RM Bridge Professional Engineering Software for Bridges of all Types
RM-Bridge
RM Bridge V8i
Janvier 2009
DEBUTER FACILEMENT AVEC - RM - EC ANALYSE
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C I
Bentley Systems France
Contents
1 Gnral ......................................................................................................................... 1-1
1.1 Lexemple ............................................................................................................ 1-2
1.2 Modle Structurel ................................................................................................ 1-2
1.2.1 Contrainte des appuis ....................................................................................... 1-3
1.2.2 Section en T (Partie I) ...................................................................................... 1-3
1.2.3 Gomtrie du cblage de base ......................................................................... 1-1
1.2.4 Charactristique des cbles .............................................................................. 1-1
1.2.5 Proprit des Matriaux ................................................................................... 1-2
1.3 Chargement .......................................................................................................... 1-3
1.3.1 Charges Permanentes ....................................................................................... 1-3
1.3.2 Retrait et Fluage:.............................................................................................. 1-3
1.3.3 Charges Additionelles ...................................................................................... 1-3
1.3.4 Charge de Trafic .............................................................................................. 1-3
2 Dmarrage du programme ........................................................................................... 2-4
3 Passer du modle 3D au Modle structurel ................................................................. 3-5
3.1 Recalculate ........................................................................................................... 3-5
3.2 Premiers Rsultats ............................................................................................... 3-5
4 Acier pour Cbles de Prcontrainte ............................................................................. 4-8
4.1 Import de Matriau .............................................................................................. 4-8
4.2 Dfinition de la Gomtrie de la Prcontrainte ................................................... 4-9
4.3 Squence de mise en tension ............................................................................. 4-15
5 Dfinition des Charges .............................................................................................. 5-18
5.1 Gestion des cas de charge : Load Manager ................................................. 5-18
5.2 Dfinition des cas de charge .............................................................................. 5-20
6 Calendrier de Construction ........................................................................................ 6-26
6.1 Actions et Activation des Phases ....................................................................... 6-26
6.1.1 Dfinition de phases Individuelles................................................................. 6-26
6.1.2 Activation des nouvelles phases .................................................................... 6-27
6.1.3 Actions de calcul pour chaque chargement ................................................... 6-28
7 Trafic.......................................................................................................................... 7-32
7.1 Dfinition des Charges de Trafic ....................................................................... 7-32
7.2 Calcul des Actions en tant que Phase ................................................................ 7-37
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C II
Bentley Systems France
8 Combinaison de Cas de charge pour vrification au Code ........................................ 8-39
8.1 Table de Combinaison ....................................................................................... 8-39
8.2 Actions de Calcul pour les Combinaisons de Cas de Charge ............................ 8-40
9 Vrifications au Code ................................................................................................ 9-42
9.1 Vrification de contrainte aux fibres (ELS)....................................................... 9-42
9.1.1 Action de calcul de vrification des contraintes aux fibres ........................... 9-42
9.2 Vrification aux tats limites ultimes (ELU) ..................................................... 9-43
9.2.1 Action de Calcul pour vrification aux tats limites ultimes ......................... 9-43
10 Lancement du calcul suivant calendrier .................................................................. 10-44
10.1 Lancement du Calcul ....................................................................................... 10-44
11 Prsentation des Rsultats Post-Processing .......................................................... 11-45
11.1 Rsultats Numriques ...................................................................................... 11-45
11.1.1 Listings Standards .................................................................................... 11-45
11.1.2 Revue Interactive des Rsultats ............................................................... 11-45
11.2 Rsultats Graphiques ....................................................................................... 11-47
11.2.1 RMSets .................................................................................................... 11-47
11.2.2 Diagrammes ............................................................................................. 11-49
11.2.3 Listings .................................................................................................... 11-50
11.2.4 Utilisation des RMSet dans le calendrier de construction ....................... 11-51
11.3 Reprsentation Graphique des Rsultats ......................................................... 11-52
11.3.1 Plot ........................................................................................................... 11-52
11.3.2 Affichage de Profils (Plot Profiles) dans le calendrier de construction... 11-55
11.3.3 Affichage Interactif des contraintes, efforts et dplacements:................. 11-56
12 Export et Stockage ................................................................................................... 12-59
12.1 Export du projet ............................................................................................... 12-59
12.2 Quiter le Programme........................................................................................ 12-60
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-1
Bentley Systems France
1 Gnral
Nous allons tudier les points suivants dans RM :
Contenu:
Dmarrage du programme
Diffrence dinterface avec GP
Import de la maquette GP hritage - ajouts
Dfinition du systme structurel
Gomtrie de la prcontrainte
Dfinition du chargement
Dfinition du trafic
Dfinition dune phase de construction
Vrification des contraintes aux fibres
Vrification chargement ultime
Analyse
Sorties imprimes et schmas
Ce manuel dcrit les entres dans RM. Simultanment le guide dutilisation de RM doit tre utilis pour le complment dinformation sur les fonctions utilises.
