Ri tu SahebR e a l E s t a t e D e v e l o p e r / A r c h i t e c t

C: 917-562-6011 E: [email protected]

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 1

HM/HECKMAN MINKOFF

13 EIGHTH AVENUE

13 EIGHTH AVENUE

Project #: 13-107

1 Issued For Department of Buildings 03.27.2013

Floor:

DWG:

T-001.00

2 Issued For Landmarks 03.27.2013

3 Issued For Landmarks 04.16.2013

4 Issued For Bid 04.26.2013

5 Addendum 1 05.08.2013

6 Issued For Department of Buildings 05.16.2013

7 Issued For Department of Buildings 06.11.2013

8 Issued For Department of Buildings 06.24.2013

9 Issued For Landmarks 08.07.2013

Penthouse addition for single family townhousewith HM Ventures, West Village

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 2

HM/HECKMAN MINKOFF

13 EIGHTH AVENUE

13 EIGHTH AVENUE

Project #: 13-107Floor:

DWG:

A-402.00

5 VIEW FROM 8TH AVENUE

6 VIEW FROM 8TH AVENUE

1 Issued For Landmarks 04.16.2013

ISSUED

FOR B

ID

NOT FOR C

ONSTRUCTIO

N

2 Issued For Bid 04.26.2013

3 Issued For Landmarks 08.07.2013

Penthouse addition for single family townhousewith HM Ventures, West Village

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 3

Conversion of a boutique hotel into single family luxury home, West Village

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 4

Binder Site Mtg. Report 12/06/11

PC CONSULTING MANAGEMENT41 East 60th Street, New York, NY 10022 Tel 212.760.1780 Fax 212.760.1781Pcconsultingmgt.com

MEETING REPORT 23: Dec 6

Project: Binder Residence: 240 + 242 East 48th StreetTo: Mr. Lyn Carner- Client’s Rep + Designer: 917.566.0678

Mr. Frederic Zonsius-Architect - FZAD: 914-557.3201Ms. Ritu Saheb- Project Manager - FZAD: 917.562.6011Mr. JB Macutay- Structural Engineer: 212.643.1414, c: 917.488.3181Mr. Eric Martinsen - MEP Engineer: 917.776.7949Mr. Andy Ciancia - Langan Engineering: 201.665.6409Mr. Tyler Horsley - Tyler Horsley Garden Design: 917.204.4867Mr. Scott Bellone - Home Entertainment Systems: 732.241.4580Mr. Mike Reynolds - DGA Security Systems: 914.879.0667Mr. Paul Gambino - President - PC management: 917.770.6201Mr. John Austin – Project Administrator - PC Management: 646.294.2497

Meeting Date: Week of Dec 5 - Dec 9

Construction Build Out: 10 months substantial completion + 4 weeks underpinning + 5 days sewer main extension: May 3, 2012 extended to June 3, 2012

Punch List- 4 weeks: Final Completion: June 30, 2012

Week No 23 of construction: 28 weeks to Final Turn Over: JUNE 30, 2012Pre-construction: 7 weeks: May 15 – July 4: DAY 1 OF CONSTRUCTION JULY 5, 2011

Construction Start Date: June 26, 2011, extended to July 4th (based on move out date)

Punch List: 4 Weeks: June 3 to June 30, 2012

Page 1 of 13

(6/3-6/30/12)

Next meeting will be on site at 3.00 pm on Thursday, December 15, 2011.

Date Bldg no. Fl. No Description By Status Deadline

OPEN ITEMS FOR IMMEDIATE REVIEW12/6/11 240-242 A 1.01 Review of Site Mtg Report: 12/06/11 herein follows: 12/9/11

10/3/11 240-242 A 1.02 HVAC ADDITIONAL SUBMITTALS: Submit connection, hangar, isolator etc. specifications

Fiskaa Behind 10/14/11

8/29/11 240-242 A 1.03 COORDINATED SHOPS: PCCM to submit coordinated set of shop drawings indicating HVAC, sprinkler, electrical, beam locations, HVAC register/grille locations etc. GC states there are no conflicts. Plumber to draw sprinklers on vellum on hand-revised HVAC drawings

PCCM Behind 8/29/11

6/30/11 242 A 1.04 TIME WARNER: Resolve Verizon/Time Warner for cable route and new conduit from rear of property to third floor at 242. HES submitted a request to be notified by Time Warner if a connection becomes available on the south side of the street, currently they are only

PCCM/HES Behind 7/14/11

8/19/11 240-242 F 1.05 SHORING FIELD SHOP DWGS: PCCM to submit shoring shop drawings and sequenceoperations for work on front façade, west wall and floor installations submited aug 8 to OJR,returned aug 12 BY OJR and submitted back to CADER on aug 17. Received revisions for frontfacade on 11/8/11- forwarded to OJR. Returned by OJR on 11/10- Revise and resubmit- adresscomments from previous submissions. Rec'd revised version on 12/9, forwarded to OJR forcomments

