Page 1: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Risk-Based Pipeline Route Optimization for the Persian Gulf Region

Scott ByronExxonMobil Exploration Co. &

Master’s Candidate, Penn State University MGIS Program

2010 ESRI Petroleum Users Group ConferenceFebruary 23, 2010

Page 2: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Presentation Overview

• Project overview

• Analysis methodology

• Results & Conclusion

Courtesy: NASA

2010 ESRI PUG Conference

Page 3: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Project Overview

2010 ESRI PUG Conference

Page 4: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Project Objectives

• Proof of concept

• Create risk maps by Identifying & weighting analysis risk factors

• Test system against existing pipelines

2010 ESRI PUG Conference

Qatar – Abu Dhabi – Oman PipelineCourtesy: Oil & Gas Journal

Page 5: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• New pipelines will encounter high-risk environments

• People can easily perceive risks

• Risk management improves project performance

• Must apply internal safety & risk management policies

2010 ESRI PUG Conference

Why Focus on Risk?

0m

~90m (Approx. depth of Persian Gulf)

2,863m-1,788m

Key Map

The Persian Gulf region topography & bathymetry

Page 6: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• Availability of experts

• No marine examples

• Reliance on public data

• Expectation that low risk path will equate to shortest, lowest cost path

2010 ESRI PUG Conference

Constraints

0m

~90m (Approx. depth of Persian Gulf)

2,863m-1,788m

Key Map

The Persian Gulf region topography & bathymetry

Page 7: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Analysis Methodology

2010 ESRI PUG Conference

Page 8: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• 36 risk factors identified

• 19 – terrestrial, 11 – marine, 6 - both

• Divided into 4 categories

Risk Factor Identification

2010 ESRI PUG Conference

Construction10 risks

Operation13 risks

Socio-Economic7 risks

Environmental6 risks

Risk Categories

Page 9: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Formal Risk Analysis

• Probability of Occurrence & Potential Impact scores combined for Risk Score

• High priority risks have Risk Score >= 3.0

• High priority risks used in weighting methods

2010 ESRI PUG Conference

Risk Scores

Risk Count

= High Priority Risks

1 2 3

1 1.5 2.5 3.5

2 2.0 3.0 4.0

3 2.5 3.5 4.5

Potential Impact

Prob

abili

ty o

f O

ccur

renc

e

1 2 3

1 4 8 6

2 2 2 6

3 2 3 3

Potential Impact

Prob

abili

ty o

f O

ccur

renc

e

Page 10: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Weighting MethodologySimple Weighted Index

• Factors evaluated independently

• Evaluated 21 risks

Incr

easi

ngris

k

2010 ESRI PUG Conference

Index Factor

4.5 A

4.0 B

3.5 C

3.0 D

Page 11: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• Evaluating Brown & Peterson method, Analytical Hierarchy Process

• Factors compared to each other

• Data collected via survey

• Fewer risks evaluated

Factor C

Factor B

Factor C

Factor A

Factor A

Factor B

<

<

>

2010 ESRI PUG Conference

Weighting MethodologyPair-Based Comparison Overview

Factor A

Factor B> Factor

C>

Page 12: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• Captures selection frequency

• Is row factor riskier than column factor?

• No factor categories

• Simple calculation of weights

A B C D

A 8 5 2

B 2 5 6

C 5 5 4

D 8 4 6

15 17 16 12

30 30 30 30

0.500 0.567 0.533 0.400Weight

Factors

Fact

ors

Column Sums

Max. selection #

Factor ‘s column sumMaximum selection # = Weight

Frequency matrix for 10 respondents

2010 ESRI PUG Conference

Weighting MethodologyBrown & Peterson Method

Page 13: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• Captures Degree of importance (How much riskier?) on scale of 1 – 7 (similar – significantly riskier)

• Weights categories

• Uses matrix similar to BP method

• Weights categories

• Complex weight calculation

Analysis Problem

Category 1 Category 2

Factor A

Factor B

Factor C

Factor D

2010 ESRI PUG Conference

Weighting MethodologyAnalytical Hierarchy Process

Page 14: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Weighting

2010 ESRI PUG Conference

Weighting MethodologyAnalytical Hierarchy Process

A B C D

A 3 5 1

B 0.333 0.25 0.143

C 0.2 4 0.2

D 1 7 4

Factors

Fact

ors

1. Sum each column2. Divide all cell values by column sum3. Sun each row4. Divide all row sums by smallest row

sum 5. Divide by combined row sums6. Multiply by Category weights, repeat

steps 4 & 5

FactorC

Weight = 6.1

FactorA

Weight = 4.28

Analysis Problem

Category 1Weight = 1.00

Category 2Weight = 1.5

FactorD

Weight = 4.52

FactorB

Weight = 1.00

Steps

Page 15: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Results

2010 ESRI PUG Conference

Page 16: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Top High Priority Risks

Seismic

2010 ESRI PUG Conference

Commercial Shipping

Landslide

Steep Slope (>5%)

Crossings Reefs & Spill Windows

Low High Low High Low High

High risk areas River, road, rail or pipe Spill response window (2 day)Coral reefs

