Rochester Joint Schools Construction Board Moving Services Bid Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB) Rochester Schools Modernization Program (RSMP) 2019 RSMP Moving Services Bid January 9, 2019 ADDENDUM #1 dated January 21, 2019

Upload: others

Post on 17-Jul-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 – Addendum #1

Rochester Joint Schools Construction Board (RJSCB)Rochester Schools Modernization Program (RSMP)

2019 RSMP Moving Services BidJanuary 9, 2019

ADDENDUM #1 dated January 21, 2019

Page 2: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 – Addendum #1

Addendum No. 1

Include this Addendum as part of the “Rochester Joint Schools Construction Board (RJSCB) / RochesterSchools Modernization Program (RSMP) Moving Services Bid Documents dated January 9, 2019. ThisAddendum supplements portions of the original bid solicitation and any prior addenda, the content ofwhich shall remain, except as revised herein or by subsequent addenda:

1.) East High School: Attached as part of this addendum is the following:

· A revised scope of work document for East High School· Pictures of existing furniture in E-Wing that require relocation

2.) Attached as part of this addendum are the move matrices for the following schools: East HighSchool, Edison Career & Technology High School, Abraham Lincoln School No. 22 and The Flower CitySchool No. 54

**END**

Page 3: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 – Addendum #1

Appendix A

East High School1801 Main Street, Rochester, NY

Moving Services Scope of Work

Relocation Requirements and General Project Information:

East High School is a 419,000 square foot, grade 7-12 high school enrolling approximately 1,470 students.Portions of this school are currently under construction and other areas will begin construction upon completion ofthe upcoming school year. There will be numerous internal, phased moved relocations of Areas A, B, D, E and Frequired at East High School.

E-WINGPre- moves to vacate E-Wing will begin on Saturday, June1st and then the following consecutive Saturdays, June8th and June 15th. E-Wing must be completely vacated by end of day on June 15th. The Mover will be responsibleto relocate all furniture, equipment, machinery, kitchen appliances, perishables, 4 kilns, and contents. ManySpecialty Classrooms are located in the E-Wing like Precision Optical, Optical Shop Lab, 2 Art Classrooms, AVDigital and Metals Café (fully operational café and kitchen run by faculty and students. Approximately 20% ofexisting furniture and contents will be moved directly onto storage trailers located on East High School Campus.Mover to provide 2 dumpsters to remain onsite from June through August. Approximately 30% of the existingfurniture and contents will require the Mover to relocate to the RSMP warehouse and another 50% of the furniturewill require relocation to a specified recycling facility. The relocation of the optical shop lab and the precision opticalclass will require the mover to engage a rigger to properly relocate specialty machinery. Bidders should contactTony Marino from Advanced Glass Industries to obtain an estimate for relocation support. The removal/disposal ofall furniture, contents and equipment must be complete no later than June 15th.

Starting August 19, 2019, 25% of E-Wing contents shall be relocated by Mover, from the basement of East HighSchool to four (4) classrooms in the F-Wing. These four classrooms consist of (2) Art Rooms and (2) StandardClassrooms. The relocation of these contents must be complete no later than August 20, 2019.

Starting August 22, 2019, upon completion of the new FF&E deliveries, 75% of E-Wing contents shall be relocatedby Mover, from the basement of East High School back to the renovated E-Wing. The relocation of these contentsmust be complete no later than August 23, 2019.

F-WINGFloor protection shall be installed on all three floors of F-Wing on June 26, 2019. Starting June 27, 2019, F-Wingmust be emptied by the Mover of all furniture, equipment, and contents. All packed boxes and contents will bemoved directly to the RSMP Warehouse. Approximately 40% of the existing furniture will require disposal by theMover into onsite dumpsters (Mover to provide dumpsters) and another 60% of the furniture will require relocationto a specified recycling facility. The removal/disposal of furniture must be complete no later than July 3, 2019.

