Page 1: Riyadh metro project presentation 06052015 Final

Great Stories Start Here

at HxGN LIVE

Page 2: Riyadh metro project presentation 06052015 Final

Geosystems at HxGN LIVERiyadh metro project – Kingdom of Saudi Arabia

Clemens Tierie

Version Date: 26.4.15

Page 3: Riyadh metro project presentation 06052015 Final

Riyadh metro project

• 178 km

• 6 Lines

• 85 Stations

• 22 Billion dollar

Page 4: Riyadh metro project presentation 06052015 Final
Page 5: Riyadh metro project presentation 06052015 Final

First Viaduct Installed by Governor of Riyadh

Page 6: Riyadh metro project presentation 06052015 Final

FAST Line 4

Current Works Locations – Line 44G3

4G2

4G1

4E1

4D1

4C2

4C1

4B1

4A1

FSLM Precast ProductionFSLM Precast Production

Page 7: Riyadh metro project presentation 06052015 Final

Viaducts and Elevated stations

Page 8: Riyadh metro project presentation 06052015 Final

Line 5

North TBM Launching

Shaft/Depot

5C4 / 2C4

5C2

5C15B4

5B35B2

5B1

5A4

5A3

5A5

5A2

5A6

5A1 / 1F4

Central TBM Launching Shaft / Station 5B3

1st TBM assembling at Central Launching Shaft1st TBM assembling at Central Launching Shaft

Page 9: Riyadh metro project presentation 06052015 Final

TBM – Line 5

5B2

5B1

5A4

5A3

5A2

5A6

Page 10: Riyadh metro project presentation 06052015 Final

Line 6

6D1/4C2

6D2

6E1

6F1/2E1

6G1

6G2

6H1

6H2/3J1

FSLM / BCM Precast Yard

Viaduct Section 6.1.2

Viaduct Section 6.1.3

Station 6E1

Cut & Cover Section 6.2

Viaduct Section 6.2

Steel Cage for Pile – Viaduct 6.1.3Steel Cage for Pile – Viaduct 6.1.3

At Grade Section 6.1

Cut & Cover Section 6.3 -Barriers

At Grade Section 6.2

Cut & Cover Section 6.4 -Barriers

Page 11: Riyadh metro project presentation 06052015 Final

Line 6 Construction sites

Total length line 6 : 21.043 m

C&C Tunnel : 7.202 m

Viaduct : 12.419 m

At grade : 1.422 m

Page 12: Riyadh metro project presentation 06052015 Final

Elevated Stations (ELS)

Page 13: Riyadh metro project presentation 06052015 Final

C&C Tunnel Construction

Page 14: Riyadh metro project presentation 06052015 Final

Construction of pile cap

Page 15: Riyadh metro project presentation 06052015 Final

Creation of Permanent Reference Markers

Specifications:

Primary network:

• Spacing > 1000 meter

• Horizontal error between two points > 10mm

• Vertical error between two points 2.0 mm (loop misclosure)

15

Page 16: Riyadh metro project presentation 06052015 Final

Creation of Permanent Reference Markers

16

Page 17: Riyadh metro project presentation 06052015 Final

Installation of GNSS reference stations

17

Page 18: Riyadh metro project presentation 06052015 Final

Construction surveying

Requirements:

• High accuracy

• Proven technology

• Reliable supplier

• Reliable after sales organisation

• Quick response time in case of emergency

18

Page 19: Riyadh metro project presentation 06052015 Final

Construction surveying

19

Page 20: Riyadh metro project presentation 06052015 Final

Monitoring

20

Page 21: Riyadh metro project presentation 06052015 Final

Kumonos

21

Page 22: Riyadh metro project presentation 06052015 Final

Riyadh Metro Project – Questions ?

22

Page 23: Riyadh metro project presentation 06052015 Final

Thank You!