Roof Terms
• Span– Distance across the building
![Page 2: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/2.jpg)
Roof Terms
• Run– 1/2 the distance across the building (1/2
span distance)
![Page 3: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/3.jpg)
Roof Terms
• Rise– The distance the roof rises (distance from
the square of house to ridge)
![Page 4: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/4.jpg)
Calculating Roof Surface
• Calculate horizontal area• Determine slope factor (ratio between run and
hypotenuse of the roof pitch
• Multiply slope factor times horizontal area.
4
75 feet
35 feet
12
5
![Page 5: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/5.jpg)
FOUNDATIONS
5
![Page 6: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/6.jpg)
FoundationsLuke 6: 48-49
48. “He is like a man building a house, who dug deep and laid the foundation on the rock. And when the flood arose, the stream beat vehemently against that house, and could not shake it, for it was founded on the rock.”
49. “But he who heard and did nothing is like a man who built a house on the earth without a foundation, against which the stream beat vehemently; and immediately it fell. And the ruin of that house was great.”
![Page 7: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/7.jpg)
FOUNDATION FAILURES STAND OUT
7
![Page 8: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/8.jpg)
3 BASIC REQUIREMENTSA foundation must:
• Not be susceptible to collapse,• Not allow settlement to occur which
results in damage or failure of the superstructure to function as it should, and
• Be feasible and buildable without affecting surroundings.
8
![Page 9: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/9.jpg)
Foundation Design Factors
• Loads & Pressures• Soil• Climatological and water control (Frost,
drainage, etc.)
![Page 10: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/10.jpg)
Loads & Pressures
• Foundation walls must be strong enough to resist applied loads
![Page 11: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/11.jpg)
FOUNDATION LOADS
• Dead loads• Live loads• Wind loads• Other horizontal loads (?)• Buoyant loads• Earthquake (seismic) loads
11
![Page 12: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/12.jpg)
SOIL TYPESROCK
SOILBOULDERS
COBBLES
GRAVEL
SAND
SILT
CLAY
12
![Page 13: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/13.jpg)
Soil Types Bearing Capacity
• Rock 4000 psi or 20% (crushing value)• Gravel 2000• Sand
– Course 1500– Fine 1000
• Clay– Hard 3000– Sandy 2000– Soft 1000
• Adobe 1000• Silt 500
Bearing capacity of the soil depends on soil composition and moisture content
![Page 14: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/14.jpg)
Climate Considerations
• Moisture/Water Content– permeability of soil--water absorbed into soil
causes expansion, thus causing the foundation to heave
• Surface and ground water must have proper drainage– Codes require finish grade to slope away from the
foundation at minimum slopes: • planted--1/2”/12” 6 foot away from building• paved areas--1% slope
![Page 15: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/15.jpg)
Climate Considerations
• Freezing– Water expands as it freezes– Expansion and shrinking of the soil causes
heaving in the foundation– General depth requirement/guideline
• 12” below average frost depth
– Design for sizing footing is determined by the calculations done by the architect or engineer considering loads and soil conditions or using code, depth may follow the rule given above
![Page 16: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/16.jpg)
Climate ConditionsFrost Depth Chart
![Page 17: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/17.jpg)
FOUNDATION SELECTION
PRIMARY• SUBSURFACE AND GROUND WATER• STRUCTURAL REQUIREMENTS
SECONDARY• CONSTRUCTION METHODS• ENVIRONMENT• CODES / REGULATIONS• IMPACTON NEARBY FACILITIES• TIME AVAILABLE FOR CONSTRUCTION• CONSTRUCTION RISKS
17
![Page 18: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/18.jpg)
TYPES OF FOUNDATIONSDEEP
• CAISSONS• PILES
SHALLOW• COLUMN FOOTINGS• WALL FOOTINGS• SLAB ON GRADE• MATS• FLOATING
18
![Page 19: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/19.jpg)
Pilings• Cast-in-Place
concrete piling shapes
• Steel Piling Detail Drawing
![Page 20: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/20.jpg)
Caisson Rebar Cage
20http://www.azarbuilders.com/gallery/caisson1.jpg
![Page 21: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/21.jpg)
COLUMN / WALL FOOTINGS
21
![Page 22: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/22.jpg)
Pier Foundations• Pier foundation resemble pedestal
foundations• Pier Foundation Drawing Representations
![Page 23: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/23.jpg)
Grade Beams• Replaces footings
in unstable soil• Grade beam
becomes an actual beam support by pilings or large pier footings
![Page 24: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/24.jpg)
Mat Foundation
24http://www.irvinegeotech.com/projects.htm
![Page 25: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/25.jpg)
Stepped Foundation
Most Codes give limits:
• Height of step = 24” maximum
• Run of step = 32” minimum
![Page 26: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/26.jpg)
Slab or Monolithic Foundations
• On-Grade Slabs-- called Monolithic if foundation and slab are poured together
• One Placement Two Placements
![Page 27: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/27.jpg)
Foundation Reinforcement
• Concrete & Masonry Resists Compressive Forces
• Concrete & Masonry lousy in resisting Tensile Forces
![Page 28: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/28.jpg)
Foundation Wall Reinforcement
• Reinforcing Bar (Rebar) is placed in the foundation wall to resist possible lateral and bending forces.
![Page 29: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/29.jpg)
Footing Reinforcement
• When the footing is placed near conditions of expansive soil, the bottom of the footing will bend, placing the footing in tension.
• Steel reinforcement is placed in the bottom of the footing to resist the forces of tension in concrete.
• The distance from the bottom of the footing:– Cover varies (1 ½” to 3” coverage) depends on size of
reinforcement and exposure conditions. (formed, not formed, in contact with soil or not, environment, etc.)
![Page 30: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/30.jpg)
Slab Reinforcement
• WWF is used to help the slab resist cracking
• Also placed near the surface in grid patterns to help resist tension in bending
• Steel rebar can also be used to prevent bending of the slab due to beam action in the slab
![Page 31: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/31.jpg)
31
![Page 32: Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)](https://reader036.vdocuments.net/reader036/viewer/2022062717/56649e605503460f94b5b38b/html5/thumbnails/32.jpg)
SETTLEMENT
• UNIFORM SETTLEMENT• DIFFERENTIAL SETTLEMENT