risk matrix
DESCRIPTION
RBI matrixTRANSCRIPT
Criticality Summary Report
Organization: LR Capstone
Plant: 001
Selection Criteria SummaryInspection Priority Category
Pro
bab
ilit
y C
ateg
ory
Operating Unit: 00346-001
System Name:
All Criticality: No
Driving Risk Criticality: Yes
What If Criticality: No
Effective Risk Date(s): No restrictions
Probability Category: Combined ProbabilityE D C B A
Consequence Category: Combined Consequence
2 Equipment Type(s):
Criticality Matrix
1Air Cooled Exchanger, Pressure Vessel, Fire Heater, Storage Tank, Boiler, Shell and Tube Exchanger, Column, Pipe
3
4
5
Consequence Category
Criticality
Equipment Type Component Equipment No. Equipment Description Analysis Date Criticality CategoryEffective Risk Date
Inspection Priority Category
Print date/time: 02/01/2014 13:04:26 EquipmentID: Page 2 of 2
15674845 18002097777