Page 17: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

• Further loss of ocean –land distinction

• Exaggerated risk variation

Final Risk SurfacesSimple Weighted Index Brown & Peterson Analytical Hierarchy Process

0 0.424 0 0.466 0 0.514

2010 ESRI PUG Conference

• Land riskier than ocean due to higher number of land risks

• Zagros has highest risk

• Less ocean – land distinction

• Zagros is riskiest

Page 18: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

ValidationIGAT 4 Pipeline

• Land oil pipeline

• Crosses mountains, active earthquake area

• ~$1 billion

Key Map

The IGAT 4 pipeline, Iran

Page 19: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

ValidationIGAT 4 Pipeline

• SWI shortest, has greater slope variability

• BP, AHP have best match

• Key risks: seismic, slope, landslide, crossings

Alignments on BP Risk Map

Key Map

Page 20: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

CriteriaIGAT 4

PipelineStraight-

lineSWI

AlignmentBP

AlignmentAHP

AlignmentLength (km) 635 547 620 696 694

Length of pipeline (km) within seismic risk environment (peak horizontal acceleration)

1.6 - 2.4 cm/s 2 164 1 92 245 2382.4 - 3.2 cm/s 2 264 211 370 301 2893.2 - 4.0 cm/s 2 206 215 158 150 158

> 4.0 cm/s 2 0 120 0 0 0Length of pipeline by slope categories (km)

< 5% (preferred) 400 265 469 573 5665 - 15% 182 214 123 108 113

15 - 30% 53 68 28 15 1530% + 4 6 0 0 0

Number of crossingsPipelines 3 8 5 4 4

Rivers 3 7 2 2 8Roads 34 18 35 38 37

Number of urban areas crossed 3 1 1 1 12010 ESRI PUG Conference

ValidationIGAT 4 Pipeline

Page 21: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

ValidationDolphin Pipeline

• Marine gas pipeline

• Crosses highly developed area

• $3.5 billion

Key Map

The Dolphin Pipeline, Qatar - UAE

Page 22: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

ValidationDolphin Pipeline

• SWI has best match

• BP, AHP similar, but route southward

• Key risks: commercial shipping, pipeline crossings, coral reefs & spill windows

Alignments on SWI Risk Map

Key Map

Page 23: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

ValidationDolphin Pipeline

CriteriaDolphin Pipeline

Straight-line

SWI Alignment

BP Alignment

AHP Alignment

Length (km) 364 346 361 470 469Length of pipeline (km) within low seismic risk environment (peak horizontal ground acceleration of 1.6 - 2.4 cm/s2)

197 191 190 111 111

Length of pipeline within spill window (km) 15 11 10 15 15Length of pipeline within commercial shipping threat zone (km)

Moderate 203 135 89 46 46Low 160 208 270 314 313

Number of pipeline crossings 15 19 18 11 11Number of coral reefs crossed 2 2 2 1 1Number of urban areas crossed 1 1 0 1 1

Page 24: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Conclusion

2010 ESRI PUG Conference

Page 25: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

Learnings

• Risk approach is valid

• Lowest risk path: pair-based• Shortest path: SWI

• Data quality impacts results

• Finer resolution needed

• Reevaluate some factors for coverage and weight

Page 26: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Questions?

Dubai, UAE

2010 ESRI PUG Conference

Page 27: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Appendix

2010 ESRI PUG Conference

Page 28: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

List of Risk FactorsHigh Priority Risk Factors Analyzed by all Weighting Methods

Category RiskProbability of Occurrence

Potentia l Impact

Risk Score/SWI Weight

BP Weight

AHP Weight

Socio-Economic Contam ination of water supply 1 3 3.5 0.565 3.364Operational Corrosion from sea spray 3 2 3.5 0.130 1.260Construction Cost of building over high slopes 3 3 4.5 0.556 4.137Construction Cost of excessive river , rail, pipeline or road crossings 2 3 4.0 0.417 2.668Construction Cost of urban construction 3 3 4.5 0.685 5.628Operational Damage from commercial ship traffic (anchors and collisions) 2 3 4.0 0.870 6.000

Operational Damage from seismic activi ty 3 3 4.5 0.269 10.833Operational Damage from shifting sand dunes 1 3 3.5 0.185 1.860Operational Damage from unstable Sabkha surface 1 3 3.5 0.444 1.433Environmental Damage to cora l reefs 3 2 3.5 0.574 2.416Operational Damage to footings from wave activity 2 3 4.0 0.157 4.930Environmental Damage to forest environment 2 3 4.0 0.750 1.000

Socio-Economic Impact to agr icu lture (limited use on Right of W ay) 2 3 4.0 0.389 2.022Socio-Economic Pollution of populated areas 1 3 3.5 0.611 3.974Construction Route too close to existing oil infrastructure 3 2 3.5 0.389 2.665Construction Shallow or surface bedrock requires blasting 1 3 3.5 0.407 2.522Environmental Spill pollutes environmentally sensitive area - assumes pipel ine fa ilure 2 3 4.0 0.407 2.507Operational Threat from landslides (high slope) 1 3 3.5 0.676 6.747

