Page 1: Rohini Patil Profile

PROFILE IN VARIOUS ASSIGNMENTS

IN THE FIELD

MECHANICAL & ELECTRICAL SERVICES OF

ROHINI PATIL DEE,DBM,MMS, PGDPM with 16+ years of experience

Contact No:-8237002837 Email:- [email protected]

Page 2: Rohini Patil Profile

Responsibilities

Spearheading MEP Services teams & coordination for MEP services activities in multiple industry segments with various alternatives.

In design build contract, the work performed –

Feasibility & concept study of the project Formulation and freezing of Owners Project Requirement (OPR) Formulation of RFP for design/service consultants Evaluation & on boarding of design/service consultants Evaluation and on boarding of stakeholders .

Finalising the design as per project requirement for all services in tandem.

Supporting client to obtain all statutory approvals for entire infrastructure.

Effective deliverables from respective stakeholders and providing value added services facilitating efficient, time bound and quality Project Management which includes –

Complete design validation. Preparation of CAPEX and OPEX Checking of tender documents prepared by consultants Prequalification of contractors

Page 3: Rohini Patil Profile

Floating of the tender to qualified vendors Analysis, reframe and finalisation of tenders cost comparisons Support the client for techno commercial negotiations & zeroing prospective vendor.

Post award of contract checking –

All Quality Assurance Plans (QAP’s) General Arrangement drawings Material submittal Factory testing of all services equipment's Conducting & owning review meetings Co-ordination and control with architects, all service consultants and vendors for trouble

shooting and smooth execution of project in time , budgeted cost with quality based on tracked MSP/ P 6 schedule .

Evaluation, finalisation, documentation and freezing of project completion report (PCR) and handing over documents for archival.

Responsibilities

Page 4: Rohini Patil Profile

Worked with Clientele

Page 5: Rohini Patil Profile

Accomplished Projects

General Electric Multimodal Facility, ChakanLand Area: 67 Acres Built Area: sq. ft.Project Commencement: Project Completion: Services cost: 60 Cr.

Volkswagen – Training Centre & other facilities, PuneLand Area: 7.5 Acres Built Area: 250,000 sq. ft.Project Commencement: Oct 2011Project Completion: Dec 2012Services cost: 30 Cr

Page 6: Rohini Patil Profile

SE Composites Ltd. Office Facility, Padubidri (Designed)Land Area: 2 Acres

Built Area: 80,000 sq. ft.Project Commencement: June 2008Project Completion: NAServices Cost : 40 Cr.

Mercedes Benz India, City Bus Project, Chakan, PuneLand Area: 3.5 Acres Built Area: 100,000 sq. ft.Project Commencement: July 2010Project Completion: Feb 2011Services Cost:- 40 Cr

Accomplished Projects

Page 7: Rohini Patil Profile

Accomplished Projects

Mercedes Benz - Q3 Block Allied Structures, Chakan, Pune Land Area: 10 Acres Built Area: 500,000 sq. ft.Project Commencement: Feb 2012Project Completion: OngoingServices cost: 40 Cr.

Mercedes Benz India Ltd., Paint shop project Chakan, PuneBuilt Area: 11,000 sq. ft.Project Commencement: Oct 2014Project Completion: OngoingServices cost: 60 Cr.

Mercedes Benz India Ltd., QII Body Shop East Side Expansion, Chakan, PuneBuilt Area: 11,000 sq. ft.Project Commencement: Oct 2014Project Completion: OngoingServices cost: 20 Cr.

Page 8: Rohini Patil Profile

Design of Gas based captive power plant for ONGC- Ankaleshwar 0f 3 MW.

Degremont India, Dehli-2.4 MW, Essar Oil corporation -2 MW, HNGL Bhadurgarh-

4MW, GAIL - Delhi4 MW, Cadila , Ahmadabad- 2 MW etc

Electrical Design and contract management of Galaxy surfactants Ltd, Mumbai,Jagdamba auto components, Kohinoor city Mumbai, SSF Hyma muscat, Soujanyacolours Mumbai.

Electrical design and contract management of Aeroflex Industries Mumbai, Bil care pharmsuticals, Bangalore.Barbeque nation hotel chain for Pune, Mumbai, Ahmedabad, Delhi, Chennai, Vizag etc.

