Letter of Submittal & Attachments
State Project No.: (NFO) 0035-087-112, PE-101, RW-201, C-501, B-604Federal Project No.: BR-087-5(014)
Contract ID Number: C00081457DB57
September 11, 2013
ROUTE 35 BRIDGE REPLACEMENT
ORIGINAL
submitted by
In association with
0035-087-112, B604
DHV
V (MPH)
REVISED
STATE LINECOUNTY LINECITY,TOWN OR VILLAGERIGHT OF WAY LINEFENCE LINEUNFENCED PROPERTY LINEFENCED PROPERTY LINEWATER LINESANITARY SEWER LINEGAS LINEELECTRIC UNDERGROUND CABLETRAVELED WAYGUARD RAILRETAINING WALLRAILROADSBASE OR SURVEY LINE
LEVEE OR EMBANKMENTBRIDGESCULVERTSDROP INLETPOWER POLESTELEPHONE OR TELEGRAPH POLESTELEPHONE OR TELEGRAPH LINESHEDGETREESHEAVY WOODSGROUND ELEVATIONGRADE ELEVATION
CONVENTIONAL SIGNS
30
30
+50
DATUM LINE
DATUM LINE
173
175
T/Tg
E
6" W
8" S
4" G
PLPL
DEPARTMENT OF TRANSPORTATION
PLAN AND PROFILE OF PROPOSED
STATE HIGHWAY
FUNCTIONAL CLASSIFICATION AND TRAFFIC DATA
D (%) (design hour)
T (%) (design hour)
1
WHERE OTHERWISE NOTED.
THE ORIGINAL APPROVED TITLE SHEET(S), INCLUDING ORIGINAL
SIGNATURES, ARE FILED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY.
ANY MISUSE OF ELECTRONIC FILES, INCLUDING SCANNED SIGNATURES,
IS ILLEGAL AND ENFORCED TO THE FULL EXTENT OF THE LAW.
ALL CURVES ARE TO BE SUPERELEVATED, TRANSITIONED AND
DESIGN FEATURES RELATING TO CONSTRUCTION OR TO REGULATION
AND CONTROL OF TRAFFIC MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT.
THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE
FOR SECTION NUMBERS)
(SEE TABULATION BELOW
STATE
PROJECT
NO.
SECTIONEQUALITIES
FEET
LENGTH INCLUDINGFEDERAL AID
PROJECT NO.FEET FEETMILES MILES
LENGTH EXCLUDINGTYPE
PROJECTDESCRIPTIONBRIDGE(S) BRIDGE(S)TYPE
CODE
UPC
NO.
BRIDGE
NO.
Project Lengths are based on Construction Baseline.
TIER 2 PROJECT
AND BRIDGE STANDARDS, 2009 MUTCD, 2011 VIRGINIA SUPPLEMENT TO
THE MUTCD, 2011 VIRGINIA WORK AREA PROTECTION MANUAL AND AS
AMENDED BY CONTRACT PROVISIONS AND THE COMPLETE ELECTRONIC
PDF VERSION OF THE PLAN ASSEMBLY.
DEPARTMENT’S 2007 ROAD AND BRIDGE SPECIFICATIONS, 2008 ROAD
SIGNATURES AND THE OFFICIAL PLAN ASSEMBLY IN ELECTRONIC
AS AWARDED, HAS BEEN SEALED AND SIGNED USING DIGITAL
FORMAT IS STORED IN THE VDOT CENTRAL OFFICE PLAN LIBRARY,
INCLUDING ALL SUBSEQUENT REVISIONS, WILL BE THE OFFICIAL
CONSTRUCTION PLANS. FOR INFORMATION RELATIVE TO ELECTRONIC
FILES AND LAYERED PLANS, SEE THE GENERAL NOTES.
THE COMPLETE ELECTRONIC PDF VERSION OF THE PLAN ASSEMBLY
0035-087-112
35
0 200’ 400’
SCALE
FHWA 534 DATA 14011
ADT(2012)
ADT (2036)
BRIDGE
RIGHT OF WAY
CONSTRUCTION
PREL. ENGR81457
81457
81457
81457B-604
RW- 201
C-501
PE-101 BR-087-5(014)
0035-0
87-112
3,400
50 MPH
0035-087-112, P101, C501
Tow
n of Courtla
nd
Approxim
ate C
orp Limits
Southa
mpton Cou
nty
Nottoway River
0035-087-112, R201
3 4 5 6
STATEFEDERAL AID STATE
PROJECT PROJECTROUTE
VA.
APPROVED FOR RIGHT OF WAY ACQUISITION
RECOMMENDED FOR APPROVAL FOR CONSTRUCTION
APPROVED FOR CONSTRUCTION
APPROVED
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
DATE
PROJECT SHEET NO.
CHIEF OF POLICY AND ENVIRONMENT
DIVISION ADMINISTRATOR
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
RECOMMENDED FOR APPROVAL
FOR RIGHT OF WAY ACQUISITION
VIRGINIA
SIC SEMPER TYRANNIS
SHEET
NO.
COMMONWEALTH OF VIRGINIA
STATE LOCATION AND DESIGN ENGINEER
FOR INDEX OF SHEETS SEE SHEET 1B
d8145701.dgn
Plotted By: kmaregn
11:57:36 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\General\d8145701.dgn
1
PROGRAMMING DIVISION DIRECTOR
CHIEF ENGINEER
CHIEF ENGINEER
DATE STATE STRUCTURE AND BRIDGE ENGINEER
STATE LOCATION AND DESIGN ENGINEER
CHIEF OF PLANNING AND PROGRAMMING
CHIEF OF PLANNING AND PROGRAMMING
PROGRAMMING DIVISION DIRECTOR
Copyright 2013, Commonwealth of Virginia
Route 58
Bus
& 35 (M
ain Str
eet)
DESCRIPTION REFERENCE:
POT Sta. 8+30.88 Rte. 35 Constr. Bl
Population SouthHampton 18,570 (2010 Census)
Fr: 0.039 miles West of Southhampton County Line
Fr: 0.039 miles West of Southhampton County Line
To: 0.402 miles West of Southhampton County Line
1628.00
1628.00
1920.00
0.308
0.308
0.364
0.172
718.00
718.00
GEOPAK Computer Identification No. 81457
DESIGN PACKAGE (GEOPAK).
THIS PROJECT WAS DEVELOPED UTILIZING THE DEPARTMENT’S ENGINEERING
0.136
0.136
Town of Courtland
031-13a910.00
SOUTHAMPTON COUNTY
4,525
410
50/50
WIDENED IN ACCORDANCE WITH STANDARD TC-5.11R, EXCEPT
To Route US 58
(NFO)0035-087-112
SECTION NUMBERS)
BELOW FOR
(SEE TABULATION
BR-087-5 ( )
Rural Collector(GS-3)- Undivided-Level 50MPH-Min.Design Speed
ROUTE 35 (MEHERRIN ROAD)
6%
P
P
P
0.1911010
Prop. Bridge and Approaches over Nottoway River
PR
OJE
CT
MA
NA
GE
R
SU
RV
EY
ED
BY,
DA
TE
DE
SIG
N
BY
DE
SIG
N
SU
PE
RVIS
ED
BY
SU
BS
UR
FA
CE
UTILIT
Y
BY,
DA
TE
John
G
Har
man, P.E (7
57) 925-2
308 (H
ampto
n Roads)
Walter D. F
ree
man, L.S. (757) 925-1608 (H
ampto
n Roads), 9/8/11
Volkert In
c. (703) 642 810
0 (Ale
xandria, V
A)
Keith
Weakle
y (7
03) 642-8
100 (V
olkert, Inc.)
Walter D. F
ree
man, L.S. (757) 925-1608 (H
ampto
n Roads), 9/9/11
To: 0.402 miles West of Southampton County Line
PLAN
Fr: 0.072miles West of Southhampton County Line
To: 0.364miles West of Southhampton County Line
Fr: 0.039 miles West of Southhampton County Line
To: 0.402 miles West of Southhampton County Line
Sta. 10+3
5.0
0
Constr. B
aseline
Sta. 10+8
9.0
0
Const. B
aseline
Sta. 14+4
0.0
0
Constr. B
aseline
Sta. 2
3+5
0.0
0
Constr. B
aseline
Sta. 2
7+17.0
0
Constr. B
aseline
Sta. 2
9+5
5.0
0
Constr. B
aseline
PO
T 7+0
0.0
0
PC 10
+62.3
7
PT 11+3
3.5
2
10
PC 13
+50.0
4
PT 14
+40.0
015
PC 23
+50.0
0
PT 24+3
0.2
2
252
0
PC 26+4
6.7
4
PT 27+2
6.9
5
PC 34+8
0.5
4
30
35
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
SEPTEMBER 5, 2013
PROPOSAL PLANS
CONCEPTIAL TECHNICAL
Tank
9’ Chain Link Fence
Tank
Structure #B604
49
1B
1B
INDEX OF SHEETS
1 TITLE SHEET
DESCRIPTIONSHEET
1B INDEX OF SHEETS
TYPICAL SECTIONS
PLAN SHEET
2A
CONSTRUCTION ALIGNMENT DATA SHEET
PROFILE SHEET
EROSION AND SEDIMENT CONTROL PLAN
TOTAL CROSS SECTION SHEETS 10 (SEE CROSS SECTION SHEET NUMBER 1 FOR INDEX OF SHEETS)
STATIONS
3 - 6
3B - 6B
3A - 6A
7+00.00 TO 34+00.00
7+00.00 TO 34+00.00
1D
1E - 1E(1)
SURVEY ALIGNMENT DATA SHEETS
SEPTEMBER 5, 2013
CONCEPT PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145701b.dgn
Plotted By: kmaregn11:57:37 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\General\d8145701b.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
50
1D
1D
SURVEY ALIGNMENT DATA SHEETS
SEPTEMBER 5, 2013
CONCEPT PLANS
To Convert Va. State Plane Coordinates NAD 83 Metric Values to Va. D. O. T. Project Coordinates.
