![Page 1: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/1.jpg)
Robotizing workforce in future built environments
Citation for published version (APA):Maas, G. J., & Gassel, van, F. J. M. (2014). Robotizing workforce in future built environments. InternationalScientific Conference Construction Technology and Management (CTM 2014), September 9-10, 2014,Bratislava, Slovakia, Bratislava, Slovakia.
Document status and date:Published: 01/01/2014
Document Version:Accepted manuscript including changes made at the peer-review stage
Please check the document version of this publication:
• A submitted manuscript is the version of the article upon submission and before peer-review. There can beimportant differences between the submitted version and the official published version of record. Peopleinterested in the research are advised to contact the author for the final version of the publication, or visit theDOI to the publisher's website.• The final author version and the galley proof are versions of the publication after peer review.• The final published version features the final layout of the paper including the volume, issue and pagenumbers.Link to publication
General rightsCopyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright ownersand it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights.
• Users may download and print one copy of any publication from the public portal for the purpose of private study or research. • You may not further distribute the material or use it for any profit-making activity or commercial gain • You may freely distribute the URL identifying the publication in the public portal.
If the publication is distributed under the terms of Article 25fa of the Dutch Copyright Act, indicated by the “Taverne” license above, pleasefollow below link for the End User Agreement:www.tue.nl/taverne
Take down policyIf you believe that this document breaches copyright please contact us at:[email protected] details and we will investigate your claim.
Download date: 22. Aug. 2020
![Page 2: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/2.jpg)
Robotizing Workforce in Future Built Environments Ger Maas & Frans van Gassel
CTM 2014
![Page 3: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/3.jpg)
Safety
![Page 4: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/4.jpg)
N. Karl Wiggins, BAM Construction
Safety
![Page 5: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/5.jpg)
The presenters
Frans van Gassel Eindhoven University of
Technology (The Netherlands
• Construction management & engineering • Former Secretary General IAARC
Ger Maas Eindhoven University of
Technology and
Royal BAM Group (The Netherlands)
• Construction management & engineering • European strategy in construction
![Page 6: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/6.jpg)
Construction management research
www.fransvangassel.nl
A method for analyzing unsafe en unhealthy
production processes on the construction site.
& Design principles to
improve creative and collaborative working.
![Page 7: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/7.jpg)
The construction sector in EU27 (1)
The biggest industrial employer: – 10.4% of GDP and 49.2% of
Gross Fixed Capital Formation (FIEC, 2008)
– 30% of industrial employment, 7.6% of total employment (16.3 million operatives)
– 3 millions enterprises (95% SMEs with <20 workers, local markets, low innovative)
![Page 8: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/8.jpg)
The construction sector in EU27 (2)
A large influence on the whole economy
– 48,9 millions workers
depending on Construction – The buildings/infrastructure
supplied by the Construction sector serve a lot of other industries and services
![Page 9: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/9.jpg)
The construction sector in EU27 (3)
A large influence on the whole economy
– Construction can make the
difference – Automation and Robotics can
help construction to do so!
![Page 10: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/10.jpg)
European policy (1)
Challenges: To address and to adapt • Climate change • Demographic change, • Energy supply and security, • Food shortages • Safety • Environmental concerns.
Smart Grid
![Page 11: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/11.jpg)
European policy (2)
Demands: For convenience • Low maintenance • Automation • Flexibility • Health improve features • Optimal environmental integration
![Page 12: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/12.jpg)
From Production to Performance
• Not just what construction makes • Does it fit? • Are users happy? • Are working conditions safe?
![Page 13: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/13.jpg)
Busan Geoje Fixed Link
![Page 14: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/14.jpg)
![Page 15: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/15.jpg)
Busan Geoje Fixed Link
26,5m
12m
![Page 16: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/16.jpg)
Busan Geoje Fixed Link
Automation
To measure location To measure the flow and waves To control, check and steer tunnel elements
![Page 17: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/17.jpg)
Human machine technologies Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
Construction engineering
Future needs in automation and robotics
Construction management
Performance engineering
![Page 18: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/18.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 19: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/19.jpg)
Mechanization graph (1) Horizontal axis: • Control tasks equipment Vertical axis: • Energy supply in production process.
Control tasks equipment
Energy task equipment
![Page 20: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/20.jpg)
Mechanization graph (2)
![Page 21: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/21.jpg)
Mechanization examples (1)
THE NETHERLANDS
![Page 22: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/22.jpg)
Mechanization examples (2)
JAPAN
![Page 23: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/23.jpg)
Mechanization examples (3)
CHINA
JAPAN
![Page 24: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/24.jpg)
Mechanization examples (4)
ROTTERDAM
R
![Page 25: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/25.jpg)
Mechanization examples (5)
![Page 26: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/26.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 27: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/27.jpg)
Labor analysis (1)
Before starting to mechanize and robotize construction processes there is a need to get more insight into the production tasks of the construction worker and equipment. To get this insight an analysis method has been developed.