Starting August 19, 2019, all packed boxes and contents at the RSMP Warehouse shall be relocated by Mover, tothe various assigned classrooms within East High School. The relocation of these contents must be complete nolater than August 21, 2019.

D-WING WESTFloor protection shall be installed on all three floors of D-Wing West on July 31, 2019, for the FF&E deliveries.Starting August 19, 2019, all packed boxes and contents located in various classrooms at East High shall berelocated by Mover, back to the renovated D-Wing classrooms. The relocation of these contents must be completeno later than August 21, 2019.

Page 4: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 – Addendum #1

Appendix A

A-WINGStarting June 27, 2019, a portion of A-Wing must be emptied by the Mover of all furniture, equipment, and contents.All packed boxes and contents will be moved directly to the RSMP Warehouse. Approximately 40% of the existingfurniture will require disposal by the Mover into onsite dumpsters (Mover to provide dumpsters) and another 60% ofthe furniture will require relocation to a specified recycling facility. The removal/disposal of furniture must becomplete no later than July 3, 2019.

Starting August 19, 2019, all packed boxes and contents in the RSMP warehouse shall be relocated by Mover,back to the renovated A-Wing classrooms. The relocation of these contents must be complete no later than August21, 2019.

B-WINGStarting June 25, 2019, all cafeteria tables located in the Area B Cafeteria shall be relocated, by Mover, to theRSMP Warehouse. The removal of this furniture must be complete the same day.

General:The moving company will turn over all vouchers from the recycling company to Vargas Associates who will forwardto the Rochester City School District Facilities Department. Refer to Section 4.5 of the General Conditions for moreinformation on the recycling process.

Mover will be required to install approximately 400 square feet of Masonite and 20,500 square feet of Ram Boardfloor protection in the corridors of East High. Ram Board only will be provided by others but installed by Mover.Refer to the attached floor plan designating exact locations. Exact dates for installation of this floor protection areTBD and will be coordinated by Vargas Associates.

There is a passenger elevator at East High that may be used by the Mover.

All desktop computers at East High shall remain in place. They will be decommissioned and relocated by theSchool District.

One (1) large copier/printer will require relocation by the Mover. Mover must take proper precautions to avoiddamage and it is recommended that any pre-existing damage is identified to the Move Manager. The SchoolDistrict will be responsible for the de-installation and re-installation of any and all equipment being relocated.

No teacher laptops will be moved by the Mover, the staff members will relocate their own laptop equipment.

All phones are to remain in place. These will also be relocated by the District.

Any textbooks slated for relocation to the Book Depository on Hudson Ave, shall remain at East High. Mover is notrequired to perform this relocation.

District staff will be packing the contents of their classrooms into pop-up style boxes with color coded labels, both tobe provided by others. Movers will be provided details on the color coding system prior to the first move day. Onlyitems with an approved label are to be moved by the Mover, unless specifically directed otherwise by the movemanager.

All planned activities are to be accomplished within the scheduled timeframes on the East High Master Schedule.The Mover will become familiar with East High to understand the inherent constraints at each location and willcoordinate with move manager to mitigate any and all constraints and limitations of same.

For the duration of this project, Mover will need to provide a minimum of two (2) crews comprised of at least ten(10) workers each as well as a minimum of three (3) large trucks that will be dedicated to the East High relocations.

Page 5: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-1

Page 6: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-2

Page 7: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-3

Page 8: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-4

Page 9: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-5

Page 10: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-6

Page 11: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-7

Page 12: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-8

Page 13: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-9

Page 14: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-10

Page 15: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-11

Page 16: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-12

Page 17: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-13

Page 18: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-15

Page 19: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-16

Page 20: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-16

Page 21: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-17

Page 22: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-18

Page 23: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-19

Page 24: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-20

Page 25: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-21

Page 26: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-22

Page 27: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-23

Page 28: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-24

Page 29: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction Board Moving Services BidRochester Schools Modernization Program January 9, 2019 - Addendum #1