La pratique de ce manuel doit permettre de traiter par la suite lexemple indiqu en moins de 30 minutes.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-2
Bentley Systems France
1.1 Lexemple
Nous continuons dans RMBridge lanalyse de la structure modlise prcdemment dans Modeleur, un pont simple 2 traves :
1.2 Modle Structurel
A1 A3 30m
10x3m
A2
10x3m
30m
Fig. 1: Systme structurel
Axe en plan: Partie 1: ligne droite: Pk: 0-60 m
Profil en long: Partie 1: Ligne horizontale: Pk: 0-60 m altitude Z=Cste=0
Numrotation: Nuds de tablier sur les centaines : 101-111-121 puis 201--- Elments Tablier: 101-110,111-120 puis 201--
Support puis Piles sur les Milliers: 1100, 1200, 1300
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-3
Bentley Systems France
1.2.1 Contrainte des appuis
Encastr sur la pile, libre en X et en rotation sur les cules
A 1 A 2
X
Z
101-110
A 3
111-120
1100 1200 1300
Fig. 2: Dfinition des Contraintes de Support
1.2.2 Section en T (Partie I)
8.00 m
3.50 m 3.40 m
0.10 m
1.00 m
2.0
0 m
1.6
5 m
0.2
5 m
0.1
0 m
Fig. 3: section en T
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-1
Bentley Systems France
1.2.3 Gomtrie du cblage de base
Trave 1 101 (9 cbles) AT=1600mm2, AD=5000mm2 (101-112)
Trave 2 102 (9 cbles) AT=1600mm2, AD=5000mm2 (109-120)
1.2.4 Charactristique des cbles
Pertes de friction: 0.20
Friction en courbure: 0.20 [Deg/m]
Enfoncement des clavettes: 6 mm = 0.006 m
Contrainte admissible dans les cbles:
Contrainte avant clavettesaprs Clav. Avant Clav aprs Clav
fpk 1860000 0.8 0.7 1488000 1302000fp0.1k 1674000 0.9 0.8 1506600 1339200
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-2
Bentley Systems France
1.2.5 Proprit des Matriaux
Material name :C_35/45 (import de GP)
E-Modulus longitudinally 0.33300E+08
Poisson`s ratio 0.20000
Shear-Modulus 0.13875E+08
Coeff. of thermal expansion 0.10000E-04
Specific weight 25.00000
Coeff. of consistency 2
Degree of cement hardening 2
Water cement ratio 0.40000
Cement content in concrete 3.00000
Char.compr. cylinder strength of concrete at 28 days 35000.00000
Char.compr. cubic strength of concrete at 28 days 45000.00000
Mean value of concrete compresive strength 43000.00000
Mean value of axial tensile strength of concrete 3200.00000
Tension split strength 2240.00000
Material name :Fe500-S(A) (import de GP)
E-Modulus longitudinally 0.20000E+09
Poisson`s ratio 0.30000
Shear-Modulus 0.76923E+08
Coeff. of thermal expansion 0.10000E-04
Specific weight 78.50000
Yield strength of reinforcement 0.50000E+06
Design yield strength of reinforcement 0.43478E+06
Relaxation class 0
Material name :St-1570/1770
E-Modulus longitudinally 0.19500E+09
Poisson`s ratio 0.30000
Shear-Modulus 0.75000E+08
Coeff. of thermal expansion 0.10000E-04
Specific weight 78.50000
E-Modulus of prestressing 0.19500E+09
Stressing limit 0.12560E+07
Tensile strength of prestressing steel 0.17700E+07
Design tensile strength of prestressing steel 0.15391E+07
Relaxation class 0
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 1-3
Bentley Systems France
1.3 Chargement
1.3.1 Charges Permanentes
Poids propre bton: 25,0 kN/m3
Charges Permanentes: 30,0 kN/m
1.3.2 Retrait et Fluage:
Le retrait et le fluage seront tudis suivant lEC2.
1.3.3 Charges Additionelles
Temprature
Coefficient thermique: 1e-5 m/ C
Gradient de Temprature: +10C
vent
Vent latral: 2.00 kN/m2
1.3.4 Charge de Trafic
Afin de conserver un chargement simple un seul convoi sera tudi qui correspond un
camion de 4.25 t et une charge uniforme sur 12m.
15 [kN/m]
200 [kN]
2 [m] 2 [m]
15 [kN/m]
200 [kN]
2 [m]
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 2-4
Bentley Systems France
2 Dmarrage du programme
Comme indiqu prcdemment RMBridge dmarre par licne sur le bureau
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-5
Bentley Systems France
3 Passer du modle 3D au Modle structurel
Une fois que lexport, Calculate, a t fait, vous pouvez entrer dans le modle structu-rel en tuant la fentre graphique de modeleur ou en appuyant sur nimporte laquelle des fonctions structurelles puis effacer le tableau en appuyant sur la croix en haut gauche. Le
modle structurel saffichera alors dans la fentre principale. Attention le modle affich ne tient pas compte des inerties de section, il faut pour cela recalculer le modle.
3.1 Recalculate
Veri
fication e
t calc
ul des s
ections
Sta
rt c
alc
ula
tion
Nous allons tout
dabord relancer un calcul en appuyant sur
licne :
Les deux seules options
cocher sont Cross section calculation et Structure check..
Pressez Recalc.
Sto
p
Pendant le calcul, dans
la partie infrieure
saffichent les tapes, et les messages
dattention ou derreur linfo Calculation stop indique que le calcul sest fait et doit afficher 0 errors
3.2 Premiers Rsultats
Vous pouvez visualiser maintenant dans la fentre graphique, la structure aprs calcul.
Dans le guide dutilisation, vous trouverez la description de toutes les commandes pour naviguer dans la vue et grer laffichage.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-6
Bentley Systems France
Dpart
La premire vue dans
RM montre une struc-
ture o les barres re-
lient les nuds.
Vis
ualis
ation
Aprs calcul et gestion
de laffichage pour voir les sections, on note
que maintenant les
barres sont bien posi-
tionnes au centre de
gravit de la section, et
se trouve relies aux
nuds par des parties indformables. Il en est
de mme pour les res-
sorts dappuis.
Nous pouvons de mme visionner les caractristiques mcaniques des sections, vous trou-
verez une description complte de ces fonctions dans le manuel:
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 3-7
Bentley Systems France
Section -
In
fo
Par la touche Info sur la
section qui a t trans-
fre par GP, vous pouvez afficher tous les
renseignements nces-
saires.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-8
Bentley Systems France
4 Acier pour Cbles de Prcontrainte
4.1 Import de Matriau
Tous les matriaux dfinis dans Modeleur ont t imports dans Analyse lors de lexport. Comme le cblage est dfini dans Analyse, il faut au pralable dfinir le matriau utilis pour les cbles.
Import
de
Mat
ria
u
Choisir File dans le menu principal et Re-load Default Proper-
ties pour ouvrir la liste des matriaux stan-
dards.
Choisir au pralable les
matriaux de la norme
NF. Slectionnez
lacier de prcontrainte voulu et appuyer sur
pour le
transfrer dans le projet
en cours.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-9
Bentley Systems France
4.2 Dfinition de la Gomtrie de la Prcontrainte
La partie manquante de la structure est le cblage de prcontrainte que nous allons dfinir.
Ceci est fait comme suit :
Cble
s
Choisir dans le menu
droulant Structure, Tendons pour ouvrir le menu de saisie des
cbles.
Gom
tr
ie d
es C
ble
s
La partie haute du me-
nu indiquent les cbles
qui ont t dfinis.
Dans la partie basse
pour chaque table, on
va trouver les tronons
de structure concerns :
(assignation des l-
ment) et la dfinition de
la gomtrie
Choisir licne dajout sur la partie haute du menu:
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-10
Bentley Systems France
Tendon -
Pro
pert
ies
Nous allons dfinir le
cble 101, que forment
9 units. Remplir les
diffrents champs pour
un cble et dfinir 9
units. Utiliser les va-
leurs rfrences en
dbut de manuel et af-
fiches ci-contre
Confirmez
Assig
nation
Nous allons dfinir les
lments traverss par
le cables 101. choisir
Assignment.
Choisir licne dinsertion des lments assigns.
Assig
nation
Le cble 101 sera dfini
sur les lments 101
112, ceci correspond
la premire phase
dactivation
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-11
Bentley Systems France
Geom
etr
ie
Passer dans la dfini-
tion Geometry
Les entres numrique peuvent tre controlles imdiatement par affichage dune vue grahique de la structure en appuyant sur la touche i.
