Page 1: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

ROUTE RECONNAISSANCE

SSG WHELER

1/383RD TSB

EN TEAM OC/T

Page 2: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

REFERECE

FM 5-36

FM 5-34

GTA 05-07-013

ARTEP 5-415-13-MTP

Page 3: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK

CONDUCT A ROUTE RECON (5-4-0401)

Page 4: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

CONDITION

THE SQUAD/SECTION IS TASKED TO PERFORM A ROUTE RECONNAISSANCE OVER A SPECIFIED ROUTE. THE AREA IS SECURE BUT ENEMY CONTACT WITH SQUAD-SIZE OR SMALLER ELEMENTS IS POSSIBLE. SOME ITERATIONS SHOULD NOT BE DONE IN MOPP-4

Page 5: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

STANDARDS

THE SQUAD/SECTION USE THE CORRECT SYMBOLS TO PREPARE AND SUBMIT AN OVERLAY IDENTIFYING ALL OBSTACLES, OBSTRUCTIONS, TERRAING FEATURES, CRITICAL MEASURMENTS, DIMENSIONS AND CLASSIFICATIONS ARE ACCURATE WITHIN PLUS OR MINUS 10 PERCENT. THE SQUAD COMPLETES THE ECONNAISSANCE NLT THE TIME SPECIFIED IN THE OPORD

Page 6: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

THE SQUAD LEADER PLANS THE ROUTE RECON a) PERFORMS A MAP ORIENTATION TO ID THE

ROUTE AND START/STOP POINTS b) ESTABLISHES THE RECON OBJECTIVES

(OBSTACLE LOCATION, TRAFFICABILITY AND WATER POINTS). c) REQUESTS A SECURITY TEAM TO SUPPORT THE RECON IN THE EVENT OF ENEMY CONTACT (2 PERSONELL PER SQUAD) d) PLANS FOR A DOUBLE FLOW OF TRACKED VEHICLES (UNLESS OTHERWISE DIRECTED BY THE COMMANDER).

Page 7: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

THE LEADER PREPARES AN OVERLAY OF THE SPECIFIED ROUTE

a) DRAWS THE ROUTE TO SCALE ON TH OVERLAY. SHOWS THE

LIMIT OF SECTOR SYMBOLS (ONE EACH AT THE START AND

END POINTS).

b) PLOTS AT LEAST 2 GRID REFERENCE POINTS AND A GRID OR

MAGNETIC NORTH ARROW.

c) PREPARES THE TITLE BLCK. AS A MINIMUM, INCLUDES NAME,

SSN, UNIT, MAP SHEET, SERIES, SCALE AND ANY REMARKS

Page 8: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

LEADER BRIEFS THE TEAM ON THE MISSION USING 5-PARAGRAPH FORMAT

a) ROUTE TO RECONNOITER

b) RECON METHOD (HASTY OR DELIBERATE)

c) RECON OBJECTIVES

d) TIME AND DISTANCE FACTORS

e) NOISE AND LIGHT DISCIPLINE

f) RADIO COMMUNICATIONS (PROGRESS REPORTS, ASSISTANCE,

COMMO CHECKS)

g) ACTIONS THE SECURITY TEAM TAKES AT HALTS AND UPON

ENEMY CONTACT.

Page 9: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

LEADER INSPECTS a) COMPASSES AND TAPE MEASURES

b) REQUIRED DA FORMS, (1248, 1249, 1251,1252,AND 1711R)

c) WEAPONS, LBE, MASKS, CANTEENS, AMMO

d) RADIO (SECURE MODE AND COMMO CHECK)

Page 10: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

THE TEAM RECONS THE ROUTE TAKING REQUIRED MEASUREMENTS AND RECORDING INFO ALONG THE ROUTE

a) IDENTIFIES THE TRAVELED WAY WIDTH ALONG THE

ROUTE

1. SINGLE FLOW: 5.5M TO 7.3M WHEEL, 6M TO 8M TRACK

2. DOUBLE FLOW: AT LEAST 7.3M WHEEL, 8M TRACK

3. IN THE ABSENCE OF GUIDANCE, RECONS FOR DOUBLE

FLOW TRACK TRAFFIC.