Accomplished & Ongoing Projects

Suzlon Energy Ltd, Expansion of Bay No. 3 &4 Rotor Blade Unit -PadubidriBuilt Area: 18,500 sq. ft.Project Commencement: Jan 2015Project Completion: OngoingServices cost: 1 Cr.

Suzlon Energy Ltd, New WTG Plant at AnantpurBuilt Area: 18,500 sq. ft.Project Commencement: Jan 2015Project Completion: OngoingServices cost: 60 Cr

Feasibility study for entire pipe manufacturing unit for Finolex industries, chichwad,PuneComplete MEP concept finalization for Firodiya Hospital Project, Chinchwad.

Page 9: Rohini Patil Profile

Alfa Laval Project – Shirwal Land Area: 47 Acres Project Commencement: Aug 2013Project Completion: Dec 2014Services cost: 60 Cr.

Lupin Research Park –Lavale , Pune

Land Area: 19 Acres Built Area: 300,000 sq. ft. (B+G+3)Project Commencement: May 2012Project Completion: OngoingServices Cost:60 Cr.

Accomplished & Ongoing Projects

Page 10: Rohini Patil Profile

Ongoing Projects

Suzlon Energy Ltd, Expansion of Bay No. O Rotor Blade Unit - DhuleBuilt Area: 18,500 sq. ft.Project Commencement: Jan 2015Project Completion: OngoingServices Cost: 1 Cr.

Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - JaisalmerBuilt Area: 150,000 sq. ft.Project Commencement: Dec 2014Project Completion: OngoingServices Cost: 50 Cr.

Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - RatlamBuilt Area: 150,000 sq. ft.Project Commencement: Dec 2014Project Completion: OngoingServices cost:60 Cr.

Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - AnantapurBuilt Area: 150,000 sq. ft.Project Commencement: Dec 2014Project Completion: OngoingServices cost: 120 Cr.

Suzlon Energy Ltd, Manufacturing Rotor Blade Unit - BhujBuilt Area: 150,000 sq. ft.Project Commencement: Dec 2014Project Completion: OngoingServices cost: 50 Cr

Suzlon Energy Ltd, New Nacelle Plant at Anantpur Built Area: 18,500 sq. ft.Project Commencement: Jan 2015Project Completion: OngoingServices cost: 60 Cr

Page 11: Rohini Patil Profile

Value Addition in Projects

Lupin Research Park , PuneSl. No Description Remark

1 Proposed and implemented Switchgears ratings from oversized designs to optimum required

Savings @ 10% on panel costs

2 Proposed and implemented Transformer rating from 3500 KVA to 3150 KVA as

Saving of cost of about 40 lacks and avoided non standardisation of equipment's

3 Change in UPS configuration scheme implemented

Intangible

4 Proposed design up gradation and testing modalities to ensure sustaining the DGs to bear 100% load conditions

Intangible

5 For selection lighting fixtures suggested good brands and simplified the packages for lighting s.a Trilux , Arco

Resulted in excellent reduction of cost saving and delivery of fixtures on site in required time

6 Implementing correct and cost effective solution in design which was missed at the stage designing s.a scrubber panel, pump panels, fire fighting panels feeding from main D..G set

Avoided delay and cost reduction

Page 12: Rohini Patil Profile

Value Addition in Projects

Lupin Research Park , PuneSl. No Description Remark

7 Avoided the delay in installation of linear lights by close coordination with Triux to deliver correct length lighting fixtures on site

Intangible

8 Oversized design in rain water system reduced to optimum requirement

Saving of cost of about 4 lacks

9 Change in UPS configuration scheme implemented

Intangible

10 Direct procurement strategy for major CAPEX items

Proved 5% - 7% savings in project cost

11 Finalising the operation philosophy in detail to optimise the available D.G Set in absence of grid power

Intangible

12 Proposed and implemented option formaintenance free solar lighting system

Added Leed points and OPEX cost with a ROI in 3 years.