Reduce the Eastings 2. 5 Million Meters and the South and North Zone Northings by 1 and 2 Million Respectively.
Multiply by the U. S. Survey Foot (3. 28083333333) .
Multiply These Values by the Combined Scale and Elevation Factor ( 1. ) for this County.
A Reverse of this Procedure will Transform VDOT Project Coordinates to NAD 83 Values.
Note:
3.
2.
1.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
129. 50’ 134. 00’
VDOT Disk #87-0081
CL
26. 30’
Rte 35
To Courtland
Rte 35
To Courtland
Rte 651
32. 48’
61. 64’
28. 90’
CL
13. 06’
VDOT Disk #87-0080
Stop Sign
To Boykins To Boykins
"
"
"
"
"
"
"
"
to Sta 87-0079 to Sta 87-0080 to Sta 87-0081 to Sta 87-0078
DATUM NAVD 88 (FEET)
BENCH MARKS SURVEY ALIGNMENTS
POINT STATION BEARING PROJECT COORDINATES
ID. NORTH (Y) EAST (X)
Rte 35
SS 97+50.000 143,200.065 3,700,571.387
S 70° 37’ 34" W
PI 104+69.551 142,961.367 3,699,892.581
S 71° 43’ 03" W
PI 111+02.131 142,762.925 3,699,291.933
S 73° 12’ 32" W
PI 120+45.731 142,490.335 3,698,388.564
S 73° 29’ 19" W
PI 125+72.443 142,340.640 3,697,883.572
S 73° 04’ 20" W
PI 132+51.140 142,143.027 3,697,234.281
S 58° 48’ 57" W
PI 138+90.580 141,811.931 3,696,687.235
S 49° 41’ 44" W
PI 144+57.877 141,444.975 3,696,254.604
S 49° 32’ 08" W
PI 151+86.420 140,972.168 3,695,700.322
PROJ# 0035 - 087 - 112, P101, RW201, C501, B604
PPMS# 81457
VDOT Disk Stamped "87 - 0078"
VDOT Disk Stamped "87 - 0079"
VDOT Disk Stamped "87 - 0080"
VDOT Disk Stamped "87 - 0081"
Bench Mark Elev. = 25. 60’
Bench Mark Elev. = 25. 57’
Bench Mark Elev. = 14. 80’
Bench Mark Elev. = 16. 45’
T-Bar 1 Survey Traverse Alignment
Bench Mark Elev. = 25. 02’
Sta. 111+02. 13
T-Bar 2 Survey Traverse Alignment
Bench Mark Elev. = 25. 34’
Sta. 120+45. 73
T-Bar 3 Survey Traverse Alignment
Bench Mark Elev. = 20. 63’
Sta. 125+72. 44
T-Bar 4 Survey Traverse Alignment
Bench Mark Elev. = 18. 85’
Sta. 132+51. 14
T-Bar 5 Survey Traverse Alignment
Bench Mark Elev. = 15. 36’
Sta. 138+90. 58
A STANDARD METAL DISK STAMPED "87-0081" SET IN CONC. 0. 20’ BELOW GROUND LEVEL. THE DISK IS LOCATED
129.50’ SOUTHHWEST FROM A DOMINION VIRGINIA POWER POLE # AA34, 134. 00’ NORTHEAST OF A DOMINION VIRGINIA POWER POLE AND 26. 30’ FROM THE CENTER LINE OF RTE. 35.
DVP #F1-37- YD-25
DVP #YD-24
A STANDARD METAL DISK STAMPED "87-0080" SET IN CONC. 0. 20’ BELOW GROUND LEVEL. THE DISK IS LOCATED
13.06’ NORTHWEST OF A STOP SIGN ON RTE 651, 32. 48’ SOUTHWEST OF A DOMINION VIRGINA POWER POLE
Signals
Rail Road
Asphalt
Rte 35
Gravel
To Petersburg To Boykins
Main Str
eet
Rte 35
DVP #IG-77
51. 37’
91. 5
4’
29. 09’
Tracks
Rail Road
A STANDARD METAL DISK STAMPED "87-0078" SET IN CONC. 0. 20’ BELOW GROUND LEVEL. THE DISK IS LOCATED
EASTERN RAIL OF TRACK.91. 54’ NORTHWEST OF A DOMINION VIRGINIA POWER POLE #IG-77, 51. 37’ FROM RAIL ROAD SIGNAL AND 29. 09’ FROM
3 Nails in Base of 15" Sycamore Tree,
Bench Mark Elev. = 21. 53’
134’ Lt. Sta. 104+40. 16
3 Nails Base of 18" Cypress Tree Left
Bench Mark Elev. = 10. 93’
101’ Lt. Sta. 128+95. 60
LINE OF RTE 35.#FI-37-YD-25, 61. 64’ NORTHEAST FROM A DOMONION VIRGINIA POWER POLE #YD-24 AND 28.90’ FROM THE CENTER
A STANDARD METAL DISK STAMPED "87-0079" SET IN CONC. 0. 20’ BELOW GROUND LEVEL. THE DISK IS LOCATED
OF A SIGN POST AND 23. 05’ FROM THE CENTER LINE OF RTE. 35. 500’ To Main St.68.60’ NORTHWEST FROM A PROPERTY PIN ON RTE. 35, 16. 44’ NORTHWEST OF A SIGN POST, 30. 71’ NORTHEAST
VDOT Disk #87-0079
To Courtland
CL Rte 35
16. 44’
68. 60’
23. 05’
30. 71’Sign
Sign
To Boykins
500’ To Main St
Virginia Department of Transportation Horizontal Control
N (5decimal places)
W (5decimal places)
Sketch and Detailed Description on Other Side
values, use the following formula.
To convert state plane metric units to VDOT project
Values By 1 and 2 Million Respectively.
Meters. The South and North Zone Northing Metric
1. Reduce the Easting Metric Values By 2. 5 Million
2. Multiply These Values by the U. S. Survey Foot (3. 280833333)
DETAILED SKETCH
V. D. O. T. Project Coordinates
Virginia State Plane Coordinates - NAD 83 Metric Values
(circle one)
or
LD-200 (REV. 8/2000)
Zone North South (circle one)
* *
Control Station I. D. 87 - 0078 Project 0035-087-112
Route 35 City/County Southampton Date 09-02-11
Established By W. D. Freeman LS
Vertical Datum Based On NAVD 88 Geoid 96 or 03
Horizontal Datum Based On NAD 83 (1993)
Azimuth to Station 250°37’34"
Latitude: 36°43’03.65095
Longitude: 77°04’07.46652
Geoid Separation (N) : -34.9102
Coordinates
VDOT Project Coordinates to NAD 83Metric Plane
Reverse This Proceedure to Transform
Ellipsoid Height (h) : -27.0994 (WGS 84)
Control Based on: Station (name or PID) Courtland 1
Project (monument no. ) Order:
East (X) 3627864.5293 m
North (Y) 1043622.1892 m
Ortho. Elevation 7.8108 m
East (X) 3700335.5432 ft.
North (Y) 143117.1324 ft.
Elevation 25. 60 ft.
Horizontal Closure
Elevation Factor ( 1. 00000 ) for the County.
3. Multiply These Values by Combined Scale and
DVP #AA-34
Virginia Department of Transportation Horizontal Control
N (5decimal places)
W (5decimal places)
Sketch and Detailed Description on Other Side
values, use the following formula.
To convert state plane metric units to VDOT project
Values By 1 and 2 Million Respectively.
Meters. The South and North Zone Northing Metric
1. Reduce the Easting Metric Values By 2. 5 Million
2. Multiply These Values by the U. S. Survey Foot (3. 280833333)
DETAILED SKETCH
V. D. O. T. Project Coordinates
Virginia State Plane Coordinates - NAD 83 Metric Values
(circle one)
or
LD-200 (REV. 8/2000)
Zone North South (circle one)
* *
Control Station I. D. 87 - 0079 Project 0035-087-112
Route 35 City/County Southampton Date 09-02-11
Established By W. D. Freeman LS
Vertical Datum Based On NAVD 88 Geoid 96 or 03
Horizontal Datum Based On NAD 83 (1993)
Azimuth to Station 247°22’21"
Latitude: 36°43’02.17731
Longitude: 77°04’12.93533
Geoid Separation (N) : -34.9070
Coordinates
VDOT Project Coordinates to NAD 83Metric Plane
Reverse This Proceedure to Transform
Ellipsoid Height (h) : -27.1012 (WGS 84)
Control Based on: Station (name or PID) Courtland 1
Project (monument no. ) Order:
East (X) 3627729.5144 m
North (Y) 1043574.7118 m
Ortho. Elevation 7.8058 m
East (X) 3699892.5818 ft.
