hazards Identified (include
the exposed groups)
Probability
1 - 5
Electricity Electrocution
3
Fire – Explosion Abrasive particles
3
Chemical risk Projection of chemical
products
4
RISK ASSESSMENT FORM
Probability
5
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 -
4 12 Protect electrical equipment from
ingress of water
Identify equipment risk
Warning notices
Verification of electric cables
before the start of work by an
electrician
2
3 9 Check the cleanness of the
workplace
Site emergency plan to befollowed in event fire orexplosion.
All personnel to be inducted andaware of emergency procedures.
Installation of fire extinguishersvisible and accessible
No smoking or naked lights
2
4 16 Materials to be clearly and
correctly labeled
Protection of personnel under theguidance of MSDS for eachchemical product used
2
Page 5 of 6
Probability
5
Severity
1 - 4
Risk
1 - 20
ResidualRisk
DateAction
Completed
3 6
3 6
3 6
Tasks Hazards Identified (includethe exposed groups)
Probability
1 - 5
Waste control
Environmental impact
from used chemicals
33
Environmental
Pollution the air:
Exhaust gas, The dust
Leaking oil or diesel
machines on soil
3
Assessor Print :
RISK ASSESSMENT FORM
Probability
5
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 -
4 12 Empty drums to be collected
and disposed off regularly to
avoid waste accumulation and
disposal according waste
management procedures
To finish the work site clean
2
3 9
Checking the condition of
equipments before beginning
the work
ventilation Workstation
2
Sign: Date:
Page 6 of 6
Probability
5
Severity
1 - 4
Risk
1 - 20
ResidualRisk
DateAction
Completed
3 6
2 4