Staking grade elevations in the North side of the site prior to Geo-Thermal work

Page 3: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Staking grade elevations in the North side of the site prior to Geo-Thermal work

Page 4: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Clerestory Steel Installation at Area A

Page 5: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Clerestory Steel Installation at Area A complete, winterization shown on the interior

Page 6: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) 13th Street Main Entrance Reconstruction

Page 7: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

13th Street Main Entrance Cupola Erection

Page 8: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

13th Street Main Entrance Cupola Erection

Page 9: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area A Ground Floor Garage

Page 10: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Ground floor level of Area A – Ceiling Grid

Page 11: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area A 1st Floor

Page 12: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area A 1st Floor - Fireproofing

Page 13: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area A 1st Floor other side of wall from previous slide

Page 14: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area A 1st Floor - Drywall Installation has begun

Page 15: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Screen wall steel structure and curbs are install on areas A & B roof

Page 16: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Waterworks Rainwater Tanks set and Pad for Above Ground Poured

Page 17: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Waterworks - Winterization and concrete wall poured.

Page 18: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Waterworks Rainwater Tanks set and Pad for Above Ground Poured

Page 19: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Waterworks West Elevation – Winterization and new windows.

Page 20: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Ground Floor Area C – Part of the Switch Gear is being installed

Page 21: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Ground Floor Areas C/D - Mechanical Insulation Beginning

Page 22: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Ground Floor Areas C/D - Mechanical insulations is near complete

Page 23: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Ground Floor Areas C/D – Media Center opening

Page 24: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Electrical Room Panel Boxes are being installed

Page 25: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

1st Floor Historical Lobby

Page 26: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

1st Floor Areas C/D – Above ceiling work is still ongoing

Page 27: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

1st Floor Drywall Mock-up Revision

Page 28: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

1st Floor Drywall Mock-up Original

Page 29: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area C/D 2nd Floor Rough-in is Ongoing

Page 30: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Areas C/D 2nd Floor CMU is complete

Page 31: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Atrium East Elevation and New Stair Framing

Page 32: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Main Stair leading into the Atrium

Page 33: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Atrium Steel Columns

Page 34: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Atrium – Installation of Tube steel for skylight support

Page 35: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Slate and gutter work in the Atrium

Page 36: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Slate and gutter work in the Atrium

Page 37: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Pavilion Grade Beam Reinforcement

Page 38: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Pavilion concrete walls and steel erection

Page 39: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Pavilion concrete walls and steel erection

Page 40: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Pavilion concrete walls and steel erection

Page 41: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area E East Side Demolition

Page 42: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area E Gymnasium – Bleacher Steel

Page 43: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area E Gymnasium

Page 44: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area E Gymnasium

Page 45: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area E New Elevator Layout

Page 46: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area E – Masonry work

Page 47: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

(Before) Area E Pool

Page 48: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area E Pool – Storefront openings created and scaffolding installation is ongoing

Page 49: Roosevelt High School Renovation Project SIT Meeting (January 15, 2015)

Area E Pool – Storefront openings created and scaffolding installation is ongoing