rosarito beach binational seawater desalination study · phase 1 draft conclusions . 13 no “fatal...
TRANSCRIPT
![Page 1: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/1.jpg)
I N T E R N A T I O N A L B O U N D A R Y A N DW A T E R C O M M I S S I O N C I T I Z E N ’ S F O R U M
M A Y 1 0 , 2 0 1 2
D A V E F O G E R S O NS A N D I E G O C O U N T Y W A T E R A U T H O R I T Y
Rosarito Beach Binational Seawater Desalination Study
![Page 2: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/2.jpg)
Setting for Binational Discussion 2
Living with less water: Bureau of Reclamation Demand and Supply Study River is already oversubscribed and demands are increasing Climate change could reduce river supplies
Recent U.S. projects reduced excess Colorado River water to Mexico All American Canal Lining Project Brock (“Drop 2”) Reservoir Yuma Desalination Plant pilot operation
Managing shortages: 2007 completion of shortage guidelines and operating
criteria for Lake Mead, Lake Powell
![Page 3: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/3.jpg)
Binational Cooperative Process3
International Boundary and Water Commission initiated binational cooperative process
Goal: Improve water supplies and water management for both countries
![Page 4: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/4.jpg)
Process Organization4
U.S. Core Group: IBWC United States Section United States Bureau of Reclamation Colorado River Basin states
Lower Basin: California, Nevada, Arizona Upper Basin: Colorado, Utah, Wyoming, New Mexico
Conservation organizations
![Page 5: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/5.jpg)
Process Organization, cont.5
Mexico Core Group: IBWC Mexico Section Comision Nacional del Agua (National Water
Commission) SEMARNAT (Mexico EPA) States of Baja California and Sonora Conservation organizations
![Page 6: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/6.jpg)
Process Organization, cont.6
Issue-specific work groups New water supply Water conservation System operations Environmental
Potential benefits: Increased system augmentation Shortage management flexibility Beneficial changes to system operations River ecosystem improvements
![Page 7: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/7.jpg)
Potential Binational Projects7
Desalination (ocean and brackish) Mexicali Valley irrigation improvements Drought management Operational storage Storage in Lake Mead Wetlands and habitat restoration, protection Mexico water delivery via All American Canal New River water Aquifer monitoring
![Page 8: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/8.jpg)
Seawater Desalination Study8
Proposed Baja California, Mexico seawater desalination plant Located at Rosarito Beach in Baja California Product water could supply Mexico or U.S.
Direct pipeline to U.S. (San Diego), or Exchange of Colorado River water
![Page 9: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/9.jpg)
9
● Goal: evaluation and preliminary design of Rosarito Beach site for 50-mgd seawater desalination plant
● Initiated study funded by:o Central Arizona Water Conservation District
o Metropolitan Water District
o San Diego County Water Authority
o Southern Nevada Water Authority
Overview of Project
![Page 10: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/10.jpg)
Project Scope of Work10
Project divided into four phases:
1. Feasibility evaluation
2. Detailed review and conveyance evaluation
3. Pilot plant development and testing
4. Preliminary design
![Page 11: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/11.jpg)
11
![Page 12: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/12.jpg)
Project Execution 12
Each phase is implemented separately Allows “go” or “no go” decision Funding agencies may opt out after each phase
SDCWA administers contract
First phase completed in 2010
![Page 13: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/13.jpg)
Phase 1 Draft Conclusions 13
● No “fatal flaws” to project were found● Significant Mexico / U.S. demand for product water
(greater than 50 MGD)● Suitable building sites are available● Sufficient electric power is available, with access to
intake and outfall channels for seawater supply and brine disposal
● Need to develop alternative pipeline alignments to deliver product water
● Complex environmental permitting issues
![Page 14: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/14.jpg)
Phase 2 of Study14
Phase 2 provides a more detailed review, including:1) Analyzing existing pilot plant data2) Reassessing potential sites and evaluating existing facilities (power
plant intake and outfall facilities)3) Updating plant conceptual design4) Evaluating alternative conveyance alignments5) Permitting activities6) Outreach activities with stakeholders7) Cost estimate
![Page 15: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/15.jpg)
Current Status of Study15
Funding agencies considering Phase 2 U.S. agencies participation is pending Minute 319
discussions and implementation
Mexico proceeding with a Phase 2 task Hired consultant to analyze pipeline alignments for from
plant to San Diego County Working in coordination with U.S. agencies
![Page 16: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/16.jpg)
16
Corridor 2000
Rosarito BeachDesalination Site
Inland Route
Coastal Route
![Page 17: Rosarito Beach Binational Seawater Desalination Study · Phase 1 Draft Conclusions . 13 No “fatal flaws” to project were found Significant Mexico / U.S. demand for product water](https://reader033.vdocuments.net/reader033/viewer/2022043017/5f396e4d92d7e71f98548c22/html5/thumbnails/17.jpg)
Next Steps17
U.S. agencies decision on continuing study Mexico completion of pipeline alignment study Integration into larger Colorado River binational
process