Gom
tr
ie d
es C
ble
s
Les lments slection-
ns (101 112) sont
affichs dans la fentre
avec les sections stta-
ches
Gra
phiq
ue
Vous pouvez, comme
pour toutes les vues
graphiques rorienter la
vue.
Choisir licne dajout sur la parte basse du menu.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-12
Bentley Systems France
Gom
tr
ie d
u C
ble
Le menu affich droite permet
de:
- Positionner le cble lintrieur de llment
- De dfinir la tangente au point de passage.
x/l est la position relative le
long de llment du point de passage dfini.
Plusieurs points de passage
peuvent tre dfinis dans le
mme lment.
Bien choisir licne ajout aprs pour viter les retours en arrire du cble, ce qui ncessiterait un r ordonnancement des lignes par les flches. (haut-bas)
Gom
tr
ie d
u C
ble
Au tiers de la trave, le
point de passage du
cble est dfini par rap-
port un point particulier
de la section. Dans le
cas prsent nous util-
sons le point de
contrainte bas FIB_INF
avec une excentricit
en Y de .25 (vertical)
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-13
Bentley Systems France
Continuer entrer le cble avec les entres suivantes:
TA
BLE
DE
S E
N-
TR
EE
S
Cable Nunero: 101
Type: Normal Normal Normal Normal Normal
Ref. Elem.: 101 104 107 110 112
CS Pnt: - FIB_INF FIB_INF - -
x/l: 0 0 1 1 1
eY [m]: 0.00 0.25 0.20 0.00 0.00
eZ [m]: 0.00 0.00 0.00 0.00 0.00
Relative to: Elem CS Pnt. CS Pnt. Elem Elem
Alpha1: Free Value Value Value Free
Value: - 0.00 0.00 0.00 -
Alpha2: Free Value Value Value Free
Value: - 0.00 0.00 0.00 -
Relative to: Elem Elem Elem Elem Elem
PR
OP
RIE
TE
CA
BLE
Le cble 102 peut
tre ajout avec
loption ajout aprs.
Il peut tre aussi reco-
pi de 101 .
On aurait pu encore les
dfinir tous les deux
grce la dfinition
multiple 101 102 par
pas de 1
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-14
Bentley Systems France
Assig
nation
Passer sur la ligne
Elements pour d-
finir les assignations.
Assigner le cble 102
aux lments 109
120.
Geom
etr
ie
Passer sur la ligne
geometry
Par ajout aprs, entrer les valeurs ci-dessous dans la table.
TA
BLE
DE
S E
N-
TR
EE
S
Tendon No.: 102
Type Normal Normal Normal Normal Normal
Ref. Elem.: 109 110 113 117 120
C Pkt: - - FIB_INF FIB_INF -
x/l: 0 1 1 1 1
eY [m]: 0.00 0.00 0.20 0.25 0.00
eZ [m]: 0.00 0.00 0.00 0.00 0.00
Relative to: Elem Elem CS Pnt CS Pnt Elem
Alpha1: Free Value Value Value Free
Value: - 0.00 0.00 0.00 -
Alpha2: Free Value Value Value Free
Value: - 0.00 0.00 0.00 -
Relative to: Elem Elem Elem Elem Elem
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-15
Bentley Systems France
4.3 Squence de mise en tension
Les deux groupes de cbles tant dfinis dans leur gomtrie et leur donnes structurelles
nous pouvons regarder la squence de mise en tension
Toutes les actions sont dcrites dans la table suivante, attention de bien les ordonner !
Definir les actions suivantes :
1. Mise en tension du groupe 101 un facteur 1.06 (6% de surcontrainte tem-poraire) du cot gauche (left).
2. Pertes dues lenfoncement des clavettes du cot gauche (left) de 6 mm.
3. Mise en tension du groupe 101 un facteur 1.06 (6% de surcontrainte tem-poraire) du cot droit (right).
4. Pertes dues lenfoncement des clavettes du cot droit (right) de 6 mm.
.
Constr
uction
phasage
choisir Schedule du menu principal et
Stages en suite
Cable
Choisir la ligne Ten-don Action pour ou-vrir le menu
Choisir licne dajout pour dfinir la premire action
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-16
Bentley Systems France
Action C
ble
Comme nous lavons dcrit au dessus nous
tendons les cbles 101
par la gauche (PREL)
dun facteur 1.06
Limpact sur la structu-re sera stock sous le
nom de Tension1.
Action
Cble
Puis nous relchons le
cble qui vient
simmobiliser aprs une entre des clavettes de
6mm (WEDL)
Limpact sur la structu-re sera aussi stock
sous le nom de ten-sion1.
Les deux actions suivantes, son tune rptition des mmes actions pour le cot droit.
.
A chaque action choisir ajouter aprs et renplir les champs comme indiqu dans le ta-
bleau ci-dessous:
Table
Stress/Release: PREL - PRER -
Force/Factor: Factor - Factor -
Wedge slip: - WEDL - WEDR
Tendon: 101 101 101 101
Fact of SIGmax: 1.06 1 1
Wedge slip: - 0.006 - 0.006
Stress label: Tension1 Tension1 Tension1 Tension1
Description: Mise en tension
Gauche Entre clavettes
Gauches Mise en tension
Droite Entre clavettes
Droites
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 4-17
Bentley Systems France
Choisir Ajout Aprs pour dfinir la squence pour les cbles 102. Tout se fera du cot droit car on suppose lancrage gauche noy. Dautre part, nous stockerons les effets dans Tension2.
Table
Stress/Release: PRER -
Force/Factor: Factor -
Wedge slip: - WEDR
Kabel: 102 102
Fact of SIGmax: 1 1
Wedge slip: - 0.006
Stress label: tension2 Tension2
Description: Mise en tension
Droite Entre clavettes
Droites
Mis
es e
n T
ensio
n
Lensemble des actions pour les cbles (101 et
102) sont rpertories
dans le tableau haut, le
dtail pour chaque c-
ble apparait en bas.
Un contrle graphique de la tension en tout point du cble peut tre obtenue en appuyant
sur le bouton i . Choisir la ligne dsire, lensemble des effets antrieurs sont dcrits. Ce shma permet de vrifier si la gomtrie na pas des coudes ou des points de rebrousse-ment dus au lissage du cble.
Tensio
n C
ble
Evolution de la tension,
effort normal appliqu
par la prcontrainte sur
le pont en tout Pk.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-18
Bentley Systems France
5 Dfinition des Charges
Chaque charge est dfinie en tant que cas de charge unique.
Une accumulation automatique des cas de charge est disponible grce lutilisation du Load manager .
Les rsultats des charges peuvent aussi tre combins par des combinaisons de charge.
Les combinaisons calcules peuvent tre combins avec dautres combinaisons pour crer des enveloppes.
Des facteurs de multiplication (Coefficient de scurit) peuvent tre assigns tout rsultat
de combinaison en utilisant une table de combinaison.
