rsrdc unit-ii jodhpur. organisation chart of rsrdc unit-ii jodhpur sh suresh sharma re sh. ashok...

20
RSRDC UNIT-II JODHPUR

Upload: logan-cannon

Post on 26-Mar-2015

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

RSRDC

UNIT-II JODHPUR

Page 2: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

ORGANISATION CHART OF RSRDC UNIT-II

JODHPUR SH SURESH

SHARMARE

SH. ASHOK KUMAR

MATHUR ARE

SH. RAKESH CHANDRA MATHUR

ARE

SH. NIRMAL KUMAR

MATHUR ARE

SH JASPAL SINGH

ACCOUNTANT

SH. AJIT JAIN ARE

SH. SHANTI CHAND

ARE

SH. MAHENDERA SINGH

DEORA ARE (E)

SH. SANJAY NARAIN

MATHUR JEN

Page 3: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Financial Work Load in UnitS. No.

Name of Work Client Deptt.

A& F Sanction Expenditure till date Balance Work

ARE – I SHRI ASHOK KUMAR MATHUR

1 Strengthening & DEV. PAL ROAD MDM CIRCLE -BORANADA

UIT/JDA JODHPUR

UDD/01/07/Dt 24-07-07 OF RS. 51.60 CRORE

29.00 CRORE 22.60 Crores

2 INDOOR STADIUM

UIT/JDA JODHPUR

LT. NO. 1848-56 LACS DT. 23.03.07 RS. 172.40 LACS

108.71 lacs 63.69 lacs

ARE – II Sh.Rakesh Chandra Mathur

1 Constt. Of USQ & LSQ at PTS Jodhpur

Police Deptt. (Govt of Raj)

898.05 LACS 776.95 LACS 121.10 LACS

2 Constt. Of LSQ& USQ at RAC Ist Ballalion (Mandore Campus ) Jodhpur

Police Deptt. (Govt of Raj)

3 Constt. Of LSQ & USQ at RPTC Jodhpur

Police Deptt. (Govt of Raj)

Rs. 4985.71 Lacs

Page 4: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Financial Work Load in Unit

S. No.

Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work

ARE – III Sh.Shanti Chand Mathur

1 Construction of OIL HOUSE at Jodhpur

OIL India Ltd 850.04 lacs 254.14 lacs 595.90 lacs

ARE – IV Sh.Nirmal Mathur

1 Construction of ROB in lieu of LC No. C-27 at Pali.

State Govt.(PWD)

1200.00 lacs 26.36 lacs 1173.64 lacs

2 Residencial Boys School Kenpura Pali.

REIS 223.76 lacs 204.17 lacs Work Completed & handed over to client in the month of June 09.

ARE – V Sh.Ajit Jain

1 Construction of ROB in lieu of LC No. 134-B at Abu Road.

State Govt.(PWD)

1000.00 lacs 159.52 lacs 840.48 lacs

ARE – VI Sh.Mahendra Singh Deora

1 Elect work of all work of unit II Jodhpur

ARE – VII Sh. Sanjay Narain Mathur

1 Residencial Boys School Mandore Jodhpur

REIS 250.69 lacs 197.06 lacs Work Completed & handed over to client in the month of June 09.

Rs. In Lacs

Page 5: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Important Works Completed during last 5 years

Civil and architectural work in superstructure of main power house building at GLTPP BARMER

DATE OF START 18-2-05DATE OF COMP 17-5-06WORK IS COMPLETEDCOST OF WORK 449.61 LACS

Page 6: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Important Works Completed during last 5 yearsAREA DEVELOPMENT WORK SUCH AS WATERSUPPLY,SEVERAGE,ROAD AND

DRAINAGE WORK IN VARIOUS RESIDENTIAL COLONIES &DEVELOPMENT OF LAND FILL

SITES AT JODHPUR PACKAGE JOD-ST-O5DATE OF START 3-2-03DARE OF COMP 3-9-06

COST 454.88 LACS

Page 7: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Residential Boys School Mandore Jodhpur

Total Cost : Rs. 250.69 LacsLocation : Residential Boys School Mandore

JodhpurDate of Start : 27.06.08Stipulated Date of Completion: 26.02.09Expenditure till Date : Rs. 197.06 lacsLikely Completion date : Work Completed.Bottlenecks if any :

Page 8: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

ROB Rashala Road Jodhpur

Completion Cost – Rs. 10.14 Crs.

Important Works Completed during last 5 years

Page 9: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Residential Boys School Kenpura Pali.

Total Cost : Rs. 223.76 CroresLocation : Construction of ROB in lieu of LC No.

C-27 at Pali. Date of Start : 27.06.08Stipulated Date of Completion: 26.02.09Expenditure till Date : Rs.204.17 lacsLikely Completion date : Work is Completed.