North (Y) 142961.3670 ft.
Elevation 25.57 ft.
Horizontal Closure
Elevation Factor ( 1. 00000 ) for the County.
3. Multiply These Values by Combined Scale and
Virginia Department of Transportation Horizontal Control
N (5decimal places)
W (5decimal places)
Sketch and Detailed Description on Other Side
values, use the following formula.
To convert state plane metric units to VDOT project
Values By 1 and 2 Million Respectively.
Meters. The South and North Zone Northing Metric
1. Reduce the Easting Metric Values By 2. 5 Million
2. Multiply These Values by the U. S. Survey Foot (3. 280833333)
DETAILED SKETCH
V. D. O. T. Project Coordinates
Virginia State Plane Coordinates - NAD 83 Metric Values
(circle one)
or
LD-200 (REV. 8/2000)
Zone North South (circle one)
* *
Control Station I. D. 87 - 0080 Project 0035-087-112
Route 35 City/County Southampton Date 09-02-11
Established By W. D. Freeman LS
Vertical Datum Based On NAVD 88 Geoid 96 or 03
Horizontal Datum Based On NAD 83 (1983)
Azimuth to Station 229°32’08"
Latitude: 36°42’47.72763
Longitude: 77°04’57.89136
Geoid Separation (N) : -34.8837
Coordinates
VDOT Project Coordinates to NAD 83Metric Plane
Reverse This Proceedure to Transform
Ellipsoid Height (h) : -30.3611 (WGS 84)
Control Based on: Station (name or PID) Courtland 1
Project (monument no. ) Order:
East (X) 3626620.6573 m
North (Y) 1043112.5145 m
Ortho. Elevation 4.5226 m
East (X) 3696254.6065 ft.
North (Y) 141444.9747 ft.
Elevation 14.80 ft.
Horizontal Closure
Elevation Factor ( 1. 00000 ) for the County.
3. Multiply These Values by Combined Scale and
Virginia Department of Transportation Horizontal Control
N (5decimal places)
W (5decimal places)
Sketch and Detailed Description on Other Side
values, use the following formula.
To convert state plane metric units to VDOT project
Values By 1 and 2 Million Respectively.
Meters. The South and North Zone Northing Metric
1. Reduce the Easting Metric Values By 2. 5 Million
2. Multiply These Values by the U. S. Survey Foot (3. 280833333)
DETAILED SKETCH
V. D. O. T. Project Coordinates
Virginia State Plane Coordinates - NAD 83 Metric Values
(circle one)
or
LD-200 (REV. 8/2000)
Zone North South (circle one)
* *
Control Station I. D. 87 - 0081 Project 0035-087-112
Route 35 City/County Southampton Date 09-02-11
Established By W. D. Freeman LS
Vertical Datum Based On NAVD 88 Geoid 96 or 03
Horizontal Datum Based On NAD 83 (1983)
Azimuth to Station 65°10’03"
Latitude: 36°42’43.13537
Longitude: 77°05’04.78495
Geoid Separation (N) : -34.8813
Coordinates
VDOT Project Coordinates to NAD 83Metric Plane
Reverse This Proceedure to Transform
Ellipsoid Height (h) : -29.8584 (WGS 84)
Control Based on: Station (name or PID) Courtland 1
Project (monument no. ) Order:
East (X) 3626451.7116 m
North (Y) 1042968.4029 m
Ortho. Elevation 5.0229 m
East (X) 3695700.3238 ft.
North (Y) 140972.1685 ft.
Elevation 16.45 ft.
Horizontal Closure
Elevation Factor ( 1. 00000 ) for the County.
3. Multiply These Values by Combined Scale and
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145701d.dgn
Plotted By: kmaregn11:57:38 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\General\d8145701d.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
51
PO
T 7+0
0.0
0
10
PC 10
+62.3
7
PT 11+3
3.5
2
PC 13
+50.0
4
PT 14
+40.0
0
15 20
PC 23
+50.0
0
PT 24+3
0.2
2
25
PC 26+4
6.7
4
PT 27+2
6.9
5
30
0
SCALE
100’ 200’
PC 34+8
0.5
4
35
40
PT 40+6
7.64
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-1
PI = 10+97.96
T = 35.58’
L = 71.15’
R = 1,300.00’
10+62.37PC =
PT = 11+33.52
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-2
PI = 13+95.04
T = 45.00’
L = 89.96’
R = 1,300.00’
13+50.04PC =
PT = 14+40.00
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-3
PI = 23+90.12
T = 40.12’
L = 80.22’
R = 1,300.00’
23+50.00PC =
PT = 24+30.22
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-4
PI = 26+86.86
T = 40.12’
L = 80.22’
R = 1,300.00’
26+46.74PC =
PT = 27+26.95
1E
1E
MA
TC
HLIN
E
ST
A. 3
2+0
0.0
0
MA
TC
HLIN
E
ST
A. 3
2+0
0.0
0
1
2 3
4
5
Curve ROUTE35-5
PI = 37+77.90
T = 297.36’
L = 587.10’
R = 1,500.00’
34+80.54PC =
PT = 40+67.64
Civil Engineer
Alexandria, Virginia
Volkert Inc.
CONSTRUCTION ALIGNMENT DATA SHEET
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145701e(0).dgn
Plotted By: kmaregn11:57:39 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\General\d8145701e(0).dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
52
Course from PT ROUTE35-3 to PC ROUTE35-4 S 76° 44’ 05.91" W Dist 216.52
Chord Bear = S 74° 58’ 02.15" W
Ahead = S 76° 44’ 05.91" W
Back = S 73° 11’ 58.39" W
C.C. N 143,709.07 E 3,698,041.87
P.T. Station 24+30.22 N 142,443.75 E 3,698,340.16
P.C. Station 23+50.00 N 142,464.55 E 3,698,417.62
Mid. Ord. = 0.62
Long Chord = 80.20
External = 0.62
Radius = 1,300.00
Length = 80.22
Tangent = 40.12
Degree = 4° 24’ 26.52"
Delta = 3° 32’ 07.52" (RT)
P.I. Station 23+90.12 N 142,452.96 E 3,698,379.21
Curve ROUTE35-3
*----------*
Curve Data
Course from PT ROUTE35-2 to PC ROUTE35-3 S 73° 11’ 58.39" W Dist 910.00
Chord Bear = S 71° 13’ 01.82" W
Ahead = S 73° 11’ 58.39" W
Back = S 69° 14’ 05.25" W
C.C. N 143,972.09 E 3,698,913.02
P.T. Station 14+40.00 N 142,727.58 E 3,699,288.78
P.C. Station 13+50.04 N 142,756.54 E 3,699,373.93
Mid. Ord. = 0.78
Long Chord = 89.94
External = 0.78
Radius = 1,300.00
Length = 89.96
Tangent = 45.00
Degree = 4° 24’ 26.52"
Delta = 3° 57’ 53.14" (RT)
P.I. Station 13+95.04 N 142,740.59 E 3,699,331.85
Curve ROUTE35-2
*----------*
Curve Data
Course from PT ROUTE35-1 to PC ROUTE35-2 S 69° 14’ 05.25" W Dist 216.52
Chord Bear = S 70° 48’ 09.61" W
Ahead = S 69° 14’ 05.25" W
Back = S 72° 22’ 13.97" W
C.C. N 141,617.75 E 3,700,037.28
P.T. Station 11+33.52 N 142,833.30 E 3,699,576.38
P.C. Station 10+62.37 N 142,856.70 E 3,699,643.56
Mid. Ord. = 0.49
Long Chord = 71.14
External = 0.49
Radius = 1,300.00
Length = 71.15
Tangent = 35.58
Degree = 4° 24’ 26.52"
Delta = 3° 08’ 08.71" (LT)
P.I. Station 10+97.96 N 142,845.92 E 3,699,609.65
Curve ROUTE35-1
*----------*
Curve Data
Course from ML100 to PC ROUTE35-1 S 72° 22’ 13.97" W Dist 362.37
Point ML100 N 142,966.44 E 3,699,988.92 Sta 7+00.00
===============================================================================
Beginning chain ROUTE35 description
ML100 CUR ROUTE35-1 CUR ROUTE35-2 CUR ROUTE35-3 CUR ROUTE35-4 CUR ROUTE35-5
Chain ROUTE35 contains:
Ending chain ROUTE35 description
===============================================================================
Chord Bear = S 61° 59’ 12.13" W
Ahead = S 50° 46’ 25.88" W
Back = S 73° 11’ 58.39" W
C.C. N 140,719.47 E 3,697,764.09
P.T. Station 40+67.64 N 141,881.46 E 3,696,815.52
P.C. Station 34+80.54 N 142,155.45 E 3,697,330.53
Mid. Ord. = 28.63
Long Chord = 583.36
External = 29.19
Radius = 1,500.00
Length = 587.10
Tangent = 297.36
Degree = 3° 49’ 10.99"
Delta = 22° 25’ 32.52" (LT)
P.I. Station 37+77.90 N 142,069.50 E 3,697,045.87
Curve ROUTE35-5
*----------*
Curve Data
Course from PT ROUTE35-4 to PC ROUTE35-5 S 73° 11’ 58.39" W Dist 753.59
Chord Bear = S 74° 58’ 02.15" W
Ahead = S 73° 11’ 58.39" W
Back = S 76° 44’ 05.91" W
C.C. N 141,128.75 E 3,698,427.71
P.T. Station 27+26.95 N 142,373.27 E 3,698,051.96
P.C. Station 26+46.74 N 142,394.07 E 3,698,129.42
Mid. Ord. = 0.62
Long Chord = 80.20
External = 0.62
Radius = 1,300.00
Length = 80.22
Tangent = 40.12
Degree = 4° 24’ 26.52"
Delta = 3° 32’ 07.52" (LT)
P.I. Station 26+86.86 N 142,384.86 E 3,698,090.36
Curve ROUTE35-4
*----------*
Curve Data
1E(1)
1E(1)
Civil Engineer
Alexandria, Virginia
Volkert Inc.
