rock pile sampling program - trelawney mining and

17
Rock Pile Sampling Program Trelawney Mining and Exploration Inc. Massey Property, Sudbury Mining Division, Ontario (June - July 2011) Claims Due July 28, 2011 Township/Area Claim Number SALTER 4247933 SALTER 4247934 SALTER 4247935 SALTER 4247936 SALTER 4247937 MAY 4247938 MAY 4247939 MAY 4247940 Gary Nassif, M.Sc., P.Geo. July 27, 2011

Upload: others

Post on 16-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Rock Pile Sampling Program

Trelawney Mining and Exploration Inc.

Massey Property, Sudbury Mining Division, Ontario

(June - July 2011)

Claims Due July 28, 2011

Township/Area Claim

Number

SALTER 4247933

SALTER 4247934

SALTER 4247935

SALTER 4247936

SALTER 4247937

MAY 4247938

MAY 4247939

MAY 4247940

Gary Nassif, M.Sc., P.Geo.

July 27, 2011

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

i

Table of Contents

Summary ......................................................................................................................................... 1

Introduction .................................................................................................................................... 1

Location and Access ........................................................................................................................ 1

Property Description ....................................................................................................................... 2

Regional Geology ............................................................................................................................ 4

Property Geology ............................................................................................................................ 5

Economic Geology........................................................................................................................... 5

Work Performed ............................................................................................................................. 6

Results ............................................................................................................................................. 6

Recommendations for Further Exploration .................................................................................... 7

Work Performed By ........................................................................................................................ 7

List of Tables

Table 1a. Massey Property – Unpatented Claims ........................................................................... 3

Table 1b. Massey Property – Patented Claims ............................................................................... 3

List of Figures

Figure 1. Massey Property – Location Map .................................................................................... 2

Figure 2. Massey Property – Claim Map ......................................................................................... 4

Appendices

Appendix A. Assay Certificates .........................................................................................................i

Appendix B. Claim Map. .................................................................................................................. ii

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

1

Summary

A sampling program of the ore pile located near the Hermina No. 3 Shaft on Trelawney Mining

and Exploration’s Massey Property was undertaken during the months of June 30 and July 1,

2011. A total of 62 rock samples were taken from the ore pile and assayed for gold, copper,

silver and uranium. Samples were submitted to Cattarello Assayers Inc. in Timmins, Ontario.

Only partial assay results were received from the laboratory at the time that this report was

written. Results of 50 out 62 gold assays were received and the rest of the assays for gold for

the remaining 12 samples and 62 silver, copper and uranium assays are pending.

Introduction

Trelawney recently spent June and July refurbishing and upgrading the access roads within their

Massey Property for the purpose of undertaken exploration activities. The road took four

weeks to re-establish to access the ore pile for sampling. Five culverts were placed along the

access road. Contractor excavator and rock truck equipment were utilized for the

refurbishment of the road. These expenses are not being applied for assessment work credit as

they are considered as infrastructure-upgrading costs. The excavator, however, was

systematically utilized for sampling rock samples from the ore pile. The purpose of the program

was to characterize the type of mineralization on the property, envisaged to be of an IOCG-type

deposit. A total of 62 samples were collected for gold, copper, silver and uranium assays.

Location and Access

The Massey Property occupies parts of Salter and May Townships, approximately 85 km west of

Sudbury, Ontario in the Sudbury Mining Division. The property is located about 7 km

northwest of the town of Massey. The NTS reference for the area is 41J/1.

Access to the property is provided by provincial highway number 17 and seconday gravel roads.

About 4 km west of Massey, Seldom Seen Road branches off of highway 17 in a northerly

direction linking up with a seasonal road at its terminus. This provides access from the western

side of the property. Some secondary logging roads and old trails provide access to various

parts of the property by foot or all-terrane vehicle.

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

2

Figure 1. Massey Property –Location Map

Property Description

Trelawney Mining and Exploration Inc. holds 100% interest in 20 unpatented mining claims (88

claim units – 1,377 hectares) and 5 patented mining claims (6 claim units - 97 hectares) on its

