row power stripping maisonville twp

16
Ministry of Northern Development and Mines Ontario. DOCUMENT NO. 010 .. w. w IWI - Refer to Sections T6 and 77, the Mining Act tor i requirements and the reverse side o( this form tor table of Information. Mining Act Report of Work Name and Address of Recorded Holder i+JC, Prospector'* Licence No, 70 tfvf. L.AKC O*JT. /*X*/ 7. J" f Telephone No. •705-- Summary of Distribution of Credits and Work Performance Mining Division i-AAfoEA. UAKE Township or Area / //lATO/VW^tf T t 0 . Total Assessment Credits Claimed X f o A *ys Type of Work Performed (Check one only) D Manual Work [ , Shaft Sinking Drifting or other LJ Lateral Work O Mechanical equipment rn Power Stripping other than Manual WO (maximum credit allowed - 100 days per claim) O Diamond or other Core drilling Q Core Specimens Mining Claim Prefix L L, L, L L L Number .Q6/2./7 SOT.?**- 8cso 3 V^ 6*00 3^8 80/Z22. 802.3* l Work Days Cr. ft 6Q 31 3 1 31 2.1 Mining Claim Prefix Number Work Days Cr. Mining Claim Prefix Number Work DaysCr. Dates when work was performed From: S E^n 2 V /?O l To: O C T. 6. / 9O Total No. of Days Performed /9o j G*ys Total No. of Days Claimed /fo A *ys Total No. of Days to be Claimed at a Future Date AJ/t-. All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. * (See note No. 1 on reverse side) Mining Claim No. of Days Mining Claim No o( Days Mining Claim (l-8oo3V6 Mining Claim No. of Days 32.3 No. of Days Mining Claim L- Bo/ ill. Mining Claim No. ol Days &6-Z No. of Days Mining Claim z.-#oo3va Mining Claim No. of Days 9/-S No. of Days Mining Claim i-778379 No. of Days 50 Mining Claim No. of Days Required Information eg. type of equipment, Names, Addresses, etc. (See Table on j-everse side) If space below Is insufficient, attach schedules with required information and location sketches" 3. f H.p, /y /9 S /y*v. s ef*T. Tt46S.SCPT. ^fO. SEPT. l 4/f O r/vvnj. j f fr. 2 7/90 /foA/. o c.r. l / fo - t otfts. - /O. S HAS. - / O HAS. - 9 .S HAS. oc/: f - /o H AS. TOTAL - JT2.S-.ct> / // ov /? ^ Certification of Beneficial Interest * (See Note No. 2 on reverse side) 1 hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder. Date /V*j a. s /9o Recorded Holder or Agent (Signature) Certification Verifying Report of Work l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true. Name and Address of Person Certifying Telephone No. Date A/0V, f /jo Certified By (Signature) For Office Use Only Work Assignments L 1-) "S 3-~7 9 ^ 3^^.7S J-o 3 y 2. o NOISIAIQ ON1NIW 768(89/06)

Upload: others

Post on 27-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Ministry ofNorthern Developmentand Mines

Ontario.

DOCUMENT NO.

010.. w. w IWI

- Refer to Sections T6 and 77, the Mining Act tor i requirements and the reverse side o( this form tor table of Information.

Mining Act Report of WorkName and Address of Recorded Holder

i+JC,Prospector'* Licence No,

70 tfvf. L.AKC O*JT. /*X*/ 7. J" fTelephone No.•705--

Summary of Distribution of Credits and Work PerformanceMining Division

i-AAfoEA. UAKETownship or Area

/ //lATO/VW^tf T t0.Total Assessment Credits Claimed

X f o A*ysType of Work Performed (Check one only)

D Manual Work

[ , Shaft Sinking Drifting or other LJ Lateral Work

O Mechanical equipment

rn Power Stripping other than Manual WO (maximum credit allowed - 100 days

per claim) O Diamond or other Core drilling

Q Core Specimens

Mining Claim

Prefix

L

L,

L,

LL

L

Number

.Q6/2./7

SOT.?**-8cso 3 V^6*00 3^880/Z22.802.3* l

Work Days Cr.

ft

6Q31

3 1

312.1

Mining Claim

Prefix NumberWork

Days Cr.Mining Claim

Prefix NumberWork

DaysCr.

Dates when work was performed

From: S E^n 2 V /?O l To: O C T. 6. /9O

Total No. of Days Performed

/9o jG*ysTotal No. of Days Claimed

/fo A *ysTotal No. of Days to be Claimed at a Future Date

AJ/t-.

All the work was performed on Mining Claim(s): Indicate no. of days performed on each claim. * (See note No. 1 on reverse side)

Mining Claim No. of Days Mining Claim No o( Days

Mining Claim

(l-8oo3V6Mining Claim

No. of Days

32.3No. of Days

Mining Claim

L- Bo/ ill.Mining Claim

No. ol Days

&6-ZNo. of Days

Mining Claim

z.-#oo3vaMining Claim

No. of Days

9/-SNo. of Days

Mining Claim

i-778379

No. of Days

50Mining Claim No. of Days

Required Information eg. type of equipment, Names, Addresses, etc. (See Table on j-everse side) If space below Is insufficient, attach schedules with required information and location sketches"

3. f H.p, /y

/9 S /y*v. s ef*T.Tt46S.SCPT.^fO. SEPT. l 4/f Or/vvnj. j f fr. 2 7/90/foA/. o c.r. l /fo

- totfts.- /O.S HAS.- / O HAS.- 9 .S HAS.

oc/: f - /o HAS.

TOTAL - JT2.S-.ct> ///ov/? ^

Certification of Beneficial Interest * (See Note No. 2 on reverse side)1 hereby certify that, at the time the work was performed, the claims covered in this report of work were recorded in the current recorded holder's name or held under a beneficial interest by the current recorded holder.

Date

/V*j a. s /9o

Recorded Holder or Agent (Signature)

Certification Verifying Report of Work

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.Name and Address of Person Certifying

Telephone No. Date

A/0V, f /jo

Certified By (Signature)

For Office Use OnlyWork AssignmentsL

1-) "S 3-~7 9 ^ 3^^.7SJ-o 3

y 2. o NOISIAIQ ON1NIW

768(89/06)

42A01NE54e5 W90e8-ee6S5 MAISONVILLE 900

JIM FORBES17 FOSS LANE

KIRKLAND LAKE, ONTARIOPHONE: 568-8361

Invoice to Carl P. Forbes - October 15. 1990

For hydraulic stripping 1n Maisonville Township using a 3.5 horsepower high pressure Honda supply pump with hoses and accessories; the dates are as follows:

Monday September 24/90 - 8 hours

Tuesday September 25/90 - 10 hours

Wednesday September 26/90 -10.5 hours

Thursday September 27/90 - 10 hours

Monday October 1/90 - 9.5 hours

Tuesday October 2/90 - 8 hours

Friday October 5/90 - 10 hours

Saturday October 6/90 - 10 hours

TOTAL - 76 Hours 9 125.00/per hour* $1900.00

For helping to sample and map stripped areas as follows:

Saturday October 13/90 - 8 hours

Sunday October 14/90 - 8 hours

TOTAL - 16 Hours 9 SlS.OO/per hour- S240.00

TOTAL INVOICE

Respectfully,

mes H. Forbes

S2140.00

PROSPECTING REPORT

ON THE

S E S E K I N I K A LAKE PROPERTY

MAISONVILLE TOWNSHIP

LARDER LAKE MINING DIVISION

BY: CARL P. FORBES

November 4, 1990 Kirkland Lake, Ontario

INDEX

INTRODUCTION

LOCATION AND ACCESS

HISTORY

Page Number

GEOLOGY 2,3

WORK PROGRAM 3,4,5

CONCLUSIONS 5,6

APPENDED

FOUR ASSAY SHEETS

2 ASSAY INVOICES

STRIPPING MAPS "A" TO "E" (5)

BULLDOZER INVOICES (5)

HYDRAULIC STRIPPING INVOICE

^INTRODUCTION- This report describes a surface exploration program

conducted on the Sesek1n1ka Lake gold property of

Premier Explorations Inc. located 1n Maisonville

Township, Larder Lake Mining Division, Ontario. This

program was funded by the Ontario Prospectors

Assistance Program and was designated as OP 90-077.

