risk sharing in practice towards integrated flood ......risk sharing in practice towards integrated...

33
Risk Sharing in Practice towards Risk Sharing in Practice towards Integrated Flood Management Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Masahiko Murase Murase Takeo Office of River, Takeo Office of River, Ministry Ministry of Land, Infrastructure, Transport and of Land, Infrastructure, Transport and Tourism (MLIT) Tourism (MLIT) Saga Saga , , Japan Japan

Upload: others

Post on 10-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Risk Sharing in Practice towards Risk Sharing in Practice towards Integrated Flood ManagementIntegrated Flood Management

2011.9.29 ICFM5, Tokyo

Masahiko Masahiko MuraseMuraseTakeo Office of River, Takeo Office of River,

MinistryMinistry of Land, Infrastructure, Transport and of Land, Infrastructure, Transport and Tourism (MLIT)Tourism (MLIT)

SagaSaga,, JapanJapan

Page 2: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

ContentsContents

IntroductionIntroductionConstruct of Flood RiskConstruct of Flood RiskRisk Sharing under Risk Sharing under IntegratedIntegrated Flood Flood

ManagementManagementFloodFlood Management in Rokkakugawa Management in Rokkakugawa

River basinRiver basinResidual Risk and Materialized RiskResidual Risk and Materialized RiskCocluding RemarksCocluding Remarks

Page 3: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Floods Floods Settling on floodplains has enormous advantagesand at the same time poses great risks,alsonew challenges of flood management, such as:

IncreasingIncreasing Flood Flood RisksRisks

AbsoluteAbsolute safetysafety againstagainst floodsfloods isis a a mythmythClimateClimate change change uncertainityuncertainity

GrowingGrowing environmentalenvironmental concernsconcerns

Page 4: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Flood Management in the Flood Management in the contextcontext of of IntegratedIntegratedWater Water ResourcesResources Management, Management, aimingaiming atat::

SustainableSustainable developmentdevelopment: : balancingbalancing developmentdevelopment needsneedsand flood and flood risksrisksMaximisingMaximising net net benefitsbenefits fromfrom floodplainsfloodplains: : ensureensurelivelihoodlivelihood securitysecurity and and povertypoverty alleviationalleviation therebytherebyreducingreducing vulnerabilityvulnerabilityMinimisingMinimising lossloss of lifeof life: in : in particularparticular throughthrough endend--toto--end end FF&W Systems and FF&W Systems and preparednesspreparedness planning for planning for extremeextremeeventseventsEnvironmentalEnvironmental preservationpreservation: : ecosystemecosystem healthhealth & & servicesservices

Integrated Flood Management

Page 5: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Flood Risk ManagementFlood Risk Management

WMO, 2006

Page 6: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Risk SharingRisk Sharing

WMO, 2009

Potential risk Residual risk

Risk Reduction Residual Risk Reduction National Government

State Government

Local Government

Individual

Risk retainedby individual

Risk solidarity

National Government

State Government

Local Government

Individual

Level of responsibility at each stageHigh

Medium

Low

Materialized lossesTransferred risk

Page 7: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Rokkaku

Saga City

Ariake

Kasegaw

a

Route 34

Ushizu

Chikugo

城原川

JR line

LowlandLowland--Saga PlainSaga Plain

Elevation1800m1000m

150m

14m8m-14m

5m-8m

3m-5m

1m-3m

under 0m

Sea

(T.P.)

Page 8: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Rokkakugawa R.

Ushizugawa

R.

Saga City

Ariake Sea

600 A.D.

Deve

lopm

ent

About 2000 years ago

800 A.D.

1600 A.D.

Present

Inundation Period

Development of Saga PlainDevelopment of Saga Plain

Page 9: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

・・Low and Flat Plain under Low and Flat Plain under AriakeAriake Sea (maximum 6 m tidal difference) Sea (maximum 6 m tidal difference)

・・Frequent Sedimentation and vegetationFrequent Sedimentation and vegetation

Saga city Mt. Sefuri

Chikugogawa R.