5.1 Gestion des cas de charge : Load Manager
Cale
ndrier
Choisir Schedule dans le menu principal
puis loption Load Definition.
LM
ana
ge
Choisir Load Mana-ger pour afficher la table des cas de charge.
Choisir Ajout aprs pour dfinir le premier cas de charge. (G1).
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-19
Bentley Systems France
LM
ana
ge
G1
Nous crons un identi-
fiant G1 (haut du ta-
bleau Load Manag;) Tous les cas de charge
qui comporteront
lidentifiant G1 comme LoadInfo seront cumuls dans les
cas de charge in-
ternes :
PP1 qui dans notre cas accumulera les r-
sultats dus au poids
propre (gravitaire),
mais aussi dans le cas
de charge PERM-
SUM qui totalise
lensemble des actions permanentes.
Rajouter les cas suivants par ajout aprs (G1).G2 regroupe les charges gravitaires sup-
plmentaires(superstructure), PT regroupera les charges de prcontrainte, RF, les efforts
dus au retrait et fluage
Table
Load Manag.: G1 G2 PT RF
Load Case 1: PP1 PP2 PT RF
Type: Total Total Total Total
Load Case 2: PERM-SUM PERM-SUM PERM-SUM PERM-SUM
Type: Total Total Total Total
Load Case 3: - - - -
Type: Total Total Total Total
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-20
Bentley Systems France
5.2 Dfinition des cas de charge
LC
ase
Choisir la ligne
Load Case dans larborescence.
Ajouter dans le tableau du haut le cas de charge (G1-101).
LC
ase
G1
Ce cas de charge G1-
Ph1, sera utilis pour la
premire phase de
construction du tablier.
Nota : si vous cochez
Load only elements, activated in current
stage Le chargement se fera automatique-
ment sur les lments
actifs uniquement.
Le type de chargement
est choisi comme char-
ge permanente, donc
pris en compte pour le
fluage, dautre part, le fait de lui donner
lattribut G1, permettra de stocker les rsultats
dans PP1 et dans
PERM-SUP, comme
nous lavons vu prc-demment
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-21
Bentley Systems France
Lis
te d
es C
as d
e C
harg
e
Le cas de charge appa-
rait ainsi dans le ta-
bleau du haut.
Dans le tableau du bas,
nous allons dcrire ce
cas de charge. Ceci
peut tre fait par des
Load Set ensemble
de charges sur divers
lments, ou plus sim-
plement par une des-
cription directe du
chargement sans passer
par un load set , ce
que nous allons faire :
Dans le tableau du bas de definition de (G1-101), demander lajout dune charge.
Type d
e C
he
rge
Choisir Uniform load et Self weight-just as load pour de-finir le type de charge.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-22
Bentley Systems France
Poid
s P
ropre
Dfinir les lments
dont on va prendre en
compte le poids propre.
Le vecteur est vertical
vers le bas (-Y), il nest pas ncessaire de red-
finir la densit si nous
prenons celle par dfaut
du bton. Cette valeur
peut permettre de tenir
compte le cas chant
de bossages ou paissi-
cements locaux des
mes et hourdis. Nota:
Tous les lments sont
cits car nous avons
coch Load only ele-ments, activated in cur-
rent stage.
Tous les autres chargements sont effectus de la mme manire.
Choisir Ajout Aprs pour dfinir un cas de charge supplmentaire. Nota : cocher. Load only elements, activated in current stage!
Table
Name: G1-Ph1 G1-Ph2
Duration-Type: Permanent Permanent
Loadmanag.: G1 G1
Description: Poids Propre Phase 1 Poids propre Phase 2
Choisir Ajout Aprs pour dfinir un cas de charge supplmentaire.
Table
Name: G2-Sup
Duration-Type: Permanent
Loadmanag.: G2
Description: Charges Permanentes Addition-
nelles
Choisir Ajout Aprs pour dfinir deux cas de charge supplmentaires.
Table
Name: PT-Cab1 PT-Cab2
Duration-Type: Permanent Permanent
Loadmanag.: PT PT
Description: Prcontrainte Phase 1 Prcontrainte Phase
2
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-23
Bentley Systems France
Choisir Ajout Aprs pour dfinir trois cas de charge supplmentaires.
Table
Name: RF-1 RF-2 RF-inf
Duration-Type: P P P
Loadmanag.: RF RF RF
Description: Retrait et Fluage
Phase1 Retrait et Fluage
Phase 2 Retrait et Fluage
t=oo
Choisir Ajout Aprs pour dfinir deux cas de charge supplmentaires.
Table
Name: LC-GT LC-V
Duration-Type: Non Permanent Non Permanent
Loadmanag.: - -
Description: Gradient de Temprature
(+10C) Vent
Pour chaque cas de charge cr, nous allons maintenant dfinir les chargements propres
appliquer
Confre les tables ci-dessous
Dans la table du bas, le cas de charge tant slectionn dans la table du haut, presses
Ajout aprs.
LC
P
oid
s p
rop
re
Loading Case: G1-Ph1 G1-Ph2
Insert: Tableau Bas Tableau Bas
Actual loading: Uniform load Uniform load
Loading type: Self Weight Self Weight
Confirm: OK OK
From: 101 101
To: 120 120
Step: 1 1
Rx: - -
Ry: -1 -1
Rz: - -
Type: Real length Real length
Confirm: OK OK
Tous les lments
ont t slectionns
car Load only elements, activated
in current stage
est activ
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-24
Bentley Systems France
Toujours dans le tableau bas, aprs activation de G2-299. Charge concentrique rpartie
LC
C
ha
rges P
erm
anente
s
Loading case: G2-Sup
Insert: Tableau bas
Actual load: Uniform load
Loading type: Concentric load
Confirm: OK
From: 101
To: 120
Step: 1
Qx: -
Qy: -30.0
Qz: -
Type1: Global
Type2: Real length
Type3: Load/Length
unit
Confirm: OK
Toujours dans le tableau bas, aprs activation des cas PT- ???. Charge concentrique r-
partie
LC
P
rcontr
ain
te
Loading case: PT-Cab1 PT-Cab2
Insert: Tableau Bas Tableau Bas
Actual load: Pre-
stressing Pre-
stressing
Loading type: Stress tendon Stress tendon
Confirm: OK OK
From: 101 102
To: 101 102
Step: 1 1
Type: Increment -
Force Increment -
Force
Confirm: OK OK
Pour le retrait Fluage, aucune charge locale dfinir, seul le temps sera entr.
