41I05NWM33 2.12416 DUNLOP 010
Magnetic and VLF Electromagnetic Surveysby
Geosearch Consultants Limitedfor
Placer Dome Inc.on
Project 379Dunlop Township, Ontario
To Accompany Maps 89-81, 82, 83, 84-A 6 B
LANDS
April 24, 1989
INTRODUCTION
A VLF electromagnetic survey and a total field magnetic
survey were carried out for Placer Dome Inc. on Project 379,
Dunlop Township, Ontario, in February 1989.
The project consists of 17 contiguous, unpatented mining
claims, a list of which is appended to this report. The claim
group is located on and around the Spanish River in the south
east quadrant of Dunlop Township, Ontario. Access to the
property was made via motor vehicle and snow machine along
secondary roads off of highway 17.
The purpose of the surveys was to locate subsurface,
geo-electrical conductors and to outline geological structures
as revealed by the magnetics, which may prove conducive for
gold mineralization. Three conductive horizons were located.
The magnetics reveal distinct rock units, as well as a number
of isolated anomalies. Hydro transmission lines cross the
north edge of the property. Many stations in the direct
vicinity of the power lines were not able to be read.
The accompanying maps show the area surveyed and the
results obtained.
- 2 -
METHOD
The VLF survey was completed using Geonics EM-16
receivers. The transmitting station read was NLK located
near Seattle, Washington, transmitting at 24.8 kHz. The
inphase and quadrature values were posted and profiled (Maps
89-82-A, B). The inphase data was "fraser filtered" and
these values were posted and contoured (Maps 89-84-A, B).
The magnetic survey was completed using Gem Systems
GSM-18 Magnetometers. The diurnal was corrected using a base
station with readings taken at 3 second intervals. The data
was posted (Maps 89-81-A, B) and contoured (Maps 89-83-A, B).
All contouring was completed by Geosearch Consultants using
the Geosoft software package.
RESULTS
The VLF survey located three conductive horizons. There
is a one line conductor located on L 7+OOW, 2+84S, A second
anomaly is located from L 4+OOW, 2+42S to L 2+OOW, 2+58S. This
conductor is coincident with a local magnetic anomaly centred on
L 3+OOW, 2+75S.
The third anomaly located is a broad feature better
outlined by the fraser filtered map. It extends from L 14+OOE,
- 3 -
3 + 50S to L 22+OOE, 3+75S. This is located at the southern
edge of the detailed section of the grid. A cliff edge
parallels this feature and may be its cause. It would be
better defined if the lines were extended further south to
properly cover the anomaly.
The transmission line which crosses the northern edge of
this grid created much interference. Readings were attempted
at each station, however, no valid readings were obtainable.
The magnetic survey reveals an area with very flat magnetic
relief with a background of 58,200 gammas. Most of the anomalies
are 200 to 300 gammas above the level.
The centre of the grid has a background of 58,300 gammas.
This higher background suggests it is a separate rock unit.
The western edge of this separate unit extends from L 4+OOW,
10+OOS to L 4+OOE, 4 + OOS to L 2+OOE, 0*00. The eastern edge
extends from L 5+OOE, 0+00 to L 9+50E, 5+OOS. Few features
are noted within this area.
The area to the west of this contains a number of isolated
magnetic anomalies. Examples are located on L 5+OOW, 5+62S
and L 3+OOW, 2+75S. This latter anomaly is associated with a
VLF conductor.
l
- 4 -
East of the centre rock unit the line spacing was
reduced from 100 metres to 50 metres. A number of localized
anomalies are visible. The most obvious feature is a north
west trending, narrow, linear anomaly extending from L 14+OOE,
0+62S to L 17+50E, 1+37N.
An anomaly exists on the southern edge of Tie Line 4+OOS
at approximately 17+OOE. There is not enough data to properly
define the anomaly. It is coincident with the poorly defined
VLF anomaly noted previously.
A number of readings beneath the transmission lines were
not obtainable by the magnetometer.
RECOMMENDATIONS
A drill test of the VLF conductor on L 3+OOW, 2+75S is
recommended. The broad conductor around Tie Line 4+OOS is
coincident with the cliff. The geology should dictate the
need for drill testing, or the need to acquire more ground.