Massey Property. The contiguous claim group occupies a total of 1,474 hectares. The property

is located 85 kilometres west of Sudbury, Ontario

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

3

Table 1a. Mishi Property – Unpatented Claims

TownshipClaim

Number

Recording

Date

Claim Due

Date

Work

Required

Total

Applied

Total

Reserve

MAY 4247938 2009-Jul-28 2011-Jul-28 $1,200 $0 $0

MAY 4247939 2009-Jul-28 2011-Jul-28 $800 $0 $0

MAY 4247940 2009-Jul-28 2011-Jul-28 $1,600 $0 $0

SALTER 3009372 2004-May-03 2012-May-03 $1,600 $9,600 $1,827

SALTER 3009451 2004-May-03 2012-May-03 $5,600 $33,600 $0

SALTER 3009452 2004-May-03 2012-May-03 $4,800 $28,800 $0

SALTER 3009453 2004-May-03 2012-May-03 $2,800 $16,800 $45,015

SALTER 4247933 2009-Jul-28 2011-Jul-28 $400 $0 $0

SALTER 4247934 2009-Jul-28 2011-Jul-28 $1,200 $0 $0

SALTER 4247935 2009-Jul-28 2011-Jul-28 $1,200 $0 $0

SALTER 4247936 2009-Jul-28 2011-Jul-28 $1,200 $0 $0

SALTER 4247937 2009-Jul-28 2011-Jul-28 $1,600 $0 $0

SALTER 4247941 2009-Sep-28 2011-Sep-28 $1,600 $0 $0

SALTER 4247942 2009-Sep-28 2011-Sep-28 $800 $0 $0

SALTER 4247943 2009-Sep-28 2011-Sep-28 $1,600 $0 $0

SALTER 4247944 2009-Sep-28 2011-Sep-28 $3,200 $0 $0

SALTER 4247945 2009-Sep-28 2011-Sep-28 $1,600 $0 $0

SALTER 4247946 2009-Sep-28 2011-Sep-28 $800 $0 $0

SALTER 4247947 2009-Sep-28 2011-Sep-28 $400 $0 $0

SALTER 4249441 2009-Sep-28 2011-Sep-28 $1,200 $0 $0

Note: shaded claims due July 28, 2011

Table 1b. Mishi Property – Patented Claims

Township Parcel

SALTER 17730SWS

SALTER 17730SWS

SALTER 17729SWS

SALTER 17729SWS

SALTER 17730SWS

Description

S1/2 SE1/4 SEC16 - S77917-18

SE1/4 SW1/4 SEC16 - S77919

SW1/4 OF SW1/4 SEC16 - S77920

SE1/4 SE1/4 SEC17 - S77921

SW1/4 OF SE1/4 SEC17 - S77922

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

4

Figure 2. Massey Property - Claim Map

Regional Geology

The Massey Property lies within the Southern Structural Province of the Canadian Shield. This

province is characterized by the occurrence of the Paleoproterozoic Huronian Supergroup, an

assemblage of mainly sedimentary and subordinate volcanic rocks that rest unconformably on

older Archean rocks of the Superior Province.

The Huronian Supergroup forms an arcuate belt extending for a distance of about 450 km from

the east shore of Lake Superior to Sudbury and northeast to the Noranda area of Quebec. The

Huronian rocks consist of 4 unconformity bounded mainly sedimentary groups: the Elliot Lake

group, the Hough Lake group, the Quirke Lake group and the Cobalt Group. The Elliot Lake

Group is the only one that contains volcanic rocks. All of the Huronian rocks were folded and

faulted during at least one major orogenic event - the Penokian orogeny. Several igneous

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

5

intrusions are spatially associated with rocks of the Huronian Supergroup. Layered gabbro -

Anorthosite intrusions known as the East Bull Lake Suite are localized along the base of the

sedimentary pile. Examples are the East Bull Lake Intrusion and the May Township anorthosite.

Nipissing gabbro bodies form dikes and sills that are widespread throughout the Huronian

Supergroup. Several granitic to syenitic bodies intrude the Huronian sediments. Rocks in the

Southern Province have been folded and faulted during the Penokian orogeny. However a

major structure associated with these rocks is the Murray fault. This fault is thought to have

been active for about 1 billion years and it has in part controlled the location and distribution of

the sedimentary and volcanic rocks. Dip slip movements of 10 to 15 kilometres have been

estimated for the Murray fault. This fault crosses the southern portion of the Massey Property.

Property Geology

The oldest rocks exposed on the property are the Archean granite and mafic metavolcanics

underlying the northern part of the property. These rocks have been intruded by a gabbro -

anorthosite body. Along the southern edge of the property, units composed of quartzite or

argillite of quartzite and/or argillite are present. These rocks have been assigned to the Pecors

and Matinenda formations, respectively. Deformation is most evident in the argillites where a

prominent foliation increases in intensity towards the south likely due to the effects of the

Murray fault. Nipissing gabbro intrudes all other rock types on the property.