LC
R
F
Loading case: RF-1 RF-2 RF-Inf
Insert: Pas dentre ncessaire
Pas dentre ncessaire
Pas dentre ncessaire
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 5-25
Bentley Systems France
Toujours dans le tableau bas, aprs activation des cas indiqus. Charge de temprature et
de vent
Ch
arg
es P
erm
an
ente
s A
dd
itio
nne
lles
Loading case: LC-GT Loading case: LC-V
Insert: Lower Listing Insert: Lower Listing
Actual Load: Initial
Stress/Strain Actual Load: Uniform Load
Load Type: Temperature
load Load Type: Concentric load
Confirm: OK Confirm: OK
From: 101 From: 101
To: 120 To: 120
Step: 1 Step: 1
Alpha (1/C): 1e-005 Qx: -
DT-G (C): 10.0 Qy: -
DT-Y (C): - Qz: 2.00
H-Y (m): - Typ1: Global
DT-Z (C): - Typ2: Real Length
H-Z (m): - Typ3: Qz multiply
Load with Cs depth
Confirm: OK Confirm: OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-26
Bentley Systems France
6 Calendrier de Construction
Tous ce qui est ncessaire pour dfinir le phasage de construction se trouve sous ce para-
graphe. Les lments seront activs selon le calendrier.
Le tableau haut indique les phases proprement parl, leur ordre doit tre correct !
Le tableau bas va indiquer les lments nouvellement actives dans cette phase avec lage du bton ce moment l.
6.1 Actions et Activation des Phases
6.1.1 Dfinition de phases Individuelles
Con
str
. S
tages
Choisir Schedule et Stages pour dfinir une nouvelle phase.
Apuyer sur Ajout Aprs dans le tableau haut
Constr
. S
tage
Choisir un numro ou
un nom court pour la
phase (Phase1).
Insrer de mme les phases suivantes
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-27
Bentley Systems France
Table
Name: Phase1 Phase2 Phase3 AjoutCharge
List: - - - -
Duration: - - - -
Descrip-tion:
Phase 1 Phase 2 Phase 3 Ajout Charges Supplmentaires
6.1.2 Activation des nouvelles phases
Constr
. S
tage
Pour chaque phase
nous allons dfinir les
lments active pour
cette phase
Positionner vous sur la
premire ligne du ta-
bleau haut, et choisir
activation dans
larborescence.
Dans le menu du bas, ajouter les activations:
Activation
Pour la phase 1, nous
activerons les lments
de tablier 101 112
sans oublier les sup-
ports 1100 et 1200!
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-28
Bentley Systems France
Faire de mme pour la phase 2!
Activation
Constr. Stage: Phase1 Phase1
Insert: Tableau bas Tableau bas
Type: Active Active
From: 101 1100
To: 112 1200
Step: 1 100
Age: 14 14
ts: - -
Confirm: OK OK
Activation
Constr. Stage: Phase2 Phase2
Insert: Tableau bas Tableau bas
Type: Active Active
From: 113 1300
To: 120 1300
Step: 1 100
Age: 14 14
ts: - -
Confirm: OK OK
6.1.3 Actions de calcul pour chaque chargement
Action
Dans larborescence, passer de activa-
tion Schedule
Actions
Aprs avoir slectionn la Phase 1 dans le tableau du bas, presser licne dajout du ta-bleau bas
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-29
Bentley Systems France
Actions
Parmi toutes les actions
disponibles, il en est
une qui peut se faire de
2 manires. Nous avons
dfini des cas de charge
avec des stockage par
somme. Ces fichiers
doivent tre initialiss
par des 0 toutes les
valeurs. Ceci peut se
faire par la commande
LcInit.
Mais cela peut aussi se
faire automatiquement
au moment de lancer
les calculs en cochant
Init Load Manager.
Attention ces deux op-
tions sont exclusives
car un fichier ne peut
tre initialis quune seule fois. Par contre la
commande LcInit per-
met ventuellement
dinitialiser un cas de charge avec des valeurs
dj calcules.
Actions
Si vous choisissez LcI-
nit, le Input 1 peut
tre un cas de charge
existant. Dans notre
cas, il suffit de marquer
le fichier de sortie G1
Confirm
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-30
Bentley Systems France
Si vous choisissez dinitialiser en bloc au moment du calcul, ignorez le premier tableau suivant
Actions
Phase1
Constr. Stage: Phase1 Phase1 Phase1 Phase1 Phase1
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: LC/Envelope Actions
LC/ En-velope Ac-
tions
LC/ En-velope Ac-
tions
LC/ En-velope Ac-
tions
LC/ En-velope Ac-
tions
Type: LcInit LcInit LcInit LcInit LcInit
Confirm: OK OK OK OK OK
Input 1: - - - - -
Input 2: - - - - -
Input 3: - - - - -
Output 1: G1 G2 PT RF PERM-SUM
Output 2: - - - - -
Delta-T: - - - - -
Description: - - - - -
Confirm: OK OK OK OK OK
Actions
Phase
1
Constr. Stage: Phase1 Phase1 Phase1 Phase1 Phase1
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Type: Calc Stress Calc Grout Creep
Confirm: OK OK OK OK OK
Input 1: G1-Ph1 - PT-Cab1 101 1
Input 2: - Tension1 - - -
Input 3: - - - - -
Output 1: - - - - RF-1
Output 2: * - * - *
Delta-T: - - - - 28
Description: - - - - -
Confirm: OK OK OK OK OK
Puis dfinir pour la phase 2
Actions
Sta
ge2
Constr. Stage: Phase2 Phase2 Phase2 Phase2 Phase2
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Type: Calc Stress Calc Grout Creep
Confirm: OK OK OK OK OK
Input 1: G1-Ph2 - PT-Cab2 102 1
Input 2: - Tension2 - - -
Input 3: - - - - -
Output 1: - - - - RF-2
Output 2: * - * - *
Delta-T: - - - - 28
Description: - - - - -
Confirm: OK OK OK OK OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 6-31
Bentley Systems France
Remplissons la phase3, qui reprsente la livraison de louvrage et son vieillissement
Actions
Sta
ge99
Constr. Stage: Phase3 Phase3
Insert: Tableau Bas Tableau Bas
Action: Calcula-tion (Static)
Calcula-tion (Static)
Type: Calc Creep
Confirm: OK OK
Input 1: G2-Sup 3
Input 2: - -
Input 3: - -
Output 1: - RF-Inf
Output 2: * *
Delta-T: - 10000
Description: - -
Confirm: OK OK
Enfin les charges variables. Pour le vent nous ferons un fichier enveloppe ne prenant en
compte que les effets dfavorables du vent quite a appliquer le vent contraire (-
)(SupAndXLc)
Actions
AddL
oads
Constr. Stage: AjoutCharge AjoutCharge AjoutCharge AjoutCharge
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: Calcula-tion (Static)
Calcula-tion (Static)
LC/envelope actions
LC/ en-velope ac-
tions
Type: Calc Calc SupInit SupAndXLc
Confirm: OK OK OK OK
Input 1: LC-GT LC-V - Vent.sup
Input 2: - - - LC-V
Input 3: - - - -
Output 1: - - Vent.sup -
Output 2: * * - *
Delta-T: - - - -
Description: - - - -
Confirm: OK OK OK OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-32
Bentley Systems France
7 Trafic
7.1 Dfinition des Charges de Trafic
Le trafic dans notre cas ne correspond pas un convoi standard dun code quelconque.