The geophysics was of no use beneath the transmission lines,
as was expected.
Respectfully submitted,
Louis Racic Geophysicist
Ministry ofNorthern Developmentand Mines
1 Ontario
Geophysteal-Geologlcal-Geochemlcal Technical Data Statement
File
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
S MagneticType ofTownship or ArMDu" loP TwP- . Ontario
Claim Holder(s). Placer Dome Inc.
Author ofAddress of Authors 0-111 Queen St.E., Toronto, Ont. Covering Dates of Survey___15/02/89 - 24/04/89
'Tdtal Miles of Line Cut————8
SPECIAL PROVISIONS CREDITS REQUESTED
ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.
Geophysical—Electromagnetic.—Magnetometer——Radiometric——
DAYSper cW*
40
20
Geological
AIRBORNE CREDITS (Special proMagnetometer.
credits do not apply to airborne turveyi)
. Electromagnetic
DATE:24/04/89
SIGNATURE^Author tt Report or Afent
Res. Geol.. .Qualifications.Previous Surveys
File No. Type Date Claim Holder
Geosearch Consultants Ltd.
Racic
MINING CLAIMS TRAVERSED Lilt numerically
...J3 782819
S 960432-960437
'""s 988118-988127
l
TOTAL CLAIMS. 17
837 (85/12)
GEOPHYSICAL TECHNICAL DATA
GRO
Number of Stations
SURVEYS — If more than one survey, specify data for each type of survey
1570
Station interval. Profile scale——
25 m (12.5 m)l cm =
-Number of Readings JLine spacing ____
MAG 3139
VLF 3139
100m, 5Oro
Contour interval Magnetic: AO gammas Fraser Filter: 5 gammas
Instrument. Gem Systems GSM-18 magnetometer
Accuracy — Scale constant. Diurnal correction method.
0.1 gamma
Base station recorder with readings taken
Base Station check-in interval (hours). Base Station location and value ———
at 3 second intervals
H[Kzc
ili
d
251
Instrument Geonics EM-16
Coil configuration Coil separation — Accuracy————— Method:
l%
Frequency.VLF Q Fixec| transmitter O Shoot back NLK SEATTLE, WASHINGTON 24.8 kHz
D In line O Parallel line
(ipedfyVX-F. totten)
Parameters
Instrument.
n " a r\f
secondary field.
Scale constant,Corrections made.
Base station value and location.
Elevation accuracy.
Instrument ————————— Method Q Time DomainParameters — On time.
— Off time .— Delay time ———— Integration time.
Power.
O Frequency Domain _ Frequency ____i—. Range ———————
Electrode array — Electrode spacing. Type of electrode
Ministry ofNorthern Developmentand Mines
Ontario
Ty
Report of Work | DOCUM1
(Geophysical, Geological, j W890 Geochemical and Expenditi
Mining 41I05NWM33 2.12416 DUNLOP 300Survey(s)
Claim Holeler(t)
VLF-EM, S Magnetic-
Placer Dome Inc. 2. 1 241*5Township or Area
Dunlop Twp.Prospector7! Licence No.
T-837
P.O. Box 350, IBM Tower, TD Centre, Toronto, Ont.bate of Survey (from a lo)Survey Company
Geosearch Consultants LimitedName and Address of Author (of Geo-Tochnica! report)
Louis Racic, 360-111 Queen St. E., Toronto, Ont., M5C JS2
3 ft?
Total Mitet of line Cut
36.4 km
Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total (s) here
Airborne Crjlkst S* C 1 V
Note: Speci^M^is^g | credits do not apply to Airborne Surveys.
MINING LANDS
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
. Magnetometer
- Radiometric *
- Other
Geological
fireahnmirnl
Kfctromagnetic
Magnetometer
OTJMicExpenditures (excludes pjpwer s.Uipping)oLOf.,rAj
Days per Claim
402u
Days per Claim
.