Page 10: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Indoor Stadium Jodhpur

Total Cost : Rs. 172.40 CroresLocation : JodhpurDate of Start : 04.07.07Stipulated Date of Completion: 03.01.08Expenditure till Date : Rs. 108.71 lacsLikely Completion date : On the availability of fundBottlenecks if any : Funds are not made available by JDA

Page 11: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Strengthening & Dev. Pal Road MDM Circle to Boranada Jodhpur

Total Cost : Rs. 51.60 CroresLocation : JodhpurDate of Start : 01.02.09Stipulated Date of Completion:Expenditure till Date : Rs. 2900.00 lacsLikely Completion date : On the available of fund Bottlenecks if any : Funds are not made available by JDA

Page 12: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of LSQ&USQ at PTS Jodhpur

Total Cost : Rs. 4.366 CroresLocation : RPTC Campus JodhpurDate of Start : 01.04.08Stipulated Date of Completion : 28.02.09Expenditure till Date : Rs. 332.03 lacsLikely Completion date : 31.12.09Bottlenecks if any :

Page 13: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of LSQ&USQ at RPTC Jodhpur

Total Cost : Rs. 2.35 CroresLocation : RPTC Campus JodhpurDate of Start : 01.04.08Stipulated Date of Completion : 28.02.09Expenditure till Date : Rs. 244.56 lacsLikely Completion date : 31.12.09Bottlenecks if any :

Page 14: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of LSQ&USQ at RAC Ist Battalion Jodhpur

Total Cost :Rs. 2.27 CroresLocation : RPTC Campus & RAC Campus

JodhpurDate of Start : 25.02.08Stipulated Date of Completion : 24.01.09Expenditure till Date : Rs. 200.36 lacsLikely Completion date : 31.12.09Bottlenecks if any :

Page 15: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of “OIL HOUSE” at Jodhpur

Total Cost : Rs. 8.50 CroresLocation : Construction of “OIL HOUSE” at

JodhpurDate of Start : 22.07.08Stipulated Date of Completion : 21.01.10Expenditure till Date : Rs. 254.14 lacsLikely Completion date : 30.04.10Bottlenecks if any :1. Some decisions about RCC designs and finishing work are pending from OIL

India Ltd.2. Approval for subletting of some works like Aluminum and fire fighting is

pending 3. Tenders for Electrical and AC works are not finalised.

Page 16: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of ROB in lieu of LC No. C-27 at Pali.

Total Cost : Rs. 12.00 CroresLocation : Construction of ROB in lieu of LC No.

C-27 at Pali. Date of Start : 19.10.08Stipulated Date of Completion: 18.10.09Expenditure till Date : Rs. 26.36 lacsLikely Completion date : Work is temporarily suspended.Bottlenecks if any : Revised A&F is required

Page 17: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Construction of ROB in lieu of LC No. 134-B at Abu Road.

Total Cost : Rs. 10.00 CroresLocation : Construction of ROB in lieu of LC No.

134-B at Abu Road. Date of Start : 12.09.08Stipulated Date of Completion: 11.09.09Expenditure till Date : Rs. 159.52 lacsLikely Completion date : 30.06.10Bottlenecks if any : GAD was revised by RAILWAY delayed

the work by 2 month .

Some qty Steel supplied didn’t confirm to specifications and had to be replaced by

supplier three times so work delayed by 3months..

Page 18: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

DEC 09 JAN 10 FEB 10 MAR 10 APRIL 10 MAY 10 JUNE 10

ABUTMENT A2

ABU ROAD SIDE

APPROACH ABU ROAD SIDE

ABATMENT A1 (AMBAJI SIDE)

APPROACH AMBAJI SIDE

SERVICE ROAD AMBAJI SIDE

SERVICE ROAD ABU ROAD SIDE

DRAIN ABU ROAD SIDE

DRAIN AMBAJI SIDE

WMM, BT ABUROAD SIDE

WMM BT AMBAJI SIDE

P,A1 SPAN SUPPER STRACTURE

P5,A2 SPAN SUPPER STRACTURE

ROAD FURNITURE

BAR CHART FOR Construction of ROB in lieu of LC No. 134-B at Abu Road.

Page 19: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

Proposed New Works

S. No.

Name of Work Client Deptt. Mode Estimated Cost

1 ROB Barmer LC-325 State Govt. (PWD)

Actual plus GAD under approval

Page 20: RSRDC UNIT-II JODHPUR. ORGANISATION CHART OF RSRDC UNIT-II JODHPUR SH SURESH SHARMA RE SH. ASHOK KUMAR MATHUR ARE SH. RAKESH CHANDRA MATHUR ARE SH. NIRMAL

THANKS