PCCM Received 8/19/11

8/29/11 240 C 1.06 RFI: PCCM asked if they could reduce the elevator slab to 1'2" from 6" since they are dowling it to solid granite bedrock. OJR referred this issue to Westwood Elevator, awaiting written memo from them. No drawing revisions will be issued, but the change will be treated as a substitution to be revised and submitted in shop drawings

Westwood Completed 9/2/11

10/3/11 240-242 B 1.07 FZAD to sketch updated rear yard paving pattern and review on site after pouring of slab Carner Interiors Behind 11/4/11

11/28/11 240-242 B-4 1.08 RFI: Issue one for FZAD review of substituted Synergy façade system specifications PCCM Behind 12/9/11

12/5/11 240-242 B 1.09 Regency to submit specification cuts for pond LED strip light FZAD Behind 12/9/11

11/28/11 240-242 B 1.10 Review rock outcropping at pond- rock being chipped away by PCCM to maintain the footprint of the pond as designed. Cellar rock to be sheathed in concrete pour

PCCM Resolved 12/9/11

11/21/11 240-242 B-4 1.11 242 FAÇADE: OJR to issue structural drawings by 12/9/11. Conceptual dwg. issued OJR Behind 12/9/11

Page 1 of 13

13,000 sf luxury single family double townhouse, UN District

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 5

13,000 sf luxury single family double townhouse, UN District

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 6

Conversion of SROs into apartments with RKA Developers, Harlem

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 7

Landmarked building sprinkler study, NYU Warren Weaver Hall, Greenwich Village

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 8

Conversion to traditionalfacade in townhouse with RKA Developers, Carnegie Hill

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 9

Harry Winston factory renovations, Fifth Avenue

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 10

AEC Consulting

HARRY WINSTON, INC

PROJECT NAME

Project #: 12227

No. Description Date

Floor: FACADE

DWG:

A-400.00

5 SECTION 4 ACRYLIC CLUSTER FRONTVIEW 3 ACRYLIC CLUSTER BACKVIEW

Office of JamesRuderman, LLP

HARRU WINSTONHOLIDAY DECORATIONA-400.00

5

A-400.00

5

6 DETAIL

A-400.00

6

1. ISSUED TO DOB 10/4/2012

Harry Winston holiday lighting, Fifth Avenue

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 11

Infrastructure upgrade of 10 floors of landmarked NYU Warren Weaver Hall, Greenwich Village

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 12

LUKE RESIDENCE

FISKAA Engineering

Kevin Luke

LUKE RESIDENCE

OJR The Office Of James Ruderman LLP

1

Duplex apartment renovation in National Historic Register Stanford White building, Murray Hill

R i t u S a h e b • R e a l E s t a t e D e v e l o p e r / A r c h i t e c t • C : 9 1 7 - 5 6 2 - 6 0 1 1 • E : r i t u s a h e b @ g m a i l . c o m 13

NYC Landmark office building façade rejuvenation, Brooklyn Borough Hall

ARCHITECTURE + DESIGN

16 West 56th Street, New York, NY 10019 Tel 212.243.2933 Fax 212.243.2868 www.fzad.com

The building was built in 1961 and has one street fronting facade, about 98 feet long. The front facade is constructed with metal mullions and cladding panels. The side and rear facades are constructed of brick veneer. A combination of scaffold drops and binocular inspections were used to examine the façade condition.

(F) Detailed Examination Description: 1 scaffold drop inspection was conducted on the Front (South- Remsen Street) Façade, 2 scaffold drop

inspections were conducted on Side (West) Façade and 2 scaffold drops were made at Rear (North) Facade. In addition to this, 5 visual inspections were conducted via binoculars from various observation platforms. These

platforms were the sidewalk bridge, neighboring terrace or neighboring egress staircase in the adjacent building on same side of the street.

These inspections were performed and completed in accordance with the Administrative Code and 1RCNY 103-04 Chapter 100 for the Maintenance of Buildings.

Rigger: Jo Corso Joe Rich Construction Co. In. 45 W 34th Street #707 New York, NY 10001 T: 212-695-9450 Registration no: 0608332-GC Start of critical examination: 2/12/2012 Completion of critical examination: 10/21/2013

(G) Description and classification of each significant condition observed: Condition Description Location (elevation) Repairs conducted Status Façade: Deterioration Brick repointing South, West, North, Bulkhead Yes Safe Deterioration Brick replacement South, West, North, Bulkhead Yes Safe Deterioration Metal cladding paint South Yes Safe Deterioration Window sill West Yes Safe Water tightness Building separation

joint sealing with brick North Yes Safe Water tightness Building separation Joint sealing with sealant South Yes Safe

Water tightness Window caulking West, South Yes Safe

Exterior appurtenances: Flagpoles None exist N/A N/A N/A Signs Yes South Not required Safe Parapets Yes Roof terrace Not required Safe Copings Yes Roof terrace Not required Safe Guard rails Yes West Not required Safe

Window frames Yes South, West, North Yes Safe Balcony enclosures Yes West Not required Safe Window guards None exist N/A N/A N/A Window air conditioners None exist N/A N/A N/A Flower boxes None exist N/A N/A N/A