Cale
ndrier
Dans Schedule choi-sir Load Definition .
Voie
s
Choisir Traffic La-nes pour afficher les voies de circulation
dj dfinies (Vide).
Ajouter une dfinition de voie
Voie
1
Choisir 1 pour la voie
1. Le rsultat sera stoc-
k dans le fichier la-
ne0001.lst
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-33
Bentley Systems France
Choisir Insrer aprs pour dfinir la position de la voie1
Voie
1
Des MACROS sont
disponibles pour mo-
dliser les voies de cir-
culation sur les l-
ments. Les macros ci-
tes dans le tableau
assure le calcul de ligne
dinfluence pour une charge unitaire dans les
conditions dfinies par
la Macro.
Choisir Macro2 pour des voies excentres
sur le tablier
pressez
Voie
1
Un tableau vide est
affich
pressez ajout aprs pour dfinir la srie
dlments
Voie
1
Remplir le tableau avec
les valeurs ainsi dfi-
nies.
Ces entres correspon-
dent une voie excen-
tre de -2m le long des
lments101 120.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-34
Bentley Systems France
La
ne
1
La voie est dfinie dans
le tableau du haut, le
chargement unitaire
correspondant est dfini
dans le tableau du bas.
Confirmez et ajouter
une nouvelle Voie
La deuxime voie est identique mais avec une excentricit de +2m.
La
ne
2
Remplir le menu com-
me indiqu.
Pressez
La dfinition des voies est maintenant finie.
Ltape suivante consiste dfinir le convoi.
LT
rain
Choisir Load Trains dans larborescence pour dfinir le convoi.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-35
Bentley Systems France
Tous les convois sont montrs dans la partie haute du tableau. Chaque convoi est dtaill
dans la partie basse.
Ajouter aprs, dans le tableau bas pour dfinir le premier convoi
LT
rain
Accepter les valeurs
par dfaut 1.
Note: Certains codes
ont des facteurs diff-
rents pour les valeurs
minimales et maximales
de charges.
.
Confirmez
LT
rain
Nous entrons les char-
ges de trafic dcrites en
dbut de manuel.
Appuyer sur licne dajout aprs
15 [kN/m]
200 [kN]
2 [m] 2 [m]
15 [kN/m]
200 [kN]
2 [m]
Entre 1
Entre 2
Entre 3
Entre 4
Entre 5
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-36
Bentley Systems France
LT
rain
Dfinir une charge re-
partie de 15KN qui sera
applique dans les zo-
nes dfinies par le cal-
cul de ligne dinfluence
Confirmez
Insrez les valeurs suivantes du tableau.
Table
Load train: 1 1 1 1 1
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Q [kN/m]: -15.0 - - - -15.0
F [kN]: - - -200.0 -200.0 -
Input 1: - - - - -
Input 2: Free
Length - - -
Free
Length
L-from: - 2 2 2 -
L-to: - 2 2 2 -
L-step: - 2 2 2 -
Confirm: OK OK OK OK OK
Vous pouvez vrifier
laspect du convoi en appuyant sur i
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-37
Bentley Systems France
7.2 Calcul des Actions en tant que Phase
Constr
. S
chedule
Choisir Schedule and Stages et Activa-tions pour dfinir une nouvelle phase TRA-
FIC
Choisir ajout aprs
Table
Name: TRAFIC
List: -
Duration.: -
Description: Charge de trafic
Pas dactivation puisque lensemble des lments est dj actif
Action
Choisir Schedule Ac-tion pour dfinir ce que le logiciel doit cal-
culer
Ajouter aprs dans le tableau du bas, et initialiser les fichiers enveloppe.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 7-38
Bentley Systems France
Table
Constr. stage: TRAFIC TRAFIC TRAFIC
Insert: Tableau Bas Tableau Bas Tableau Bas
Action: LC/Envelope action
LC/Envelope action
LC/Envelope action
Type: SupInit SupInit SupInit
Confirm: OK OK OK
Input 1: - - -
Input 2: - - -
Input 3: - - -
Output 1: Voie1.sup Voie2.sup Trafic.sup
Output 2: - - -
Delta-T: - - -
Description: - - -
Confirm: OK OK OK
Ajouter Aprs, les calculs de charge de trafic en fonction des paramtres dj entrs.
Table
Constr. stage: TRAFIC TRAFIC TRAFIC TRAFIC
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Calcula-tion (Static)
Type: Infl Infl LivelL LivelL
Confirm: OK OK OK OK
Input 1: 1 2 1 2
Input 2: - - 1 1
Input 3: - - - -
Output 1: lane0001.inf lane0002.inf Voie1.sup Voie2.sup
Output 2: * * - -
Delta-T: - - - -
Description: - - - -
Confirm: OK OK OK OK
Table
Constr. stage: TRAFIC TRAFIC
Insert: Tableau Bas Tableau Bas
Action: LC/Envelope action
LC/Envelope action
Type: SupAddSup SupAddSup
Confirm: OK OK
Input 1: Trafic.sup Trafic.sup
Input 2: Voie1.sup Voie2.sup
Input 3: - -
Output 1: - -
Output 2: * *
Delta-T: - -
Description: - -
Confirm: OK OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-39
Bentley Systems France
8 Combinaison de Cas de charge pour vrification au Code
8.1 Table de Combinaison
Sched
ule
Choisir Schedule et Load Definition pour ouvrir la dfini-
tion des charges
Com
b.
Choisir Load Combi-nation dans larborescence
Choisir Ajout Aprs pour entrer pour un cas de charge, les coefficients appliqus dans la
combinaison.
Com
bin
ations
Choisir pour Load Case le groupe PP1 (G1 poids propres).
Utilisez la loi de com-
binaison SupAddLc , ajout inconditionnel
des cas de charge.
.
