Doug Davis Director of Airworthiness, Northrop Grumman Corporation
March 24, 2015
RPAS Airworthiness Negotiation between
Military Regulator and Manufacturer
ICAO RPAS Symposium Montreal, Quebec, Canada March 23-25 2015
Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
NORTHROP GRUMMAN PRIVATE / PROPRIETARY LEVEL I
US Airworthiness Authorities National Airworthiness Council (NAC)
Consistency across NAS (National Airspace
System) Single Voice on US AW
Tri-Service Standards (516)
Minimize Duplication
Leverage Processes
Mutual Acceptance
Standard for National AW
Title 10
Public Aircraft
2 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
NAVAIR Flight Clearance Authority
US Code Title X, Ch 503, Sec 5013
AIR-00 is Design Control Activity Authority, Technical Authority, and Airworthiness Authority
SECNAVINST 5400.15C
OPNAVINST 3710.7U & 3510.15A
NAVAIRINST 13034.1D
Airworthiness Execution
DoDD 5030.61
Public Aircraft Operations
3 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
NAVAIR Airworthiness Authority as delegated to AIR-4.0P
• All USN/USMC owned or leased aircraft shall have an airworthiness approval in the form of a Flight clearance document promulgated / issued by COMNAVAIRSYSCOM
– Per OPNAVINST 3710.7U: NATOPS General and Flight Operating Instructions (dated 23 Nov 2009)
• Flight clearances issued as an IFC/Interim Flight Clearance
– NATOPS-Naval Air Training and Operating Procedures Standardization
– NATIP-Naval Aviation Technical Information Product
AIR-00 DELEGATES AIRWORTHINESS AUTHORITY TO
AIR-4.0P
4 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
The Flight Clearance Process UAS Specific
SAME AS GENERAL PROCESS WITH SOME SPECIFIC STEPS
AIR-4.0P FLIGHT CLEARANCE PROCESS
5 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
Roles and Responsibilities
• Flight Clearance Key Players Requirements defined in NAVAIRINST 13034.1D (which governs the USN airworthiness process) including minimum and recommended training and empowerment levels for:
– APMSE (Assistant Program Manager for Systems & Engineering)
– Competency Managers – TAEs (Technical Area Expert) – Facilitators – Test Team members
6 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
Roles and Responsibilities
Original Equipment Manufacturer / Prime
• Supports the NAVAIR Airworthiness Process
• When applicable, submit accurate requests
• Provides data, details, project descriptions, and any necessary support to NAVAIR engineers, as required
7 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
Roles and Responsibilities
NAVAIR 4.0P– Owns the process • Educates all participants of the process
• Provides tasking to TAEs to review flight clearances
• Ensures a proper and complete engineering review
• Releases clearances on behalf of AIR-00
• Keeps NAVAIR leadership informed of airworthiness issues
8 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
Airworthiness Terminology
Airworthiness • The property of an air system configuration to safely attain, sustain, and compete flight per approved usage limits. • USN airworthiness process is governed by NAVAIRINST 13034.1
EDRAP (Engineering/Data Requirements Agreement Plan) • USN term to document the NAVAIR / NGC agreement on what engineering data is required to establish the system
airworthiness.
DEL (Data Element List) = Appendix A of the EDRAP. • An Excel spreadsheet (recommended but not mandated) listing specific MIL-HDBK-516 criteria paragraphs identified to be
applicable to system. Spreadsheet also contains the allocation, artifacts (supporting data), status for each criteria. – MIL-HDBK-516 is the ‘DoD Handbook containing the airworthiness certification criteria.
• It is important that there be a means to trace 516 criteria/standards/MOCs and data artifacts to the DEL
EDEF (EDRAP Data Evaluation Form) • One page word document produced to support the review of each item identified within the DEL spreadsheet. The form
explicitly shows which artifact (supporting data) is used to substantiate each MIL-HDBK- 516 criteria and allows the NAVAIR TAE to:
– Approve (with or without limitations) – Disapprove
• Used on several Navy/NGC programs, but is not universally applied across USN UAS airworthiness
Artifacts (data elements) • Supporting data showing the compliance to the MIL-HDBK-516 criteria. • Each Artifact can be used by multiple RE/TAEs and can be mapped to one or many different MIL-HDBK- 516 criteria.
9 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
MIL-HDBK-516 to EDRAP
Tailored Airworthiness Criteria
Standards Methods of Compliance
Artifacts
Data Elements List
Planning Meeting
EDRAP
The building blocks of the airworthiness process
10 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
EDRAP (Engineering/Data Requirements Agreement Plan)
• EDRAP developed by program should capture meeting decisions – If design changes, EDRAP will need to be updated
• Ensure Contractors understand required analyses / data – Govt may need to help Contractors in performing analyses to
support the development of the flight clearance data pkg. – A flight clearance “Gotcha” is to submit analyses with errors and
those that do not follow MIL-STD guidance.
• IFC Request – Reference planning meeting & TAEs – Submit request with most/all of data
Pre-coordination = No surprises = Happy TAEs = Faster IFC!
1. Program description 2. IPT/EDT POCs 3. Platform POC 4. Schedule 5. Need dates for FC 6. Configuration for FC 7. Limitations/envelope for FC 8. Impact to NATOPS / NATIP 9. Flight clearance facilitator 10. IPT POC to submit request 11. Data element list 12. Technical concerns / risk 13. Signature block 14. Date of issue
11 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
General Airworthiness Process Flow
Change in Configuration,
Usage, or Environment Defined
EDRAP Agreement?
Focus Groups (RE, TAE, AW Team,
Class Desk)
Request Flight Clearance from AIR-
4.0P Artifact Submittals
Artifacts Approved?
Rework or Additional
Data?
Flight Clearance Granted
Yes
No
Yes No Risk, Hazard, or Limit
Accepted?
Yes
No
Yes
No
12 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
USN and Industry Certification Coordination Representative Example
System Design
Description
Or
IFC Definition
WRA Qualification HSCM
Proposed DEL
for IFC
NGC IFC Formal testing
(SW, SST, ST)
TRR
Design, build,
integration and
Preliminary Testing
NAVAIR agreed
upon DEL
Structural Qualification
DEL approval
NGC IFC Cert
System Configuration and Analysis
Initial DTR
submittal and
NAVAIR review
Final DTR
submittal for NGC Cert and
DEL support
Flight Test
Plans
FOLD/ GOLD/ COLD
Ground test
Flight Clearance
Test Readiness Review / Safety
Review Board
First Flight
ERB / TPA
Mission Plan
Validation
Requirement definition, Test Plan
review
USN Key= Joint Industry
DEL submittal
AW Qualification
Plan, EDRAP
Flight Readiness Review
13 Approved for Public Release: by NAVAIR, 3/18/15; Northrop Grumman 15-0505
Summary
• USN has decades of experience and has strong processes for very effective airworthiness certification
• Joint Industry and USN working as a integrated team ensures success
• Buy in from USN upfront is critical • EDRAP negotiation early is key
Key to Success = Strong working relationships between USN and Industry!