CONSTRUCTION ALIGNMENT DATA SHEET
1
2
3
5
4
SEPTEMBER 5, 2013
CONCEPT PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145701e(1).dgn
Plotted By: kmaregn11:57:40 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\General\d8145701e(1).dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
53
2A
2A
12’
2:1
STD. GS-11
11’
Route 35
3’8’
11"
12’11’
8’11"
3’
CL
INSET A
2:1
STD. GS-11
Route 35
3’
11"11"
3’
CL
Var. *
Var.*
Var. * Var. *
Var. *
Var. *
* SEE PLANS
2:1
2:1
STD. GS-11
Station 23+50.00 to 27+17.00
Station 10+89.00 to 14+40.00
Station 27+17.00 to 29+00.00
Station 9+00.00 to 10+89.00
2% 2%
Route 35
LC
Point of Finished Grade
20’20’
42’4"
INSET B
Var. * Var. *
* SEE PLANS
1.5’ 1.5’
1.5’1.5’
INSET A
Route 35
CL
NOTE: PAVEMENT WIDTHS VARY AT TAPERS.
SEE PLAN SHEETS AND CROSS SECTIONS
FOR PAVEMENT LENGTHS AND WIDTHS.
TYPICAL SECTIONS
1
Finished Grade
Point of
Seeding Req’d
2" Topsoil &Seeding Req’d
2" Topsoil &
Asphalt Curb
Std. MC-3B
Back- up Material Asphalt Concrete Curb
Seeding Req’d
2" Topsoil &
Asphalt Curb
Std. MC-3B
Back- up Material
Asphalt Concrete Curb
Finished Grade
Point of
Seeding Req’d
2" Topsoil &
Asphalt Curb
Std. MC-3B
Back- up Material Asphalt Concrete Curb
Seeding Req’d
2" Topsoil &
Seeding Req’d
2" Topsoil &
Back- up Material
Asphalt Concrete Curb Asphalt Curb
Std. MC-3B
Finished Grade
Point of
2 % AND VAR. 2 % AND VAR.
STD. GS-11 2 % AND VAR. 2 % AND VAR.
(See Bridge Plan for details)
Station 14+40.00 to 23+50.00
Station 29+00.00 to 29+50.00
Station 8+90.00 to 9+00.00
1
2
3
Type SM-12.5A @ 220 lbs. per sq.yd.
Asphalt Concrete Surface Course
Type BM-25.0A
4" Asphalt Concrete Base Course
Type 1, NO. 21B
8" Aggregate Base Material
Civil Engineer
Alexandria, Virginia
Volkert Inc.
321
NOT IN SCALE
INSET A
NOT IN SCALE
INSET B
2" and overlayed.Existing pavement shall be planed approximately
SEPTEMBER 5, 2013
CONCEPT PLANS
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145702a.dgn
Plotted By: kmaregn11:57:41 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Typicals\d8145702a.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
54
3
3
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 4
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
757-654-6024
Dominion Virginia Power
1600 Hamiton Ave.
Gaylene 757-393-3824
Portsmouth VA. 23707-3528
Courtland, VA. 23837
Department Of Public Utilities17287 Pittman Rd.
Julien W. Johnson Jr.Director Of Pubic Utilities
Verizon South Inc.Mr. Mike Ziegler2920 OSP Engineering - 2nd Floor3011 Hungary Spring RoadRichmond, VA. 23322
Ms. Gaylene Watson
P. O. Box 39
Boykins, VA 23827
Town Of Courtland
*** Utility Owners ***
1100 Confroy Drive, Suite 4
Mid-Atlantic Broadband Communities Riverstone Technology Park
South Boston, VA 24592Mr. Doug Herrin
434-570-1300
Network Operations Manager
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
3A
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
E&SC Plan 3B
0
SCALE
25’ 50’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
73 Conc. Footers
Sig
n
Sig
n
Metal Post
Iron Rod
Gravel Ent.
Woods
Sig
n
Sig
n
#22235
1 - Sty. Br. Bldg.
4 Wooden Posts
Conc
BM 3 Nails in Base Of 15" Sycamore
Exist
R/
W
Exist
R/
W
Exist
R/
W
Sig
n
Sig
n
Sig
n
Sig
n
+18.18
45.4
6’
+31.25
55.5
9’
Iron Rod
+11.14
173.0
3’
175.7
0’
Iron Rod
+98.7
9
199.4
3’
Iron Rod
Tank
Exist R/W
Elev 21. 52’
Z Z Z
(N 17
° 44’ 00"
W 80. 3
5’)
N 23° 54’ 19"
W 80. 3
5’
(N 21° 2
2’ 00"
W 87. 7
0’)
PL
(N 67° 27’ 34" W 72. 57’)
PL
PL15’
Utility Ease
ment
(S 11° 00’ 00" E 12
0. 5
0’)
S 16
° 58’ 55" E 12
0. 2
1’
N 73° 40’ 44" W +45. 36
Exist
R/
W
PI 10
4+6
9.5
5
S 71° 43’ 03" W
104 10
5 106 107 108 109 110
Route 58 Bus & 35 (Meherrin Road)
Approxim
ate Corp Limits
(S 85° 32’ 47" E 122. 66’)
(N 85° 13’ 13" E 174. 20’)PL (30. 7
7’)
(N 12
° 16’ 29"
W)
PL(N 84° 17’ 49" E 904’ )+-
(649. 02’ To Tie Line)
Town of Courtla
nd
Southa
mpton County
Exist R/W
+57.0
4
68.3
3’
+64.3
3
56.7
6’ +67.9
8
62.16’
+67.7
6
50.18’
+66.3
3
18.8
5’
Exist
R/
W
+55.4
5
11.6
5’
+31.42
59.3
8’
+81.62
43.9
8’
Iron Rod
+44.5
9
0.6
7’
Iron Rod
+13.0
0
2.2
5’
Iron Rod
Iron Rod
Tax# 60 - 25
8 ACRES
DB 396 PG 816
DB 284 PG 247
Tax# 60A-1-4
PB 7 PG 108
R
Property In Sections Numbered J - R Are Based On VDOT Project #475 - Rt. 12, Plats
and Limited Field Evidence. A Title Search And Or Boundary Survey May Produce
DB 445 PG 773
Tax# 60A - 66
PB22 PG 120
2. 4 ACRES
WMWV
Veriz
on #C-10
Veriz
on #C-9
Veriz
on #C-8
Veriz
on #C-7
DVP #IG-18
DVP #H
G-6
6
4
Guy
Wires
2
Guy
Wires
DVP #H
G-6
5
Guy
Wire
PO
T 7+0
0.0
0
7 8 9 10P
C 10
+62.3
7
11
PT 11+3
3.5
2
12
13 PC 13
+50.0
4
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-1
PI = 10+97.96
T = 35.58’
L = 71.15’
R = 1,300.00’
10+62.37PC =
PT = 11+33.52
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-2
PI = 13+95.04
T = 45.00’
L = 89.96’
R = 1,300.00’
13+50.04PC =
PT = 14+40.00
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
F
F St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
PROP. R/W
PROP. R/W
PROP. R/W
+00.0
0
20’
+89.0
0
24’
Shoulder Transition 230’
Pavement Transition 189’
Shoulder Transition 162’
Sta. 8+90.00 Constr. BL
Begin Construction
Sta. 10+35.00 Constr. BL
Begin Proj. 0035-087-112, RW201
Sta. 10+89.00 Constr. BL
Begin Proj. 0035-087-112, P101, C501
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145703.dgn
Plotted By: kmaregn11:57:43 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145703.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
DONALD A VICK
GARY L COWAN AND
JOSEPH KINDRED MAGETTE JR
JERRY R. BRYANT
THOMAS E. BRYANT
GEORGE LEROY BRYANT, JR.
55
0035-087-112
35
d8145703a.dgn
Plotted By: kmaregn11:57:44 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145703a.dgn
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
PROJECT SHEET NO.
Civil Engineer
Alexandria, Virginia
Volkert Inc.