PIC-25

Page 30: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

East High SchoolMove Matrix - East High School Internal Moves

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

1 Optical Storage East High 1 E-107A East High TBD TBD2 Optical Shop Lab East High 1 E-107B East High TBD TBD3 Precision Optics East High 1 E-110 East High TBD TBD4 Optics Classroom East High 1 E-112 East High TBD TBD5 Computer Room East High 1 E-109 East High TBD TBD6 Art Room East High 1 E-111 East High TBD TBD7 AV Digital East High 1 E-114 East High TBD TBD8 Computer Lab East High 1 E-113 East High TBD TBD9 Teaching Learning Lab East High 1 E-116 East High TBD TBD10 Social Studies Class East High 1 E-118 East High TBD TBD11 Art Room East High 1 E-115 East High TBD TBD

12 CSE Office East High 1 A-100 East High TBD TBD13 Conference East High 1 A-100B East High TBD TBD14 Office East High 1 A-100C East High TBD TBD15 Exam East High 1 A-103B East High TBD TBD16 Nurse Practitioner East High 1 A-103C East High TBD TBD17 Exam East High 1 A-103E East High TBD TBD18 Exam East High 1 A-103F East High TBD TBD19 Exam East High 1 A-103G East High TBD TBD20 Reception Office East High 1 A-105 East High TBD TBD21 Office (Social Work) East High 1 A-103H East High TBD TBD22 Waiting East High 1 A-103R East High TBD TBD23 School Nurse Reception East High 1 A-103I East High TBD TBD24 Nurse Office East High 1 A-103J East High TBD TBD25 Health Clinic Director East High 1 A-103L East High TBD TBD26 Rest Area East High 1 A-103O East High TBD TBD27 Storage East High 1 A-103Q East High TBD TBD28 Storage East High 1 A-104 East High TBD TBD29 Health Clinic Office East High 1 A-106 East High TBD TBD30 Waiting East High 1 A-107 East High TBD TBD31 Barber Shop East High 1 A-107A East High TBD TBD32 Sterilization Room East High 1 A-107C East High TBD TBD33 Dental #1 East High 1 A-107D East High TBD TBD34 Equipment Room East High 1 A-108 East High TBD TBD35 Scenery Storage East High 1 A-109 East High TBD TBD36 Scenery Storage East High 1 A-109A East High TBD TBD37 Music (Instrumental) East High 1 A-112 East High TBD TBD38 Practice East High 1 A-110A East High TBD TBD39 Practice East High 1 A-114B East High TBD TBD

EAST HIGH SCHOOL CURRENT INFORMATION atEast High NEW INFORMATION at East High

E - Wing

A - Wing

Page 31: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

East High SchoolMove Matrix - East High School Internal Moves

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

EAST HIGH SCHOOL CURRENT INFORMATION atEast High NEW INFORMATION at East High

40 Storage East High 1 A-114E East High TBD TBD41 Lessons Office East High 1 A-110G East High TBD TBD42 Listening East High 1 A-114H East High TBD TBD43 Listening East High 1 A-114I East High TBD TBD44 Music Library & Storage East High 1 A-110N East High TBD TBD45 Storage East High 1 A-110J East High TBD TBD46 Practice East High 1 A-110K East High TBD TBD47 Practice East High 1 A-110L East High TBD TBD48 Practice East High 1 A-110M East High TBD TBD49 Office East High 1 A-110I East High TBD TBD50 Music Classroom East High 1 A-114 East High TBD TBD51 Music (Vocal) East High 1 A-114 East High TBD TBD52 Storage East High 1 A-117 East High TBD TBD53 Community Support East High 1 A-119 East High TBD TBD

54 Cafeteria/ Study Hall East High 1 B-121 East High TBD TBD55 Study Hall (Collaboratorium) East High 1 B-125 East High TBD TBD

56 Storage/ Guest Locker Room East High 1 C-109 East High TBD TBD57 Office East High 1 C-112 East High TBD TBD58 Coach's Office East High 1 C-114 East High TBD TBD59 Phys. Ed Office East High 1 C-115 East High TBD TBD60 Storage East High 1 C-116 East High TBD TBD