Human actions
Equipment actions
Initial situation
End situation
![Page 28: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/28.jpg)
Labor analysis (2)
Before starting to mechanize and robotize construction processes there is a need to get more insight into the production tasks of the construction worker and equipment. To get this insight an analysis method has been developed.
Human actions
Equipment actions
Initial situation
Human actions
Equipment actions
Mechanization Robotizing
End situation
![Page 29: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/29.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 30: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/30.jpg)
Modular construction
To shift heavy and complex construction tasks from the site to the factory modular construction can be a solution. To design the production process of such modular system a method has been developed and applied.
![Page 31: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/31.jpg)
Topics Human machine Technologies
Mechanization phases, Labouranalysis, Modulair construction
Process management Creative meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 32: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/32.jpg)
Creative meetings (1)
Designing mechanized and robotized production processes needs collaboration between all types of professionals. During creative meetings this collaboration can be taken place. Working methods are developed to create new ideas and concepts.
![Page 33: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/33.jpg)
Creative meetings (2)
Creativity techniques 1. Making what you think visible: mind maps
2. Group idea creation: brainstorm sessions
3. Systematic idea generation: Systematic Inventive Thinking (SIT)
4. To create insight: simulation games
3
4 2
1
![Page 34: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/34.jpg)
Creative meetings (3)
Problem (re-)formulation
Creation ideas
Choosing ideas
Action planning
Problem description A creative meeting has to be prepared very carefully. To obtain really new concepts a certain order of activities is necessary.
![Page 35: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/35.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 36: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/36.jpg)
BIM (1)
Building Information Modeling (BIM) in the life cycle
![Page 37: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/37.jpg)
BIM (2)
NCC’s three stepped approach to VDC, with some typical uses.
![Page 38: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/38.jpg)
BIM (3)
BIM implementation process of BAM (2013)
![Page 39: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/39.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 40: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/40.jpg)
Lean management (1) How to start Lean management at project level? • Place responsibility as low as possible within
the organization • The project manager nor the works foreman
has the lead during the Lean session • The specialists (workforce of BAM Civiel and
workforce of subcontractors/supplies) have the lead during the Lean sessions
• The specialists make interface agreements
![Page 41: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/41.jpg)
Lean management (2) Key learning: Reverse the hierarchy. • Managers are there to support and enable the site teams and the workforce • Work to change key resistors – they will become advocates of lean • Leadership messages need to be carefully cascaded on large projects • The approach can be scaled up for large projects (the supply chain led the planning of work to deliver client outcomes within constraints) • Integrate the team(s) - work together e.g. through co-location • Interfaces must be owned by the parties interfacing – not the main contractor
![Page 42: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/42.jpg)
Lean management (3)
Transferring this approach to construction focuses on: • the reduction of construction period • the reduction of the variability • the simplification of tasks • the increase of transparency • the increase of flexibility
![Page 43: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/43.jpg)
Lean management (4)
Project values 1 • Reduction building period (25-
50%) • Better communication • Less stress on the work floor • Reduction on general
construction costs (e.g. man-hours, equipment, offices for staff, rooms for personnel)
![Page 44: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/44.jpg)
Lean management (5)
Project values 2 • Building specialists know what they and the others have to do • Building specialists take responsibility for their scope of work, the interfaces and the success of the entire project
![Page 45: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/45.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 46: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/46.jpg)
Active aging in an aging society (1)
The coming decades a discrepancy will arise between the number people who can work and median age of people who are part of our community.
![Page 47: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/47.jpg)
COUNTRIES – LARGEST POPULATION
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
20142030
X 1000
(Koshi, 2014)
![Page 48: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/48.jpg)
GLOBAL POPULATION DISTRIBUTION
CHINA INDIA
25%
Rest
United States Indonesia
Brazil Pakistan Nigeria
Bangladesh Russia Japan
62% 13%
(Koshi, 2014)
![Page 49: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/49.jpg)
http://www.worldlifeexpectancy.com/
World 1990
(Koshi, 2014)
![Page 50: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/50.jpg)
World 1950 - 2050
(Koshi, 2014)
![Page 51: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/51.jpg)
2020 (World)
1990 (World)
2000 (World)
2050 (World)
2020 (China)
2020 (India)
2020 (USA)
2020 (Japan)
2020 (Nigeria)
http://www.worldlifeexpectancy.com/
![Page 52: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/52.jpg)
POPULATION TRIANGLE SHAPE
GENERAL REQUIREMENT FOR AUTOMATION
REQUIREMENT FOR JOB CREATION
LOW HIGH
MED HIGH
HIGH LOW (Koshi, 2014)
![Page 53: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/53.jpg)
1: Developing business models. Proposing new business models that are able to exploit the new regulations / methodologies / technologies for building. Theme 2: Housing policies. To support affordable housing and in-home care later in life. Theme 3: Ageing and consumer spending. Attitudes and spending patterns with respect to housing, healthcare and accessibility in particular Theme 4: Housing costs and energy saving. A need for innovative, economical design and building. Theme 5: Ageing at work. Productivity and skills. The changing needs of workers and employers. Theme 6: Investment and Infrastructure. Assessing the true economic value of investment in projects for the ageing population particularly in the planning and designing for an ageing populace at an urban level.
