ronald kempf enterprises

15
BUILDING SPECIFICATIONS AREA: Approx 153,000 square feet STORIES: 3 stories FRAMING: Steel Frame EXTERIOR: Metal Studs, Brick, Storefront Glass PRIMARY USE: Class-A Office Space CONTRACTING: Negotiated BUDGET: Varied City Center Office Building Southfield, MI Brookfield Office Park Southfield, MI BUILDING SPECIFICATIONS AREA: Approx 286,000 square feet STORIES: 3 stories each FRAMING: Steel Frame EXTERIOR: Metal Studs, Brick, Storefront Glass, Curtain Wall, Stone Facades PRIMARY USE: Class A Office Space CONTRACTING: Negotiated BUDGET: Varied

Upload: ronladkempfenterprises

Post on 09-May-2015

382 views

Category:

Documents


2 download

DESCRIPTION

Ronald Kempf EnterprisesProject ManagementCost ManagementClaims Settlement

TRANSCRIPT

Page 1: Ronald Kempf Enterprises

BUILDING SPECIFICATIONS

AREA: Approx 153,000 square feet

STORIES: 3 stories

FRAMING: Steel Frame

EXTERIOR: Metal Studs, Brick, Storefront Glass

PRIMARY USE: Class-A Office Space

CONTRACTING: Negotiated

BUDGET: Varied

City Center Office Building Southfield, MI

Brookfield Office Park Southfield, MI

BUILDING SPECIFICATIONS

AREA: Approx 286,000 square feet

STORIES: 3 stories each

FRAMING: Steel Frame

EXTERIOR: Metal Studs, Brick, Storefront Glass, Curtain Wall, Stone Facades

PRIMARY USE: Class A Office Space

CONTRACTING: Negotiated

BUDGET: Varied

Page 2: Ronald Kempf Enterprises

Ronald Kempf Enterprises

Project Management

Cost Management

Claims Settlement

“We allow our clients to do what they do best

While they allow us to do what we do best”

Page 3: Ronald Kempf Enterprises

Ronald Kempf Enterprises is a collaborative of

highly experienced construction consultants that,

over time, have mastered their specialty in:

Civil Construction

Structural Steel and Concrete

Architectural Trades

Plumbing and Fire Protection

Heating, Ventilating and Air Conditioning

Electrical and Low Voltage Systems

The company’s strengths stem from, over 90

years’ experience in Project Management, Cost

Management and Claims Settlement.

Page 4: Ronald Kempf Enterprises

Project Management Services

Pre-construction Phase

Design Phase

Construction Phase

Page 5: Ronald Kempf Enterprises

Pre-construction Phase

Meet to review current building requirements.

Equipment, furniture, fixtures and special needs.

Manage the selection of all consultants.

Prepare contracts for consultants.

 

Prepare master design plan and schedule.

 

Provide program cost model.

 

Formulate communication structure.

Page 6: Ronald Kempf Enterprises

North County Medical Office Building Escondido, CA

BUILDING SPECIFICATIONS

AREA: 50,000 square feet

STORIES: 2-stories

FRAMING: Structural Steel

EXTERIOR: Plaster on Metal Studs

PRIMARY USE: Medical Office Suite.

CONTRACTING: Negotiated Fee with Guaranteed Maximum Price

BUDGET: $8,000,000

Village of Torrey Pines East (North Campus Housing) Campus of UC San Diego

BUILDING SPECIFICATIONS

AREA: Approx 146,000 square feet

STORIES: Multiple buildings including 13-story

FRAMING: Concrete Frame

EXTERIOR: Plaster on Metal Studs

PRIMARY USE: Student Housing.

CONTRACTING: CM at Risk

BUDGET: $96,000,000

Page 7: Ronald Kempf Enterprises

Design Phase

Prepare a detailed design schedule

Refine the costs to the current design features.

Install Cost management/value engineering constraints.

Formulate the preparation of bidding documents.

Manage the bidding process.

Analyze general contractors bid for compliance.

Negotiate prepare contract for general contractor.

