route 55: lauer rd –tsp & access management. agenda welcome and introductions workshop...

30
Route 55: Lauer Rd –TSP & Access Management

Upload: jason-grant

Post on 13-Jan-2016

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Route 55: Lauer Rd –TSP & Access Management

Page 2: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Agenda

Welcome and Introductions Workshop Purpose Project Introduction & Background Citizen Advisory Committee Report Introduce Preliminary Design Alternatives Question & Answer Period Break Out Session Report Back Next Steps

Page 3: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Workshop Purpose Report Back to Community on Public

Workshop I & the Citizen Advisory Committee

Introduce the Preliminary Design Alternatives to Community

Gain community feedback

Page 4: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Introduction & Background

NYSDOT Project Objectives:Reduce AccidentsReduce Traffic DelaysSupport Future needs of the corridor and

the community

Page 5: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Project Overview Feb 2008

Initiated to address safety and operational concerns along the corridor

Oct 2010 Public Officials Meeting

February 2011 Public Workshop 1

April – July 2011 CAC meetings

August 2011 Public Workshop 2

Page 6: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Public Workshop 1

Page 7: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Summary of Things That Work

Access to TSP/Poughkeepsie Current Assets/Setup Access to Businesses Small Town Feel Existing Turn Lanes Zoning Town Maintenance

Page 8: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Summary of Needs Improve Intersection Operations at

Stringham Rd. & Arlington High School (AHS)

Address heavy traffic along Route 55

Improve safety for pedestrians and bicyclists

Improve right turn movement onto Freedom Rd.

Improve ability to make left turns throughout the corridor

Improve traffic flow and signal timing throughout Route 55 corridor

Improve access to the many driveways along Route 55

Improve access to Post Office

Improve operations at Mobil Station near Freedom Rd.

Add left turn access at Lexington Park exit

Improve vehicle & pedestrian access on Dr. Fink Rd.

Improve site distance at TSP ramps and Route 55

Address flooding problems along Route 55 near Kelly’s

Address inconsistent vehicle speed through corridor

Maintain consistency of roadway corridor along Route 55

Page 9: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Citizens Advisory Committee Committee Make-up

Represent different facets of community Community voice

FocusCommunity Priorities

Schedule Monthly Meetings

Page 10: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

CAC Focus

Priority NeedsImprove Intersection OperationsAddress Heavy Traffic on Route 55Improve Business AccessImprove Bike/Pedestrian Access and Safety

Page 11: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Conceptual Layouts

Page 12: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Concept 1

Page 13: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Concept 2

Page 14: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Concept 3

Page 15: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Concept 4

Page 16: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Concept 5

Page 17: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

From Layout to Alternative

Page 18: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory
Page 19: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory
Page 20: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Standard Traffic Signal• Protected Approach• Designated Turn Lanes• Flush Median• Protected Pedestrian

• Standard Traffic Signal• Protected Approach• Designated Turn Lanes• Flush Median• Protected Pedestrian

Page 21: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Standard Traffic Signal• Protected Approach• Designated Turn Lanes• Flush Median• Protected Pedestrian

• Standard Traffic Signal• Protected Approach• Designated Turn Lanes• Flush Median• Protected Pedestrian

Page 22: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Modern Roundabout • Yield Approach• No Turn Lanes• Raised Median• Permitted Pedestrian

• Standard Traffic Signal• Protected Movements• Designated Turn Lanes• WB Right Turn By-Pass• Flush Median

• Standard Traffic Signal• Protected Movements• Designated Turn Lanes• WB Right Turn By-Pass• Flush Median

Page 23: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

1 2-Way Dr. Fink Connection2 Access to Business3 Access to School4 Pedestrian Connection5 Right’s In / Out

1 2-Way Dr. Fink Connection2 Access to Business3 Access to School4 Pedestrian Connection5 Right’s In / Out

Page 24: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory
Page 25: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Comparison of AlternativesWeighting Criteria

Signalized Alternative(w/ flush median & turn lanes)

Roundabout Alternative(w/ Raised Median Section)

Safety High Speed on Green28 conflict pointsProtected Pedestrian Phase

Low Speed Operation8 conflict pointsYield Control

Access Turning Movement FrictionNo Left at Peak Hours

Rights in / Rights out Utilize Roundabout To make left

Operation Restricted Lefts Red pedestrian phase

Raised MedianRights in / out

Environment More PavementMore Signs / Stripes

Less PavementMore Green Space

Const. Cost 4.8 M 5.2 M

Page 26: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Safety Considerations32 32

Vehicle to Vehicle to Vehicle Vehicle Conflict Conflict PointsPoints

24 Ped. to 24 Ped. to Vehicle Vehicle Conflict Conflict PointsPoints

8 Vehicle 8 Vehicle to Vehicle to Vehicle Conflict Conflict PointsPoints

8 Ped. to 8 Ped. to Vehicle Vehicle Conflict Conflict PointsPoints

Page 27: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Q & A

Page 28: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Break Out Session Choose a Recorder and a Reporter Using the worksheets provided Discuss

How Well The Alternatives Meet The Project Objectives and Community Needs.

Please write down your comments on the worksheet- Be specific. This is our record of what happened at this meeting.

In 30 minutes or so we’ll ask the reporter at each table to present TWO items that your group identified (positive/negative).

Page 29: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory

Next Steps

Review comments; additional meetings with the CAC; refine alternatives; use specific design criteria; design report etc.

Workshop III – Present Preferred

Alternative

Please Fill Out Your Surveys And Drop Them By The Door Before You Leave

Page 30: Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory