rissb - group presentation
DESCRIPTION
Kevin Taylor, CEO, Jesse Baker, Manager - Safety & Systems, Joe Thompson, Manager – Interoperability, Alex Borodin, Manager – Rollingstock, Laurie Wilson, Manager - Infrastructure and Engineering of RISSB delivered this presentation at the Rail Safety Conference 2014. Rail Safety 2014 brought together the key national decision-makers to deliver new ideas and develop innovative ways to leverage technology for safer outcomes. For more information, please visit http://www.railsafetyconference.com.au/rs14TRANSCRIPT
![Page 1: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/1.jpg)
RISSB Safety Conference Leveraging technology for safer outcomes
March 2014 Kevin Taylor
Jesse Baker Joe Thompson Laurie Wilson Alex Borodin
![Page 2: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/2.jpg)
Scope • Introduction
• RISSB issues and scorecard
• Safety – Jesse Baker
• Interoperability – Joe Thompson
• Infrastructure – Laurie Wilson
• Rolling Stock – Alex Borodin
• Conclusion
![Page 3: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/3.jpg)
RISSB Issues A new way of doing business • Based on stakeholder feedback
• Products will be Performance based in lieu of prescription
• All standards will be made available in ‘Word’ as well as ‘Excel’ Format
• Technical standards will be condensed into one part
• Each standard and code will have a justification stage included to highlight benefits of the product.
• Tap into other Orgs such as ASA • RISSB products will be mandated
![Page 4: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/4.jpg)
Product Score Card In FY 13-14 RISSB has published • 7 x standards
• 1 x Code of Practice
• 5 x Guidelines
3 products less than that planned due to: • Consensus issues
• People on Development Groups withdrawing without replacement
![Page 5: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/5.jpg)
Future Challenges Meeting the development challenge • Greater number of projects undergoing 5 year review • Less money for new projects unless additional funders obtained Take up of RISSB Products • Presently 60 percent of the rail Industry • Another survey will be undertaken this year • Working with other standards development organisations SISAR project • Provide a risk based approach for developing RISSB products • Share safety data and allow benchmarking
![Page 6: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/6.jpg)
Safety and Systems JESSE BAKER
![Page 7: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/7.jpg)
Published Train Control products
• Rail Network Control Mobile Communication Systems (standard - AS7660)
• Railway Level Crossings (standard - AS7658)
• Railway signal Cables (standard - AS7663)
• Railway Signalling Cable Routes, Cable Pits and Foundations
• (standard - AS7664)
• TPC Interoperability (standard - AS7666)
![Page 8: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/8.jpg)
Published Safety products • Consolidation of Public Level Crossings (guideline)
• Emergency Management Planning (guideline)
• Fatigue Risk Management (guideline)
• Hazard Register (guideline)
• National Rail Safety Strategy
• Near Misses Reporting (guideline)
• Rail Security Risk Management Handbook (guideline)
• SPAD Management (guideline)
![Page 9: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/9.jpg)
Train Control products under development • Signalling Systems Design Process Management (standard)
• Signals, Signage and Indicators (standard)
• Train Detection (standard)
• Signalling Systems – Testing and Commissioning Management (standard)
• Type Approval (standard)
![Page 10: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/10.jpg)
Safety products under development • Rail Safety Investigations (code of practice)
• Safety Performance Indicators (guideline)
• Taking Safe Decisions (guideline)
• …… SISAR
![Page 11: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/11.jpg)
What is SISAR? • A tool to support better safety decision making.
• Industry already collects data but….
• It is for the benefit of Industry itself both directly, and indirectly via RISSB / ONRSR.
• SISAR Information lifecycle….
Data Analysis / Information Knowledge Decision Action
Review
![Page 12: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/12.jpg)
How SISAR fits in
Data Analysis / Information Knowledge
Industry will provide safety/WHS data via a reporting system (SMIS)
Analysis of that data will generate information on incident rates / benchmarks etc as well as inform risk models (SRM)
Knowledge will be recorded in the reports generated
![Page 13: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/13.jpg)
![Page 14: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/14.jpg)
PASSENGER39%
WORKFORCE21%
MEMBER OFTHE PUBLIC
40%
Fatalities (20.8%)
Major injuries (55.9%)
Reportable minor injuries (12.8%)
Non-reportable minor injuries (9.0%)
Class 2 shock/ trauma (1.6%)
Fatalities (15.7%)Major injuries (48.0%)
Reportable minor injuries(11.3%)
Non-reportable minor injuries (17.1%)
Class 1 shock/ trauma (4.1%)
Class 2 shock/ trauma (3.9%)
Fatalities (89.3%)
Major injuries (9.6%)
Reportable minor injuries (0.7%) Total risk = 141.3 FWI/yr
![Page 15: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/15.jpg)
Why is RISSB pushing for SISAR, and why now? • NTC Rail Safety Data Strategy 2008,
• Taig review of RISSB 2012
• Business case (Industry benefit, ONRSR, RISSB)
• UK system developed after 1988 Clapham Junction accident (35 fatalities, 500 injuries)
But we need industry support !!!
![Page 16: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/16.jpg)
Interoperability
JOE THOMPSON
![Page 17: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/17.jpg)
THE DILEMMA
Where we are:
Same Requirement → Different Solutions
The Solution = Interoperability
Interoperability means:
Same Requirement → Same Solution Reference – Neil Saville - UGL
![Page 18: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/18.jpg)
Rail Systems Interoperability Overview Interoperability: • is a vital part of rail systems in many parts of the world including
Australia;
• has the potential to provide many benefits to the Australian rail industry in terms of safety, harmonisation, cost effectiveness and future proofing; and
• can be achieved through standardisation.