Confirmez
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-40
Bentley Systems France
Continuez ajouter des lignes avec les valeurs suivantes
Table
Comb. Table:
Result Type: LCase LCase LCase LCase
Name: PP1 PP2 PT RF
Comb. Law: SupAddLc SupAddLc SupAddLc SupAddLc
favourable I: 1 1 1 1
unfavourable I: 1 1 1 1
favourable II: 1.35 1.35 1 1
unfavourable II: 1.35 1.35 1 1
favourable III: - - - -
unfavourable III: - - - -
Confirm: OK OK OK OK
Table
Comb. Table:
Result Type: LCase superpo-
sition superpo-
sition
Name: LC-GT Vent.sup Trafic.sup
Comb. Law: SupAddLc SupAddSup SupAddSup
favourable I: 1 1 1
unfavourable I: 1 1 1
favourable II: 0.8 0.8 1.5
unfavourable II: 0.8 0.8 1.5
favourable III: - - -
unfavourable III: - - -
Confirm: OK OK OK
8.2 Actions de Calcul pour les Combinaisons de Cas de Charge
Schedule
Choisir Schedule et Stages pour ouvrir la liste des phases
Insrer une nouvelle phase qui lancer le calcul des combinaisons
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 8-41
Bentley Systems France
Table
Name: Comb
List file: -
Duration.: -
Description: Load Combination
Action
Choisir Schedule Ac-tions pour dfinir les actions effectuer
Ajouter Aprs, avec les valeurs suivantes pour lancer les 2 combinaisons dfinies et
stocker les rsultats
Table
Constr. Stage: Comb Comb
Insert: Tableau Bas Tableau Bas
Action: LC/envelope action
LC/envelope action
Type: SupComb SupComb
Confirm: OK OK
Input 1: 1 2
Input 2: - -
Input 3: - -
Output 1: Comb1.sup Comb2.sup
Output 2: - -
Delta-T: - -
Description: - -
Confirm: OK OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 9-42
Bentley Systems France
9 Vrifications au Code
9.1 Vrification de contrainte aux fibres (ELS)
9.1.1 Action de calcul de vrification des contraintes aux fibres
Constr
. S
ched.
Choisir Schedule et Stages pour dfinir une nouvelle phase de
calcul des vrifications
aux fibres
Insrer Aprs la tche suivante
Table
Name: ELS
List file: -
Duration.: -
Description: Vrification Fibres
Ajouter Aprs, dans la table du bas laction suivante
Table
Constr. Stage: ELS
Insert: Tableau Bas
Action: Check Actions (SUP)
Type: FibSup
Confirm: OK
Input 1: Comb1.sup
Input 2: 1
Input 3: -
Output 1: -
Output 2: *
Delta-T: -
Description: -
Confirm: OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 9-43
Bentley Systems France
9.2 Vrification aux tats limites ultimes (ELU)
9.2.1 Action de Calcul pour vrification aux tats limites ultimes
Constr
. S
tage
Choisir Schedule et Stages pour dfinir une nouvelle tape de
calcul.
Ajouter Aprs, le calcul de vrification aux tats limites ultimes
Table
Name: ELU
List file: -
Duration.: -
Description: Vrification ELU
Ajouter dans le tableau du bas les actions suivantes.
Table
Constr. Stage: ELU ELU ELU ELU
Insert: Tableau Bas Tableau Bas Tableau Bas Tableau Bas
Action: LC/Envel
pe action Checking action (Sup)
Checking action (Sup)
Checking action (Sup)
Type: SupInit ReiIni UltSup UltSup
Confirm: OK OK OK OK
Input 1: - - Comb2.sup Comb2.sup
Input 2: - - Rein UltMz
Input 3: - - - -
Output 1: Ult-
Comb2.sup - -
Ult-Comb2.sup
Output 2: - - * *
Delta-T: - - - -
Description: - - - -
Confirm: OK OK OK OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 10-44
Bentley Systems France
10 Lancement du calcul suivant calendrier
Maintenant que nous avons dfini toutes les donnes de charges et de calcul, nous pouvons
lancer lanalyse.
10.1 Lancement du Calcul
Calc
ul
Appuyer sur la touche
Recalc pour lancer
lanalyse
Dm
arr
age d
es C
alc
uls
Avant de lancer le cal-
cul nous devons indi-
quer dans quel fichier
se fait les sommations.
Ce sera PERM-SUM.
Dautre part suivant si vous avez fait ou pas
les initialisations des
cas de charges, il faut
cocher ou dcocher Init
Load Manager
Dmarrer le calcul en
appuyant sur
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-45
Bentley Systems France
11 Prsentation des Rsultats Post-Processing
Tout type de rsultat (forces, dplacement, contraintes,..) peut tre affich numriqauement
ou graphiquement. Pour les graphiques, un certain nombre dactions doivent tre prpares et ajoutes au calendrier de calcul.
11.1 Rsultats Numriques
11.1.1 Listings Standards
Plusieurs fichiers sont gnrs automatiquement pendant le calcul. Les rsultats des cas de
charge peuvent tre consults au moyen de lditeur. Tous ces listings contiennent efforts et dplacement, pour les lments et les cbles.
Dautre part, les fichiers dcrivant lensemble des entres sont aussi produits afin de vri-fier les hypothses de calcul.
Choisir licne de lancement de lditeur
Lis
tings
Slectionner le rper-
toire (Default Sche-dule) qui rassemble les fichiers .lst et choi-
sir le fichier que vous
voulez diter
11.1.2 Revue Interactive des Rsultats
Tous les rsultats peuvent aussi tre obtenus interactivement. La procdure suivante doit
tre utilise.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-46
Bentley Systems France
Rsulta
ts
Choisir Results et Loading Cases pour ouvrir les tableaux de
rsultats
Rsulta
ts L
Case
Le listing affich mon-
tre les efforts pour le
chargement G1. Vous
pouvez ainsi faire dfi-
ler les diffrents cas de
charge.
Nous pouvons aussi obtenir les Minima et Maxima.
Les rsultats peuvent tre obtenus de 3 manires:
Primary: Effets Primaires : uniquement effets isostatiques des charges
Secondary: Effets secondaires : effets hyperstatiques des charges.
Total: Primary + Secondary = Total.
Si vous slectionnez Diagram en bas droite, les composants dsirs peuvent tre affi-chs graphiquement de manire simple.
Choisir Results et Envelopes pour afficher les rsultats des combinaisons de la mme manire.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-47
Bentley Systems France
11.2 Rsultats Graphiques
11.2.1 RMSets
Pour un affichage rapide et ais des Efforts, Dplacements, Contraintes et Armatures, il
existe la possibilit de dfinir, ce que lon nome des RMSets. Avec quelques commandes un trac peut tre dfini, affich et incorpor dans le calendrier de construction.
RM
Sets
Choisir Properties et RMSets pour dfinir un ou plusieurs groupes
dont on veut construire
la reprsentation gra-
phique (et numrique)
des rsultats.
.
RM
Sets
Le tableau du haut
montre les noms pour
le RMSet choisi (vide
pour linstant). Tous les RMSets peuvent tre
utiliss au cours du
phasage de construc-
tion. Vous pouvez ajou-
ter tout instant les
actions y affrant au
cours du calendrier de
construction. Les
RMSets produiront des
graphiques et des lis-
tings.
Choisir Ajout Aprs pour ajouter un nouveau RMSet.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-48
Bentley Systems France
RM
Set
- N
ouvea
u
Ce nouveau RMSet est
suppose montrer la
valeur du moment MZ
la fin de la premire
phase de construction.