Days per Claim
Ci tr-iirr-*f
Type of Work Performed j, /-..,o,'..-,SMENT FiLES
ji OFFICFPerformed on Claim(s) ji
- i - t'lH. .1 J983 j
; *^,. B ,Calculation of Expenditure Days Credits vj H I V E, D H
S -^ 15 | =
Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date 1
' -- : '1^ y ^"~ Recorded Holder or Agent (Signature) /; c / y .,
Certification Verifying Report of Work
Mining Claims Traversed (List in numerical sequence)Mining Oaim
Prefix
S
Number
782819
Q 6 n J T)
960433
960434
Q (in \ -IK
960436
960437
988-118
988119
988120
988121 -
988122
988123
J d O i J *l
988125
988126
7 o o 1 4? f
Expend, Days Cr.
)
Mining ClaimPrefix
""""r:, i
3 r. !
i - "'
li;- ".'l' 1
Number
M
-7i-^v
Ejtpend. Days Cr.
j
- --
loial number of mining claims covered by this report of work.
For Office Use OnlyTolaTDays Cr. Recorded
Date Recorded
Date Aaproved at Branch. Direc
*V
f hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true. ^^^
Name and Postal AJdtf9 .py.1f?g(C5yyin9360 , 111 yueen jj J- . E . , Toi'OntO, Ont., M5C 1S2 -J
Oat. Certjf^ 03/89 C*ftrfied by (Signature)
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work
(Geophysical, Geological, Geochemical and Expenditures)
Mining Act
Instruction!: Please tvpe or print. If number of mining claims traversed
exceeds space on this form, attach a list.Mott: Only days credits calculated in the
"Expenditures" section may be enteredin the "Expend. Days Cr." columns.
- Do not use shaded areas below.Type of Survey (s)
Claim Holder(s)
Address
Survey Company
Name and Address
VLF Electromagnetic S. Magnetic
Placer Dome Inc.
P.O. Box 350, IBM Tower, TD Centre,Date of !
Geosearch Consultants Limited ^5,
Township or Area
Dunlop Twp.Prospector's Licence No.
T-837
Toronto, Ont.Survey (from A to) Total Miles of line Cut
1.8^ 43.89 kmof Author (of Geo-Tecnnical report)
Louis Racic, 360-111 Queen St. E., Toronto, Ont., M5C 1 52Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total (s) here
Airborne Credits
Note: Special provisions credits do not apply to Airborne Surveys,
Qeophysicel
- Electromagnetic
- Magnetometer
- Radiometric
. Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Magnetometer
Radiometric
Day* per Claim
40
30
Days pei- Claim
Days per Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claimfs)
Calculation of Expenditure Days Credits
Total Expenditures
S -r- 15
Total Days Credits
B
Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns at right.
Date * r /t 3 "7r or Agent (Signature)
Certification Verifying Report of Work
Mining Claims Traversed (List in numerical sequence)
Total number of mining claims covered by this report of work.
For Office Use OnlyTotal Days Cr. Recorded
Date Recorded
Oat* Approved ae Recorded
Mining Recorder
Branch Director
l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report is true.
Name a nd Postal 360-111 Queen St. E., Toronto, Ont., M5C dS2
OattCertif 5*4/04/89 Certit^edbyXSignatu^e) S&t^-J
1362 (85/12)
l
lh O
Ministry ofNorthern Developmentand Mines
Ontario
Geophysical-Geological-Geochemical Technical Data Statement
File—
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
MagneticType ofTownship or ArMDu " loP Twp., OntarioClaim HnlHer(s) Placer Dome Inc.
Geosearch Consultants Ltd.
MINING CLAIMS TRAVERSED List numerically
Author of RqwirfLouis Racic
Address of A..tr.n360-lll Queen St.E., Toronto, Ont. Covering Dates of Survey. 15/02/89 - 24/04/89
Total Miles of LineIlinf cutting to office)
43.89 kilometerers
SPECIAL PROVISIONS CREDITS REQUESTED
ENTER 40 days (includes line cutting) for first survey.
ENTER 20 days for each additional survey using same grid.
Geophysical —Electromagnetic.
DAYS per claim
40
20
— Radiometric
-Other ———Geological.Geochemical.
AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)
Magnetometer____Electromagnetic _____ Ratfiomejric-aim) / '
.Electromagnetic.(enter days per claim)
DATE:24/04/89
/Sir.N ATI T
Author of Report or Agent
Res. Geol.. .Qualifications (SPM l
Previous Surveys File No. Type
'""""(pVe'fixj""""""""""
,.S 782819 ........
S 960432-960437
's 988118-988127
(number)
fi P f* f l \ . ~*P.X.i^*4jl3*.j1i.****t***J*i*
•••jUf3*l*^'* t)T"*f '•AMt^VtT*
Date Claim Holder
TOTAL CLAIMS. 17
837 (85/12)
GEOPHYSICAL TECHNICAL DATA
GROUND SURVEYS — If more than one survey, specify data for each type of survey
INDUCED POLARIZATION
urcTCTTwrrv GRAVITY ELECTROMAGNETIC MAGNETIC
Number of Stationsp . . , 25 m ( 12 . 5 m)Nation interval- ,.. , 1 cm - 20% Profile scale- , ^ , Maqnetic: i.0 gammas Contour interval ^
T . . Gem SystemsInstrument 2
Accuracy — Scale constant . " y
MAG VLF M u TT, j- 3139 3139Number nf ReadingsT . . 100m, 50mLine sparing
Fraser Filter: 5 gammas
GSM-18 magnetometerma
-. , ,. ,. j Base station recorder with readings takenPierna! rorrertion method ^
Base Station cher^-in interval (hours)
Rase Station location and value
Instrument GeoniCS EM-16
Coil configurationCoil separation
i g, Arrnrary J- c
at 3 second intervals
Method: VLF D Fixed transmitter Q Shoot back D In line EH Parallel line Freq,,enry NLK SEATTLE, WASHINGTON 24.8 kHz
Parameters measured In phase and
secondary InstrumentSrale ronstant
rorrertions made
Base Station vahie anr| (oration
Elevation arnir^ry
Instrument
Method CH Time DomainParameters — On time
1 - nff time4' — Delay time4
] — Integrfltinn timei | Poweri i
Electrode array .... ,. .
Electrode spacing .Tvne of electrode
(specify V.L.F. itation)
field.
CD Frequency Domain FrequencyRange
Aeriol Cobltwoy
Boundary
Olllrlct, T**Mik 1*41* PI Mft*rr*
.MAP.. SYMBOLOGY
Pipeline
Railroad11* 11* Tfi*fc
Dentil T r*ck
Bridget***, Pt*llr**4
Building
Chimney Cliff. Pit.Pilt
Contour*
Cb
• t
A OIT740SI
O 300.01
l
Control Pointe
Vltlllll
Culvert Fall*0**bl4 fen* river
Fence, Hedge, Wall ,Ftature Outline
•u.)
Flooded Land .uockMorst) or Swamp 4* 4-Matt 0Mine Head Frame aOutcrop * - - C*----*
Road
Rapids
tMhl* l i"* r lvrr ltk ••Itlpl* r*
R***rvoirRiver, Stream, Canal
;ir*etton of tie*
Hock
Spot Elevation(l*k* •i***ti*n*l
Tower B
Transmitiion Lint
Tunnel*
Utility Poles Wharf .Dock, Pier Wooded Arta
AREAS WITHDRAWN FROM DISPOSITION
M.R.O. - MINING RIGHTS ONLY
\ S.R.O. -SURFACE RIGHTS ONLY
: . M.+ S. -MINING AND SURFACE RIGHTS
Dncrfption Ordw No. Dvtt Dapocitkin Fil*
W 4/62 14/06/62 S.R.O. 1376-*5
FLOODING OF AGNEW LAKE TO CONTOUR ELEVATION 859* FROM PLAN Y-28-16, FILE 20396 RIGHTS TO CONTROL ELEVATION 664' FROM PLAN Y14-18 (CL 1664) W.RL.A. No. 101, DATED ^12/12/0974
i1 1
SI 44000 m N5I44QOO
46" 26
5I4Q000
BIGELOW TWP
j f : ,,,.. ,.,v- -. . . .-±
\ ^ l V ii i i 0 :i\ -N \, V '* -l \ 5O N, \ \ ' "V, :
CL 1664 WPLA'NaJOi
Id f - ts t— — ' r mfMft.fr4fr- -i—t**e^*
SHAKESPEARE TWP
46*22
5195000 "i
•i t
4iiesNwea33 a.1241e DUNLOP S00
LEGEND
HIGHWAY AND ROUTE No
OTHER ROADS TRAILS SURVEYED LINES:
TOWNSHIPS, BASE LINES. ETC.LOTS, MINING CLAIMS. PARCELS. ETC
UNSURVEYED LINES:LOT LINESPAiRCEL BOUNDARYMINING CLAIMS ETC.
