RTF Delivery Verification GuidanceBatch 1

Jennifer AnzianoRegional Technical Forum

May 12, 2015

Page 2: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

2

Overview

Today, we are seeking adoption of delivery verification guidance (and revised specs as appropriate) for first batch of measures

• Review history and general approach

• Walk through “simple” measures

• Discuss approach to “complex” measures

If the RTF is not ready to adopt the guidance today, we need clear direction on how to proceed

Page 3: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

History of RTF Delivery Verification Guidance Development

For proven measures, impact evaluation only requires claim and delivery verification

• June 2014: RTF adopted updated version of the Guidelines that calls for delivery verification guidance– RTF will provide guidance on delivery verification for UES and Standard

Protocols

– Guidance describes key data that needs to be collected as part of delivery verification

• February 2015: Previewed framework proposed by BPA and team

• March 2015: Reviewed “simple” vs “complex” split and an example of each

• Today: Review first batch and get RTF direction on key questions

• Beyond: Address remaining measures consistent with RTF direction

Page 4: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

4

Proposed Approach for UES Measures

• Identify key data that needs to be collected (or checked) to ensure reliability of RTF savings estimate

• Provide detailed checklist to enable greater understanding of RTF measure specifications

• Update measure specifications (as appropriate) for greater clarity and to focus on those aspects that impact the RTF savings estimates– Safety and best practices moved to “recommended” section (more on

that later…)

• At this time, staff considered the following to be out of scope– Defining how the data should be collected

– Defining which methods of verification are sufficient to claim savings

Page 5: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

5

“Simple” vs “Complex” Classification

• Bonneville proposal to split measures into “simple” and “complex” based on the number of potential delivery verification checks:– Simple: Straightforward measure specification with only one or two

things to check

– Complex: Many components in measure specification and likely impractical to check all aspects for delivery verification

• CAT reviewed measures and put into these categories (see worksheet)

Caveat: This distinction should not stick with RTF measures. Ultimately, we plan to revise measure specs to be specifically focused on all delivery verification requirements

Page 6: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

6

First Batch of Measures10 “Simple” Measures

• Res Lighting

• Res SF Existing Home HVAC

• Res Clothes Washers

• Res Clothes Dryers

• ENERGY STAR WA

• ENERGY STAR OR

• Res Refrigerator/Freezer Decommissioning

• Res Refrigerators and Freezers

• School Weatherization

• ECMs for Walk-Ins

5 “Complex” Measures• Ind and Ag Green Motor Rewind• Grocery Door Gasket

Replacements• Res Weatherization• Res Performance Based Duct

Sealing• Res Commissioning Controls and

Sizing

Criteria for selecting these: • Prioritized for HVAC and lighting• Sought diversity in measures• Picked those with far out sunset

dates

Page 7: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

7

“Subcommittee” Engagement

• Do not have a specific subcommittee for developing delivery verification, but have been vetting this with:– Bonneville and contract team (Navigant and SBW)– Implementers Group– Contract analyst team

Page 8: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

8

Staff Highlighted Areas• Pre-Conditions

– Verifying pre-conditions in many cases may be impractical

– Guidelines focus on “what” matters for energy savings estimates (and pre-conditions matter)

– RTF direction needed: How should we address this? • Only develop spec such that everything is easily verified?

• Trust evaluators to do their best?

• Provide some direction on what might be acceptable?

• Revising measure specifications to focus on energy savings specific elements– “Complex” specs include guidance that is recommended for programs

– Proposed approach is to focus measure specification on only those elements that significantly impact our energy savings estimates, and move this guidance to “Recommendations” section

Page 9: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

9

“Simple” Batch

Page 10: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

10

Proposed Approach

• Capture guidance in the summary sheet– Create a measure specification table with an

added delivery verification checklist– Propose two other additions (not related to DV

guidance) to summary sheet• Map delivery verification checklist directly to

the measure specification

Page 11: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

11

Feedback through Process

• Need to refine some specifications for clarity – Ex: School weatherization

• Need to be specific with measure identifier guidance– Ex: Cooling zone is not required for all SF HVAC measures