Surface stripping of previously known and new showings

was highly successful 1n furthering knowledge of the

character of gold mineralization on the property.

Several new veins were opened up and a number of

good assays were obtained. This program has

determined that more exploration work on the property

is fully warranted.

LOCATION AND ACCESS- The property consists of 76 unpatented mining

claims located in south central Maisonville Township

and encompasses most of what 1s historically known as

the Sesekinika Lake gold camp. Highway 11 passes just

west of the property about 17 miles north and west of

the Town of Kirkland Lake 1n northern Ontario.

Secondary Highway 570 branches southeasterly from

Highway 11 and leads to Seseklnika village which is

the southwest corner of the property. Forest access

roads for lumber operations afford easy access to the

central and eastern parts of the property which has

recently been clear cut.

tolSTORY-

GEOLOGY-

Much prospecting activity took place on the property between 1914 and 1930, but little exploration was carried out after this period. Considerable trenching was done near the southwest corner of the "Bennett" claim (L-778379) and a shaft was sunk to 530 feet on the central part of the claim 1n the early 1920's, In 1934 Sylvanite Gold Mines Limited drilled five holes totalling 464 feet about one half mile north of Sesek1n1ka Townslte to test an area where gold had been discovered 1n numerous test pits. The presence of numerous test pits all over the property attest to a considerable amount of early prospecting activity. The only modern exploration ever carried out was done recently by Glen Auden Resources Inc. who had the property under option until December 1989. In 1985 the property was covered by airborne magnetometer and electromagnetic surveys as well as complete geological mapping. This work was followed up by considerable Induced polarization surveying 1n 1986 which outlined a number of anomalies, some of which were drilled. A total of 13 holes were put down totalling 4,527 feet. The best value from this program was .536 oz/ton Au over a ten foot sludge sample.

The property 1s underlain by Archean volcanic, sedimentary and intrusive rocks which are part of the Abitibi Geenstone Belt. The majority of the rocks on

3

the property are tholeiitic basalts of the K1nojev1s

Group which can be classified as Iron-rich tov

Iron-poor. Coarser grained basalts were originally

mapped as gabbro 1ntrus1ves, but recent work has

established these coarse grained rocks as basalts. (L.

Jensen O.G.S.). The more Iron-rich basalts are

typically dark green to black whereas the Iron-poor

rocks are a lighter green colour. The darker coloured

rocks are usually more magnetic than the lighter

coloured rocks. The volcanic sequence contains narrow

Interflow units consisting of chert, cherty tuffs and

crystal tuffs. The basalts have been Intruded by a

series of felsic syenite dikes and mafic diabase

dikes. Mineralization on the property occurs In

either north-south or east-west striking sheared

zones. Gold 1s present 1n the native form and

associated with sulphides 1n sheared zones containing

quartz veins, stringers and lenses. Gold 1s also

found 1n a north-south cherty Interflow unit on the

eastern side of the property.

WORK PROGRAM- Surface stripping using a bulldozer equipped with a

backhoe was done 1n five separate locations. Each

site was washed with a high pressure pump and then

mapped and sampled. These areas are described as "A"

to "E" and are represented on accompanying maps. The

work was carried out from September 24, 1990 to

October 14, 1990 and 1s described below.

"A" STRIPPING 1s 1n the northeast part of claim L-800346

and shows a quartz-sulphide vein zone 1n coarse grainedv

basalt. Seventeen samples were taken here and some

good gold assays were obtained. These are shown on a

sketch map scaled one Inch to fifteen feet.

"B" STRIPPING 1s about 100 feet north of the "A"

stripping on claim L-800346. Seven samples were taken

from a sheared zone with quartz veins 1n coarse

grained basalt. An encouraging assay was obtained at

the eastern extremity of this stripping. The results

are shown on a sketch map scaled at one Inch to ten

feet.