Additional High Priority Risk Factors Analyzed by SWI Weighting MethodEnvironmental Damage to wetlands 2 2 3.0 -- --

Environmental Damage to shrub/grassland environment 2 2 3.0 -- --

Page 29: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

2010 ESRI PUG Conference

List of Risk Factors (Con’t)Additional Unweighted Risks

Category RiskProbability of Occurrence

Potentia l Impact Risk Score

Operational Damage due to objects dropped from platforms/supply ships 2 1 2.0Socio-Economic Damage to historical or archaeological sites 1 2 2.5Environmenta l Degradation o f landscape 1 1 1.5Construction Excessive span lengths 1 2 2.5Operational Hydrodynamic instability from seafloor currents 1 2 2.5Operational Internal pressure variability from extreme external tem peratures 3 1 2.5Construction Limited ava ilability of power 1 1 1.5Socio-Economic Minim ize degradation of recreation/tourist areas 2 1 2.0Socio-Economic Minim ize interference with fisheries 3 1 2.5Socio-Economic Repositioning of util ities due to utility congestion 1 1 1.5Construction Route crosses lake 1 2 2.5Construction Route too close to military installa tions 1 1 1.5Construction ROW width - insufficient width for construction equipment 1 2 2.5Operational ROW width - Insufficient main tenance corridor 1 2 2.5Operational ROW width - limited access to pipeline 1 2 2.5Operational ROW width - Unable to expand pipeline 1 2 2.5

Page 30: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Applying AHP in Weighting GIS Model Criteria. Retrieved from http://www.innovativegis.com/basis/Supplements/BM_Sep_03/T39_3_AHPsupplement.htm

Brown T.C., & Peterson G.L. (2009). An enquiry into the method of paired comparison: Reliability; scaling; and thurstone's law of comparative judgment. USDA Forest Service - General Technical Report RMRS-GTR. (216 RMRS-GTR), 1-98. http://www.fs.fed.us/rm/pubs/rmrs_gtr216.pdf

Longley, P. A., Goodchild, M. F., MaGuire, D. J. & Rhind, D. W. (2005). Geographic Information Systems and Science, 2nd Ed.. London: John Wiley& Sons, Ltd..

Resources

2010 ESRI PUG Conference

Page 31: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Montemurro D., Barnett S., & Gale T. (1998). GIS-based process helps TransCanada select best route for expansion line. Oil and Gas Journal. 96(25), 63-71.

Saaty T.L., Vargas L.G., and Dellmann K. 2003. The allocation of intangible resources: The analytic hierarchy process and linear programming. Socio-Economic Planning Sciences. 37 (3):169-184.

Pipelines

Braestrup, Mikael W. Design and Installation of Marine Pipelines.. Blackwell Publishing. Online version available at:http://knovel.com.ezaccess.libraries.psu.edu/web/portal/browse/display?_EXT_KNOVEL_DISPLAY_bookid=1384&VerticalID=0

2010 ESRI PUG Conference

Resources (Con’t)

Page 32: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

Guo, Boyun; Song, Shanhong; Chacko, Jacob; Ghalambor, Ali Offshore Pipelines. Elsevier. Online version available at:http://knovel.com.ezaccess.libraries.psu.edu/web/portal/browse/display?_EXT_KNOVEL_DISPLAY_bookid=1258&VerticalID=0

Data

Global Seismic Hazard Program. (2009 August 27). Middle East Hazard Map. Retrieved from: http://www.seismo.ethz.ch/GSHAP/

National Center for Ecological Analysis and Synthesis. (2009, August 2). Commercial Activity (Shipping) Dataset. Retrieved from: http://www.nceas.ucsb.edu/GlobalMarine/impacts

2010 ESRI PUG Conference

Resources (Con’t)

Page 33: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

NationMaster.com. (2009, September 22). Oil Consumption (per Capita) (Most Recent) by Country. Retrieved from: http://www.nationmaster.com/graph/ene_oil_con_percap-energy-oil-consumption-per-capita

Tupper, M., Tewfik, A., Tan, M.K., Tan, S.L., The, L.H., Radius, N.J., & Abdullah, S. (2009, September 2) ReefBase: A Global Information System on Coral Reefs [Online]. Retrieved from: http://www.reefbase.org

United Nations Environmental Program. (2009, August 18). Global Environment Outlook (GEO) Data Portal. Retrieved from: http://geodata.grid.unep.ch/

United States Geological Survey. (2009, September 2). Earthquake Hazards Program: Epicenters Database. Retrieved from: http://neic.usgs.gov/neis/epic/epic_rect.html

2010 ESRI PUG Conference

Resources (Con’t)

Page 34: Risk-Based Pipeline Route Optimization for the Persian Gulf … ·  · 2014-06-04Project Objectives • Proof of concept • Create risk maps by Identifying & weighting analysis

World Database on Protected Areas. (2009, August 5). Annual Release 2009 Dataset. Retrieved from: http://www.wdpa.org/Default.aspx

2010 ESRI PUG Conference

Resources (Con’t)