Ronald PoeGabe Robertson
Planning and Project Development Division
![Page 2: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/2.jpg)
NDOR’s Districts
![Page 3: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/3.jpg)
Environmental Section Environmental Permits Unit
o Wetlands/404 Permittingo Threatened & Endangered Species
Environmental Documents Unito NEPA Document Delivery
Technical Documents Unito NEPA Support Document Delivery
Roadside Stabilization Unito Stormwater Permittingo Erosion Control & Landscape Designo Vegetation Managemento Environmental Compliance
(Construction & Maintenance)
![Page 4: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/4.jpg)
![Page 5: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/5.jpg)
RSU Program Goals
Restoration & Re-Vegetationo Roadside compliments surrounding landscape
Water Quality Initiativeso Erosion & Sediment Controlo Water Quality Treatment
Environmental Complianceo Ensure Commitments are being upheld
Researcho Yard waste composto Wildflowerso Fertilizerso Vegetation longevity
![Page 6: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/6.jpg)
Water Quality Permits MS4 - Municipal Separate Storm Sewer System
o Programmatic Water Quality Permit
NPDES Construction Stormwater Permito Construction Sites – 1 acre or more
NPDES Concrete Slurry Discharge Permito Specific to Diamond Grinding
NPDES Dewatering Permito Pumping Groundwater
NPDES Pesticide Application Permito Spraying weeds near waterways
![Page 7: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/7.jpg)
Compliance Timeline
1998 – First Construction Stormwater Permit
2003 – FHWA Temporary Erosion Control Process ReviewoTemporary Erosion Control was subsidiary prior to review
2005 – Construction Stormwater ProgramoNDOR/NDEQ meet to discuss stormwater program
2007 – NDEQ Approves NDOR’s 1st MS4 PermitoNDOR proposes to write permit for NDEQ’s signature
2008 – NDEQ Implements Revised Construction Stormwater Permit
2013 – NDEQ Approves NDOR’s 2nd MS4 Permit
![Page 8: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/8.jpg)
Training Erosion Control Basics for Inspectors
Erosion Control Basics for Designers
Post Construction Design
![Page 9: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/9.jpg)
Inspector Training
All NDOR employees with responsibilities on construction projectsoProject Managers, Technicians,
Maintenance Staff
All contractors responsible for installing a BMP for controlling erosionoPrime, Erosion Control, Culvert,
Grading Contractors, etc…
Any NDOR employee or consultant with site inspection responsibilitiesoEnvironmental staff, DECs,
Management
![Page 10: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/10.jpg)
Inspector Training 5 year certification
Certification RequirementsoAttend NDOR’s E&SC classoPass Exam
NDOR accepts national CertificationsoCISEC, CESWII, etc…oConsidering neighboring
states
![Page 11: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/11.jpg)
Site Inspections Originated with interest in
reviewing erosion control BMPs
Formalized with Construction Stormwater Permit requirements
NEPA Process Review Action Plan
Environmental Stewardship and assurance that commitments are being met
![Page 12: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/12.jpg)
Site Inspections Green Sheet Review Process
oPrior to lettingoEnvironmental staff review commitmentsoEnsure commitments are communicatedoGenerate questions in ECO-Database
Prior to ConstructionoSupply project staff with SWPPPoCreate a report detailing questions
During ConstructionoInspectors complete ECO-Database reportsoGoal of resolving “Corrective Actions”
within 7 days
![Page 13: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/13.jpg)
Site Inspections
Multi-level inspection processoPlaces inspection emphasis on project staffoProvides levels of oversight to ensure commitments are
being met
ECO Database Inspection SoftwareoHelps to streamline communicationoAllows the ability to query reports
NDOR Environmental Stewardship GoalsoTo be 100% in compliance with Environmental
CommitmentsoTo resolve “Corrective Actions” within 7 days
![Page 14: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/14.jpg)
Site Inspections
Routine InspectionsoOccur every 2 weeks at a minimumoConducted by District Construction Staff
Environmental Oversight InspectionsoOccur monthly on projects with SWPPPsoConducted by District Environmental Coordinators
Environmental Oversight AuditsoOccur at a predetermined frequencyoConducted by RSU, Consultants & other Environmental
Staff
![Page 15: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/15.jpg)
Site Inspections
Findings are to be corrected within 7 days
• Immediate Action issues are to be corrected within 24 hours
Tools for ComplianceoIncentives and Disincentives• NDOR’s answer to “multiple mobilizations”• Associated with Rain Event Inspections
oWithholding EstimatesoJob Shutdowns
![Page 16: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/16.jpg)
![Page 17: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/17.jpg)
![Page 18: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/18.jpg)
Environmental Compliance Oversight Database
(ECODatabase or ECOD)
![Page 19: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/19.jpg)
What is ECODatabase
Identifying Commitments to Track (Pre-Construction)o Project Setupo Project Reviewo Inspection Summary Sheet
Documenting Commitments in the System (Construction)o Logging Inspections o Inspection Report Distributiono Corrective Actionso Inspection Reminders/Past Due Noticeso Threatened and Endangered Species/Migratory Bird Surveys
Reporting Commitments when Completed (Post-Construction)
NDOR Certified Erosion Control Inspector List
Overview
![Page 20: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/20.jpg)
Electronic reporting software used to identify, document, and report environmental commitments on NDOR construction projects.
Consists of inspection software loaded on field machines and a web based headquarter module that manages the data.
A sync process exchanges data between user machines and headquarters.