Economic Geology

This Massey Property covers three former producing Cu mines, the Massey mine, the Hermina

number 1 mine and the Hermina number 3 mine. The deposits on the property exhibit many

characteristics in common with an important class of giant ore deposits referred to as iron

oxide – copper – gold (IOCG) deposits. One of the most well-known of these deposits is the

huge Olympic Dam deposit in Austrailia. This deposit contains 2.3 billion tonnes grading 1.3 %

Cu, 0.5 g/t Au and 0.4 kg/t U3O8.

The Massey mine consists of three workings over a strike length of about 1.6 km and the claims

cover two of these. It was discovered around 1900 and it produced during the periods 1901-

1906, 1915-1917 and 1968-1970. An estimated 18,535 tonnes of ore grading 2.82 % Cu were

mined from the deposit. A 1956 report on the area indicated that only 600 metres of an

estimated 2400 metres of known strike length were ever drill tested.

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

6

The Hermina mine consists of two shafts about 1700 metres apart. The main shaft (#3) is 500

feet deep with development on four levels. It was reportedly sunk on a quartz “vein” up to 9

metres wide mineralized with chalcopyrite. The “vein” contains many wallrock clasts and is

associated with hematite, chlorite and silica alteration of the enclosing granite. A total of

11,900 tonnes of ore were mined at a grade of 4.21 % Cu. The number 1 shaft is 312 feet deep

with development on three levels. Past sampling of the dumps at the #3 and # 1 shaft areas

returned values of up to 1.88 g/t Au and 9.56 g/t Au respectively. Although the Hermina does

not entirely fit the classic IOCG model it appears to be located on a splay of the Murray fault

with its confluence near the Massey mine and it may be related to geological events in this

area.

Work Performed

Trelawney Mining and Exploration personnel undertook a sampling program of the Hermina no.

3 rock pile located on claim 3009372 on June 30 and July 1, 2011. The purpose of the sampling

program was to determine the metal content of the rock pile.

The work was completed by Neil Gauthier (supervisor) of Trelawney with the assistance of two

employees. One contracted excavator was used for the sampling. Samples were taken at two

depths, at 2 feet and 6 feet below the surface of the ore pile.

A total of 20 hours over 2 days was required for the sampling program. The samples were

tagged and bagged and sent via pickup by Trelawney personnel to Cattarello Assayers Inc.

Results of 50 out 62 gold assays were received and the balance of the assays for gold for the

remaining 12 samples and 62 silver, copper and uranium assays are pending.

Results

The assay certificates for gold for 50 of the 62 rock samples submitted have been received.

Samples numbers are in sequence from 07701 to 07750. Samples were assayed for gold using

Fire Assay techniques at Cattarello Assayers Inc. in Timmins, Ontario.

Assays returned gold values ranging from below detection limits of 5 ppb (0.005 g/t Au) to a

high of 86 ppb (0.086 g/t Au.). The average grade of the rocks sampled was 21 ppb or 0.021 g/t

Au.

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

7

Recommendations for Further Exploration

It appears that the preliminary results for the rock pile at the Hermina #3 Mine indicate that

this pile is most likely waste rock from Hermina. Final assay results for the remaining gold

assays as well as copper, silver and uranium will provide a more definite picture on the pile’s

metal content.

Work Performed By

The field sampling program was supervised by Neil Gauthier of Trelawney Mining and

Exploration. This report was written and completed on July 27, 2011 by Gary Nassif of

Trelawney.

(signed July 27, 2011)

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

i

Appendix A – Assay Certificates

Certificate Of Analysis

Cattarello Assayers Inc.

Number Of Samples: 50

Client: Massey

Received Date: 2011-07-04

Job: 858

Processed Date: 2011-07-05

Type Of Sample: Rock

Report Date: 2011-07-07

Test Method: FAAA

Au Au-Dup

FA-GEO FA-GEO

gr/mt gr/mt

0.005 0.005

Sample ID ======== ========

07701 0.086

07702 <0.005

07703 0.013

07704 <0.005

07705 0.030

07706 0.026

07707 <0.005

07708 <0.005

07709 <0.005

07710 <0.005

07711 0.021

07712 0.047 0.046

07713 0.033

07714 0.025

07715 <0.005

07716 0.006

07717 <0.005

07718 <0.005

07719 <0.005

07720 0.027

07721 0.009

07722 <0.005

07723 0.040

07724 0.036

07725 0.019

07726 0.013

07727 0.069

07728 0.021

07729 <0.005

07730 0.014

Approved By Chief Analyst:

Issue Date Revision Date Rev # Owner Form ID Page

2/18/2010 2/18/2010 1 Chris Hacquard ANAL-002 1 Of 2

Certificate Of Analysis

Cattarello Assayers Inc.