C-501
0035-087-112, RW201,
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
0
SCALE VERTICAL
0
SCALE HORIZONTAL
25’ 50’ 5’ 10’
30
25
20
15
10
5
0
35
40
30
25
20
15
10
5
0
35
40
SEPTEMBER 5, 2013CONCEPT PLANS PROFILE VIEW
-5_
0_
5_
10_
15_
20_
25_
30_
26.13
STA = 10+15.00
EL = 25.50
-0.50%
+2.08%
L = 250.00
K = 97
V = 50 MPH
Sta. 10+35.00 Constr. BL
Begin Proj. 0035-087-112, RW201
Sta. 10+89.00 Constr. BL
Begin Proj. 0035-087-112, P101, C501
Sta. 8+90.00 Constr. BL
Begin Construction
ROUTE 35
7+00.00 8+00.00 9+00.00 10+00.00 11+00.00 12+00.00 13+00.00
-5_
26.8
0
26.7
8
26.7
5
26.7
0
26.6
5
26.5
0
26.3
4
26.2
0
26.0
7
25.9
5
26.0
1
26.11
26.2
7
26.3
9
26.4
4
26.3
9
26.14
26.2
4
26.19
26.13
26.0
4
25.9
3
25.8
2
25.7
0
25.6
3
25.18
24.3
2
24.17
26.0
8
26.0
1
26.0
1
26.0
7
26.2
0
26.3
9
26.6
5
26.9
7
27.3
5
27.8
0
28.3
1
28.8
3
29.3
5
29.8
7
30.3
9
30.9
1
31.43
31.95
32.4
5
32.9
3
3A
3A
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 4
A
Station Label
PGL Elevation
Left EOP
Right EOP
9+07.04
+07.0
426.0
625.8
9 (-8.5
5’)
25.8
2 (11.93’)
+50.0
026.0
125.8
2 (-9.4
3’)
25.9
9 (11.95’)
+00.0
026.2
025.9
9 (-10.4
6’)
26.4
2 (11.97’)
10+03.0496.00’
Lt
+03.0
426.2
226.0
1 (-10.5
2’)
26.4
6 (11.97’)
+28.0
426.4
226.0
8 (-11.0
3’)
26.7
8 (11.98’)
+50.0
026.6
526.19 (-11.4
8’)
27.12 (11.99’)
+53.0
426.6
826.2
1 (-11.5
4’)
27.17 (12.0
0’)
+78.0
427.0
126.4
0 (-11.9
5’)
27.6
3 (12.0
0’)
10+97.9694.92’
Lr
+97.9
627.3
226.6
0 (-12.0
0’)
28.0
3 (12.0
0’)
+00.0
027.3
526.6
5 (-12.0
0’)
28.0
6 (12.0
0’)
+50.0
028.3
127.8
6 (-12.0
0’)
28.7
6 (12.0
0’)
+00.0
029.3
529.15 (-12.0
0’)
29.5
6 (12.0
0’)
+50.0
030.3
930.4
4 (-12.0
0’)
30.3
5 (12.0
0’)
+00.0
031.43
31.73 (-12.0
0’)
31.14 (12.0
0’)
+50.0
032.4
533.0
0 (-12.0
0’)
31.91 (12.0
0’)
FULL SUPERELEVATION 6.42%
56
3B
3B
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 4
Denotes Temporary Silt Fence, St’d EC-5TSF
TCE Denotes Temporary Stone Construction Entrance
EROSION AND SEDIMENT CONTROL PLAN
Civil Engineer
Alexandria, Virginia
Volkert Inc.
0
SCALE
25’ 50’
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
Mainline Plan
3A
3
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
73 Conc. Footers
Sig
n
Sig
n
Metal Post
Iron Rod
Gravel Ent.
Woods
Sig
n
Sig
n
#22235
1 - Sty. Br. Bldg.
4 Wooden Posts
Conc
BM 3 Nails in Base Of 15" Sycamore
Exist
R/
W
Exist
R/
W
Exist
R/
W
Sig
n
Sig
n
Sig
n
Sig
n
+18.18
45.4
6’
+31.25
55.5
9’
Iron Rod
+11.14
173.0
3’
175.7
0’
Iron Rod
+98.7
9
199.4
3’
Iron Rod
Tank
Exist R/W
Elev 21. 52’
Z Z Z
(N 17
° 44’ 00"
W 80. 3
5’)
N 23° 54’ 19"
W 80. 3
5’
(N 21° 2
2’ 00"
W 87. 7
0’)
PL
(N 67° 27’ 34" W 72. 57’)
PL
PL15’
Utility Ease
ment
(S 11° 00’ 00" E 12
0. 5
0’)
S 16
° 58’ 55" E 12
0. 2
1’
N 73° 40’ 44" W +45. 36
Exist
R/
W
PI 10
4+6
9.5
5
S 71° 43’ 03" W
104 10
5 106 107 108 109 110
Route 58 Bus & 35 (Meherrin Road)
Approxim
ate Corp Limits
(S 85° 32’ 47" E 122. 66’)
(N 85° 13’ 13" E 174. 20’)PL (30. 7
7’)
(N 12
° 16’ 29"
W)
PL(N 84° 17’ 49" E 904’ )+-
(649. 02’ To Tie Line)
Town of Courtla
nd
Southa
mpton County
Exist R/W
+57.0
4
68.3
3’
+64.3
3
56.7
6’ +67.9
8
62.16’
+67.7
6
50.18’
+66.3
3
18.8
5’
Exist
R/
W
+55.4
5
11.6
5’
+31.42
59.3
8’
+81.62
43.9
8’
Iron Rod
+44.5
9
0.6
7’
Iron Rod
+13.0
0
2.2
5’
Iron Rod
Iron Rod
Tax# 60 - 25
8 ACRES
DB 396 PG 816
DB 284 PG 247
Tax# 60A-1-4
PB 7 PG 108
R
Property In Sections Numbered J - R Are Based On VDOT Project #475 - Rt. 12, Plats
and Limited Field Evidence. A Title Search And Or Boundary Survey May Produce
DB 445 PG 773
Tax# 60A - 66
PB22 PG 120
2. 4 ACRES
WMWV
Veriz
on #C-10
Veriz
on #C-9
Veriz
on #C-8
Veriz
on #C-7
DVP #IG-18
DVP #H
G-6
6
4
Guy
Wires
2
Guy
Wires
DVP #H
G-6
5
Guy
Wire
PO
T 7+0
0.0
0
7 8 9 10P
C 10
+62.3
7
11
PT 11+3
3.5
2
12
13 PC 13
+50.0
4
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-1
PI = 10+97.96
T = 35.58’
L = 71.15’
R = 1,300.00’
10+62.37PC =
PT = 11+33.52
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-2
PI = 13+95.04
T = 45.00’
L = 89.96’
R = 1,300.00’
13+50.04PC =
PT = 14+40.00
F
F
PROP. R/W
PROP. R/W
PROP. R/W
TSF
TCE
TSF
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145703b.dgn
Plotted By: kmaregn11:57:45 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\ESC\d8145703b.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
DONALD A VICK
GARY L COWAN AND
JOSEPH KINDRED MAGETTE JR
JERRY R. BRYANT
THOMAS E. BRYANT
GEORGE LEROY BRYANT, JR.
57
4
4
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 3
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 5
A
Note: See Sheet 3 for Utility Information
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
E&SC Plan 4B
4A
Civil Engineer
Alexandria, Virginia
Volkert Inc.
0
SCALE
25’ 50’
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Brid
ge Bases
2
Conc
Support
Old
Brid
ge
Support
Old
Brid
ge
Supports
2
Old
Brid
ge
Conc
Conc
Wall
Wood
Retainin
g
(685’ P Is
Alo
ng C
River)
L
L
+-
(170’ P Is
Alo
ng C
River)
L
L
+-
(S 38° 20’ 57" E 665. 7
4’ Survey
Tie Line)
Exist
R/
W
S 42° 30’ 25" E
+96. 3
5
PI 111+02.13
S 73° 12’ 32" W
111
112
113
114
115
116
117
Nottoway River
Nottoway River
(N 39° 4
3’ 02"
W 13
1. 70’)
Surve
y Tie Line
Z
(148’ Alo
ng River)
+-
N 44° 3
9’ 44"
W +8
6. 2
7
Structure #B604
Exist R/W
+67.9
4
58.19’
Exist
R/
W
+39.9
5
25.4
1’
Exist
R/
W
+10.7
0
59.4
2’
Exist
R/
W
Exist
R/
W
+53.3
3
25.3
4’
+37.4
8
59.8
2’
Tax# 60 - 25
8 ACRES
DB 396 PG 816
Guy
Wire
Veriz
on #C-14
Veriz
on #C-13
Veriz
on #C-12
Veriz
on #C-11
DVP
No#
4
Guy
Wires
S
SF
MV
3
Guy
Wires
DVP
No# D
VP
No#
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-2
PI = 13+95.04
T = 45.00’
L = 89.96’
R = 1,300.00’
13+50.04PC =
PT = 14+40.00
14 PT 14
+40.0
0
15 16 17 18 19 20
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.St’d. GR-FOA-1 Req’d.
St’d. GR-FOA-1 Req’d.
PROP. R/W
PROP. R/W
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
PROP. R/W
PROP. R/W
Sta. 14+40.00Constr. Baseline
Begin Proj. 0035-087-112, B-604
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145704.dgn
Plotted By: kmaregn11:57:47 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145704.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
DONALD A VICK
GARY L COWAN AND
58
0035-087-112
35
d8145704a.dgn
Plotted By: kmaregn11:57:48 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145704a.dgn
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
PROJECT SHEET NO.
Civil Engineer
Alexandria, Virginia
Volkert Inc.