Page 13: Rohini Patil Profile

Project Photos

Lupin Research Park , Pune

Page 14: Rohini Patil Profile

Project Photos

Lupin Research Park , Pune

Page 15: Rohini Patil Profile

Value Addition in Projects

Sl. No Remark

1 Substantial CAPEX cost savings potential is available in case heating systems are procured locally.

Intangible

2 Close coordination with Paint process supplier EISENMANN

Smooth and clash free execution of project

3 Proposed reduction in transformer capacity from 3150 to 2500 KVA with detail study of loading pattern and transformer efficiency

Cost saving of about 1.CR. And avoided standardisation of equipment's and ease of operation

4 Direct procurement strategy for major CAPEX items

Proved 5% - 7% savings in project cost

5 Finalising the operation philosophy in detail Intangible

6 Supported MBIL to do the Liasoning with MSEDCL authorities to get sanction of power

Intangible

Mercedes Benz Paint Shop, Chakan , Pune

Page 16: Rohini Patil Profile

Project Photos

Mercedes Benz Paint Shop, Chakan , Pune

Page 17: Rohini Patil Profile

Value Addition in Projects

Sl. No Remark

1 Suggested for nearest location of transformer and D.G sets near factory premises instead of the location suggested by client as per Vastu.

Achieved the cost saving of about 1 Cr /Plant and avoided the voltage drop and power losses for all the RBU units

2 Proposed and implemented aluminium cables for crane of required size instead of cu cables which are asked by crane vendor

Resulted in smooth crane operation and resulted in cost saving of 50 lacsper plant

3 For selection lighting fixtures suggested LED lighting in finishing area where more LUX level is required.

Resulted in cost saving of about 1.0 CR

4 Direct procurement strategy for major CAPEX items

Proved 5% - 7% savings in project cost

5 On the plants where the bay expansion is required suggested use of existing resources and optimisation of cost

Intangible

6 Supported Suzlon to do the Liasoning with respective state authorities to get sanction of power

Intangible

Suzlon Rotor Blade Units at all over India

Page 18: Rohini Patil Profile

Project Photos

Suzlon Rotor Blade Units at all over India

Page 19: Rohini Patil Profile

Value Addition in Projects

Sl. No Remark

1 Coordination with Factory Mutual for Fire fighting scheme approvals, with complete COMPLIANCE till project completion and handover.

Intangible

2 Implementation of fabricated raceway for cable laying & light fitting installation instead of suspended rod

Achieved Cost saving of 5 % and ease of installation

3 D.G Set with 100 % block loading was installed avoiding deviation in specifications and requirement

Intangible

4 Proposed options for lighting control s.a Schneider, Honeywell ,GE .Concluded techno commercial analysis and finally GE lighting control system was finalised. Very close working with GE US team to finalise the lighting control design and get it executed from SM and SPCL.

Intangible

5 Owned and guided GE to do the liasoning with MSEDCL for getting sanction of power. And resulted in saving of cost of substation and land

Cost saving of 5 Cr.

General Electric Multimodal Manufacturing Facility, Chakan, Pune

Page 20: Rohini Patil Profile

Project Photos

General Electric Multimodal Manufacturing Facility, Chakan, Pune

Page 21: Rohini Patil Profile

Project Achievements

General Electric Multimodal Manufacturing Facility, Chakan, Pune

Page 22: Rohini Patil Profile

Retrospective learning's in my career

Detail study of clients requirement needs to be understood before start of design. This will avoid the reworking on the design aspects.

The BOQ prepared should be crystal clear matching the specifications and drawings to avoid incremental cost in project budget during execution.

The contract documents should be very clear specifying the detail contract conditions to avoid any further claims by vendor.

The exact coordination between all services from design to execution considering the site conditions is must.

While finalising the CAPEX items , selection and suggestion of vendors should be proper by consultant's to avoid confusion of client

The Inspection of the CAPEX equipment's should be done considering the site conditions and the design done.

Selection of vendor should be perfect to achieve the project time , cost & quality.

Before suggesting any new options to client detail study of the market trend is to carried out in detail.

Project deliverables should be the passion till completion to maintain the ownership of the project.

Page 23: Rohini Patil Profile

Sl.No Educational Qualification

Year Of passing Marks obtained

Name of institute

1 P.G Diploma in Project Management

2010-11 63% Pune University

2. Master in management science

June-2002 61.75% Pune University

3. Diploma in Business Management

April-1999 66.16% Shivaji University

4. Diploma in Electrical Engineering

May -1994 62.45% B.T.E Mumbai

5. S.S.C March-1990 83.42% Maharashtra State Board.

Educational Qualifications

THANK YOU