Number Of Samples: 50

Client: Massey

Received Date: 2011-07-04

Job: 858

Processed Date: 2011-07-05

Type Of Sample: Rock

Report Date: 2011-07-07

Test Method: FAAA

Au Au-Dup

FA-GEO FA-GEO

gr/mt gr/mt

0.005 0.005

Sample ID ======== ========

07731 0.022

07732 <0.005

07733 0.027 0.024

07734 0.009

07735 0.006

07736 0.008

07737 0.038

07738 0.042

07739 0.011

07740 0.012

07741 0.015

07742 0.022

07743 0.010

07744 0.014

07745 0.036

07746 0.067

07747 0.018

07748 0.009

07749 0.084 0.098

07750 0.046

Approved By Chief Analyst:

Issue Date Revision Date Rev # Owner Form ID Page

2/18/2010 2/18/2010 1 Chris Hacquard ANAL-002 2 Of 2

Trelawney Mining and Exploration Inc. Massey Property Assessment Work

ii

Appendix B – Claim Map

SALTER MAY

GOUGHTENNYSON

Massey PropertyClaim Map

0 2

km

X

Hermina no. 3rock pile

upgradedaccess road

0241E (04/2006) © Queen’s Printer for Ontario, 2006

Ministry of Northern Development and Mines

Assessment Work Performed

on Mining Lands

Folder Identification Number (office use)

Transaction Number (office use)

W -

Mining Act, Subsections 65(2) and 66(3), R.S.O. 1990 Submission Number (office use)

2.

Personal information collected on this form is obtained under the authority of subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, this information is used to maintain a public record. This information will be also used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Senior Manager, Mining Lands Section, Ministry of Northern Development and Mines, 3

rd Floor, 933 Ramsey Lake Road, Sudbury ON P3E 6B5. Telephone 1 888 415-9845.

Instructions: - For work performed on Crown Lands before recording a claim, use form Assessment Work Performed Before Recording Claim(s)

- Please type or print in ink. - Submit to Geoscience Assessment Office, 933 Ramsey Lake Road,

Sudbury ON P3E 6B5. Telephone 1 888 415-9845.

Note: All correspondence will be sent to the address on record in the Provincial Recording Office, as required under the

Mining Act, subsections 19(6) and (8).

1. Submitter I am an authorized agent or the recorded holder (if a company, enter name of person submitting)

Name (last)

NASSIF

(first)

GARY

(initial)

J

Client number (optional)

402664 Address – Unit number, Street number, Street name

SUITE 2700 - 130 ADELAIDE STREET WEST

City, Town or Village

TORONTO

Province or State

ON

Country

CANADA

Postal Code

M5X1A6

Telephone number

( 416 ) 363-8567 ext 103

Fax number

( 416 ) 216-8535

E-mail address (optional)

[email protected]

2. Provide

where there is a surface rights holder, before starting ground exploration work for the first time on a staked claim you must provide notice to the surface rights holder(s) as required by the Mining Act and provide proof of notification to the Ministry

your technical report and maps in paper or on a compact disc

a current legible map showing how the contiguous mining lands are linked for assigning work

proof of beneficial interest (if assigning amongst different recorded holders)

3. Work Performed This includes the date you traveled to the field or mobilized equipment to the date the technical report was completed.

From: DD/MMMM/YYYY (enter the month in full in this box e.g. 12/July/2008)

30/June/2011

To: DD/MMMM/YYYY (enter the month in full in this box e.g. 28/July/2008)

27/July/2011

Regulations: Calculate the time-adjusted credit column, in the tables below, as follows:

1. Work filed within 2 years of performance is claimed at 100%. (Enter 100% of actual costs in both of the last 2 columns).

2. Work filed after 2 years and up to 5 years after performance is credited at 50%. (Enter 100% of actual costs in the 2nd

last column and 50% in the last column.)

3. Work older than 5 years is not eligible for credit.

3(A) Dates and Costs of Work Performed

From date DD/MM/YYYY

To date DD/MM/YYYY

Work Type Unit of Work (example: hours/day,

metres of drilling, km of grid lines)

Cost per

Unit of

Work

Actual Costs

($)

Time-Adjusted

Credit ($) (See notes 1 and 2

above)

30/06/2011 01/07/2011 supervisor 20 hours 60 1,200 1200

30/06/2011 01/07/2011 labour 20 hours 25 500 500

30/06/2011 01/07/2011 labour 20 hours 20 400 400

30/06/2011 01/07/2011 operator 20 hours 80 1,600 1,600

30/06/2011 01/07/2011 assaying 62 samples 40 2,480 2,480

3(B) Associated Costs

From date DD/MM/YYYY

To date DD/MM/YYYY

Associated Costs (example: supplies, mobilization, demobilization)

