risk-based supplier assurance a missing key to enhanced supplier quality program success

16
Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success Quality Assurance and Risk Management Services, Inc. Robert J. Navarro, President & CEO A.A. Flippen, Director, Systems Engineering University of Bradford, UK School of Engineering, Design & Technology Chakib Kara-Zaitri, PhD, Senior Lecturer in Risk & Reliability September 28, 2008

Upload: nuwa

Post on 20-Jan-2016

53 views

Category:

Documents


0 download

DESCRIPTION

Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success. Quality Assurance and Risk Management Services, Inc. Robert J. Navarro, President & CEO A.A. Flippen, Director, Systems Engineering University of Bradford, UK School of Engineering, Design & Technology - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

Risk-Based Supplier Assurance

A Missing KeyTo Enhanced Supplier Quality Program Success

Quality Assurance and Risk Management Services, Inc. Robert J. Navarro, President & CEO

A.A. Flippen, Director, Systems Engineering

University of Bradford, UK School of Engineering, Design & Technology

Chakib Kara-Zaitri, PhD, Senior Lecturer in Risk & Reliability

September 28, 2008

Page 2: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

2

Presentation Objectives

• Quality & Risk Management Process Today

• Where We Want to Be

• How Do We Get There?

• Case Study

• Summary

Page 3: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

3

• Quality System Elements– Management responsibility– Purchasing / Supply chain management– Product realization– Control of non-conforming products– Etc.

Quality Community

You Are Here

Where We Are Today

Page 4: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

4

Where We Are Today

NPR 8000.4 Agency Risk Management Procedural Requirements

- Includes supply chain risk

Risk ManagementCommunity

“They” Are There

Page 5: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

Supplier Quality

Community

5

Where We Want To Be

• Integration of Quality and Risk Management– Current focus of this initiative on supply chain QA management– Supplier QA risks typically reported in supplier audit reports

• Transformation of quality audit deficiencies into a risk management framework

• Systematic reporting of supply chain risks as part of the program/project management councils (PMCs)

Risk ManagementCommunity

Page 6: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

6

An Approach for Integration

• Program/Project risk management is governed by the NASA Risk Management Policy NPR 8000.4

– Includes the Continuous Risk Management (CRM) Process– The CRM process requires program/project risk management

plans to provide definitions for likelihood and consequence ratings

• Apply these definitions to each supplier audit finding

• Map results in the traditional 5X5 Risk Reporting Matrix

• Report significant supply chain QA results as part of an integrated reporting process at program/project PMCs

How Do We Get There?

Page 7: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

7

Likelihood & Consequence 5X5 MatrixL

ike

liho

od

Consequence

Likely to Occur

Probably

May Occur

Unlikely to Occur

Improbable

Very Low Mod High VeryLow High

Case Study

Page 8: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

8

DefinitionsLikelihood

A. Likely to occur (e.g., probability > 0.1)B. Probably will occur (e.g., 0.1 > probability > 0.01)C. May occur (e.g., 0.01 > probability > 0.001)D. Unlikely to occur (e.g., 0.001 > probability > 0.000001)E. Improbable (e.g., 0.000001 > probability)

ConsequenceVery High -- A condition that may cause death or permanently disabling injury,

facility destruction on the ground, or loss of crew, major systems failure, or vehicle during the mission

High -- A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule

Moderate -- A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule

Low -- A condition that could cause the need for minor first aid treatment but would not adversely affect personal safety or health, damage to facilities, equipment, or flight hardware

Very low -- Minimal or no consequences

Case Study, cont’d

Page 9: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

9

Case Study, cont’d

An audit was completed for Supplier A. Selected results:

F1. Supplier A does not have a defined receiving inspection process to systematically:

– Verify the conformity of purchased products and services– Provide a traceable record of conformity including who, when, how,

and to what criteria, conformity was verified

Project RiskPurchased products may not meet technical requirements, and may have no traceable record of conformity to requirements. Failures could occur downstream and result in costly delays.

Consequence High - A condition that may cause severe injury or occupational illness, or major property damage to facilities or systems or major impact to project schedule

Likelihood C - May occur

Page 10: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

10

Case Study, cont’dTransformed Supplier Risk

Supplier “A” Risk Report

Lik

elih

oo

d

Consequence

F1

Likely to Occur

Probably

May Occur

Unlikely to Occur

Improbable

Very Low Mod High VeryLow High

Page 11: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

11

F2. While performance history is cited as a basis for approving suppliers, there appears to be no defined process for reporting supplier deficiencies that could affect supplier approval status.

Project RiskRepeat problems with subcontracted and/or purchased products. Initial supplier deficiencies may not be recorded and/or addressed with appropriate controls.

Consequence Moderate - A condition that may cause minor injury or occupational illness, or minor property damage to facilities, systems or minor impact to project schedule.

Likelihood C - May occur

Case Study, cont’d

Page 12: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

12

Lik

elih

oo

d

Consequence

F2 F1

Likely to Occur

Probably

May Occur

Unlikely to Occur

Improbable

Very Low Mod High VeryLow High

Case Study, cont’dTransformed Supplier Risk

Supplier “A” Risk Report

Page 13: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

13

F3. It appears that there is no defined process for reviewing controlled documents to determine whether updating is needed.

Project RiskIncorrect builds, tests and inspections could occur due to use of outdated material and process specs, and manufacturing and QA work instructions. Consequence High - A condition that may cause severe injury or occupational illness, or major property damage to facilities, systems or major impact to project schedule

Likelihood B - Probably will occur

Case Study, cont’d

Page 14: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

14

Lik

elih

oo

d

Consequence

F3

F2 F1

Likely to Occur

Probably

May Occur

Unlikely to Occur

Improbable

Very Low Mod High VeryLow High

Case Study, cont’dTransformed Supplier Risk

Supplier “A” Risk Report

Page 15: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

15

Summary

• Supplier risks can and should be integrated into the NASA risk management program defined in NPR 8000.4 (new revision in NODIS review)

• A systematic and practical risk-based supplier QA process can be applied– Integrated quality and risk management

• Supply chain risks are a critical element of the integrated project risk profile

• Next steps– Field testing for practicality – Program and project feedback

Page 16: Risk-Based Supplier Assurance A Missing Key To Enhanced Supplier Quality Program Success

16

Where We Want To Be

Risk ManagementCommunity

Supplier Quality

Community

Contact

[email protected]

[email protected]