Page 1: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Ropemaker PlaceInvestors Report

IR06 May 2018

Page 2: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Schedule of AccommodationInternal sub-division with non-loadbearing partitions

Ground Floor4 retail units - Total floor area 1,025m2

First Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2

Second Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2

Third Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2

Fourth Floor6 no. 1 Bed & 6 no. 2 Bed Apts (Total 12) - Total floor area 634m2

Fifth Floor6 no. 1 Bed & 4 no. 2 Bed Apts (Total 10) - Total floor area 512m2

Sixth Floor6 no. 1 Bed & 3 no. 2 Bed Apts (Total 9) - Total floor area 447m2

Seventh Floor5 no. 1 Bed & 2 no. 2 Bed Apts (Total 7) - Total floor area 351m2

Ropemaker Place 74 Luxury Apartments

89-99 Renshaw Street, Liverpool L1 2SP

Page 3: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

The eight storey new build development generally comprises:

• Demolition of adjoining structures, perimeter walls and site clearance

• Excavation and formation of new foundations

• Below and above ground drainage

• New ground supported and part suspended concrete floor slab

• Eight storey steel frame structure

• External brick envelope

• Suspended metaldeck and concrete floors

• Flat roof structures and finishes

• Aluminium curtain walling, external windows and doors and shopfronts

• External balconies and balustrades

• Internal sub-division of retail units and apartments with non-loadbearing block and stud partitions

• Installation of plumbing services and mechanical services

• Installation of electrical services

• Installation of new lift car access

• Installation of kitchen and sanitary fittings

• New internal finishes, joinery fittings and decorations

New Build Development to Create 74 Residential Apartments & 4 Retail Units

89-99 Renshaw Street, Liverpool L1 2SP

Page 4: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Building StructureRopemaker Place, 89-99 Renshaw Street, Liverpool

New Build Development

Page 5: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Site investigations

Site compound and temporary supplies

Demolition and site clearance

Ground fill to existing basements

Strengthening support to adjacent buildings

Underpinning adjacent structures

Concrete pad foundations & ground beams

Concrete strip footings

Steel reinforcement concrete slab

Floor slab construction

Steel Frame Structure

Upper suspended steel floor structure

Concrete pour Upper suspended floor structure

Internal staircase structure

Sub-structure Masonry walls

Fire coating steel framework

Structural framework forming external walls

Timber flat roof structure

100% complete

100% complete

100% complete

100% complete

100% complete

100% complete

100% complete

100% complete

95% complete

85% complete

100% complete

100% complete

100% complete

100% complete

90% complete

70% complete

8% complete

10% complete

Sub-Structure & Super-Structure Construction Progress

M A Y 2 0 1 8

Page 6: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Building frame structure, front elevation view from Berry Street

Building frame structure, front elevation

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 7: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Building frame structure, front elevation view from Renshaw Street

Building frame structure, side elevation view from Oldham Street

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 8: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Concrete Ground floor slab installed Concrete Ground floor slab installed

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 9: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Underground drainage pipework Steel reinforcement and preparation ground floor slab structure

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 10: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Concrete screed laid to form stairwell landings

Concrete screed laid to form stairwell landings

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 11: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Protective fire resistant paint coatings being applied to steel frame structure

Protective fire resistant paint coatings being applied to steel frame structure

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 12: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Steel structure framework commenced forming external walls

Steel structure framework commenced forming external walls

Page 13: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

Timber flat roof structure commenced Timber flat roof structure commenced

Sub-Structure & Super-Structure Progress

M A Y 2 0 1 8

Page 14: Ropemaker Place Investors Report€¦ · Concrete screed laid to form stairwell landings Concrete screed laid to form stairwell landings Sub-Structure & Super-Structure Progress M

T O F I N D O U T M O R E A B O U T

Reliance House20 Water Street, Liverpool

P L E A S E C O N T A C T

W W W . L E G A C I E . C O . U K

By Appointment Only

Unit 4 Connect Business Village

Liverpool, L5 9PR

+44 (0) 151 207 9990