Page 8: Ronald Kempf Enterprises

Cost Management Services

Schematic Design Cost Plan

Design Development Cost Plan

Design Development Cross Check

Construction Document Cost Plan

Construction Document Cost Review

Page 9: Ronald Kempf Enterprises

Construction Phase

Attend project progress meetings.

Manage the flow of information

Review and evaluate changer order request

Make unannounced site visits.

Evaluate and assess construction progress.

Settlements of construction conflicts.

Minimize the effect of any schedule delays.

Review monthly billings.

Final package and budget reconciliation.

Page 10: Ronald Kempf Enterprises

Construction Claims Services

Assessing the Claim

Procedures in Rejecting a Claim

Procedures in Settling a Claim

 

Settlement Conferences

Conclusion

Page 11: Ronald Kempf Enterprises

BUILDING SPECIFICATIONS

AREA: Approx 46,000 square feet

STORIES: Existing 2-story

FRAMING: Concrete Frame

EXTERIOR: Painted concrete with aluminum framed windows and glass curtain wall

PRIMARY USE: Office

CONTRACTING: Fixed Fee with Guaranteed Maximum Price

BUDGET: $8,000,000

BUILDING SPECIFICATIONS

AREA: Approx 62,000 square feet

STORIES: Existing 4-story

FRAMING: Steel Frame

EXTERIOR: Metal Stud frame with plaster and aluminum framed windows and glass curtain wall

PRIMARY USE: Medical Office

CONTRACTING: Preconstruction Services, Competitive Bid

BUDGET: $12,000,000

Mission Internal Medical Group Mission Viejo, CA

Hunsaker & Associates San Diego, CA

Page 12: Ronald Kempf Enterprises

Over 26 years of experience in construction and construction management

Has been involved with over $ 8,000,000,000 in construction projects.

Experience in General Contracting, Land Development and Cost Management

Owned a that specialized in earthwork, underground utilities, and paving.

Bachelor of Science Construction Management University of Cincinnati

Associates in Applied Science Civil/Construction Technology University of Toledo

Software Expertise in On Screen Takeoff, Microsoft Excel, Microsoft Word, Microsoft Project

Actively involved in San Diego Lion’s Club, Little League Umpire, Strategic Trusted Advisors Roundtable

Ronald W. Kempf, President

Page 13: Ronald Kempf Enterprises

Over 27 years of experience of mechanical construction

Started a Mechanical Consulting Firm in the early 1990’s

Involved with over $ 8,000,000,000 in construction projects

Software Expertise in Microsoft Excel, Microsoft Word, Microsoft Project and Timberline Estimating Software

Actively involved in The Autobahn Society as a member and preservationist, The State of California Parks as donor and patron

Member of the National Association of Female Executives and International Association of Plumbing and Mechanical Professionals

Jody Brumfield, Mechanical Consultant

Page 14: Ronald Kempf Enterprises

Brings over 39 years of experience in electrical construction

Started his construction career in the 1960’s with Disney Imaging

Involved with over $ 12,000,000,000 in construction projects

Retired Lieutenant in the US Navy served on the USS Greenfish

Orange Coast College Construction Management

Software Expertise in On Screen Takeoff, Microsoft Excel, Microsoft Word and Microsoft Project

Is a Certified Professional Estimator ASPE CRT No 1600-860-278-1 and a Licensed Electrical Contractor California C-10

Richard Holmes, Electrical Consultant

Page 15: Ronald Kempf Enterprises

Muir Housing Campus of UC San Diego

BUILDING SPECIFICATIONS

AREA: Approx 91,000 square feet

STORIES: Multiple 9-story buildings

FRAMING: Concrete Frame

EXTERIOR: Plaster on Metal Studs with punched openings

PRIMARY USE: Student Housing.

CONTRACTING: CM at Risk

BUDGET: $42,500,000

National Oceanic Atmospheric Agency La Jolla, CA

BUILDING SPECIFICATIONS

AREA: Approx 220,000 square feet

STORIES: 4-story building with 2 subterranean parking levels

FRAMING: Concrete Frame

EXTERIOR: Plaster on Metal Studs with aluminum framed windows and glass curtain wall

PRIMARY USE: Office and Research

CONTRACTING: Competitive Bid

BUDGET: $98,000,000