Ariake Sea

Jobarugawa R.

Kasegawa R.Rokkakugawa R.

Saga Plain

Characteristics of Saga PlainCharacteristics of Saga Plain

13/98513/985

After dredging on 28 November 2009After 1 year on 11 November 1998

sedimentation

vegetation

Page 10: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

RokkakugawaRokkakugawa R. in July 1990R. in July 1990

Daily Precipitation 320mmInundation Area 10,430haAbove floors 3,028Below Floors 5,658

N ki E (T k I C )

Page 11: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Higashikawa R.

RokkakugawaRokkakugawa R. from route 498R. from route 498

RokkakugawaRokkakugawa R. in July 2009R. in July 2009

normalnormal

Page 12: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

嘉瀬川下流域-嘉瀬川

0

1

2

3

2 2 2

0

1

3

0

2

1

2

3

2

3

1

4

3 3

2 2

1 1 1

2

4

3

0

1

2

3

4

5

6

7

8

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 (年)

発生

回数

時間雨量30mm以上

近年20年平均

過去20年平均

1974-1993年平均1.71回/年

1989-2008年平均2.24回/年(+0.53回/年)

牛津川上流域-岸川

4

2

0

1

2

3 3 3

0 0

5

2

1

3

1

2

3

1 1

3 3

2

3

1

4

7

1

3

0

4

3

7

3 3

4

1 1

3

0

1

3

2 2

0

1

2

3

4

5

6

7

8

1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 (年)

発生

回数

時間雨量30mm以上

近年20年平均

過去20年平均

1955-1974年平均2.00回/年

1989-2008年平均2.65回/年(+0.65回/年)

Events over 30mm hourly precipitation

1974-19931.71 times/year

↓1989-2008

2.24 times/year(Kasegawa R.)

1955-19742.00 times/year

↓1989- 2008

2.65 times/year(Ushizugawa R.)

Precipitation Trend in Saga PlainPrecipitation Trend in Saga Plain

Page 13: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Expenditure in Rokkakugawa River BasinExpenditure in Rokkakugawa River Basin

Recovery

Construction, O/M

1997

flood

1985

Typ

hoon

2009

rain

y se

ason

(1/2

0 flo

od)

1990

rain

y se

ason

(1/1

00 fl

ood)

1980

rain

y se

ason

1993

sum

mer

1995

rain

y se

ason

0

5000

10000

15000

20000

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

Year

Exp

enditur

e (M

illio

n Yen

)

(Completion of MutabeRetarding Pond)

Page 14: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Facilities in Rokkakugawa RIver BasinFacilities in Rokkakugawa RIver Basin

53.4ha 900,000m3

Total capacity of pump stations:350m3/s

Page 15: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

0

50000

100000

150000

200000

250000

1/2 1/5 1/10 1/20 1/30 1/50 1/80 1/100

Flood Probability

Million Yen

Potential Annual Losses for each Flood Potential Annual Losses for each Flood Probability in Rokkakugawa River BasinProbability in Rokkakugawa River Basin

Page 16: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Tentative marking Clear marking observed through CCTV

Facilities near vulnerable areaObservation Points

CCTV (ClosedCCTV (Closed--circuit Television) Monitoringcircuit Television) Monitoring

Page 17: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

30 organizations participation on 11 November 2010※DIG method is one of the drilling methods in room without any scenarios. Each participant is expect to consider;

• What kind of information are immediately required?• What kind of actions are immediately necessary?• How to establish the collaboration with many players?

2010.11.11 NHK 2010.11.11 STS

Disaster Drill Disaster Drill –– DIG method (disaster imagination game)DIG method (disaster imagination game)

Page 18: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Resident’s sheltering action

Local flood prevention activities

Government’s information

SelfSelf--helphelp

Mutual aidMutual aid Public supportPublic support

Reducing Residual RisksReducing Residual Risks

Page 19: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

19

Community Development Considering Risk ManagementCommunity Development Considering Risk Management

Through combining Through combining ““usualusual”” and and ““unusualunusual””viewpoints in the map, viewpoints in the map, desirable community can desirable community can be clarified. be clarified.

