r.m. gary paxton design build aahpa presentation

53
COLLABORATION & INNOVATION Josh Zellmer, PE Project Engineer Jason Davis President

Upload: others

Post on 15-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

COLLABORATION & INNOVATION

Josh Zellmer, PE

Project Engineer

Jason Davis

President

R&M’s WATERFRONT ENGINEERING TEAM

Kim Nielsen, PE

Group Manager, Waterfront

Engineering

Jean Cumlat, EIT

Staff Engineer

Duane Anderson, PE

Group Manager, Structural

Engineering

John Daley, PE

Senior Waterfront Engineering

Josh Zellmer, PE

Structural Engineer

Josh Crowe, PE

Structural Engineer

Mike Adams, EIT

Engineering Technician

Kristi McLean, LEED AP

BD+C, CESCL

Group Manager, Environmental

Bob Pintner, PE

Senior Geotechnical Engineer

Buzz Scher, PE

Senior Geotechnical Engineer

City of Valdez New Harbor Development

Kodiak Ferry Terminal and Dock Improvements

Kodiak Ferry Terminal and Dock Improvements

Seward Harbor Fish Cleaning Stations

Homer Deep Water Dock Expansion Feasibility Study

Option 1

Option 2

Seward Marine Industrial Center Breakwater and Harbor Improvements

Kotzebue Shore Avenue Reconstruction and Seawall

TURNAGAIN’S MARINE CONSTRUCTION TEAM

Seward BCS Floats

Hoonah Berthing Facility

Kodiak Channel Transient Float

Homer Ferry Terminal Improvements

Kloosterboer South Dock

Ouzinkie Municipal Dock

Gary Paxton Industrial Park Dock

§ Design Build RFP

§ Commercial Dock Facility

§ Owner Budget = $6,800,000

§ Proposers Compete on Value

Sawmill Cove, Sitka AK

Sawmill Cove, Sitka AK

Pile Supported Fixed Dock

Steel Sheet Pile Dock

Cellular Steel Sheet Pile Dock

Alternative Options Proposal

§ “Utilize an innovative approach when developing Alternative Options Proposals……”

§ “Maintain an alignment with Project Goals…..”

§ “Not limited by Project Requirements…..”

Design ChallengesLiquefaction and Lateral Soil Spreading

Design ChallengesCorrosion & Design Forklift

Design ChallengesDesign Vessel

Fixed Dock $7,400,000

Floating Dock Alternative$6,800,000

Floating Dock Alternative

Dolphin Elevation

Dolphin Cap

Dolphin Cap

Design Build Advantages

§ Bidders compete on value

§ Efficient Design

§ Leverage Contractor’s Equipment & Experience

§ Designers Can Focus on Key Design Elements

REVIT Modeling

REVIT Modeling

REVIT Modeling

REVIT Modeling

REVIT Modeling

REVIT Modeling

REVIT Modeling

Plan

Section

Plan

Section

Structural Analysis

RISA Modeling

RISA Modeling

RISA Modeling

RISA Modeling

RISA Modeling

Barge Construction

Barge Construction

Questions