What is ECO-Database?
Project Data
Inspections
![Page 21: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/21.jpg)
Projects are manually created within the ECODatabase system and then additional project information is automatically pulled in from the SiteManager database on a regular basis:o Project Name/Number/Control Numbero Project Description/Locationo Project Manager/Responsible Chargeo Prime Contractoro Key Dates (Letting, Notice to Proceed, Start & Completion)
Identifying Commitments – Project Setup
![Page 22: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/22.jpg)
ECODatabase sign-off incorporated into existing Environmental Review Process within Planning and Project Development Divisiono Roadside Stabilization Unit
Manages the ECODatabase System Reviews for stormwater and erosion control conditions
o Environmental Permits Unit Reviews for wetland and 404 permit conditions Reviews for threatened and endangered species conditions
o Environmental Documents Unit Reviews for NEPA related conditions
After reviews are completed, an ECOD Inspection Summary Report is generated and sent to the construction project manager.
Identifying Commitments – Project Review
![Page 23: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/23.jpg)
Identifying Commitments – Project Review
![Page 24: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/24.jpg)
ECOD Inspection Summary Report
Sent to Construction Project Manager and District Environmental Coordinator before construction begins.
o Contains Project Review Status
o Outlines Required Inspections in ECOD
o Highlights Species Conditions
![Page 25: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/25.jpg)
ECOD Inspection Tool Software installed on user machines Inspection reports are tailored to each project:
oCommitments become inspection questions in the fieldo Inspectors only have access to projects they are responsible for
and inspections that they may conduct .
NDOR environmental inspections are recorded using the ECOD systemoRoutine Environmental Inspection (Construction Phase)oRoutine Environmental Inspection (Establishment Phase)oEnvironmental Compliance Oversight InspectionoEnvironmental Compliance AuditoStormwater Permit Close-Out InspectionoThreatened and Endangered Species SurveyoMigratory Birds Survey
Documenting Commitments – Logging Inspections
![Page 26: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/26.jpg)
Corrective Action Button
will glow if items are pending
Inspectors only have access to projects they
are responsible for.
Documenting Commitments – Logging Inspections
![Page 27: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/27.jpg)
Erosion Control Certification Number auto-populates the
report.
Documenting Commitments – Logging Inspections
![Page 28: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/28.jpg)
Questions are generated from environmental
commitments and are specific to each project.
Answering “No” requires an action to be logged,
and then the system will generate a corrective action that must be
addressed.
Documenting Commitments – Logging Inspections
![Page 29: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/29.jpg)
Documenting Commitments – Logging Inspections
![Page 30: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/30.jpg)
Documenting Commitments – Logging Inspections
Sign and Seal button makes the reports final and un-editable.
Inspectors can make a draft of the report before signing.
![Page 31: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/31.jpg)
Documenting Commitments – Inspection Report Distribution
Completed inspection reports are automatically distributed (email) to pre-defined groups for review.
Email contains web links to both the inspection report and corrective action log for the project. o PDFs of the report and corrective action log can be
generated and printed using the included links.
![Page 32: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/32.jpg)
Documenting Commitments – Corrective Actions
![Page 33: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/33.jpg)
Documenting Commitments – Corrective Actions
A “Corrective Action Punch List” can be printed and filled out by contractor or inspector as things are completed.
Inspectors then date-out each completed action within the system and items are removed from their to do list.
![Page 34: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/34.jpg)
ECODatabase allows NDOR to schedule inspections and send out inspection reminders/past-due notices.
o One day before an inspection is due, an “inspection reminder email” will be sent out to project inspectors.
o Likewise one day after an inspection should have been logged in the system, an “inspection past-due notice email” will be send to project inspectors as well as select upper management personnel within the District.
These are auto-generated by the system based off of the inspection frequency and phase of the project.
Currently programming email notices for Threatened and Endangered Species Surveys…..
Documenting Commitments – Inspection Reminders/Past Due Notices
![Page 35: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/35.jpg)
Documenting Commitments – Logging Inspections
Threatened and Endangered Species/Migratory Bird Surveys also logged using ECODatabase.
Surveys are submitted on a weekly basis.
Species are specific to each project and the time of year the survey is being completed.
Reports are automatically sent to Headquarters for review and are then made available to Partner Agencies such as FHWA and USFWS.
![Page 36: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/36.jpg)
ECODatabase has the ability to query data in the system and generate summary reports.
Reporting Commitments when Completed
![Page 37: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/37.jpg)
Reporting Commitments when Completed
DRAFT
![Page 38: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/38.jpg)
NDOR requires inspectors to be certified in the Erosion Control Inspector Certification Program.
The list of certified inspectors is managed through ECODatabase. A link to the database is available on NDOR’s Environmental Website.
Inspector ID’s automatically populate the inspection report. The system issues notifications to individuals through email when
their certification is about to expire. The notice contains a web link to the UNL-LTAP training site so they can re-certify.
NDOR Certified Erosion Control Inspector List
Online Training is Now
Available.
![Page 39: Ronald Poe Gabe Robertson Planning and Project Development Division](https://reader030.vdocuments.net/reader030/viewer/2022032802/56649e175503460f94b02f87/html5/thumbnails/39.jpg)
Gabe Robertson
Highway Stormwater Specialist
Nebraska Department of Roads
(402) 479-4685
Questions?
Ronald Poe
Highway Environmental Program Manager
Nebraska Department of Roads
(402) 479-4499