• Pointing to dated/versioned specification– Ex: Res lighting, refrigerator freezer, dryers– More detail would likely be needed for clothes dryers

• Should not require checks for embedded compliance– Ex: residential lighting assumes a built in compliance

• Checking pre-conditions is going to be challenging

Review workbook for details

Page 12: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

• For Proven UES, Guidelines give region a big pass on evaluating savings; therefore there is a big stake in developing reliable savings estimates

• Pre-conditions matter for savings estimates, but are hard to check• Example: Attic Insulation R0 to R19

– Pre-conditions require R7 or less, how do you check this?– How much should the RTF say on this point?

• Additionally: Add language to the Guidelines recommending getting evaluators involved from the start

• Keep in mind: We are thinking about this for the future (not for today’s evaluations)

How to Address Pre-Conditions

Trust the evaluators to figure it out

RTF requires specific physical measurement of pre-conditions

RTF suggests options (i.e. provides examples) for physical measurement of pre-conditions

Say nothing

Say a lot

Page 13: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

Proposed ChangesMeasure DV Spec

Res SF Existing HVAC (ASHP Upgrades, ASHPs Conversions, DHPs) X

Res Clothes Washers X X

Res Clothes Dryers X X

Res ENERGY STAR WA (includes ENERGY STAR and Built Green) X

Res ENERGY STAR OR X

Res Refrigerator/Freezer Decommissioning X

Res Refrigerators and Freezers X X

School Weatherization X X

Grocery ECMs for Walk-Ins X

Green Motor Rewind (both Ag and Ind) X

Grocery Door Gasket Replacements X

Res Lighting*

* Not seeking adoption delivery verification guidance today, will address with spec update

Page 14: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

14

Proposed Motion• “I ________ move the RTF adopt the delivery verification

guidance, and related specification changes, as presented for the following measures:– Single Family Existing HVAC measures

– Residential Clothes Washers

– Residential Clothes Dryers

– New Construction ENERGY STAR WA

– New Construction ENERGY STAR OR

– Refrigerator/Freezer Decommissioning

– School Weatherization

– Grocery ECMs for Walk Ins

– Industrial and Agricultural Green Motor Rewind

– Grocery Door Gasket Replacements”

Page 15: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

15

“Complex” Batch

Page 16: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

16

Proposed Approach• Staff recommendation: Measure specification should specify

those aspects that significantly impact RTF energy savings estimates– If one of the items in the spec cannot be verified, then that project

should either be:• Re-classified as a different UES

• Re-classified as an “Other UES” (requiring more evaluation burden), or

• Counted as “0”

• Reviewed existing measure specifications to identify these key elements– Pulled key elements into measure specification tables and developed a

delivery verification guidance checklist

– Put remainder of existing measure specification into a “Recommended Approaches” section

Page 17: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

17

Summary of Proposed ChangesMeasure In Spec Recommendations

Weatherization Specific insulation, window, and infiltration requirements, applicability requirements

Materials specs, quality installation practices, safety recommendations, warranties, education guidance

Performance Based Duct Sealing

Specific duct sealing requirements

Testing procedures, materials, duct connecting & sealing applicability; combustion recommendations

CC&S* Specific sizing requirements, commissioning requirements, and control requirements

Auxiliary heat sizing recommendations, compliance with standards, quality installation practices

* CC&S specification was recently refined by RTF to remove PTCS program requirements

Page 18: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

18

Proposed Motion

• “I ________ move the RTF adopt the delivery verification guidance, and related specification changes, as presented for the following measures:– Residential Weatherization (SF and MH)– Residential Performance Based Duct Sealing (SF

and MH)– Residential Commissioning Controls and Sizing (SF

and MH)”

Page 19: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

19

Additional Slides

Page 20: RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015

20

Plan for Finishing Delivery Verification Guidance Development

• Batch 1 – Revisit if needed (goal: Jul meeting)• Batch 2 – Work on next (goal: Sep meeting)• Batch 3 – Work on next (goal: Nov meeting)• Batch 4 – Update as measure comes to RTF

See workbook for batch number