RAILWAY AND RIGHT OF WAY UTILITY LINES NON-PERENNIAL STREAM FLOODING OR FLOODING RIGHTS \ SUBDIVISION OR COMPOSITE PLAN RESERVATIONS ORIGINAL SHORELINE MARSH OR MUSKEG MINES TRAVERSE MONUMENT
l
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENT SYMBOL
PATENT, SURFACE fe MINING RIGHTS ___.............. 9
.SURFACE RIGHTS ONLY_____—™....™ O
.MINING RIGHTS ONLY____.____.——.™. ® LEASE, SURFACE ft MINING RIGHTS——™.........m H
" , SURFACE RIGHTS ONLY,____.........^.__ B" .MINING RIGHTS.ONLY._______^_.....__. B
LICENCE OF OCCUPATION .___._______.....____ TORDER-IN-COUNCIL .....,......____-i...........__. OCRESERVATION ____....._____—™.™.™.™_. ©
CANCELLED __........__...____................... ®SAND 8t GRAVEL __...._____..___.__._..... (J)
NOTE: M INING RIGHTS IN PARCELS PATENTED PRIOR TO MAY 6. 1913, VESTED I N ORIGINAL PATENTEE BV THE PUBLIC LANDS ACT. R.S.O. 1 970. C HAP. 3*0, SEC. 03. SUBSEC 1.
500 1000Mvtr**
10Chain* i-
10 20 30 U SO 60 70
SOD O 1000 2000 4000 5000FM!
SCALE 1:2O 000
GRID ZONE: 17
W7* OF ISSUE
ocr i 9
TOWNSHIP
DUNLOPM.N.R. ADMINISTRATIVE DISTRICT
ESPANOLAMINING DIVISION
SUDBURYLAND TITLES/ RE0ISTRY DIVISION
SUDBURY
Ministry ofNaturalResources
Land
Management
Branch
Ontario
Oat t NOVEMBER, 1984
G-3002
SPANISHRIVER
2 1^ . JL
41I0SNW8833 2.12416 DUNLOP S10
N
TOPOGRAPHYCLAIM POST
LAKE
STREAM
SWAMP
ACCESS ROAD
BUSH ROAD
POWER LINE
CUFF
MAP KEY
BASE LEVEL 58,000 nT REMOVED INSTRUMENT: GEM SYSTEMS GSM-18
SCALE 1 s 2 50050 Cmetres3 100 150 200
TOTAL FIELD MAGNETIC SURREYi
GEOSEARCH CONSULTANTS LTp.for i
PLACER DOME INC.
PROJECT 379 DUNLOP TOWNSHIP,
DATE : FEB 1989 DRAWN : J.A.R.
NTS j : 411 589 - 61A
MAP KEY TOTAL FIELD MAGNETIC SURVEby
6EOSEARCH CONSULTANTS LTD.
PLACER DOME INC.BASE L EVEL 58.000 nT REMOVED INSTRUMENT : GEM SYSTEMS GSM-18 PROJECT 379
DUNLOP TOWNSHIP, ONT.SCALE 1 : 2 50050 (metres) 100
DATE : FEB 1989 DRAWN : J.A.R.
s... ^
900/23
MAP KEYTOPOGRAPHYCLAIM POST.
LAKE.
STREAM.
SWAMP.
ACCESS ROAD.
BUSH ROAD.
POWER LINE.
CLIFF
VLF ELECTROMAGNETIC SURVEYVLF PROFILES1 cm ^ 20
PROFILE O POSTING IP 6EOSEARCH CONSULTANTS
PLACER DOME INC.
