WA SCHOOLS PUBLIC PRIVATE PARTNERSHIP PROJECT

DATE

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 1

01COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 3

Humans are social creatures, and our

greatest achievements have been

collaborative efforts, often vast ones

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 4

COLLABORATION

So, why isn’t collaboration the centrepiece of all building projects?

WHAT IS HOLDING US BACK?

• Culture (habit)?

BUILDING BRIGHTER FUTURES | PAGE 5

COLLABORATION

So, why isn’t collaboration the centrepiece of all building projects?

WHAT IS HOLDING US BACK?

• Culture?

• Insecurity?

BUILDING BRIGHTER FUTURES | PAGE 6

COLLABORATION

So, why isn’t collaboration the centrepiece of all building projects?

WHAT IS HOLDING US BACK?

• Culture?

• Insecurity?

• Conservatism?

BUILDING BRIGHTER FUTURES | PAGE 7

COLLABORATION

So, why isn’t collaboration the centrepiece of all building projects?

WHAT IS HOLDING US BACK?

• Culture?

• Insecurity?

• Conservatism?

• Trust?

BUILDING BRIGHTER FUTURES | PAGE 8

COLLABORATION

So, why isn’t collaboration the centrepiece of all building projects?

WHAT IS HOLDING US BACK?

• Culture?

• Insecurity?

• Conservatism?

• Trust?

• Self Preservation?

02TYPICAL DESIGN APPROACH WITHIN AUSTRALIAN INDUSTRY

BUILDING BRIGHTER FUTURES | PAGE 10

COLLABORATION

Progressively add companies and people to

the project team, often after critical planning

decisions have been made and often under

contractual terms that promote silo

thinking.

BUILDING BRIGHTER FUTURES | PAGE 11

COLLABORATION

DESIGN PHASE PROCESS

.

Brief Master Planning

Concept Design

Sketch Design

Design Development Documentation

Construction

Client

Architect/Planner

Cost Planner

Builder

Engineer/s

BUILDING BRIGHTER FUTURES | PAGE 12

COLLABORATION

CONSEQUENCES

Decisions are made without access to the knowledge

held by all the parties that make a successful project,

ultimately impacting:

1. Quality

2. Time

3. Cost

BUILDING BRIGHTER FUTURES | PAGE 13

COLLABORATION

ACCESS TO TEAM KNOWLEDGE

WK 30 - 80

WK 20 - 30

WK 10-20

WK 1-10

BUILDING BRIGHTER FUTURES | PAGE 14

COLLABORATION

We need to understand that when

people work together their

potential is significantly

multiplied.

BUILDING BRIGHTER FUTURES | PAGE 15

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 16

COLLABORATION

So how does our industry transition

from a culture of silo thinking,

i.e. what is best for my business to a

culture of collaboration (teamwork),

i.e. what is best for the team and the

project?

BUILDING BRIGHTER FUTURES | PAGE 17

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 18

The shift from silo to collaboration

is simple

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 19

COLLABORATION

THE SHIFT = VALUE FOR MONEY

Identify the procurement method that

will align the participants to work toward a

common goal, with opportunities for all

parties to create value, a win…win

environment

BUILDING BRIGHTER FUTURES | PAGE 20

COLLABORATION

THE SHIFT = VALUE FOR MONEY

Resulting in:

• Client & User Satisfaction

• Great Design (presence, function, adaptability)

• Safe Construction

• Cost Effectiveness (capital & lifecycle)

• Quality

• Completion Certainty (return on investment)

03CASE STUDY- WA SCHOOLS PPP

BUILDING BRIGHTER FUTURES | PAGE 22

WA SCHOOLS PPP - OVERVIEW

BUILDING BRIGHTER FUTURES | PAGE 23

WA SCHOOLS PPP - OVERVIEW

WA SCHOOL PPP

ELLENBROOK

NORTH

SECONDARY

LANDSDALE

PRIMARY

LAKELANDS

SECONDARY

HAMMOND

PARK

SECONDARY

HARRISDALE

STAGE 2

SECONDARY

ALKIMOS

PRIMARY

BYFORD

PRIMARYBALDIVIS

PRIMARY

BUILDING BRIGHTER FUTURES | PAGE 24

WA SCHOOLS PPP –

BUILDING BRIGHTER FUTURES | PAGE 25

WA SCHOOLS PPP –

BUILDING BRIGHTER FUTURES | PAGE 26

WA SCHOOLS PPP –

BUILDING BRIGHTER FUTURES | PAGE 27

WA SCHOOLS PPP – SECONDARY SCHOOLS

BUILDING BRIGHTER FUTURES | PAGE 28

WA SCHOOLS PPP –

BUILDING BRIGHTER FUTURES | PAGE 29

COMMON GOAL – WIN THE BID!

.

TEAM

Client

COLLABORATION

Architect

Subbies

Cost

ManagerPlanners

Builder Facilities

Manager

Engineers

BUILDING BRIGHTER FUTURES | PAGE 30

COMMON GOAL – WIN THE BID!

.

COLLABORATION

CIVIC PRESENCE

FLEXIBILITY

COMMUNITY & ENVIRONMENT

QUALITY

LIFECYCLE vs CAPITAL

COSTS

PROGRAMME SAFETY

FUNCTIONALITY

FORM & MATERIALITY

BUILDING BRIGHTER FUTURES | PAGE 31

With everyone in the team

committed to winning, the silos

were demolished and in their place is

a culture of collaborative

decision making, decisions

made on the basis of what are best

for team and significantly the project.