C-501
0035-087-112, RW201,
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
0
SCALE VERTICAL
0
SCALE HORIZONTAL
25’ 50’ 5’ 10’
30
25
20
15
10
5
0
35
40
30
25
20
15
10
5
0
35
40
SEPTEMBER 5, 2013CONCEPT PLANS PROFILE VIEW
STA = 18+65.00
EL = 43.20
+2.08% -2.08%
L = 1,100.00
K = 264
SSD = 755’
V = 70 MPH
Sta. 14+40.00Constr. Baseline
Begin Proj. 0035-087-112, B-604
ROUTE 35
14+00.00 15+00.00 16+00.00 17+00.00 18+00.00 19+00.00 20+00.00
24.17
23.8
0
23.18
23.0
2
10.12
7.11
10.7
2
11.0
0
11.3
5
11.5
8
11.6
1
9.14
11.3
4
11.7
6
12.6
7
5.0
6
0.9
3
-1.4
6
-1.8
8
-0.5
1
-0.9
7
-0.5
2
1.11
1.54
4.8
9
9.5
4
13.2
4
14.9
9
32.9
3
33.3
8
33.8
1
34.2
1
34.5
9
34.9
5
35.2
8
35.5
9
35.8
8
36.14
36.3
8
36.6
0
36.7
9
36.9
6
37.10
37.2
2
37.3
2
37.3
9
37.4
4
37.4
7
37.4
7
37.4
5
37.4
0
37.3
4
37.2
4
37.13
36.9
9
36.8
2
4A
4A
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 5
A
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 3
A
13+95.04
+95.0
433.2
934.0
6 (-12.0
0’)
32.5
2 (12.0
0’)
+00.0
033.3
840.2
8 (-12.0
0’)
32.6
3 (12.0
0’)
+50.0
034.2
134.7
1 (-12.0
0’)
33.7
2 (12.0
0’)
+00.0
034.9
535.2
0 (-12.0
0’)
34.7
0 (12.0
0’)
15+01.19106.15’
Lt
+01.19
34.9
735.2
1 (-12.0
0’)
34.7
3 (12.0
0’)
+50.0
035.5
935.5
9 (-12.0
0’)
35.3
5 (12.0
0’)
15+97.1996.00’
Lt
+97.19
36.12
35.8
8 (-12.0
0’)
35.8
8 (12.0
0’)
+00.0
036.14
35.9
0 (-12.0
0’)
35.9
0 (12.0
0’)
+50.0
036.6
036.3
6 (-12.0
0’)
36.3
6 (12.0
0’)
+00.0
036.9
636.7
2 (-12.0
0’)
36.7
2 (12.0
0’)
+50.0
037.2
236.9
8 (-12.0
0’)
36.9
8 (12.0
0’)
+00.0
037.3
937.15 (-12.0
0’)
37.15 (12.0
0’)
+50.0
037.4
737.2
3 (-12.0
0’)
37.2
3 (12.0
0’)
+00.0
037.4
537.2
1 (-12.0
0’)
37.2
1 (12.0
0’)
+50.0
037.3
437.10 (-12.0
0’)
37.10 (12.0
0’)
+00.0
037.13
36.8
9 (-12.0
0’)
36.8
9 (12.0
0’)
+50.0
036.8
236.5
8 (-12.0
0’)
36.5
8 (12.0
0’)
NORMAL CROWN -2.00%
Station Label
PGL Elevation
Left EOP
Right EOP
59
4B
4B
MA
TC
HLIN
E
ST
A. 13
+75.0
0 S
HE
ET 3
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 5
A
2
1
Access Road Typical
Causeway Typical
4
3
1
56
TYPE 1, NO. 21B
6" AGGREGATE BASE MATERIAL1
2
3
4
5
6
2’ Class 1 RIPRAP
GEOTEXTILE FABRIC
8.5’ Class 1 RIPRAP
6" AGGREGATE MATERIAL, NO. 3 STONE
12" AGGREGATE MATERIAL, NO. 1 STONE
1.
are for informational purposes only.
Location and shapes of cofferdams shown
NOTE
24
EROSION AND SEDIMENT CONTROL PLAN
SCALE
0 25’ 50’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
Mainline Plan
4A
4
TCE Denotes Temporary Stone Construction Entrance
Denotes Temporary Silt Fence, St’d EC-5TSF
TC-1 Denotes Turbidity Curtain, Type - Impervious
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Brid
ge Bases
2
Conc
Support
Old
Brid
ge
Support
Old
Brid
ge
Supports
2
Old
Brid
ge
Conc
Conc
Wall
Wood
Retainin
g
(685’ P Is
Alo
ng C
River)
L
L
+-
(170’ P Is
Alo
ng C
River)
L
L
+-
(S 38° 20’ 57" E 665. 7
4’ Survey
Tie Line)
Exist
R/
W
S 42° 30’ 25" E
+96. 3
5
PI 111+02.13
S 73° 12’ 32" W
111
112
113
114
115
116
117
Nottoway River
Nottoway River
(N 39° 4
3’ 02"
W 13
1. 70’)
Surve
y Tie Line
Z
(148’ Alo
ng River)
+-
N 44° 3
9’ 44"
W +8
6. 2
7
Structure #B604
Exist R/W
+67.9
4
58.19’
Exist
R/
W
+39.9
5
25.4
1’
Exist
R/
W
+10.7
0
59.4
2’
Exist
R/
W
Exist
R/
W
+53.3
3
25.3
4’
+37.4
8
59.8
2’
Tax# 60 - 25
8 ACRES
DB 396 PG 816
Guy
Wire
Veriz
on #C-14
Veriz
on #C-13
Veriz
on #C-12
Veriz
on #C-11
DVP
No#
4
Guy
Wires
S
SF
MV
3
Guy
Wires
DVP
No# D
VP
No#
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-2
PI = 13+95.04
T = 45.00’
L = 89.96’
R = 1,300.00’
13+50.04PC =
PT = 14+40.00
14 PT 14
+40.0
0
15 16 17 18 19 20
PROP. R/W
PROP. R/W
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
PROP. R/W
PROP. R/W
Access Road
Causeway
Class 2 Riprap
Causeway
Class 2 Riprap
Fingers
Crane Mat
below mudline
Demolition
Cofferdam for
below mudline
Demolition
Cofferdam for
below mudline
Demolition
Cofferdam for
P1 P2 P3 P4
TC-1TC-1
TSF
TSF
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145704b.dgn
Plotted By: kmaregn11:57:49 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\ESC\d8145704b.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
DONALD A VICK
GARY L COWAN AND
60
5
5
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 4
A
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 6
Note: See Sheet 3 for Utility Information
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
3A
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
E&SC Plan 3B
SCALE
0 25’ 50’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Conc
(S 21° 0
6’ 47" E 19
0. 3
2’)
(Survey Tie Lin
e)
(S 38° 20’ 57" E 665. 7
4’ Survey
Tie Line)
+67.9
8
51.87’
+17.2
1
56.0
5’
Exist
R/
W
Exist
R/
W
+17.2
1
55.5
0’
Exist
R/
W
+67.4
8
59.9
5’
Exist
R/
W
Exist
R/
W
+80.19
25.2
1’
Exist
R/
W
S 42° 30’ 25" E
+96. 3
5
S 25° 16’ 20" E
+76. 4
4
Exist R/W
Exist R/W
PI 12
0+4
5.7
3
S 73° 29’ 19" W
118
119
120
121
122
123
124
Inst. # 030003098
Tax# 60 - 29
PB 26 PG 124
44 ACRES
36. 5 ACRES
PB 26 PG 125
Inst. # 030003098
Tax# 60 - 28
Veriz
on #C-18
Veriz
on #C-17
Veriz
on #C-16
Two Guy
Wires
Veriz
on #C-15
SF
MV
Ele
v 8.5
8
Rim
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-3
PI = 23+90.12
T = 40.12’
L = 80.22’
R = 1,300.00’
23+50.00PC =
PT = 24+30.22
Curve ROUTE35-4
PI = 26+86.86
T = 40.12’
L = 80.22’
R = 1,300.00’
26+46.74PC =
PT = 27+26.95
21
22
23
PC 23
+50.0
0
24
PT 24+3
0.2
2
25
26
PC 26+4
6.7
4
27
PT 27+2
6.9
5
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
St’d. GR-FOA-1 Req’d.
St’d. GR-FOA-1 Req’d.
PROP. R/W
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
For Bridge ConstructionProp. Temp. Constr. Easement
PROP. R/W
PROP. R/W
PROP. R/WPROP. R/W
+17.0
0
24’
Sta. 23+50.00Constr. Baseline
End Proj. 0035-087-112, B-604
Sta. 27+17.00 Constr. BL
End Proj. 0035-087-112, P101, C501
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145705.dgn
Plotted By: kmaregn11:57:50 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145705.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
JJ PEANUT COMPANY
JJ PEANUT COMPANY
61
0035-087-112
35
d8145705a.dgn
Plotted By: kmaregn11:57:51 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145705a.dgn
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
PROJECT SHEET NO.
Civil Engineer
Alexandria, Virginia
Volkert Inc.