(Phase1-MZ)
Appuyer sur I pour obtenir le menu de saisie interactif.
Lis
te
lm
ents
Choisir Elements and Nodes pour dfinir les lments tracer.
Choisir Element of a group: TAB.
Une fois que tous les
lments ont t choi-
sis, confirmez vos
choix en appuyant sur
licne Insrer Avant .
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-49
Bentley Systems France
Lis
ting
l
ments
Choisir Load Cases pour choisir le cas de charge..
Choisir le cas PERM-SUM.
Choisir le composant-
Mz.
Choisir insrez avant
Sauvegarder la dfini-
tion en appuyant sur
Save.
11.2.2 Diagrammes
RM
Set
tracs
Pour la configuration
choisie, vous pouvez
dfinir un nom de trac.
Dfinir Dgm-Phase1-Mz.pl
Pour voir le rsultat
appuyez sur la com-
mande plot diagram file
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-50
Bentley Systems France
11.2.3 Listings
Impre
ssio
n R
MS
et
Pour cette mme confi-
guration vous pouvez
definer un nom de lis-
ting qui sera gnr
Choisir Rep-Phase1-Mz.lst
Pour voir le rsultat,
appuyez sur write to report file
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-51
Bentley Systems France
11.2.4 Utilisation des RMSet dans le calendrier de construction
Lis
ting E
lm
ents
Les RMSets peuvent
tre incorops dans le
calendrier de construc-
tion. Caque fois que
lon doit sauvegarder des rsultats graphiques
ou numrique au cours
du calendrier de cons-
truction, on doit insrer
laction suivante.
Laction DgmSet est insre pour utiliser un
RMSet pour tracer un
diagramme.
Laction DoRep est insrer pour utiliser un
RMSet pour gnrer un
listing.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-52
Bentley Systems France
11.3 Reprsentation Graphique des Rsultats
Tra
cs
Choisir Results, Plot et Directory pour afficher tous les
graphiques..
11.3.1 Plot
Plot contient les types suivants:
Directory: Tous les Rm-Sets sont lists ici en tant que plot.
Plot Container: un ou plusieurs Plots avec des plot-dfinitions de RM (cf ci-dessous)
RMSet: Tous les RM-Sets sont lists
PLSYS: Une liste des fichiers ASCII *.rm venant de versions antrieures de RM.
C&S: Retrait & Fluage
Choisir Plot Container et ouvrir un nouveau Plot Container.
Plo
t C
onta
iner
Choisir un nouveau
nom ou accepter le nom
par dfaut propospar
le programme.
.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-53
Bentley Systems France
Tra
c
Pro
fil
Pressez Insrez aprs
Tra
c
Pro
fil
Choisir un nouveau
nom ou accepter le nom
par dfaut propos par
le programme.
Dautre sorties peuvent tre gnres, utilisant les Macros proposes.
Macro
Choisir Macro pour crer un plot standard.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-54
Bentley Systems France
Macro
Choisir Loading case result afin dafficher les rsultats dun cas de charge. La donne du
champ Plot Profile est utilise pour sauve-
garder les entres.
Pressez: Run Macro
Macro
Choisir les lments
afficher (Group: Ta-
blier).
Choisir les rsultats
afficher sur les l-
ments (Dplacements et
Efforts)
Dpendant du type de Plot-Container, le bouton Info ouvre le menu appropri. Des mo-difications ou des ajouts peuvent alors tre faits.
Choisir I pour ouvrir le contenu du trac (= Editeur de trac).
Lditeur de trac permet la dfinition et la modification des graphiques et tracs de profils. Le rsultat sera un plot File. Ce Plot File contient la taille de la feuille (page) et une ou
plusieurs vues. Une vue contient plusieurs objets.
Trois niveaux peuvent tre dfinis et modifis. Les fonctions principales de modification,
effacement et copie, sont accessibles par le menu suprieur.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-55
Bentley Systems France
11.3.2 Affichage de Profils (Plot Profiles) dans le calendrier de construction
Tra
c
Des commandes de
traces de profils peu-
vent tre insres tout
moment dans le calen-
drier de construction.
Laction DoPlot est utilise pour dfinir le
plot container et le Plot
Profile utiliser pour
gnrer un trac.
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-56
Bentley Systems France
Plo
ttin
g
Utilisez la flche prs
du champ de saisie
pour choisir un plot
container et un plot
profile.
Utilisez input1 et iput2
pour renseigner les
variables ventuelles du
plot profile.
11.3.3 Affichage Interactif des contraintes, efforts et dplacements:
Plo
ttin
g
Par un clic droit au
milieu de la fentre
vous accdez un me-
nu contextuel.
Prenez View Op-tions
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-57
Bentley Systems France
Tra
c
Cochez Draw cross sections et Draw CS mesh
Cochez Draw ele-ment bodies et Draw detailed bo-dies
Cochez Result et pressez Choose
Tra
c
Choisir Load Case et slectionnez PERM-
SUM.
Cochez Stresses puis presses OK
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 11-58
Bentley Systems France
Plo
ttin
g
La figure montre la
distribution des
contraintes sur les l-
ments (Rouge : lev,
vert : faible).
Vous pouvez facile-
ment afficher de la
mme manire les d-
placements et les ef-
forts
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 12-59
Bentley Systems France
12 Export et Stockage
12.1 Export du projet
Toutes les donnes (sections, matriaux, systmes, calendrier,.) peuvent tre sauvegar-
des dans un fichier ASCII au format descriptif puissant appel TCL utilise par RM . Cest un langage de programmation qui permet en particulier de dfinir des boucles..
Export
Choisir File et Ex-port TCL Project Da-
ta pour crer le fichier ASCII
Aucun rsultat ne sera
stock, seules les en-
tres sont sauvegar-
des.
Export
Choisir un nom de fi-
chier.
Vous pouvez choisir ou
pas de sauvegarder cer-
taines parties des don-
nes. Ceci est trs
commode pour gnrer
une trame partielle de
donnes qui sera dite,
modifie puis r-
importe.
Vous pouvez facile-
ment diter ce fichier
avec lditeur fournit
avec RM, qui com-prend et corrige la syn-
taxe TCL. Si vous r-importez des donnes,
vous devez relancer les
calculs (Recalc) pour
prendre en compte les
modifications dans les
rsultats
-
RM Bridge
D m a r r a g e f a c i l e a v e c R M B r i d g e A n a l y s e - E C 12-60
Bentley Systems France
12.2 Quiter le Programme
Sort
ir d
e R
M
Pour sortir de RM pres-
sez File et Exit
RM, ou utilisez licne standard.
Une sauvegarde du
projet sous forme de
TCL vous sera propo-
se au moment de la
sortie.