Page 11: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

QUESTION:

Q: WHAT DETERMINES THE TRAVELED WAY WIDTH

A: THE NARROWEST POINT ON THE ROUTE

Page 12: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

SQUAD RECONNOITERS CONT… b) ESTABLISHES THE ROUTE TYPE

1) X – ALL WEATHER

2) Y – LIMITED, ALL WEATHER

3) Z - FAIR WEATHER ROUTE.

c) ESTABLISHES THE MILITARY LOAD CLASSIFICATION

(MLC) OF THE ROUTE IAW THE LOWEST LOAD CLASS OF

ANY SECTION OF THE ROUTE

d) RECORDS TERRAIN FEATURES (THAT AFFECT TRAFFIC

FLOW) ALONG THE ROUTE ON THE OVERLAY.

Page 13: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

MLC

MILITARY LOAD CLASSIFICATION (MLC) IS USUALY EITHER THE LOWEST BRIDGE CLASSIFICATION ON THE ROUTE OR THE WORST STRETCH OF ROAD SURFACE. WHICHEVER IS LOWER

Page 14: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

MEASURING CURVES

FORMULA R= C2 + M 8M 2

Page 15: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

MEASURING CURVES CONT…

IN AREAS WHERE MINES ARE SUSPECTED OFF OF THE ROADWAY, ‘M’ CAN BE DETERMINED BY TYING STRING OR TWINE TO THE MIDPOINT OF ‘C’ THEN SUSPENDING IT OUT OVER THE OFF-ROAD AREA.

Page 16: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

MEASURING SLOPES

SLOPES CAN BE MEASURED MANY WAYS. THE BEST FIELD EXPEDIENT METHOD IS THE LINE OF SIGHT PACING METHOD.

Page 17: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

SQUAD RECONNOITERS CONT… e) IDENTIFIES ANY CRITICAL POINTS ON THE ROUTE FOR

DETAILED EXPLANATION ON DA FORM 1711-R

f) RECORDS ALL MEASUREMENTS IN METERS

Page 18: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

LEADER REVIEWS THE FOVERLAY AND FILLS OUT REQUIRED FORMS

a) COMPLETES THE OVERLAY WITH ALL APPROPRIATE.

SYMBOLS RECORDED AT THEIR GEOGRAPHICAL LOC.

b) ENSURES THE ROUTE CLASSIFICATION FORMULA IS

PRESENT (LOCATED OVER THE TITLE BLOCK).

c) FILLS OUT THE FORMS AS REQUIRED BY THE CDR.

d) RECORDS MEASURMENTS ON THE OVERLAY IN METERS.

Page 19: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

TASK STEPS AND STANDARDS

LEADER BRIEFS HIS HIGHER ON THE RECON MISSION AD SUBMITS THE OVERLAY AND FORMS TO THE CDR WITHIN THE TIME PRESCRIBED IN THE OPORD.

Page 20: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

FORMS

DA 1248 – ROUTE RECON REPORT

DA 1249 – BRIDGE RECON REPORT

DA 1250 – TUNNEL RECON REPORT

DA 1251 – FORD RECON REPORT

DA 1252 – FERRY RECON REPORT

DA 1171-R ENGINEER RECON REPORT

Page 21: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

DA FORM 1248

ROUTE RECON REPORT

USUALY ACCOMPANIED BY OVERLAY

ALL MEASUREMENTS RECORDED IN METERS

Page 22: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

DA FORM 1248 (REVERSE)LEFT SIDE IS FOR OBSACLES, REPORTABLE CURVES, RESTRICTIONS. ETC…

RIGHT SIDE IS FOR REPORTING ROAD SURFACE CHANGES

REMARKS BLOCK CAN BE USED TO REPORT ADDITIONAL DATA NOT COVERED IN NORMAL REPORT AREAS

Page 23: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

DA FORM 1249

Page 24: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

DA FORM 1249 (REVERSE)BRIDGE SCETCHES

MUST INCLUDE OVERHEAD SCETCH WITH DIRECTION OF CURRENT AND NORTH ARROW

SHOULD INCLUDE ALL MEASURMENTS FROM RECON OF BRIDGE

Page 25: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

OVERLAY

Page 26: ROUTE RECONNAISSANCE SSG WHELER 1/383 RD TSB EN TEAM OC/T

ROUTE CLASSIFICATION

3/2/45/4.3/(OB)(W)

WIDTH/TYPE/LOWEST MLC/OVERHEAD CLEARANCE/OBSTRUCTIONS/SPECIAL CONDITIONS