risk assessment - backfilling around foul sewer and storm warter manholes

6
 خر ا: جر ا مق ر: ل ا ف و: ض ر  د ق ن رط Incompetent operators, drivers Involved workers, others in vicinity 4 4 16 1 1 1 Site Engineer, Gen.Foreman Truck /Equipment operation. Unprotected work area for truck and equipment operation Involved workers, others in vicinity 4 3 12 1 1 1 Site Engineer, Gen.Foreman Site Engineer, Gen.Foreman 3 Putting backfill materials into Workers taking unsafe positions inside excavation Involved workers 4 3 12 1 1 1 *ALARP - As Low As Reasonably Practicable  م ا د  :  لب ق ن  جار ا : Date 8/2/2014  خر ا : Date:  خر ا : Signature :  ع ي ق ت ل : ع ي ق ت ل : Likelihood / اSeverity / ة د ش ا 1 Remote / د ب س Minor / ف ط2 Unlikely / حجر  ر غMajor / ي س س ا 3 Likely / حرج Severe / د 4 Frequent / ررك Fatality / ةو اEnsure the crane,mobile and trucks equipments ar e in good mechanical and operating conditions. Using trucks, mobile equipments and crane for backfilling Involved workers. Operators,drivers,. Others in vicinity 4 4 16 1  RISK ASSESSMENT FORM - ر طاخل مييق ت جذو ن Assessment location :  Stormwater and foul sewer manholes on site.  م ا  قو : SR # Activity Hazard / Conditions that could develop hazard Who Might be Harmed يو ا ر ط ا Initial Risk  صش الو س اSafety precautions needed to control the Risk to ALARP *  يب ا ر ط ا RESIDUAL RISK Responsible Person  عورش ا مس ا:   و      C     o     n     s     e     q     u     e     n     c     e     s   ة ج      L       i       k     e       l       i       h     o     o       d ر ل       R       i     s       k        R     a       t       i     n     g  Date : 8-2-2014  Description of work : Roads and Infrastructure in Al Kheesa North and East RA/AK/15  Proj ect Name : Ref No: Backgfilling around stormwater and foul sewer manholes.   ة ج      L       i       k     e       l       i       h     o     o       d ر ل       R       i     s       k        R     a       t       i     n     g   و      C     o     n     s     e     q     u     e     n     c     e     s Signature:  Assign competent operators having valid license and third party certificate . Ensure truck drivers have valid license. Unsafe condition of crane excavators,JCB, truck etc. Reviewed by: Engr. Radi Shunnar (Operations Manager) 2 1 2 Site Engineer, Equipment Supervisor Site Engineer, Equipment Supervisor Involved workers. Operator, Others in vicinity 4 4 16 Improper l ifting tackles and bucket 2 1 ط ش ا  رط ا / ورظ ارط ا روط و مق  د ق ي ا   وب ا دود ا ى ا ه و رط ا طب  ز ا تط ا" Assessed By: Mr. Aaron Aaloosi (HSE Manager) Ensure the crane and mobi le equi pment s have val id regi strati on, Third party inspection certificates. Ensure the lift ing chains / slings, shackles ar eof proper load bearing capacity and have valid third party certificate. Ensur e the lif ti ng bucket to be used wi th crane for backfi lling have proper load bea ring capacity and have valid third party inspection certificate. Ensure the safe condition of lifting hooks. Pr ovide safe access for trucks to the si te. Provide enough space for reversing and unloading activities. Cordon the equipment operat ion area. Post sign boards and prevent unauthorised entry. 2 Ensure no workers inside the trench while putting backfill materials into the trench/ excavation. Site Engineer, Gen.Foreman  Assign flagman to guide reversing and uinloading activities by trucks. Ensure no people in the vicinity Improper access,unguided reversing,unloading activities 2 Involved workers,driver others in vicinity 4 3 12 1 1 1 4 3 2 1 16 6 Likelihood 4 3 2 1 12 8 4 12 9 3 8 6 4 2 4 3 2 1 HSEF 4.3.1-01-01 Issue: 1 Rev: 2 Issue Date: 20 Mar 2012 Page 1 of 3

Upload: loveson709

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 1/6

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 2/6

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 3/6

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 4/6

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 5/6

8/11/2019 Risk Assessment - Backfilling Around Foul Sewer and Storm Warter Manholes

http://slidepdf.com/reader/full/risk-assessment-backfilling-around-foul-sewer-and-storm-warter-manholes 6/6