and in-home care later in life. Theme 3: Ageing and consumer spending. Attitudes and spending patterns with respect to housing, healthcare and accessibility in particular Theme 4: Housing costs and energy saving. A need for innovative, economical design and building. Theme 5: Ageing at work. Productivity and skills. The changing needs of workers and employers. Theme 6: Investment and Infrastructure. Assessing the true economic value of investment in projects for the ageing population particularly in the planning and designing for an ageing populace at an urban level.
Theme 1: Developing business models. Proposing new business models that are able to exploit the new regulations / methodologies / technologies for building.
Theme 2: Housing policies. To support affordable housing and in-home care later in life.
Theme 3: Ageing and consumer spending. Attitudes and spending patterns with respect to housing, healthcare and accessibility in particular.
Theme 4: Housing costs and energy saving. A need for innovative, economical design and building.
Theme 5: Ageing at work. Productivity and skills. The changing needs of workers and employers.
Theme 6: Investment and Infrastructure. Assessing the true economic value of investment in projects for the ageing population particularly in the planning and designing for an ageing populace at an urban level.
Themes for R&D in active ageing in the built environment
![Page 54: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/54.jpg)
Active aging in an aging society (3)
Themes: • Housing & Daily Living
• Mobility & Transport
• Work & Leisure
![Page 55: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/55.jpg)
Topics Human machine technologies
Mechanization phases, Labor analysis, Modular construction
Process management Design meetings, BIM, Lean management
Performance technologies Active aging
Client and Societal values
![Page 56: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/56.jpg)
Client’s and societal values
![Page 57: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/57.jpg)
Rotterdam Medical Centre (1) • City centre of Rotterdam • New hospital • Condensed urban area • No space • 31 stories high building • In a factory
![Page 58: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/58.jpg)
<Wijzig de datum met beeld\kop en voettekst>
Koninklijke BAM Groep nv - <vestiging> - <verkorte titel> 57
![Page 59: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/59.jpg)
Rotterdam Medical Centre (3) • No space
• 31 stories high building • In a factory
![Page 60: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/60.jpg)
G Rotterdam Medical Centre (4) Every week one floor in the factory on top of the new building
![Page 61: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/61.jpg)
Rotterdam Medical Centre (5) • Every week one floor in
the factory on top of the new building • Prefab wall elements • Prefab floor elements • In situ top layer at the floor
![Page 62: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/62.jpg)
Rotterdam Medical Centre (7)
![Page 63: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/63.jpg)
G Rotterdam Medical Centre (8)
![Page 64: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/64.jpg)
Rotterdam Medical Centre (9)
![Page 65: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/65.jpg)
Rotterdam Medical Centre (10)
![Page 66: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/66.jpg)
Rotterdam Medical Centre (11)
![Page 67: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/67.jpg)
Rotterdam Medical Centre (12) concrete elements As wall As floor Fixed with dry joints
![Page 68: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/68.jpg)
Rotterdam Medical Centre (13) 2 “Frames” support the steel factory
![Page 69: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/69.jpg)
Rotterdam Medical Centre (14)
2 steel beams support the shed from 2 levels below.
![Page 70: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/70.jpg)
Rotterdam Medical Centre (15) Hydraulic jacks move the
factory up every week one floor
![Page 71: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/71.jpg)
Rotterdam Medical Centre (16) • Health and Safety conditions • Integration of Design and Build • Community relation • Quality
![Page 72: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/72.jpg)
<Wijzig de datum met beeld\kop en voettekst>
Koninklijke BAM Groep nv - <vestiging> - <verkorte titel> 71
![Page 73: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/73.jpg)
Client’s and societal values
Process • Make work less heavy and more safe • Support collaborative design and construction • Monitor the performance of the designers/suppliers/contractors Product • Create low maintenance products • Support aging people at work and at home
![Page 74: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/74.jpg)
Thank you for listening and enjoy the CTM 2014 symposium
Ger Maas & Frans van Gassel
CTM 2014
![Page 75: Robotizing workforce in future built environmentsBusan Geoje Fixed Link 26,5m 12m Busan Geoje Fixed Link Automation To measure location To measure the flow and waves To control, check](https://reader033.vdocuments.net/reader033/viewer/2022042709/5f4087620d98d1706a61079e/html5/thumbnails/75.jpg)