C-501
0035-087-112, RW201,
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
0
SCALE VERTICAL
0
SCALE HORIZONTAL
25’ 50’ 5’ 10’
30
25
20
15
10
5
0
35
40
30
25
20
15
10
5
0
35
40
SEPTEMBER 5, 2013CONCEPT PLANS PROFILE VIEW
Sta. 27+17.00 Constr. BL
End Proj. 0035-087-112, P101, C501
Sta. 23+50.00Constr. Baseline
End Proj. 0035-087-112, B-604
ROUTE 35
21+00.00 22+00.00 23+00.00 24+00.00 25+00.00 26+00.00 27+00.00
14.9
9
10.19
11.8
6
13.5
9
13.4
9
10.9
2
13.7
7
13.18
12.5
3
13.8
6
13.5
7
13.6
8
17.3
0
24.5
5
24.7
9
25.0
1
25.3
6
25.3
5
25.2
4
25.17
25.0
2
24.7
4
24.5
8
24.4
2
24.2
3
24.0
1
23.7
7
23.5
5
36.8
2
36.6
4
36.4
3
36.19
35.9
3
35.6
5
35.3
5
35.0
2
34.6
6
34.2
9
33.8
9
33.4
6
33.0
2
32.5
5
32.0
5
31.53
31.01
30.4
9
29.9
7
29.4
5
28.9
3
28.4
1
27.8
9
27.3
7
26.8
5
26.3
3
25.8
1
25.2
9
5A
5A
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 4
A
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 6
A
+00.0
036.4
336.19 (-12.0
0’)
36.19 (12.0
0’)
+50.0
035.9
335.6
9 (-12.0
0’)
35.6
9 (12.0
0’)
21+94.67
+94.6
735.4
135.17 (-12.0
0’)
35.17 (12.0
0’)
+00.0
035.3
535.13 (-12.0
0’)
35.11 (12.0
0’)
+50.0
034.6
634.7
0 (-12.0
0’)
34.4
2 (12.0
0’)
22+90.6796.00’
Lt
+90.6
734.0
434.2
8 (-12.0
0’)
33.8
0 (12.0
0’)
+00.0
033.8
934.18 (-12.0
0’)
33.6
0 (12.0
0’)
+15.6
733.6
333.9
9 (-12.0
0’)
33.2
6 (12.0
0’)
+40.6
733.19
33.6
8 (-12.0
0’)
32.7
0 (12.0
0’)
+50.0
033.0
233.5
5 (-12.0
0’)
32.4
8 (12.0
0’)
+65.6
732.7
238.4
1 (-12.0
0’)
32.11 (12.0
0’)
23+90.1299.45’
Lr
+90.12
32.2
532.9
9 (-12.0
0’)
31.51 (12.0
0’)
+00.0
032.0
538.4
1 (-12.0
0’)
31.36 (12.0
0’)
+50.0
031.01
31.45 (-12.0
0’)
30.5
8 (12.0
0’)
+00.0
029.9
730.16 (-12.0
0’)
29.7
8 (12.0
0’)
+50.0
028.9
328.8
7 (-12.0
0’)
28.9
9 (12.0
0’)
+00.0
027.8
927.5
8 (-12.0
0’)
28.2
0 (12.0
0’)
+50.0
026.8
526.2
9 (-12.0
0’)
32.0
5 (12.0
0’)
26+86.86FULL SUPERELEVATION 6.22%
+86.8
626.0
825.3
3 (-12.0
0’)
26.8
3 (12.0
0’)
+00.0
025.8
125.13 (-12.0
0’)
32.10 (12.0
0’)
Station Label
PGL Elevation
Left EOP
Right EOP
62
5B
5B
MA
TC
HLIN
E
ST
A. 2
0+5
0.0
0 S
HE
ET 4
A
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 6
2
1
Access Road Typical
4
3
TYPE 1, NO. 21B
6" AGGREGATE BASE MATERIAL1
2
3
4
2’ Class 1 RIPRAP
GEOTEXTILE FABRIC
6" AGGREGATE MATERIAL, NO. 3 STONE
24
EROSION AND SEDIMENT CONTROL PLAN
SCALE
0 50’25’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
Mainline Plan
5A
5
Denotes Temporary Silt Fence, St’d EC-5TSF
TCE Denotes Temporary Stone Construction Entrance
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Conc
(S 21° 0
6’ 47" E 19
0. 3
2’)
(Survey Tie Lin
e)
(S 38° 20’ 57" E 665. 7
4’ Survey
Tie Line)
+67.9
8
51.87’
+17.2
1
56.0
5’
Exist
R/
W
Exist
R/
W
+17.2
1
55.5
0’
Exist
R/
W
+67.4
8
59.9
5’
Exist
R/
W
Exist
R/
W
+80.19
25.2
1’
Exist
R/
W
S 42° 30’ 25" E
+96. 3
5
S 25° 16’ 20" E
+76. 4
4
Exist R/W
Exist R/W
PI 12
0+4
5.7
3
S 73° 29’ 19" W
118
119
120
121
122
123
124
Inst. # 030003098
Tax# 60 - 29
PB 26 PG 124
44 ACRES
36. 5 ACRES
PB 26 PG 125
Inst. # 030003098
Tax# 60 - 28
Veriz
on #C-18
Veriz
on #C-17
Veriz
on #C-16
Two Guy
Wires
Veriz
on #C-15
SF
MV
Ele
v 8.5
8
Rim
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-3
PI = 23+90.12
T = 40.12’
L = 80.22’
R = 1,300.00’
23+50.00PC =
PT = 24+30.22
Curve ROUTE35-4
PI = 26+86.86
T = 40.12’
L = 80.22’
R = 1,300.00’
26+46.74PC =
PT = 27+26.95
21
22
23
PC 23
+50.0
0
24
PT 24+3
0.2
2
25
26
PC 26+4
6.7
4
27
PT 27+2
6.9
5
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
PROP. R/W
PROP. R/W
Prop. Temp. Constr. Easement For Bridge Construction
For Bridge ConstructionProp. Temp. Constr. Easement
PROP. R/W
PROP. R/W
PROP. R/WPROP. R/W
Access Road
Fingers
Crane Mat
Fingers
Crane Mat
P5 P6
TSF
TSF
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145705b.dgn
Plotted By: kmaregn11:57:53 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\ESC\d8145705b.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
JJ PEANUT COMPANY
JJ PEANUT COMPANY
63
6
6
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 5
A
Note: See Sheet 3 for Utility Information
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
Denotes Mill and Overlay
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
E&SC Plan 6B
6A
0
SCALE
25’ 50’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Conc Headwall
Conc Headwall
+17.5
9
Exist
R/
W
+67.5
9
42.4
6’
Exist
R/
W
+67.6
0
47.6
4’
+71.98
52.9
9’
Exist
R/
W
Exist
R/
W
Exist
R/
W
+68.4
4
23.2
7’
Exist
R/
W
+17.5
5
12.4
1’
Exist
R/
W
+17.5
6
8.13’
Elev 10. 93’
BM 3 Nails in Base Of 18" Cypress
PI 12
5+7
2.4
4
S 73° 04’ 20" W
124
125
126
127
128
129
130
36. 5 ACRES
PB 26 PG 125
Inst. # 030003098
Tax# 60 - 28
Veriz
on #C-2
3
Veriz
on #C-2
2
Veriz
on #C-2
1
Veriz
on #C-2
0
Veriz
on #C-19
DVP
No#
2
Guy
Wires
PT 27+2
6.9
5
28
29
30
31
32
33
34
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-4
PI = 26+86.86
T = 40.12’
L = 80.22’
R = 1,300.00’
26+46.74PC =
PT = 27+26.95
St’d. MC-3C Req’d.
St’d. MC-3C Req’d.
F
F
St’d. GR-2 Req’d.
St’d. GR-2 Req’d.
PROP. R/W
PROP. R/W
PROP. R/W
PROP. R/W
+00.0
0
21.5’
+17.0
0
Shoulder Transition 220’
Pavement Transition 183’
Pavement Transition 173’
Shoulder Transition 164’
Sta. 29+55.00 Constr. BL
End Proj. 0035-087-112, RW201
Sta. 29+50.00 Constr. BL
End Construction
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145706.dgn
Plotted By: kmaregn11:57:54 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145706.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
JJ PEANUT COMPANY
64
0035-087-112
35
d8145706a.dgn
Plotted By: kmaregn11:57:55 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\Roadway\d8145706a.dgn
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
PROJECT SHEET NO.
Civil Engineer
Alexandria, Virginia
Volkert Inc.
C-501
0035-087-112, RW201,
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
0
SCALE VERTICAL
0
SCALE HORIZONTAL
25’ 50’ 5’ 10’
30
25
20
15
10
5
0
35
40
30
25
20
15
10
5
0
35
40
SEPTEMBER 5, 2013CONCEPT PLANS PROFILE VIEW
STA = 29+00.00
EL = 21.64
-2.08%
-0.72%
L = 150.00
K = 110
20.9
2
V = 50 MPH
Sta. 29+55.00 Constr. BL
End Proj. 0035-087-112, RW201
Sta. 29+50.00 Constr. BL
End Construction
ROUTE 35
28+00.00 29+00.00 30+00.00 31+00.00 32+00.00 33+00.00 34+00.00
23.5
5
23.2
9
23.0
0
22.7
1
22.4
1
22.14
21.89
21.65
21.46
21.29
21.12
20.9
2
20.7
1
20.4
7
20.2
1
19.9
8
19.7
5
19.5
0
19.4
9
19.5
7
19.3
6
19.19
19.0
5
19.0
0
18.9
7
18.9
5
18.9
8
19.0
2
25.2
9
24.7
7
24.2
4
23.7
2
23.2
0
22.7
1
22.2
8
21.90
21.57
21.31
21.10
20.9
2
6A
6A
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 5
A
+50.0
024.7
724.3
4 (-11.7
8’)
25.19 (11.88’)
27+88.14101.28’
Lt
+88.14
23.9
723.7
4 (-11.4
8’)
24.2
0 (11.63’)
+00.0
023.7
223.5
0 (-11.3
8’)
23.9
0 (11.55’)
+50.0
022.7
122.4
9 (-10.9
9’)
22.6
5 (11.22’)
28+84.1496.00’
Lt
+84.14
22.13
21.92 (-10.7
1’)
21.91 (11.00’)
29+00.00
NORMAL CROWN 0.00%
+00.0
021.90
21.68 (-10.5
9’)
19.6
6 (12.8
4’)
Station Label
PGL Elevation
Left EOP
Right EOP
65
6B
6B
MA
TC
HLIN
E
ST
A. 2
7+2
5.0
0 S
HE
ET 5
A
EROSION AND SEDIMENT CONTROL PLAN
0
SCALE
25’ 50’
Civil Engineer
Alexandria, Virginia
Volkert Inc.