61 Office East High 1 D-109B East High TBD TBD62 Reception East High 1 D-109 East High TBD TBD63 Office East High 1 D-109A East High TBD TBD64 General Science East High 1 D-110 East High TBD TBD65 Office East High 1 D-111 East High TBD TBD66 Classroom (9th) East High 1 D-112 East High TBD TBD67 Computer CR (9th) East High 1 D-113 East High TBD TBD68 Classroom (9th) East High 1 D-114 East High TBD TBD69 Classroom (9th) East High 1 D-115 East High TBD TBD70 Classroom (9th) East High 1 D-116 East High TBD TBD71 Classroom (9th) East High 1 D-117 East High TBD TBD72 Classroom (9th) East High 1 D-118 East High TBD TBD73 Classroom (9th) East High 1 D-119 East High TBD TBD74 Classroom (9th) East High 1 D-120 East High TBD TBD75 Reception East High 2 D-209 East High TBD TBD76 Office East High 2 D-209A East High TBD TBD77 LS Principals Office East High 2 D-209B East High TBD TBD

C - Wing

B - Wing

D - Wing West

Page 32: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

East High SchoolMove Matrix - East High School Internal Moves

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

EAST HIGH SCHOOL CURRENT INFORMATION atEast High NEW INFORMATION at East High

78 Computer Classroom (7th/8th) East High 2 D-211 East High TBD TBD79 Classroom (7th) East High 2 D-212 East High TBD TBD80 Waiting East High 2 D-213 East High TBD TBD81 Classroom (7th) East High 2 D-214 East High TBD TBD82 Office East High 2 D-215 East High TBD TBD83 Classroom (6th) East High 2 D-216 East High TBD TBD84 Classroom (6th) East High 2 D-217 East High TBD TBD85 Classroom (6th) East High 2 D-218 East High TBD TBD86 Classroom (6th) East High 2 D-219 East High TBD TBD87 Classroom (6th) East High 2 D-220 East High TBD TBD88 Classroom (6th) East High 2 D-221 East High TBD TBD89 Classroom (6th) East High 2 D-222 East High TBD TBD90 Office East High 3 D-309 East High TBD TBD91 Office East High 3 D-309A East High TBD TBD92 Classroom (8th) East High 3 D-310 East High TBD TBD93 Classroom (8th) East High 3 D-311 East High TBD TBD94 Classroom (8th) East High 3 D-312 East High TBD TBD95 Classroom (8th) East High 3 D-314 East High TBD TBD96 Classroom (8th) East High 3 D-315 East High TBD TBD97 Classroom (8th) East High 3 D-316 East High TBD TBD98 Classroom (7th) East High 3 D-317 East High TBD TBD99 Classroom (7th) East High 3 D-318 East High TBD TBD100 Classroom (7th) East High 3 D-319 East High TBD TBD101 Classroom (7th) East High 3 D-320 East High TBD TBD102 Classroom (7th) East High 3 D-321 East High TBD TBD