“Community’s 365-day map”

Flooding

Usual

Past flood damage

Security and safety

Welfare

Children

Environment

Unusual

Viewpoint

Page 20: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Map completed for 57 districtsMap in preparation in 8 districts

Nishiura district, Takeo-cho, Takeo City (1)

Katajiro district, Tachibana-cho, Takeo City (1)

Kitagata-cho, Takeo City (3) Tenman, Ushidu-cho, Ogi City (1)

Honmachi, Ushidu-cho, Ogi City (1)

Kasemachi, Saga City (14)

Nouso, Taku City (1)

Akamatsu, Saga City (1)

Kanzaki City (1)

Okawa-cho, Imari City (1)

Yamamoto district, Karatsu City (1)

Haru・Kashiwazaki district, Karatsu City (1)

Nabeshimamachi, Saga City (22)

(As of January 2011)

Higashitakumachi district, Taku City (6)

Asahi-cho, Takeo City (7)

Takahashi district, Takeo City (1)

Tsudumi district, Imari City (1)

A total of more than 60 districtsA total of more than 60 districts

Implementation Area that our Office Supports (Achievements)

(1) (2) (3) Aims of the Development of a Disaster-Prevention Community at the Takeo Office of River

* Since April 2009, Kasegawa River has been under the jurisdiction of the ChikugoRiver Office. We support the Kasegawa basin jointly with the Chikugo River Office.

Kamikuda district, Karatsu City (1)

RokkakuRiver

KaseRiver

Matsuura River

Page 21: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

避難場所

避難経路等19項目を表示

Past disaster areas map “Personal Disaster Prevention Map”

* Inundated above the floor: 13 households (maximum: 120 cm)Evacuated: 10 persons from 4 households

For awareness-raising among the residentsFor disaster prevention awareness sharing by the residents

Voluntary Disaster Prevention OrganizationsVoluntary Disaster Prevention Organizations⎯⎯ Personal Disaster Prevention MapPersonal Disaster Prevention Map

Page 22: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Takahashi, Takeo city on 13 March~Expected flood level appears first!!~

Shuku, Imari city on 22 March~Recorded flood level in 2006~

Tachibana, Takeo city on 6 April~Expected flood level appears.~

Ubiquitous Flood Hazard Maps start in spring 2011Ubiquitous Flood Hazard Maps start in spring 2011

Page 23: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Own judgment 34%Actual flooding 34%Neighbors’ advice 20%Evacuating neighbors 10%Compare to the past floods 3%

Own judgment 28%Actual flooding 12%Neighbors’ advice 45%Evacuating neighbors 4%Compare to the past floods 11%

Thresholds of evacuation decision to persons who evacuated

Radio 61%, Neighbor 11%Email 4%, TV, radio 16%Other 8%

Radio 35%, Neighbor 41%Email 4%, TV, radio 12%Other 8%

Way of receiving the evacuation advisory information

76%89%Diffusion rate of evacuation advisory

5%35%Evacuation rate during 2009 flooding

541267Number of respondents

Town BTown A

Questionnaire Survey after 2009 FloodQuestionnaire Survey after 2009 Flood

Page 24: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Differences in the sense of crisis between the two towns caused by the difference in local characteristics

Differences in the sense of crisis between the two towns caused by the difference in local characteristics

A sense of crisis about floods caused by streams coming from the mountains

A sense of crisis about inundation within a levee

Differences in the transmission of an evacuation advisoryDifferences in sharing information within the communityDifferences in evacuation activities

The results of the questionnaire survey has shown these differences.

