Wine City, Suzhou, Jiangsu Province, China JTP Urbanism & Architecture 2014 A new eco-district integrating placemaking principles with bioclimatic design. The brief was to develop the first phase of the new Suzhou Eco town with a focus on producing an integrated masterplan for a mixed use new settlement. I worked as a consultant for JTP preparing design code documentation for the commercial element, developing an architectural design coding which included passive sustainable design principles. Rory Martin / Architect / Selected Work [email protected]

Upload: rory-martin

Post on 22-Jul-2015

38 views

Category:

Documents


2 download

TRANSCRIPT

Wine City, Suzhou, Jiangsu Province, China

JTP Urbanism & Architecture2014

A new eco-district integrating placemaking principles with bioclimatic design. The brief was to develop the first phase of the new Suzhou Eco town with a focus on producing an integrated masterplan for a mixed use new settlement.

I worked as a consultant for JTP preparing design code documentation for the commercial element, developing an architectural design coding which included passive sustainable design principles.

Rory Martin / Architect / Selected Work [email protected]

Tangzhen New City Quarter, Shanghai

SPARK Architects, Shanghai2014

Yango Group approached SPARK to redesign a retail, commercial, office & residential development in Pudong with a partially built basement from a previous non SPARK design proposal & an operational subway station in the centre of the site. The site is estimated to be worth 1.2 billion yuan.

In my role as project I was responsible for coordinating a team of architects & liasing with the client & local design institute. My focus was the coordination of our proposal with the with the existing structure & subway line.

The concrete frame for phase 1 & 2 is due for completion in Nov 2014.

Rory Martin / Architect / Selected Work [email protected]

Rory Martin / Architect / Selected Work [email protected]

Rory Martin / Architect / Selected Work [email protected]

Rory Martin / Architect / Selected Work [email protected]

University of Washington Mercer Court Apartments Seattle, USA

FCB Studios2012

University Of Washington Student Housing, USA_FCBS were appointed to work with Ankrom Moisan Architects for the University of Washington in Seattle

Feasibility studies were prepared for two student housing schemes on sites at the Western edge of the University Campus overlooking Portage Bay & with distant views of Mount Rainier.

I worked on the development of the design to RIBA stage 3/4.

The building was completed in Sept 2013.

Rory Martin / Architect / Selected Work [email protected]

Self Contained Integrated Township and SEZVallancheri, Chennai, India

RMJM Asia2007

A pristine site next to Vallanchery Lake approximately 35km from Chennai City is to be developed as an international level mixed-use integrated township. The brief calls for the masterplanning of a 75-acre site, which will be split into 4 zones; an IT specific Special Economic Zone (SEZ), a residential township and commercial development consisting of a Shopping Mall, Hotel and Serviced Apartments and finally, a school.

I worked in a small team of architects & landscape architects on the masterplanning of the site, planning of the buildings & preparation of design material that was presented to the client.

Self Contained Integrated Township and SEZ at Vallancheri, Chennai,India

Arun Excello Infrastructure in a joint ven-ture with Larsen & Toubro have obtained a pristine site next to Vallanchery Lake ap-proximately 35km from Chennai City to develop an international level mixed-use integrated township. The brief calls for the masterplanning of a 75-acre site, which will be split into 4 zones;-IT specific Special Economic Zone pro-posed in 27 acres.

-Residential Township proposed in 40 acres comprising high-rise, group housing unit types.

-Commercial development proposed in 8 acres consisting of a Shopping Mall, Hotel and Serviced Apartments.

-School.

The site is accessed by National Highway 45 and is located adjacent to the SRM Uni-versity Campus. The proposal focuses on creating an iconic urban development which maximizes the site’s development potential, respects and integrates nature and serves as a catalyst for vitalizing the Vallanchery district of Chennai.

The scope of services for the first stage was highlighted as ‘normal master planning’, ar-chitecture landscape and restricted interior design. Initial master planning stage of the 75-acre site is to run over a 6 week period.As stated in the previous quarterly record; major ammendments had to be made to previous work produced due to land owner-ship issues.

We were charged with;

-preparing a precedent study and assist in brief formulation.

-Master planning services for the entire site.

-Liase with local architect to incorporate all relevant statutory and infrastructure re-quirements.

-Incorporate all third party and client com-ments.

-Prepare MLP in compliance with Develop-ment Control Rules.

-Receive Client’s approval.

The deliverables for the each stage are highlighted in the contract. For the Master planning Design Stage we were to provide a minimum of 3 options to be developed during a process that is refined down to one for completion of stage.

The list is as follows;Master plan of the overall site @ 1:500 scale indicating:

-Pedestrian circulation-Vehicular circulation-Entry and egress-Emergency vehicle access-Handicapped access-Recreational access-Exterior landscape concept-Phasing-Detailed land use brief-Compliance statement with respect to ap-plicable development control rules and ur-ban design guidelines. (This is to be done in association with a lo-cally employed architectural consultant).-Site sections-Massing model

Proposed Traffic Consultancy (limited scope) and Proposed Landscape Consultancy Ser-vices were also a part of the contract.

Working with traffic engineers we were able to do preliminary brain storming/ briefing during which the engineer was able to offer advice to us on our conceptual MLP propos-als. Reviews had to be made of proposed ac-cesses onto surrounding roads, conceptual plans for internal traffic circulation; parking strategy and numbers; identification of key issues/constraints. Working closely with us, the traffic engineers helped design layouts and sizing of internal roads etc.