Page 33: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

Rochester Schools Modernization ProgramEdison Career Technology High School

Move Matrix 2019

Moving Services BidJanuary, 9, 2019

# FIRST NAME LAST NAME GRADE ROOM TYPE BUILDING FLOOR ROOM # BUILDING FLOOR CONSTRUCTIONCOMPLETIONROOM #

MOVEDATE

COMMENTS

1 LANDON-GARDNERJACQUIE ADVERTISING DESIGN EDISON 2 2E11 EDISON 1 1A3 TBD 20192 LANDON-GARDNERJACQUIE ADVERTISING DESIGN EDISON 2 2E12 EDISON 1 1A3 TBD 20193 LANDON-GARDNERJACQUIE ADVERTISING DESIGN EDISON 2 2E13 EDISON 1 1A3 TBD 20194 CLIFFORD COLLIER DIGITAL AUDIO EDISON 2 2E2 EDISON 1 1A4 TBD 20195 DONALD MURPHY FOUNDATIONS DMAC EDISON 1 1D8 EDISON 1 1A5 TBD 20196 CLIFFORD COLLIER INTERACTIVE MEDIA EDISON 2 2E2A EDISON 1 1A6 TBD 20197 ANNE NIEDERPRUEM ART EDISON 1 1C1 EDISON 1 1A8 TBD 20198 STEVEN LEONE ART/DDP EDISON 2 2E2A EDISON 1 1A9 TBD 20199 JAMES KROLL ART EDISON 1 1D4 EDISON 1 1A10 TBD 201910 ALANNA WILCOX ART EDISON 1 1C1 EDISON 1 1A11 TBD 201911 LAURA BARSTOW DIGITAL VIDEO CLASS/LAB EDISON 2 2E8 EDISON 1 1A17 TBD 201912 LAURA BARSTOW DIGITAL VIDEO CONTROL RM EDISON 2 2E8 EDISON 1 1A17A TBD 201913 LAURA BARSTOW DIGITAL VIDEO TELEVISION

STUDIOEDISON 2 2E8 EDISON 1 1A17B TBD 2019

14 LAURA BARSTOW DIGITAL VIDEO STORAGE EDISON 2 2E8 EDISON 1 1A17C TBD 201915 LAURA BARSTOW DIGITAL VIDEO AUDIO

RECORDINGEDISON 2 2E8 EDISON 1 1A17D TBD 2019

EDISON TECH CURRENT INFORMATION NEW INFORMATION

1/18/2019

Page 34: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

School No. 22Move Matrix - Swing Space to School 22

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

1 ELT. Admin. Franklin 1 111F School 22 TBD TBD2 Principal Franklin 1 126 School 22 TBD TBD3 Asst. Principal Franklin 1 127A School 22 TBD TBD4 Asst. Principal Franklin 2 219 School 22 TBD TBD5 CASE Franklin 2 219 School 22 TBD TBD6 Comm. Site Coord. Franklin 1 119 School 22 TBD TBD7 Clerk Franklin 1 131 School 22 TBD TBD8 Sch. Secretary Franklin 1 131 School 22 TBD TBD9 Clerk Franklin 1 131 School 22 TBD TBD10 Pre-K Bil. Teacher Franklin B 17 School 22 TBD TBD11 Pre-K Teacher Franklin B 16 School 22 TBD TBD12 Pre-K Teacher Franklin B 13 School 22 TBD TBD13 Pre-K Bilingual Para Franklin B 17 School 22 TBD TBD14 Kindergarten Franklin 1 107 School 22 TBD TBD15 Kindergarten Franklin 1 110 School 22 TBD TBD16 Kindergarten Franklin 1 104 School 22 TBD TBD17 Kindergarten - Bilingual Franklin 1 116 School 22 TBD TBD18 1st Grade Franklin 1 100 School 22 TBD TBD19 1st Grade Franklin 1 101 School 22 TBD TBD20 1st Grade Franklin 1 103 School 22 TBD TBD21 1st Grade - Bilingual Franklin 1 102 School 22 TBD TBD22 2nd Grade Franklin 1 121 School 22 TBD TBD23 2nd Grade Franklin 2 217 School 22 TBD TBD24 2nd Grade Franklin 1 125 School 22 TBD TBD25 2nd Grade - Bilingual Franklin 1 126 School 22 TBD TBD26 2nd Grade Franklin 2 221 School 22 TBD TBD27 2nd Grade - 12:1+1 Franklin 7 School 22 TBD TBD28 2/3rd Grade - 6:1+2 Franklin 1 105 School 22 TBD TBD29 3rd Grade Franklin 2 212 School 22 TBD TBD30 3rd Grade Franklin 2 218 School 22 TBD TBD31 3rd Grade Franklin 2 211 School 22 TBD TBD32 3rd Grade - Bil. Integrated Franklin 2 213 School 22 TBD TBD33 3rd Grade - 12:1+1 Franklin 1 115 School 22 TBD TBD34 4th Grade Franklin 2 207 School 22 TBD TBD35 4th Grade Franklin 2 225 School 22 TBD TBD36 4th Grade Franklin 2 209 School 22 TBD TBD37 4th Grade Franklin 2 207 School 22 TBD TBD38 4th Grade - Bil. Integrated Franklin 2 216 School 22 TBD TBD39 4th Grade - 12:1+1 Franklin 2 204 School 22 TBD TBD40 5th Grade Franklin 3 School 22 TBD TBD41 5th Grade Franklin 2 201 School 22 TBD TBD