Denotes Construction Limits in Cuts
Denotes Construction Limits in FillsF
LEGEND
Denotes Demolition of Pavement
Denotes Mill and Overlay
C
Denotes New Asphalt Pavement
Note : Figures in parenthesis and dot - dot - dashedlines denote Temporary Easements.
Note : Figures in brackets and dot - dashed linesdenote Permanent Easements.
REFERENCES
( PROFILES, DETAIL & DRAINAGE
DESCRIPTION SHEETS, ETC. )
Mainline Profile
Mainline Plan
6A
6
Denotes Temporary Silt Fence, St’d EC-5TSF
TCE Denotes Temporary Stone Construction Entrance
SEPTEMBER 5, 2013
PLAN VIEW
CONCEPT PLANS
Sig
n
Conc Headwall
Conc Headwall
+17.5
9
Exist
R/
W
+67.5
9
42.4
6’
Exist
R/
W
+67.6
0
47.6
4’
+71.98
52.9
9’
Exist
R/
W
Exist
R/
W
Exist
R/
W
+68.4
4
23.2
7’
Exist
R/
W
+17.5
5
12.4
1’
Exist
R/
W
+17.5
6
8.13’
Elev 10. 93’
BM 3 Nails in Base Of 18" Cypress
PI 12
5+7
2.4
4
S 73° 04’ 20" W
124
125
126
127
128
129
130
36. 5 ACRES
PB 26 PG 125
Inst. # 030003098
Tax# 60 - 28
Veriz
on #C-2
3
Veriz
on #C-2
2
Veriz
on #C-2
1
Veriz
on #C-2
0
Veriz
on #C-19
DVP
No#
2
Guy
Wires
PT 27+2
6.9
5
28
29
30
31
32
33
34
E = 6.70%
V = 50 MPH
Lt = 48’
Lr = 161’
Curve ROUTE35-4
PI = 26+86.86
T = 40.12’
L = 80.22’
R = 1,300.00’
26+46.74PC =
PT = 27+26.95
F
F
PROP. R/W
PROP. R/W
PROP. R/W
PROP. R/W
TSF
TCE
TSF
VA.
STATE
ROUTE PROJECT
VA.
REVISEDSTATE
STATE
ROUTE PROJECTSHEET NO.
d8145706b.dgn
Plotted By: kmaregn11:57:56 AM
T:\160500 - VDOT - Various Design Build\Task 00005-Rte 35 Nottoway RIver\Design\DGN\Sheets\ESC\d8145706b.dgn
PROJECT SHEET NO.
DESIGN FEATURES RELATING TO CONSTRUCTION
OR TO REGULATION AND CONTROL OF TRAFFIC
MAY BE SUBJECT TO CHANGE AS DEEMED
NECESSARY BY THE DEPARTMENT
John G Harman, P.E (757) 925-2308 (Hampton Roads)
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/9/11
Walter D. Freeman, L.S. (757) 925-1608 (Hampton Roads), 9/8/11
PROJECT MANAGER
SURVEYED BY, DATE
DESIGN BY
SUBSURFACE UTILITY BY, DATE
Volkert Inc. (703) 642 8100 (Alexandria, VA)
DESIGN SUPERVISED BY Keith Weakley (703) 642-8100 (Volkert, Inc.)
35
0035-087-112
C-5010035-087-112, RW201,
HA
MP
TO
N
RO
AD
S
DIS
TRIC
T
DE
SIG
N
UNIT
JJ PEANUT COMPANY
66
C C C C C C
Approach slab
Face of curb
Face of curb
PLAN
ELEVATION
Span d
130’-0"
o
Route 35 Constr
S 73°11’58"W
1’-
3"
20’-
0"
20’-
0"
1’-
3"
40’-
0"
ABUTMENT A ABUTMENT BBENT 6BENT 5BENT 4
Span a
Span b Span c Span d Span e Span fSpan g
+2.08% -2.08%
Existing Ground
Existing Ground
L = 1,110.00EL = 43.20STA = 18+65.00
Elevation 25.72
High Water
Elevation 9.57’
Ordinary High Water
7-span continuous concete (PCBT-77)
910’-0"
910’-0"
Finished Grade
Elev. 34.05
Elev. 35.83 Elev. 36.96Elev. 37.45 Elev. 37.30 Elev. 36.51 Elev. 35.09
Elev. 33.02typ.90
Approach slab
135 0035-87-112, B604
Aug. 2013 Sheet 1 of 2
81457
Scale: 1" = 40’
piles (typ.)
Prestressed conc.
RIV
ER
NO
TT
OW
AY
Prop. R/W
Prop. R/W Prop. R/W
Prop. R/W
Sta. 14+40.00Abutment AFace of backwall
Span a
130’-0"
Span b
130’-0"
Span c
130’-0"
Span e
130’-0"
Span f
130’-0"
Span g
130’-0"
Sta. 23+50.00Abutment BFace of backwall
Sta. 14+40.00
Face of backwall
Beginning of bridge
Sta. 23+50.00Face of backwallEnd of bridge
BENT 1 BENT 2 BENT 3
Sta. 15+70.00L Bent 1
Sta. 17+00.00L Bent 2
Sta. 18+30.00L Bent 3
Sta. 19+60.00L Bent 4
Sta. 20+90.00L Bent 5
Sta. 22+20.00L Bent 6
L Rte. 35 Constr.C
1’-3"
Face of rail
9" min.
32" Kansas corral typ.
1"
PCBT-77 typ.
1’-3"
1" Slope: 2.0%Slope: 2.0%
3’-5"3 spa. @ 11’-10" = 35’-6"
42’-4"
20’-0" 20’-0"
Face of rail
3’-5"
TRANSVERSE SECTIONNot to scale
PROJ. 0035-87-112, B604
SOUTHAMPTON COUNTY
RTE. 35 OVER NOTTOWAY RIVER
CONCEPTUAL TECHNICAL PROPOSAL PLANS
PLANS BY:
COORDINATED:
SUPERVISED:
DESIGNED:
DRAWN:
CHECKED:
GENERAL NOTES:
DESIGN EXCEPTION(S):
Federal Oversight Code:
NBIS Number:
and Scour Code:FHWA Construction
UPC No.
STATEROUTE PROJECT
FEDERAL AID
ROUTE PROJECT NO.
SHEETSTATE
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
No. Description Date
For Table of Revisions,
REVISIONS
Date:
Approved:
Recommended for Approval:
ERC
Chief Engineer
c
Date
Date
_ _ _ _ _ _ _ _ _ _ Sheet 2 of
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
see Sheet __ 2013, Commonwealth of Virginia
101851
VA.
Plan and Elevation S
heet.dgn
$D
ATE$
FO
164STP-965-5(079)
67
ABUTMENT SECTION
Scale: �" = 1’-0"
cScale as noted
BCG
BCG
CSL
Scale: �" = 1’-0"
End of slabBottom of slab
Bolster
Varie
s
Top of beam
1’-
8"
7"1’-8"
Geocomposite wall drain
6" pipe underdrain
3
2013, Commonwealth of Virginia
Tooth JointApproach slab
Face of backwall
3’-
6"
42’-0"
5’-
0"
L bentC
Direction of 1:6 pile batter.
PLAN OF BENT
3’-0"3’-0" 6 spa. @ 6’-0" = 36’-0"
pile typ.
Prestressed concrete
Scale: �" = 1’-0"
BENT SECTION
5’-0"
SUBSTRUCTURE DETAILSPROPOSAL PLANS
CONCEPTUAL TECHNICAL
Beam
4’-
6"
9’-0"
concrete pile
Prestressed
2
Date Plan No. Sheet No.Designed: ...........
Drawn: ................
Checked: ............
No. Description Date
STRUCTURE AND BRIDGE DIVISION
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
Revisions
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.STATE
ROUTE
FEDERAL AID
PROJECT ROUTE PROJECT
STATE SHEET
NO.STATE
STRUCTURAL ENGINEER
ALEXANDRIA, VA
VOLKERT, INC.
Structure
Details.d
gn
FOR CONSTRUCTION
THESE PLANS NOT TO BE USED
PRELIMINARY PLANS
616 0616-002-822, B674VA
of 2April 2013
68