Roller Compacted ConcreteEmbankments and Spillways
Coal Refuse Disposal Facility SeminarApril 10, 2014
Jonathan Pittman, PE
![Page 2: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/2.jpg)
What is RCC?
Roller compacted concrete (RCC) is a concrete of zero slump consistency in its
unhardened state that is transported, placed, and compacted using earth and
rockfill construction equipment.
![Page 3: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/3.jpg)
1982: 433,000 CY of RCC Placed for USACE Willow Creek Dam in Oregon
1978: Japan Uses RCC for Shimajigawa Dam
1975: Emergency Repair of Tarbela Dam Outlet Tunnel in Pakistan
1970 to 1973: TVA and USACE Research
1964: Alpe Gera Dam in Italy
1951 to 1977: Number of New Mass Concrete Dams Experiences Significant Drop-off ($$$)
A little bit of history on RCC…
![Page 4: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/4.jpg)
Most Common Applications
Water Dams
Pavements
What about coal refuse disposal impoundments?
![Page 5: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/5.jpg)
STABILITY
DURABILITY
SEEPAGECONTROL
What Are The Major Performance Requirements/Objectives for Dams?
BALANCING COST AND
LONG-TERM PERFORMANCE
…RCC is a great option!
![Page 6: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/6.jpg)
Use the Following Strategies to Achieve These Requirements / Objectives
Mix Proportions Material Quality / Aggregate Production Batching / Mixing Operations Placement Compaction Verification
![Page 7: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/7.jpg)
Factors Affecting RCC Mix Design
Durability / Long Term Performance Size of Project Materials Available Cost Thermal Requirements Bond / Bedding Aesthetics
![Page 8: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/8.jpg)
RCC Ingredients…that looks familiar!
Cement Pozzolans
Fine Aggregate Coarse Aggregate
Admixtures
![Page 9: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/9.jpg)
Ingredients…Conventional vs. RCC
![Page 10: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/10.jpg)
Well, what about all that aggregate we already have?
Potential advantage Base course gradations typically result in a
more well-graded, workable mix that requires less cementitious material and water
Fines content ↑ - Water ↑ - Strength ↓
![Page 11: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/11.jpg)
Mix Properties
Strength (fc’ and lift joints) fc’ typically ranges from 2,000 to 4,000 psi Lift Joints: Φ = 40-45 deg; c = 50-100 psi
Wet Unit Weight Typically 145 to 155 pcf
Uniformity Compactability / Workability
![Page 12: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/12.jpg)
RCC On-Site Mixing and Batching
Continuous Flow-Through Pugmill
Bowen, 2011
Batch Plant
![Page 13: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/13.jpg)
Options Trucks Loaders Trackhoes Scrapers Conveyor Belts Crane and Bucket Combination
RCC Transportation
Considerations Freefall Height Pile Height Handling Technique for
Depositing Contamination
Goal is Prompt, Non-Segregated Delivery…
Clute, 2011
![Page 14: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/14.jpg)
Segregation
Clute, 2011
![Page 15: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/15.jpg)
RCC Placement
Typically spread in lifts by a bulldozer 12” thick compacted lift is typical
Placement rates vary (100 – 1,000 cy/day) “Continuous” operation – typ. and preferred
![Page 16: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/16.jpg)
Thermal Considerations
Influenced by individual mix materials Cooling requirements or seasonal
placement restrictions are common Delicate balance of ensuring long-term
performance vs. increased costs
![Page 17: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/17.jpg)
RCC Compaction
98% of Apparent Maximum Density (AMD) Determine no. of passes and equipment
required to achieve density in test section Start compaction within 10 min of spreading
Take Care Not to Over-Compact…
![Page 18: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/18.jpg)
Lift Joint Treatment – Fresh, Warm or Cold?
Clute, 2011
![Page 19: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/19.jpg)
Steps – Unformed or Formed?
![Page 20: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/20.jpg)
QA/QC
Visual Inspection / Observation
Field & Lab Testing Instrumentation
![Page 21: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/21.jpg)
QA/QC
Nichols, 2011
![Page 22: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/22.jpg)
Let’s Talk About Cost!?
Hansen, 2011
![Page 23: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/23.jpg)
What Drives the Cost of RCC?
Economy Fixed Costs Plant Test section
Unit Costs Aggregate availability and gradation Cement / Fly Ash
Production Placement complexities Specified restrictions
![Page 24: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/24.jpg)
Main Dam
Can’t go upstream or downstream, but I need more storage or it’s time to build the cap!
What about RCC for this guy?
![Page 25: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/25.jpg)
Saddle Dike
I’m at this little saddle in the ridge and I’ve got no room to build a dike!
![Page 26: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/26.jpg)
Open Channel Spillway
So, let’s take this example a little further…
![Page 27: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/27.jpg)
Open Channel SpillwayRequirements and Objectives
1) Capacity2) Durability3) Stability
4) Cost5) Seepage Losses6) Aesthetics
![Page 28: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/28.jpg)
Open Channel Spillway ExampleMix and Design Details
Total RCC Volume of 5,000 CY (20’ Raise) Pugmill On-Site Deposited by Conveyor No – Trial Mix Design / Yes – Test Section 50/50 Cement and Fly Ash Off-Site Aggregate Less Stringent Thermal Requirements Lift Joint Preparation Thorough Cleaning Typically No Bedding Mortar
![Page 29: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/29.jpg)
Open Channel Spillway ExampleCost Estimate
RCC Quantity = 5,000 CY Relatively small quantity results in higher up-
front costs per CY Simple, mass placement (no joints, etc.) Less stringent mix design, thermal, and lift
joint requirements result in lower cost Reasonable cost might be $110/CY Cost of RCC = 5,000 CY x $110/CY = $550k Need to also consider foundation prep, etc.
![Page 30: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/30.jpg)
Open Channel Spillway ExampleSchedule Estimate
Production estimate considers small quantity and placement area versus simple, mass placement
Reasonable production rate may be 200 cy/day Assume production schedule of 10 hrs/day RCC Schedule ~ 25 days Need to consider time for mobilization, setup,
trial mix design (not required), uniformity testing, test section, foundation prep, etc.
![Page 31: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/31.jpg)
Why RCC?
Flexibility in Design and Construction Much Smaller Footprint Readily Available Equipment Potential On-Site Aggregate Source Durability and Erosion Resistance Rapid Placement Relatively Low Cost Proven Performance
![Page 32: Roller Compacted Concrete Embankments and Spillways](https://reader034.vdocuments.net/reader034/viewer/2022051404/584e03161a28ab85739241f0/html5/thumbnails/32.jpg)
Lots of Great Info Out There!