Report
Detailed Estimate framed by Er. Jagjit Singh Executive Engineer Const. Division PWD B&R Patiala for S/R to L/R (Samana to Samana Patiala Road via Noorpur Waraichan, Khadadpur, Muradpur Mial Khurd, Tarkhan Majra & Dhandhal) Under NABARD Scheme – XIX.
![Page 3: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/3.jpg)
Types of Road
NATIONAL HIGHWAY STATE HIGHWAY MAJOR DISTRIC ROAD OTHER DISTRIC ROAD LINK ROAD
![Page 4: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/4.jpg)
Work on Link Road Diagonal Cut :
* It is provided at the distance of 3m.
Angle of the diagonal cut is to be 45ᵒ
![Page 5: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/5.jpg)
Edging :
* It is provided both sides of the road for stability of stones.
* It is provided with brick’s and its height is 4”
![Page 6: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/6.jpg)
Laying Stones :
* Laying G-II Stones in the half of the road i.e. 3m.
* thickness of loss stone is 4”
![Page 7: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/7.jpg)
Dry Rolling :
* To set the stones at the thickness of 3”
![Page 8: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/8.jpg)
Laying Sand Before Wet Rolling
![Page 9: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/9.jpg)
Watering Before Wet Rolling
* To remove the air voids
![Page 10: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/10.jpg)
Wet Rolling :
* It is also known as WBM (water bond mechadum)
![Page 11: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/11.jpg)
Machines :
* Distributer * Compressor
Its temp is 150°
![Page 12: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/12.jpg)
Cleaning soil with compressor :
* For bonding tack coat
with metal stone
![Page 13: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/13.jpg)
Tack Coating :
* Laying tack coat with distrubuter
* It is laying 1kg/m²
![Page 14: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/14.jpg)
Laying 10mm aggregate over tack coat :
* Rolling after tack coat over aggregate
* For settling the metal stone
![Page 15: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/15.jpg)
Laying PC
*25mm thick
* Its temp is 120 °
![Page 16: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/16.jpg)
Seal Coating
![Page 17: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/17.jpg)
Safe on Roads and Safe Tea at Home
ThankYou
![Page 18: ROAD REPAIR CIVIL ENGINEERING](https://reader033.vdocuments.net/reader033/viewer/2022061205/54732af9b4af9fb90a8b5259/html5/thumbnails/18.jpg)
Name :- Bhupesh Sharma Roll No. :- 1180324
Department of Civil Engineering