SCHOOL 22 CURRENT INFORMATION atFRANKLIN HS NEW INFORMATION at SCHOOL 22

Page 35: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

School No. 22Move Matrix - Swing Space to School 22

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

SCHOOL 22 CURRENT INFORMATION atFRANKLIN HS NEW INFORMATION at SCHOOL 22

42 5th Grade Franklin 5 School 22 TBD TBD43 5th Grade - Bilingual Franklin 2 210 School 22 TBD TBD44 6th Grade Franklin 30 School 22 TBD TBD45 6th Grade Franklin 1 School 22 TBD TBD46 6th Grade - 15:1 Franklin 2 215 School 22 TBD TBD47 6th Grade - Bilingual Franklin 28 School 22 TBD TBD48 Lunch Aide Franklin 57 School 22 TBD TBD49 Food Service Franklin 57 School 22 TBD TBD50 Food Service Manager Franklin 69 School 22 TBD TBD51 Lunch Aide Franklin N/A School 22 TBD TBD52 Computer Lab (Basement) Franklin B 12 School 22 TBD TBD53 Computer Lab (1st Floor) Franklin 1 128 School 22 TBD TBD54 Computer Lab (2nd Floor) Franklin 2 202 School 22 TBD TBD55 Conference Room (CSE) Franklin 1 137 School 22 TBD TBD56 Lounge Franklin 52 School 22 TBD TBD57 Cafeteria Franklin 57 School 22 TBD TBD58 PE (High School) Franklin 1 179 School 22 TBD TBD59 Nurse Franklin 1 1330 School 22 TBD TBD60 Health Aide Franklin 1 133 School 22 TBD TBD61 Bil. Consultant Teacher Franklin 2 205 School 22 TBD TBD62 OT Franklin 1 132 School 22 TBD TBD63 PT Franklin 1 132 School 22 TBD TBD64 Psychologist Franklin 1 111-B School 22 TBD TBD65 PE Teacher Franklin 33 School 22 TBD TBD66 PE Teacher Franklin 33 School 22 TBD TBD67 PE Teacher Franklin 33 School 22 TBD TBD68 Library Franklin 2 200/202 School 22 TBD TBD69 Resource Teacher Franklin 1 106 School 22 TBD TBD70 Music 1 Franklin 21 School 22 TBD TBD71 Bilingual Resource Teacher Franklin 2 205 School 22 TBD TBD72 ESOL Franklin 15 School 22 TBD TBD73 ESOL Franklin 9 School 22 TBD TBD74 ESOL (PM only) Franklin 9 School 22 TBD TBD75 ESOL Franklin 15 School 22 TBD TBD76 Speech Franklin 1 111-D School 22 TBD TBD77 TOA Franklin 1 111-C School 22 TBD TBD78 Music 2 Franklin 25 School 22 TBD TBD79 Intervention Teacher Franklin 2 205 School 22 TBD TBD80 Art Franklin 2 203 School 22 TBD TBD81 Art Franklin 2 203 School 22 TBD TBD82 Instructional Coach (W) Franklin N/A School 22 TBD TBD