AS 7450 Rail Systems Interoperability
AS7666 TPC Interoperability
![Page 19: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/19.jpg)
Principles The principles of interoperability should be applied across the entire spectrum of rail system processes.
• Include within existing or proposed systems.
• Opportunities to improve interoperability should be taken where practical.
• Should: • aim to support seamless operation now and in the future;
• be based on open Standards and interfaces where practical;
• aim to support a multi-vendor competitive market;
![Page 20: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/20.jpg)
Principles
• be chosen to provide for technical harmonisation.
• In designing new systems or processes, remain capable of supporting new and emerging technologies;
• Planning should support the safety and business needs of ARO’s.
• Provide for evolution and efficient migration from one system or technology to another.
![Page 21: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/21.jpg)
Rail Systems Interoperability Context
![Page 22: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/22.jpg)
Rail Systems Interoperability Interoperability: • is not equivalent to “sameness”
• is not the same as “interchangeability”
Interoperability is achieved through various means including: • the use of similar hardware or software;
• the use of common communications, languages, data or systems; and
• through common and effective interfaces, processes or procedures.
![Page 23: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/23.jpg)
Interoperability Achievements Currently the Australian Rail Industry has: • Agreed Network Rules and Procedures
(ANRP)
• Agreed RISSB Standards
• Agreed National Track Safety Induction (ARA initiative)
• Agreed Development Agenda
![Page 24: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/24.jpg)
Interoperability Achievements - continued ANRP • Several RIMs now utilizing the
ANRP as the underpinning rules and procedures for their rulebooks.
• More RIMs are currently developing their rulebooks based on the ANRP.
Rolling Stock Substantial percentage of the Rail Industry using the RISSB Rolling Stock Standards in their SMS.
Infrastructure Substantial percentage of the Rail Industry using the RISSB Infrastructure Standards in their SMS. Development The Australian Rail Industry participate in the selection priority for future ACOP
![Page 25: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/25.jpg)
What is Next Future Interoperability Development AS7450.1
• Interoperability Guideline (DRAFT)
AS7666 – Guideline (DRAFT)
• European Train Control Systems (ETCS)
• Communications Based Train Control (CBTC)
• Advanced Train Management System (ATMS)
![Page 26: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/26.jpg)
Infrastructure
LAURIE WILSON
![Page 27: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/27.jpg)
Infrastructure Safety Principles
• Ensuring the integrity of the track and other infrastructure.
• Ensuring that both railway traffic, and the track and other infrastructure have compatible operating parameters.
• Ensuring the safety of persons and property on or adjacent to the railway.
• Communicating operating parameters, requirements and restrictions by adequate and effective means.
![Page 28: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/28.jpg)
Approved Infrastructure Standards • AS 7630 Railway Infrastructure - Track Classification
• AS 7638 Railway Infrastructure - Earthwork
• AS 7639 Railway Infrastructure - Track Structure
• AS 7635 Railway Infrastructure - Track Geometry
• AS 7636 Railway Infrastructure - Structures
• AS 7640 Railway Infrastructure - Rail Management
• AS 7642 Railway Infrastructure - Turnouts and Special Trackwork
• AS 7643 Railway Infrastructure - Track Stability
![Page 29: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/29.jpg)
Infrastructure Rail Industry Standards Currently in draft Awaiting Validation = 3 • Hydrology and Hydraulics – Corridor Access – Corridor Management
Currently in draft – development = 3 • Infrastructure Signs – Infrastructure Sighting – Infrastructure Wayside equipment
Still to be allocated funding = 1 • Infrastructure - Survey
![Page 30: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/30.jpg)
Infrastructure Related Projects RISSB Rail Safety Investigation • Code of Practice
RISSB Derailment Investigations and Analysis • Guideline.
![Page 31: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/31.jpg)
Rolling Stock
ALEX BORODIN
![Page 32: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/32.jpg)
Rolling Stock Overview • Progressively replacing ROA Manual
• Started in 2007
• First tranche published 2008
• Published: • 19 Standards, 2 Codes, 6 Guidelines/Handbooks
• Currently in production:
• 6 new standards, 2 Codes, 1 Guideline
• 10 standards undergoing five yearly reviews (5 reviews started 2013, and 5 in 2014)
![Page 33: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/33.jpg)
Recent Achievements (past six months)
• AS7529 Rolling Stock Fire Safety
• AS7527 Event Recorders
• Wheel-Rail Profile Development Guideline
• Wheel-Defects Guideline
• Concept of Operations Handbook
![Page 34: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/34.jpg)
Philosophy Aims • Replace ROA Manual
• Produce hazard-based standards
• Attempt genuinely national standards* by reducing arbitrary differences
• Cover all heavy-rail rolling stock
• Facilitate compliance tracking
![Page 35: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/35.jpg)
Challenges/Tweaks
• Reducing perceived complexity (No. of parts, Excel vs Word)
• Integrating Hazard Registers
• Reducing State-based uniqueness
• Getting people to participate actively
• Supplier wars
![Page 36: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/36.jpg)
Conclusion • RISSB is making a positive harmonisation contribution through its
products.
• Changing the way products are developed and presented.
• Review of products is becoming an issue as RISSB’s older products are now reaching the five year mark.
• 40 products presently being developed.
• The SISAR Project is significant and will allow the Industry to share safety data, determine risks and undertake safety benchmarking.
• Risk based approach to standards development
![Page 37: RISSB - Group Presentation](https://reader031.vdocuments.net/reader031/viewer/2022012400/547e6e7bb4af9fda158b561e/html5/thumbnails/37.jpg)
Thank You