Town A (high evacuation rate) Town B (low evacuation rate)

Considering the local characteristics and developing the non-physical infrastructure for each communityConsidering the local characteristics and developing the non-physical infrastructure for each community

Consideration of peopleConsideration of people’’s awareness of disaster prevention through workshopss awareness of disaster prevention through workshops

Page 25: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Analysis of evacuation activities suggested by the results of quAnalysis of evacuation activities suggested by the results of questionnaire surveysestionnaire surveys

Analysis of the questionnaire survey resultsAnalysis of the questionnaire survey results

Facts from the questionnaire survey results

Facts from the questionnaire survey results

(1) In the town where the evacuation rate was higher, the diffusion rate of the evacuation advisory was also higher.

(2) A securer means for the transmission of information is through conversations with other people.

(3) In the town where the evacuation rate was higher, more people decided to evacuate through conversations with other people.

(1) In the town where the evacuation rate was higher, the diffusion rate of the evacuation advisory was also higher.

(2) A securer means for the transmission of information is through conversations with other people.

(3) In the town where the evacuation rate was higher, more people decided to evacuate through conversations with other people.

Implicationsof the facts

Implicationsof the facts

Information transmission through conversations is a securer means and can more readily lead to evacuation by the residents.

Secure transmission of information such as an evacuation advisory through conversations can urge more residents to evacuate.

Information transmission through conversations is a securer means and can more readily lead to evacuation by the residents.

Secure transmission of information such as an evacuation advisory through conversations can urge more residents to evacuate.

The importance of communication is proven by the questionnaire survey results. The importance of communication is proven by the questionnaire survey results.

Page 26: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Preventing and mitigating damage from disasters by conducting voluntary disaster prevention activities through a spirit of cooperation among the residents• Stipulating that a disaster prevention plan and a diagram of a disaster prevention system should be prepared

[Rules for the Katajiro district voluntary disaster prevention organization]

Using the “Manual for voluntary disaster prevention organizations”published by Saga

Specifying the necessary matters for the activities of the voluntary disaster prevention organization

(1) Setting up the disaster headquarters, (2) Implementing disaster drills, and (3) Disseminating information on disaster prevention

Disaster prevention plan

Voluntary Disaster Prevention OrganizationsVoluntary Disaster Prevention Organizations⎯⎯ Establishment of the SystemEstablishment of the System

Page 27: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Voluntary Disaster Prevention OrganizationsVoluntary Disaster Prevention Organizations⎯⎯ Diagram of a Disaster Prevention SystemDiagram of a Disaster Prevention System

Organizations concerned

Chairman (District head)

Vice-chairman (Head of the community center)

Directions, liaison

Emergency alert

District officials, fire brigade

Disaster headquarters

Command group, early stage disaster prevention groupEvacuation group, provision of food and water groupMedical group, disaster recovery group

Judgment of an emergency alert and issuing a public summons

(Water level: about 5 m)

Judgment on setting up a disaster headquarters and issuing a public summons

(Water level: about 6 m)

Higashigawa drainage pumping station

Repo

rting

the

wat

er le

vel

Diagram of a Disaster Prevention System

Takeo Office of River, Kyushu Regional Bureau, MLIT

Takeo City Office

Takeo civil engineering office

Takeo City fire brigade

Tachibana Community Center

Liaison, information transmission

Page 28: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Voluntary Disaster Prevention OrganizationsVoluntary Disaster Prevention Organizations⎯⎯ Disaster Facilities Improvement ActivitiesDisaster Facilities Improvement Activities

Setting up disaster prevention equipment (Improving the safe andsecure stations)

Placing water level measurement poles (four places along Route 498)

Building

Stored disaster prevention equipment

Dynamos

Chain saws

Searchlights

Helmets

Double ladder

Armbands

etc. 15 goods

Page 29: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Emergency drill (2008)Emergency drill (2008)

Voluntary Disaster Prevention OrganizationsVoluntary Disaster Prevention Organizations⎯⎯ Advantages of establishing an organizationAdvantages of establishing an organization