PROJECT 379 DUNLOP TOWNSHIP,NLK SEATLE, WASHINGTON, 24,6kHz
INSTRUMENT : GEONICS EM-16Instrument Read Facing North
SCALE 1 s 2 50050 (metres) 100
DATE : FEB 1989 DRAWN t J.A.R.
POWER LIA/ES
702 8 '9
MAP KEY VLF ELECTROMAGNETIC SURVEYTOPOGRAPHYCLAIM POST
LAKE
STREAM
SWAMP
ACCESS ROAP
BUSH ROAD
POWER LINE.
CLIFF
VLF PROFILESl cm * 20 7
PROFILEO POSTING IP
-10 T -20 6EOSEARCH CONSULTANTS LTD.for
PLACER DOME INC.
PROJECT 379 DUNLOP TOWNSHIP,SCALE 1 : 2 500
50 (metres) 100NLK SEATLE, WASHINGTON, 24.8kHz
INSTRUMENT : GEONICS EM-16 Instrument Reed Facing North
SPANISHRIVER
2.122.12416 DUNLOP 250
-N
TOPOGRAPHYCLAIH POST ———c
LAKE
STREAH
-L
ACCESS ROAD
BUSH ROAD
POUER LINE
CLIFF
fH
II
MAGNETIC FIELD CONTOURS——————— 20 ———————
——————— 100 ———————
—————— 500 —————————————— 2500 ———————
INSTRUMENT : GSM 18
S8,000 nT Background Removed
MAP KEY
B
soSCALE l : 2 500
50 (metre?] 100 150 200
TOTAL FIELD MAGNETIC CONCURSby
GEOSEARCH CONSULTANTS LIMITEDfor
PLACER DOME INC.
PROJECT 379 DUNLOP TOWNSHIP,
DATE : FEB.1989 ORAUN : J.A.R.
NTS : 41 1/5 89 - 83A
s966121
S938/26
TOTAL FIELD MAGNETIC CONTOURSMAP KEYTOPOGRAPHYCLAIM POST ———a—
LAKE
STREAM
5UAMP
ACCESS ROAD
BUSH ROAD
MAGNETIC FIELD CONTOURS20
100500
2500
GEOSEARCH CONSULTANTS LIMITEDfor :
PLACER DOME INC.!
PROJECT 379 DUNLOP TOWNSHIP, IJNT,
INSTRUMENT : GSM 1 8
58,000 nT Background RemovedSCALE l : 2 500
DATE : FEB.1989 DRAWN : J,A.R.
41I05NW0033 2.12416 DUNLOP
5PANISH
CHANNEL^
270
VLF FRASER F lLTER CONTOURSby
GEOSEARCH CONSULTANTS LJTD.for
PLACER DOME INC.
PROJECT 379 DUNLOP TOWNSHIP,
DATE : FEB 1989 DRAWN s J.A.R.
N
TOPOGRAPHYCLAIM POST —
LAKE
STREAM
SWAMP
ACCESS ROAD
BUSH ROAD
POWER LINE CLIFF
II
VLF FRASER FILTERED CONTOURS———— s —————————— 20 ———————————— 100 ——————
Dimensionless UnitsCalculated from In Phase DataINSTRUMENT * GEONICS EM - 16
NLK SEATTLE, WASHINGTON 24.8kHz.Instrument Reed Facing North
MAP KEY
SO DSCALE l i 2 500
50 (metres) 100 150 200
NTSl : 41 l 5 89 - 84A
MAP KEY VLF FRASER FILTER CONTOURSby
6EOSEARCH CONSULTANTS
TOPOGRAPHYCLAIM POST —
LAKE
STREAM
VLF FRASER FILTERED CONTOURS
Dimensionless UnitsCalculated from In Phase DataINSTRUMENT : GEGNICS RM - ;G
NLK SEATTLE, WASHINGTON ,:4.B KInstrument Read Facinq Mcrth
PLACER DOME INC.
PROJECT 379ACCESS ROAD
BUSH ROAD
POWER LINE
CLIFF
SCALE 1 i 2 50050 CmetresJ 10Q DUNLOP TOWNSHIP,
NTS : 41 l 5 89 - 84B
DATE : FEB 1989 DRAWN : J.A.R.