Page 36: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

School No. 22Move Matrix - Swing Space to School 22

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

SCHOOL 22 CURRENT INFORMATION atFRANKLIN HS NEW INFORMATION at SCHOOL 22

83 Intervention Teacher Franklin N/A School 22 TBD TBD84 K-3 Reading Teacher Franklin 1 111-H School 22 TBD TBD85 4-6 Instructional Coach (M,T) Franklin 1 111-G School 22 TBD TBD86 K-2 Coach (M,T,F) Franklin 1 111 School 22 TBD TBD87 Social Worker Franklin 1 141-L School 22 TBD TBD88 Consultant Teacher Franklin 1 106 School 22 TBD TBD89 Speech Franklin 1 111-E School 22 TBD TBD90 Speech Franklin 1 111-F School 22 TBD TBD91 Speech Franklin 1 111-A School 22 TBD TBD92 ESOL Franklin 9 School 22 TBD TBD93 Bil. Social Worker (Wpm, TH, F) Franklin 1 137-F School 22 TBD TBD94 School Safety Officer Franklin N/A School 22 TBD TBD95 Intervention Teacher Franklin 1 114-A School 22 TBD TBD96 Spec. Ed. Franklin 1 111 School 22 TBD TBD97 Head Custodian Franklin 53 School 22 TBD TBD98 Cleaner Franklin N/A School 22 TBD TBD99 Custodian Franklin N/A School 22 TBD TBD100 Cleaner Franklin N/A School 22 TBD TBD101 Parent Liaison Franklin N/A School 22 TBD TBD

Page 37: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

School No. 54Move Matrix - School 54 to Jefferson

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

1 Principal School 54 1 120 Jefferson 3 TBD2 Asst. Principal School 54 1 118 Jefferson 3 TBD3 Help Zone School 54 1 104 Jefferson 3 TBD4 ISS School 54 1 104 Jefferson 3 TBD5 Kindergarten School 54 1 101 Jefferson 3 TBD6 Kindergarten School 54 1 102 Jefferson 3 TBD7 1st Grade School 54 1 103 Jefferson 3 TBD8 1st Grade School 54 1 100 Jefferson 3 TBD9 1st Grade School 54 1 107 Jefferson 3 TBD10 2nd Grade School 54 1 136 Jefferson 3 TBD11 2nd Grade School 54 1 136 Jefferson 3 TBD12 2nd Grade School 54 1 138 Jefferson 3 TBD13 2nd Grade School 54 1 138 Jefferson 3 TBD14 2nd Grade School 54 1 142 Jefferson 3 TBD15 3rd Grade School 54 1 140 Jefferson 3 TBD16 3rd Grade School 54 2 220 Jefferson 3 TBD17 3rd Grade School 54 1 109 Jefferson 3 TBD18 4th Grade School 54 2 201 Jefferson 3 TBD19 4th Grade School 54 2 203 Jefferson 3 TBD20 4th Grade School 54 2 218 Jefferson 3 TBD21 5th Grade School 54 2 206 Jefferson 3 TBD22 5th Grade School 54 2 226 Jefferson 3 TBD23 6th Grade School 54 2 213 Jefferson 3 TBD24 6th Grade School 54 2 222 Jefferson 3 TBD25 6th Grade School 54 2 222 Jefferson 3 TBD26 6th Grade School 54 2 205 Jefferson 3 TBD27 SpEd 2nd/3rd 8:1:2 - SC School 54 1 111 Jefferson 3 TBD28 SpEd 2nd/3rd 8:1:2 - TA School 54 1 111 Jefferson 3 TBD29 SpEd 2nd/3rd 8:1:2 - Para School 54 1 111 Jefferson 3 TBD30 SpEd 2nd/3rd 8:1:2 - 1:1 Para School 54 1 111 Jefferson 3 TBD31 SpEd 6th 12:1:1 School 54 2 224 Jefferson 3 TBD32 SpEd 6th 12:1:1 School 54 2 224 Jefferson 3 TBD33 SpEd 6th 12:1:1 School 54 2 224 Jefferson 3 TBD34 SpEd 1st/2nd 8:1:2 - SC School 54 1 105 Jefferson 3 TBD35 SpEd 1st/2nd 8:1:2 - TA School 54 1 105 Jefferson 3 TBD36 SpEd 1st/2nd 8:1:2 - Para School 54 1 105 Jefferson 3 TBD37 SpEd 1st/2nd 8:1:2 School 54 1 105 Jefferson 3 TBD38 Psychologist School 54 1 130 Jefferson 3 TBD39 Social Worker School 54 2 229 Jefferson 3 TBD40 Social Worker School 54 2 229 Jefferson 3 TBD41 Resource School 54 2 216 Jefferson 3 TBD