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 32

BREAKING DOWN THE SILOS

COLLABORATION

BUILDING BRIGHTER FUTURES | PAGE 33

GOVERNING PRINCIPLES

WA SCHOOL PPP

GOVERNING DESIGN

PRINCIPLES

BUILDING BRIGHTER FUTURES | PAGE 34

GOVERNING PRINCIPLES

MASTERPLANNING

1. Site Infrastructure

2. Geotechnical

3. Site Levels

4. Traffic

5. Security

6. Fire Protection

7. Planning

BUILDING BRIGHTER FUTURES | PAGE 35

GOVERNING PRINCIPLES

Sewer Connection Point Designed

Sewer Connection Point

Water Connection Point Designed

Communications Connection Point Designed

Communication Connection Point –

Power Connection Point Designed

Power Connection Point

Gas Connection Point Designed

Gas Connection Point

Water Connection Point

Fire Connection Point Designed

Site Infrastructure

BUILDING BRIGHTER FUTURES | PAGE 36

GOVERNING PRINCIPLES

Geotechnical &

Site Levels

BUILDING BRIGHTER FUTURES | PAGE 37

GOVERNING PRINCIPLES

Traffic/ Site Access

& Security

BUILDING BRIGHTER FUTURES | PAGE 38

GOVERNING PRINCIPLES

Traffic/ Site Access

& Security

BUILDING BRIGHTER FUTURES | PAGE 39

GOVERNING PRINCIPLES

Traffic/ Site Access

& Security

BUILDING BRIGHTER FUTURES | PAGE 40

GOVERNING PRINCIPLES

Fire Protection

BUILDING BRIGHTER FUTURES | PAGE 41

GOVERNING PRINCIPLES

Planning

04ADAPTABILITY

BUILDING BRIGHTER FUTURES | PAGE 43

SECONDARY SCHOOL FLOOR PLANS

• Structural envelopeLearning Communities

BUILDING BRIGHTER FUTURES | PAGE 44

SECONDARY SCHOOL FLOOR PLANS

• Lightweight Infill

• Flexibility of layout and services

Learning Communities

BUILDING BRIGHTER FUTURES | PAGE 45

SECONDARY SCHOOL FLOOR PLANS

• Reconfiguration of Spaces

• Flexibility of layout

• Outdoor Learning Areas

Learning Communities

BUILDING BRIGHTER FUTURES | PAGE 46

SECONDARY SCHOOL FLOOR PLANS

• Structural envelopeLearning Communities

BUILDING BRIGHTER FUTURES | PAGE 47

SECONDARY SCHOOL FLOOR PLANS

• Adaptability of lightweight structure

• Reconfiguration of spaces

• Reconfiguration of services

Learning Communities

BUILDING BRIGHTER FUTURES | PAGE 48

SECONDARY SCHOOL FLOOR PLANS

• Adaptability of lightweight structure

• Reconfiguration of spaces

• Reconfiguration of services

Learning Communities

BUILDING BRIGHTER FUTURES | PAGE 49

SECONDARY SCHOOL FLOOR PLANS

• Structural envelopeLearning Communities

BUILDING BRIGHTER FUTURES | PAGE 50

SECONDARY SCHOOL FLOOR PLANS

• Adopting new pedagogies

• Responding to new technologies

• Delivering quality educational outcomes

Learning Communities

BUILDING BRIGHTER FUTURES | PAGE 51

SECONDARY SCHOOL FLOOR PLANS

• Adopting new pedagogies

• Responding to new technologies

• Delivering quality educational outcomes

Learning Communities

05ADAPTABILITY – ALTERNATE APPROACH

BUILDING BRIGHTER FUTURES | PAGE 53

SUPERSTRUCTURE

BUILDING BRIGHTER FUTURES | PAGE 54

SUPERSTRUCTURE

BUILDING BRIGHTER FUTURES | PAGE 55

LIGHTWEIGHT STRUCTURAL STEEL

ADVANTAGES

• No Load Bearing

Internal Elements

• Efficient & Safe Erection

• Speed

• Cost (reduced tonnage)

• Quality (Pre-Fabrication)

• Adaptability (speed, cost)

06ESD – SOLAR PV

BUILDING BRIGHTER FUTURES | PAGE 57

2.3 mega watts across 8 sites

ESD

BUILDING BRIGHTER FUTURES | PAGE 58

GHG Emission Performance

Benchmarking

ESD- ENERGY BALANCE

61.3

69.9

48.6

37.0

13.9

-4.0 -10.0

-

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

GBCA Ref. WA Avg. WA Trend EDUWEST EDUWEST w/

Solar PV

EDUWEST

NET Energy

kgCO₂-e/m²

07MATERIAL SELECTION

BUILDING BRIGHTER FUTURES | PAGE 60

MATERIAL SELECTION

DRIVERS FOR SELECTION

• Availability (lead times, demand)

• Size & shape of steel members

• Fabrication Efficiency

• Coatings on steel members

• Transport & Erection

BUILDING BRIGHTER FUTURES | PAGE 61

MATERIAL SELECTION

DRIVERS FOR SELECTION

• Quality (durability, low maintenance)

• Fitness for Purpose – Safety in Design

• Manufacturer Location/ Lead times

• Warranty Periods

• Proven Product on Market

• Life Cycle costs

• Buy Local Policy

08DELIVERING EFFICIENCY

BUILDING BRIGHTER FUTURES | PAGE 63

COLLABORATION

We now understand that when

people work together their

potential is significantly

multiplied.

BUILDING BRIGHTER FUTURES | PAGE 64

COLLABORATION

How do I know this?

BUILDING BRIGHTER FUTURES | PAGE 65

COLLABORATION

DRIVERS FOR SUCCESS

• Commitment to a common goal (vision)

• Planning….strategies that will drive success

• A one-team, best for project culture

• Recognition, celebrate success

• Feedback (honest and regular)

• Leadership