The deliverables for the each stage are highlighted in the contract. For the Master planning Design Stage we were to provide a minimum of 3 options to be developed during a process that is refined down to one for completion of stage.

The list is as follows;Master plan of the overall site @ 1:500 scale indicating:

-Pedestrian circulation-Vehicular circulation-Entry and egress-Emergency vehicle access-Handicapped access-Recreational access-Exterior landscape concept-Phasing-Detailed land use brief-Compliance statement with respect to ap-plicable development control rules and ur-ban design guidelines. (This is to be done in association with a lo-cally employed architectural consultant).-Site sections-Massing model

Proposed Traffic Consultancy (limited scope) and Proposed Landscape Consultancy Ser-vices were also a part of the contract.

Working with traffic engineers we were able to do preliminary brain storming/ briefing during which the engineer was able to offer advice to us on our conceptual MLP propos-als. Reviews had to be made of proposed ac-cesses onto surrounding roads, conceptual plans for internal traffic circulation; parking strategy and numbers; identification of key issues/constraints. Working closely with us, the traffic engineers helped design layouts and sizing of internal roads etc.

Self Contained Integrated Township and SEZ at Vallancheri, Chennai,India

Arun Excello Infrastructure in a joint ven-ture with Larsen & Toubro have obtained a pristine site next to Vallanchery Lake ap-proximately 35km from Chennai City to develop an international level mixed-use integrated township. The brief calls for the masterplanning of a 75-acre site, which will be split into 4 zones;-IT specific Special Economic Zone pro-posed in 27 acres.

-Residential Township proposed in 40 acres comprising high-rise, group housing unit types.

-Commercial development proposed in 8 acres consisting of a Shopping Mall, Hotel and Serviced Apartments.

-School.

The site is accessed by National Highway 45 and is located adjacent to the SRM Uni-versity Campus. The proposal focuses on creating an iconic urban development which maximizes the site’s development potential, respects and integrates nature and serves as a catalyst for vitalizing the Vallanchery district of Chennai.

The scope of services for the first stage was highlighted as ‘normal master planning’, ar-chitecture landscape and restricted interior design. Initial master planning stage of the 75-acre site is to run over a 6 week period.As stated in the previous quarterly record; major ammendments had to be made to previous work produced due to land owner-ship issues.

We were charged with;

-preparing a precedent study and assist in brief formulation.

-Master planning services for the entire site.

-Liase with local architect to incorporate all relevant statutory and infrastructure re-quirements.

-Incorporate all third party and client com-ments.

-Prepare MLP in compliance with Develop-ment Control Rules.

-Receive Client’s approval.

The deliverables for the each stage are highlighted in the contract. For the Master planning Design Stage we were to provide a minimum of 3 options to be developed during a process that is refined down to one for completion of stage.

The list is as follows;Master plan of the overall site @ 1:500 scale indicating:

-Pedestrian circulation-Vehicular circulation-Entry and egress-Emergency vehicle access-Handicapped access-Recreational access-Exterior landscape concept-Phasing-Detailed land use brief-Compliance statement with respect to ap-plicable development control rules and ur-ban design guidelines. (This is to be done in association with a lo-cally employed architectural consultant).-Site sections-Massing model

Proposed Traffic Consultancy (limited scope) and Proposed Landscape Consultancy Ser-vices were also a part of the contract.

Working with traffic engineers we were able to do preliminary brain storming/ briefing during which the engineer was able to offer advice to us on our conceptual MLP propos-als. Reviews had to be made of proposed ac-cesses onto surrounding roads, conceptual plans for internal traffic circulation; parking strategy and numbers; identification of key issues/constraints. Working closely with us, the traffic engineers helped design layouts and sizing of internal roads etc.

Rory Martin / Architect / Selected Work [email protected]

MICROSOFT Beijing West Campus

RMJM, HK2005

Jones Lang LaSalle, Project Development Services was retained by Microsoft (China) Co. Ltd as a project Manager for the Beijing West Campus in Beijing, China. RMJM was selected to propose on a new planned facility in Beijing, PRC.

The site is located in Haidian District of Beijing. It is adjacent to Peking University and close to The Academy of Science of China, Tsinghua and Renmin University.

The site is separated into two plots of land, one with a land area of 50,000m2 and 510,00m2. The plot area ratio are 1:1.8 and 1:8.5.

RIBA stage 2-3

Cotai Strip Parcel 7&8, Sands Casino, Macau

RMJMHK, 2007

The Cotai Strip is a multi-billion casino resort project in Macau, situated on a 1.8 mile plot of land in Cotai of reclaimed land adjoining Macau’s two islands, Taipa and Coloane.

Las Vegas Sands own most of the Strip’s hotel and casino infrastructure. As a Macau concession holder, the company will manage the casino space, while the company’s hotel partners will manage their respective hotels and amenities. The first phase of the Cotai Strip opened in 2007 with the grand opening of the $1.8 billion Venetian Macao

Our group split into six groups of two people to prepare concept proposals. This project was presented to the Sands Corporation but was not chosen as the scheme that was to be developed.

Rory Martin / Architect / Selected Work [email protected]