SCHOOL 54 CURRENT INFORMATION atSCHOOL 54 NEW INFORMATION at JEFFERSON HS

Page 38: Rochester Joint Schools Construction Board (RJSCB ... · Rochester Schools Modernization Program January 9, 2019 – Addendum #1 Rochester Joint Schools Construction Board (RJSCB)

Rochester Joint Schools Construction BoardRochester Schools Modernization Program

School No. 54Move Matrix - School 54 to Jefferson

Moving Services BidJanuary 9, 2019

# LAST NAME FIRST NAME GRADE BUILDING FLOOR ROOM # BUILDING FLOOR ROOM # GRADE COMMENTS

SCHOOL 54 CURRENT INFORMATION atSCHOOL 54 NEW INFORMATION at JEFFERSON HS

42 Resource School 54 2 216 Jefferson 3 TBD43 Resource School 54 2 202 Jefferson 3 TBD44 Resource School 54 2 216 Jefferson 3 TBD45 Reading School 54 2 216 Jefferson 3 TBD46 CASE School 54 1 152 Jefferson 3 TBD47 ESOL School 54 2 225 Jefferson 3 TBD48 ESOL School 54 2 225 Jefferson 3 TBD49 ESOL School 54 2 225 Jefferson 3 TBD50 Intervention School 54 2 216 Jefferson 3 TBD51 Intervention School 54 2 216 Jefferson 3 TBD52 Speech School 54 2 202 Jefferson 3 TBD53 Speech School 54 2 202 Jefferson 3 TBD54 Nurse School 54 1 128 Jefferson 2 TBD55 Nurse School 54 1 128 Jefferson 2 TBD56 OT School 54 2 217 Jefferson 3 TBD57 PT School 54 2 217 Jefferson 3 TBD58 Break Aide School 54 1 106 Jefferson 3 TBD59 Home School Assitant School 54 1 132 Jefferson 3 TBD60 Parent Liaison School 54 1 132 Jefferson 3 TBD61 Head Secretary School 54 1 120 Jefferson 3 TBD62 Clerk School 54 1 120 Jefferson 1 TBD63 Head Custodian School 54 1 125 NA NA NA NA Not relocating to Jefferson64 Asst. Custodian School 54 1 125 NA NA NA NA Not relocating to Jefferson65 Custodian - Cleaner School 54 1 125 NA NA NA NA Not relocating to Jefferson66 Custodian - Cleaner School 54 1 125 NA NA NA NA Not relocating to Jefferson67 Cook Manager School 54 1 139 NA NA NA NA Not relocating to Jefferson68 Porter School 54 1 139 NA NA NA NA Not relocating to Jefferson69 Food Services Helper School 54 1 139 NA NA NA NA Not relocating to Jefferson70 Librarian School 54 2 207 Jefferson 3 TBD71 Vocal Music School 54 1 T1 Jefferson 3 TBD72 Band (0.5) School 54 1 T2 Jefferson 4 TBD73 Art School 54 1 106 Jefferson 3 TBD74 PE Teacher School 54 1 129 Jefferson 2 TBD75 PE Teacher School 54 1 129 Jefferson 2 TBD76 PE Storage School 54 1 Jefferson 2 TBD77 Teacher Lounge School 54 2 216A Jefferson 3 TBD78 Computer Lab School 54 2 204 Jefferson 3 TBD79 Conference Room School 54 1 134 Jefferson 3 TBD80 Text Book Storage Room School 54 Jefferson 3 TBD81 Storage Room School 54 Jefferson 3 TBD