Criticality Summary Report Organization: LR Capstone Plant: 001 Selection Criteria Summary Inspection Priority Category Probability Category Operating Unit: 00346-001 System Name: All Criticality: No Yes What If Criticality: No Effective Risk Date(s): No restrictions Probability Category: Combined Probability E D C B A Consequence Category: Combined Consequence 2 Equipment Type(s): Criticality Matrix Consequence Category Driving Risk Criticality: 1 Air Cooled Exchanger, Pressure Vessel, Storage Tank, Boiler, Shell and Tube Ex Column, Pipe 3 4 5

Upload: mirtunjay-kumar

Post on 27-Dec-2015

16 views

Category:

Documents


0 download

DESCRIPTION

RBI matrix

TRANSCRIPT

Page 1: Risk Matrix

Criticality Summary Report

Organization: LR Capstone

Plant: 001

Selection Criteria SummaryInspection Priority Category

Pro

bab

ilit

y C

ateg

ory

Operating Unit: 00346-001

System Name:

All Criticality: No

Driving Risk Criticality: Yes

What If Criticality: No

Effective Risk Date(s): No restrictions

Probability Category: Combined ProbabilityE D C B A

Consequence Category: Combined Consequence

2 Equipment Type(s):

Criticality Matrix

1Air Cooled Exchanger, Pressure Vessel, Fire Heater, Storage Tank, Boiler, Shell and Tube Exchanger, Column, Pipe

3

4

5

Page 2: Risk Matrix

Consequence Category

Criticality

Equipment Type Component Equipment No. Equipment Description Analysis Date Criticality CategoryEffective Risk Date

Inspection Priority Category

Page 3: Risk Matrix

Print date/time: 02/01/2014 13:04:26 EquipmentID: Page 2 of 2

Page 4: Risk Matrix

15674845 18002097777