"C" STRIPPING 1s 1n the northeast part of claim

L-801222. Eight samples were taken from a sheared

zone with quartz veins, but returned only very low

values. These are represented on a map scaled at one

Inch to ten feet.

"D* STRIPPING was done 1n the northwest part of claim

L-800348 and the quartz filled shear zone 1s probably

the extension of the zone exposed 1n "C" stripping.

Most of the 21 samples taken here returned only low

values, but one section assayed .354 oz/ton Au over

five feet. A parallel zone about 40 feet to the north

was exposed and four samples taken there yielded very

low values. These samples are represented on a map

scaled at one Inch to fifteen feet.

5

"E* STRIPPING exposed a strong shear zone with quartz

veins and considerable sulphides 1n the southwest part

of the "Bennett" cTalm L-778379. The zone was trenched

for several hundred feet south 1n the early days and

probably continues to the north, giving 1t

considerable strike length. Although good to

excellent values were obtained from the eleven samples

taken here, they cannot be considered representative

as the surface exposure 1s so weathered that good

samples are almost Impossible to obtain. The results

are represented on a map scaled at one Inch to fifteen

feet.

CONCLUSIONS- The east-west zones 1n the eastern part of the

property are undoubtedly related to a north-south

fault zone. Some good assays were obtained 1n the

east-west zones and there 1s every probability that

there are more of these splay fractures from the main

north-south fault. The main fault Itself Should be

drilled as 1t has never had any exploration and Isn't

exposed anywhere. The "Bennett" zone deserves

considerably more work. Good values were obtained

over fair widths and length and the zone 1s definitely

much longer than stripped. Further stripping 1s

warranted 1n this area as there are also veins and

alteration Immediately south and west of the stripping

that haven't been tested. One of Glen Auden's drill

holes tested the zone on the south boundary of the

claim and returned ,'l07 oz/ton Au over 5 feet. A

series of short holes 1n this locality might prove to

be the best way to sample this zone.

Respectfully Submitted by,

Carl P. Forbes

Licence K18293

November 4, 1990.

SKETCH M rt/0 O P XV9" C.LAIH- L-QO03*J6 -

EA LAKE M 1*1 td G

SCALE: l //JC H s JS FZGT

c. P.OCT. V /

853 -,6\ '.17 2.

865- . 003

+K-85Z. NIU

H 1865

^-H-M8fcO-.ool

86130

recA

•Oo3L

s

s

0•q

•862.-MIL

-STAAT iiiasi

l1H m I rn 1 * * i OD

^

(to

NOT

TO s

e/ae

3oo

0

m Q i Z.

V

'AM

Tft

*\

/

l* OD

liD

*

--

*6*

D !:

h,

* h

•o

C? '

D O

O

S ^

q *

* *

- h

"* r

J" S l rx. |l

NO

T

TO

f;Q iUl

-Jos ? rsi

Ut fM

V

-J g

U

m v.Q fi-

vi *

VJ -Ji;oo-HVJCI

0l**'-r'c

\

*"** A

^V

st\s

A^

0

tf3^r ? ,

o l

X

f f T (^v^^~

-i-^^v-v~-'-*---*-'—

~Q

^'r^ri SM

*-^^7

^A

lCtf\

l**l"

8 A

/ox/r/5

f

7 I

7i

; '

t o

1 ;

^i

o i

1 V(

's'

1X

J1V

i'"^/Q

o'e

Asr

yT-o^/i/fej

w.1viM^Ut5̂a m5

N4< r*u,*^j ^

5^t KM

t* .

ViK5

.ss0

*-3s*'ir-t-fli

o.?

s 1Q••xyj

* ;

Q^

S vb

k

coJ-

^?Uj

f Ul

w d̂

5^ ^

i

^UJ

^vi

U

If

U

Q

00Ul

al

GRENFELL TWP - M.35! l NOTICg OF FORESTRY ACTIV