Page 30: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Ex. Actual FEx. Actual Flood on Julylood on July 26,26, 20092009Flooding record

(Maximum depth of inundation: 1.9 m)

(Maximum depth of inundation: 0.9 m)

Disaster headquarters: 25 persons (Disaster headquarters: 25 persons (10:00 10:00 -- 220:0:000)0)Vigilance: Vigilance: 6 persons6 persons

Activities of the voluntary Activities of the voluntary disaster prevention disaster prevention organizationorganization

Operation: From 7:20 to 00:30 of the next day (17 hours 10 minutOperation: From 7:20 to 00:30 of the next day (17 hours 10 minutes)es)Operation of a drainage Operation of a drainage pumping stationpumping station

10 buildings (55cm10 buildings (55cm--10cm)10cm)--Inundated warehouses, etc.Inundated warehouses, etc.

8 persons from 2 households8 persons from 2 households----EvacuationEvacuation

3 households (35 cm3 households (35 cm--5 cm)5 cm)----Below the Below the floorfloor

(Evacuation)(Evacuation)4 persons (community 4 persons (community center)center)4 persons 4 persons (neighboring houses)(neighboring houses)

3 households (30cm3 households (30cm--15cm)15cm)Three households Three households

started to be inundated started to be inundated below the floor.below the floor.

--Above the Above the floorfloor

Inundated Inundated houseshouses

Route 498Route 498--National roadNational road

Former prefectural road (0.55m)Former prefectural road (0.55m)----Road closedRoad closed

KatajiroKatajiro--Hanashima lineHanashima lineCity roadsCity roads

Flooded Flooded roadsroads

Maximum: 6.92 mmMaximum: 6.92 mm6.826.826.906.906.726.726.256.255.695.69RainfallRainfall

Maximum: 7.58 mmMaximum: 7.58 mm6.806.807.177.177.567.567.057.056.146.14River waterRiver waterWater levelWater level(T. Pm)(T. Pm)

Total:171 mmTotal:171 mm----26264444101101Precipitation in Yahazu Precipitation in Yahazu (mm)(mm)

17:0017:0015:0015:0013:0013:0011:0011:00-- 9:009:00TimeTimeNotesNotes

July 26July 26DateDate

Page 31: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Further Approaches for appropriate risk sharingFurther Approaches for appropriate risk sharing(image)(image)

How to create an appropriate How to create an appropriate «« incentiveincentive »» for for reducing residual risks?reducing residual risks?

Visualizing current residual risks in each community Visualizing current residual risks in each community and understanding their vulnerabilityand understanding their vulnerability

Visualizing residual risk reduction in accordance with Visualizing residual risk reduction in accordance with participation for actions like voluntary disaster participation for actions like voluntary disaster prevention organization, mapping, drills, floodprevention organization, mapping, drills, flood--proofingproofing

Insurance or alternative mechanisms for risk trasferInsurance or alternative mechanisms for risk trasfer

Page 32: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Concluding remarksConcluding remarksFloodplains provide:Floodplains provide:

Excellent livelihood opportunitis, andExcellent livelihood opportunitis, and

Flood risksFlood risks

Risk sharing is one the one of the risk Risk sharing is one the one of the risk management aspectsmanagement aspects

Actual case in Saga Plain, Japan indicates the Actual case in Saga Plain, Japan indicates the potential flood risk has been eliminated through potential flood risk has been eliminated through risk reduction projects & activities and risk reduction projects & activities and communitiescommunities’’ participation such as,participation such as,

Mapping,Mapping,

Drilling, and Drilling, and

Voluntary disaster organizations, etc.Voluntary disaster organizations, etc.

Page 33: Risk Sharing in Practice towards Integrated Flood ......Risk Sharing in Practice towards Integrated Flood Management 2011.9.29 ICFM5, Tokyo Masahiko Murase Takeo Office of River, Ministry

Thank you for your attention!

visit our website:http://www.qsr.mlit.go.jp/takeo/html/eng.html