Actual Costs

($)

Time-Adjusted

Credit ($) (See notes 1 and 2

above)

30/06/2011 01/07/2011 excavator rental (20 hrs at $165/hr) 3,300 3,300

30/06/2011 01/07/2011 mobilization,demobilization 3,500 3,500

27/07/2011 27/07/2011 Nassif - Report writing, drafting 500 500

0241E (04/2006) © Queen’s Printer for Ontario, 2006

3(C) Transportation Costs

From date DD/MM/YYYY

To date DD/MM/YYYY

Transportation Costs Actual Costs

($)

Time-Adjusted

Credit ($) (See notes 1 and 2

above)

30/06/2011 01/07/2011 240 km x 3 trips x $0.40/km 288 288

04/07/2011 04/07/2011 sample shipping: 6 hrs x $20/hr labour 120 120

30/06/2011 01/07/2011 fuel 400 400

3(D) Food and Lodging Costs

From date DD/MM/YYYY

To date DD/MM/YYYY

Food and Lodging Costs Actual Costs

($)

Time-Adjusted

Credit ($) (See notes 1 and 2

above)

30/06/2011 01/07/2011 320 320 320

Total of Time Adjusted Credit Columns (3A through 3D) = Total Value of Assessment Work 14608

4. Type of Work Performed – please check off the type of survey performed (optional)

Work Type Survey Type Work Type Survey Type

Airborne geophysical

AEM

AMAG

AVLF

other airborne geophysical

Geophysical EM

GRAV

IP

MAG

VLF

other geophysical

Assays assay

beneficiation

geochemical

Physical manual work re-cutting claim lines

mechanical work trenching

overburden stripping other physical

Drilling diamond drilling

drill core submission to MNDM

overburden drilling

boring other than core

Prospecting Prospecting

Rehabilitation Rehabilitation

Other – Please print

examples: microscopic studies, bulk sampling, downhole geophysics

Line cutting line cutting

Geochemical geochemical

Geological geological

5. Commodities Explored for - please list (optional)

Gold, Copper, Silver, Uranium

6. Work Performed, Assigned, Banked

6(A) If you performed work on mining lands other than a staked mining claim, fill in the table below. Lease or Patented

Land or Licence of Occupation (LO) or Other Mining Lands: Work performed, assigned or banked

Lease # or Parcel # or G # or LO #

GAO-Approved Identifier

(office use only)

Hectares Amount of Work Performed on this

Land ($)

Amount of Credits Assigned to Mining

Claim(s) ($)

Bank (Amount of credits to be assigned at a future date)

Column Totals for 6(A)

Schedule attached (if you have more entries attach a schedule)

0241E (04/2006) © Queen’s Printer for Ontario, 2006

6(B) Mining Claims: Work performed, applied, assigned, banked or assigned from table 6(A) above

Mining Claim Number Number of Claim Units

Amount of Work Performed on this

Claim ($)

Amount of Credits Applied to this

Claim ($)

Amount of Credits Assigned to Other Mining Claims ($)

Bank (Amount of credits

to be applied or assigned at a future date)

3009372 4 14,608 9,200 5,408

4247933 1 400

4247934 3 1,200

4247935 3 1,200

4247936 3 1,200

4247937 4 1,600

4247938 3 1,200

4247939 2 800

4247940 4 1,600

Column Total for 6(B) 14,608 9,200 9,200 5,408

Column Totals of 6(A) + 6(B) 14,608

9,200 5,408

Note: Work performed on mining claims = credits applied + credits banked

Schedule attached (if you have more entries attach a schedule)

7. Some of the credits claimed in this Assessment Work form may be reduced. Please indicate below how you want your

credits reduced if they are not approved. Check ( ) in the boxes below. If you have not indicated how your remaining

credits are to be allocated, credits will be reduced from the Bank first, followed by option number 2 if necessary.

Credits are to be cutback:

1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated; or

2. Credits are to be cut back starting with the claims listed last, working backwards; or

3. Credits are to be cut back equally over all claims listed in this Assessment Work form; or

4. Credits are to be cut back as shown below:

List the claim numbers in the order you want the credits to be cut back (setting your priority list).

Priority Claim Number Priority Claim Number

1. 6.

2. 7.

3. 8.

4. 9.

5. 10.

Schedule attached (if you have more entries attach a schedule)

8. Certification by Recorded Holder or Authorized Agent

I, , do hereby certify on 27/07/2011 that I have personal (Signature) (DD/MM/YYYY)

knowledge of the facts set forth in this Assessment Work form having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.

“Mining Lands Website: http://www.ontario.ca/mininglands”